0% found this document useful (0 votes)
70 views3 pages

Fix Plan 24 Maret 2019

The document provides the daily, yesterday's, and tomorrow's service plans for various units at a coal mining site. Yesterday's plan involved servicing 3 units and completing repairs such as replacing hoses and activating a fire suppression system. The plan for today involves servicing 1 unit and completing its 250-hour service. The plan for tomorrow involves servicing 2 units and completing their 500-hour services along with repairs to suspensions, mufflers, batteries, fans, and air conditioning systems.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
70 views3 pages

Fix Plan 24 Maret 2019

The document provides the daily, yesterday's, and tomorrow's service plans for various units at a coal mining site. Yesterday's plan involved servicing 3 units and completing repairs such as replacing hoses and activating a fire suppression system. The plan for today involves servicing 1 unit and completing its 250-hour service. The plan for tomorrow involves servicing 2 units and completing their 500-hour services along with repairs to suspensions, mufflers, batteries, fans, and air conditioning systems.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 3

PT.

PAMAPERSADA NUSANTARA
PLANT DEPARTMENT
"DAILY PLAN PERIODIC SERVICE"
TOPB COAL MINING

Issue Date : Friday, 22 March 2019


Yesterday ( Thursday, 21 March 2019 ) PLAN SERVICE YESTERDAY ACTUAL SERVICE YESTERDAY
HM LOKASI EST (hrs) SERVICE BACKLOG REPAIR QTY MAN PLAN BLOG / REPAIR
LOKASI PS Start DOWN Total Deviasi Man MAN
NO C/N HM +/- SERVIC REMARKS PS
UNIT TYPE time TIME Start Finish Lead Start Finish Lead Time Time Hours POWER WR
PLAN AKTUAL E PS BLOG Mec Help WO WR
time time time time time time DATE

REPAIR PROXIMIITY ROTARY OK


PIT PIT HEAD OK
1 DR097 14000 13968.6 -31 I 8:00 4 6 10 4:00 4:00 4:00 0:00 0.00 -10.00
BISA BISA REPLACE HOSE OK
104382 K21431 19/03/1 WASHING RADIATOR
REPLACE GUIDE BLADE OK
PIT 9 AKTIVASI FIRE SURPRESSION OK
2 GR379 36000 35960 -40 WS I 8:00 4 6 10 4:00 4:00 4:00 0:00 0.00 -10.00
BISA REPAIR WIRING MOTOR OK
TW20 WIPPER
MODIFIKASI WORK LAMP OK
3 RO 3750 3749 -1 WS III 8:00 5 5 10 5:00 5:00 5:00 0:00 0.00 -10.00
4 OK
Plan Service Today ( Friday, 22 March 2019 )
EST (hrs) DOC PS PLAN BLOG / REPAIR
LOKASI HM LOKASI DOWN REMARKS BLOG OR OVERHAUL
NO C/N UNIT
PLAN HM
SERVICE
HM +/-
SERVICE
PS TYPE Start time
TIME WO WR REMARKS PS WR EST
PS BLOG WO PPM WO PPU WO PPB WO PAP WO WR PART RFU
SERVIS SERVIS DATE

1 TF204 RO 2250 2225 -25 WS I 8:00 4 4 8 104351 104352 J21289 Do Service 250 Hrs
Plan Service Tommorrow ( Saturday, 23 March 2019 )
LOKASI EST (hrs) DOC PS PLAN BLOG / REPAIR REMARKS BLOG OR OVERHAUL
LOKASI PLAN HM PS Start DOWN
NO C/N HM +/- SERVIC WO WO WR REMARKS PS WR PART RFU EST
UNIT HM SERVICE TYPE time PS BLOG TIME WO PPU WO PPB WO PAP WO WR
E PPM SERVIS SERVIS DATE
20/03/1 FRONT SUSPENSI LH WEAPING : RFU
104398 K21435 9 BCS UTVH
DT465 PIT
1 8500 8432 -68 WS II 8:00 5 5 104234 104233 H21302 Do Service 500 Hrs 104399 F21356 20/03/1 MUFFLER LEAK : BCS (RING) RFU
4 BISA
9 REPLACE BATTERY (4 EACH) UTVH

03/03/1 FUEL COOLER FAN NOISE : BCS RFU


103705 L21560 9 MIDLIFE AC SYSTEM : BCS UTVH
2 LO119 WS 6500 6455 -45 WS II 8:00 5 5 104348 104347 E21254 Do Service 500 Hrs 104509 E21250 22/03/1 RFU
9 UTVH

Plan Service After Tommorrow ( Sunday, 24 March 2019 )


LOKASI EST (hrs) DOC PS PLAN BLOG / REPAIR REMARKS BLOG OR OVERHAUL
LOKASI PLAN HM PS Start DOWN
NO C/N HM +/- SERVIC WO WO WR REMARKS PS WR PART RFU EST
UNIT HM SERVICE TYPE time PS BLOG TIME WO PPU WO PPB WO PAP WO WR
E PPM SERVIS SERVIS DATE
GERDA
1 DZ462 S
33500 33435 -65 WS II 8:00 5 5 104248 104249 104247 Do Service 500 Hrs
WP76 BSC NOT RFU
2 SUMP 15000 -15000 SUMP III 8:00 0 104358 104357 Do Service 1000 Hrs
5
WS17 NO BCS
3 WS 500 -500 WS II 8:00 0 104362 104361 Do Service 500 Hrs
0
Engineering Dept Head Production Dept Head SM Section Head Project Manager Plant Dept Head Plant Planner

Guntur J Toniko Roni M Rhoni Lesmana Hendro Sunaryo Slamet Kasdiyanto


SCH PENARIKAN UNIT 24 MARET 2019
OUTSTANDING WR AND BCS
C/N WO WO DATE WO DESC WR WR DATE WR ITEM DEL INST WAREHOUSE STATUS ETA REMARK
DT4654 104398 FRONT SUSPENSI LH WEAPING : BCS K21435 20/3/2019 21005102TOPBBACKLOG ADM1 8/3/2019 08/04/2019
DT4654 104399 MUFFLER LEAK : BCS (RING) F21356 20/3/2019 21005103TOPBBACKLOG ADM1 03/03/2019
DT4654 BCS FRONT SUSPENSI LEAK : BCS BCS 21005268TOPBBACKLOG LOGISTIC 08/04/2019
DT4654 BCS HOSE DISCHARGE BRAKE COOLING PUMP CRACK BCS 21005267TOPBBACKLOG LOGISTIC 03/03/2019
LO119 103705 3/3/2019 FUEL COOLER FAN NOISE : BCS L21560 3/3/2019 21004870TOPBBACKLOG 11/02/2019
READY
LO119 104509 22/3/2019 MIDLIFE AC SYSTEM : BCS E21250 22/3/2019 21004453TOPBBACKLOG 4/03/2019
FULL
Ready on
DZ462 99607 UNDERCARRIAGE PROGRAM OVH B21139 22/12/2018 PIN
BHT
Ready on
DZ462 99607 UNDERCARRIAGE PROGRAM OVH L21097 22/12/2018 SHAFT
BHT
SEAL COVER BOLT, MACHINE PART OVH DIKIRIM AS Ready on
DZ462 99607 REMOVE RECOIL SPRING BUSHING M21009 5/1/2019
WASHER, FLAT O-RING PLUG REQUEST P'HENI P BHT
O-RING HOSE CLAMP, HOSE Still to be
DZ462 100810 7/1/2019 MIDLIFE WATER PUMP C21013 7/1/2019
GASKET processed
HOSE

DZ462 BCS MUFFLER BROKEN BCS BCS 21005172TOPBBACKLOG LOGISTIC 28/03/2019


DZ462 BCS EXHAUST GAS TEMPERATUR ERROR : BCS BCS 21005296TOPBBACKLOG LOGISTIC 19/04/2019
CHECK VALVE 10K-200S FLEXIBLE
MODIFIKASI BOOSTER PUMP (CHECK VALVE 10K- SENT TO W/S FOR POMPA
WP765 101242 200S)
B21311 16/01/19 RUBBER JOINT DOUBL FLEXIBLE
T1
BHUT 06/04/19
RUBBER JOINT 8'' D
SENT TO W/S FOR POMPA
WP765 101301 R & I PONTON C21157 29/1/2019 DIAPHRAGM PUMP 1"
GUDANG HANDAK
BHUT 30/03/19

WP765 101392 BEARING SHAFT JAMMED L21481 20/2/2019 SWITCH FLOW TRAILING WIRE S PART CLEANING WS BHUT 13/04/19
DT4655 BCS BLADE WIPER WORN OUT : BCS BCS 21005187TOPBBACKLOG LOGISTIC rfu utvh
DT4645 104520 23/3/2019 BOTTOM GUARD ENGINE BAND : BCS J21299 23/3/2019 21005100TOPBBACKLOG 08/03/2019
DT4645 104522 23/3/2019 DUST INDICATOR WORN OUT : BCS F21369 23/3/2019 21005097TOPBBACKLOG 24/02/2019
DT4645 104523 23/3/2019 HOSE FRONT B/C RH AND LH CRACK : BCS L21692 23/3/2019 21005099TOPBBACKLOG 08/03/2019
DT4645 104524 23/3/2019 LINE FILTER WEAPING : BCS H21307 23/3/2019 21005098TOPBBACKLOG 24/02/2019
CREATE CREATE
DT4645 104521 23/3/2019 COVER OPERATOR SEAT BROKEN : BCS BCS WR BLN 21005101TOPBBACKLOG 08/03/2019 WR BLN
APRIL APRIL
SEND TO WS FOR CB050:
CB050 103790 V-BELT ALTERNATOR AND COMP AC CRACK H21169 5/3/2019 BELT V-BELT COMP AC AND BHUT
AALTERNATOR
CB050 101812 MIDLIFE CROSS JOINT PROPELLER SHAFT G21508 4/2/2019 TUBE, FUEL ASS'Y SENT TO W/S FOR CB050 BHUT
CB050 103677 FUSE ELECTRIC SHORT : BCS F21231 3/3/2019 FUSE 2A ;FUSE 2A FRO MANITOU 21004868TOPBBACKLOG BHUT