300kVA BEME 33kV Project

This document contains a bill of engineering measurement and evaluation for materials and services needed for an electrical substation and grid extension project. It includes a list of 115 line items with descriptions of transformers, cables, poles, insulators and other equipment. The quantities of each item are given as well as subtotals for materials, services, and the total project cost including contingencies.

Uploaded by

Eze Ukiwe
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
973 views10 pages

300kVA BEME 33kV Project

This document contains a bill of engineering measurement and evaluation for materials and services needed for an electrical substation and grid extension project. It includes a list of 115 line items with descriptions of transformers, cables, poles, insulators and other equipment. The quantities of each item are given as well as subtotals for materials, services, and the total project cost including contingencies.

Uploaded by

Eze Ukiwe
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 10

BILL OF ENGINEERING MEASUREMENT & EVALUATION (BEME)

MATERIALS FOR SUB-STATION


1 100kVA, 11/0.415kV Transformer(Copper to Copper) 0 No
2 200kVA, 11/0.415kV Transformer(Copper to Copper) 0 No
3 300kVA, 110.415kV Transformer(Copper to Copper) 0 No
4 500kVA, 11/0.415kV Transformer(Copper to Copper) 0 No
5 100kVA, 33/0.415kV Transformer(Copper to Copper) 0 No
6 200kVA, 33/0.415kV Transformer(Copper to Copper) 0 No
7 300kVA, 33/0.415kV Transformer(Copper to Copper) 0 No
8 500kVA, 33/0.415kV Transformer(Copper to Copper) 0 No
9 2.5MVA, 33/11kV Transformer(Copper to Copper) 0 No
10 11kV Ganged Isolator 0 Set
11 33kV Ganged Isolator 0 Set
12 11kv Ganged Isolator Silicon 0 Set
13 33kv Ganged Isolator Silicon 0 Set
14 11kV 'D ' Type Fuse 0 Set
15 33kV 'D ' Type Fuse 0 Set
16 11kV Lightning Arrester 0 Set
17 33kV Lightning Arrester 0 Set
18 M.V. Feeder Pillar ( 4-ways ) 800Amps 0 No
19 Channel Iron 3 x 2 x 21 (11kV) 0 No
20 Channel Iron 4 x 2 x 21 (33kV) 0 No
21 1 x 500mm2 MV Cable (Nigeria cable) 0 m
22 1 x 300mm2 MV Cable (Nigeria cable) 0 m
23 4 core x 70mm2 MV Cable (Nigeria cable) 0 m
24 4 core x 120mm2 MV Cable (Nigeria cable) 0 m
25 4 core x 150mm2 Cable (Nigeria cable) 0 m
26 4 core x 185mm2 Cable (Nigeria cable ) 0 m
27 1 core x 35mm2 XLPE Cable(11KV) (Nigeria cable) 0 m
28 1 core x 70mm2 XLPE Cable(33KV) (Nigeria cable) 0 m
29 Earthing Mat (1m x 1.5m) 0 Set
30 Raychem Terminating kit (11KV) 0 Set
31 Raychem Terminating kit (33KV) 0 Set
32 Earthing Rod (Copper) 0 No
33 Earthing Rod (Galvanized) 0 No
34 Earthing Wire ( Copper ) 70mm 0 m
35 Anti Climb devices 0 No
36 500mm2 Cable lug 0 No
37 300mm2 Cable lug 0 No
38 185mm2 Cable lug 0 No
39 70mm2 Cable lug 0 No
40 3M Tape 0 No
41 Ebonite Tube 0 No
42 Phase Colour Disc 0 No
SUB-TOTAL (A)
MATERIALS FOR GRID EXTENTION AND STRINGING
HT ONLY 0 km
150mm2, ACSR "WOLF" (Route
43 HT ONLY 0 km
Length) Nigeria Cable
LT 0 km
HT ONLY 0 km
100mm2, ACSR "DOG" (Route
44 HT/LT 0 km
Length) Nigeria cable
LT 0 km
HT ONLY 0 km
150mm2, AAC (Route Length)
45 HT/LT 0 km
Nigeria cable
LT 0 km
HT ONLY 0 km
100mm2, AAC (Route Length)
46
Nigeria cable
100mm2, AAC (Route Length)
46 HT/LT 0 km
Nigeria cable
LT 0 km
70mm2, AAC "EARWIG" (Route
47 LT ONLY 0 km
Length) Nigeria cable
48 35mm2, AAC "MOSQUITO" Nigeria cable 0 km
48 8.5m (28') Concrete Poles 0 No
49 10.36m (33') Concrete Poles 0 No
50 12.00m (40') Concrete Poles 0 No
51 11kV Pin Insulator complete 0 Set
52 33kV Pin Insulator complete 0 Set
53 Disc (Strain Insulator) 0 Set
54 Tension set complete 0 Set
55 MV Stay Insulator 0 No
56 11kV Stay Insulator 0 No
57 33kv Stay Insulator 0 No
58 5/8" Stay Wire (mv/11KV) 0 m
59 7/8"Stay Wire (33kv) 0 m
60 6' Stay Rod (MV/11KV) 0 No
61 8' Stay Rod (33kV) 0 No
62 Stay Thimble 0 No
63 Stay Block 0 No
64 Bracket Pot Insulator Mount 0 Set
65 11kv Silicon Pot Insulator (SC) 0 Set
66 33kv Silicon Pot Insulator 0 Set
67 11kv Disc Silicon Insulator 0 Set
68 33kv Disc Silicon Insulator 0 Set
69 33kv Lightning Arrester Silicon 0 Set
70 11kv Lightning Arrester Silicon 0 Set
71 33kv D Type Fuse Silicon 0 Set
72 11kv D Type Fuse Silicon 0 Set

73 Double Groove Shackle Insulator complete with D-iron & pins 0 No


74 Extension Strap 0 No
75 Line Tap 0 No
76 Steel Cross-Arm 11kV 0 No
77 Steel Cross-Arm 33kV 0 No
78 Fibre Cross-Arm 11kV 0 No
79 Fibre Cross-Arm 33kV 0 No
80 Tie Strap 11kV 0 No
81 Tie Strap 33kV 0 No
82 16 x 51 Bolts, Nuts, & Washers 0 No
83 16 x 152 Bolts, Nuts, & Washers 0 No
84 16 x 200 Bolts, Nuts, & Washers 0 No
85 16 x 254 Bolts, Nuts, & Washers 0 No
86 16x280/305 Bolts, Nuts, & Washers 0 No
87 Flat Washer For 22mm Dia. 0 No
88 Flat Washer For 18mm Dia. 0 No
89 M20 x 2282 Bolts, Nuts, & Washers 0 No
90 Street Lighting Fittings (Complete) 0 Set
91 Street Lighting Fittings Kiosk 0 No
SUB-TOTAL (B)
SUMMARY
A MATERIALS FOR SUB-STATION

B MATERIALS FOR GRID EXTENTION AND STRINGING


SUB- TOTAL

SUB- TOTAL (Materials)

C SERVICES
Civil Work and Substation Fencing with insulated wire mesh,
92 0 No
filled with granite and lockable iron gate

Civil Work and Substation Fencing with insulated wire mesh,


93 0 No
filled with granite and lockable iron gate -2.5MVA S/S

94 Service Connection 0 No
95 Transformer and Feeder Pillar Plinth 0 Lot
96 Sign Post (Per Sub - Station) 0 No
97 Removal of poles 0 No
98 Pole Identification & REA Inscription 0 No
99 Danger Plate 0 No
100 Excavation and backfilling of concrete pole hole 0 No
101 Pole Foundation in Swampy Soil 0 No
102 Pole Foundation in Rocky Soil 0 No
103 Route Survey and pegging (ITC) 0 km
104 Route Survey and pegging (TDN) 0 km
105 Bush Clearing - Intertownship 0 km
106 Bush Clearing - Township 0 km
107 Welding of Stay Assembly 0 No
108 Tree cutting 0 km
109 Creating of Access Road (1000mx15m) 0 km
110 Special Equipment for Riverine project 0 No
SUB-TOTAL (C)

TOTAL (Materials and Services)

Testing, Hooking & commissioning of the entire network and


112
Transformers

113 Logistics and Tranaportation 10%


114 VAT (5%)
115 Contingency (2.5% )
GRAND TOTAL :
ERECTION (12% OF
MATERIALS PROJECT COST
MATERIAL COST)

- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
-

- -
- -
- -
- -
- -
- -

- -

- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -

- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
-
-
-