Output Shaft Process Flow Chart

Nirupam Engineers provides a process flow chart for manufacturing an output shaft with part number 28350 for their customer Sanauto Engineers. The process involves 10 steps: 1) visual inspection for defects, 2) charge preparation, 3) pre-washing, 4) pre-heating, 5) carburizing and hardening, 6) post-washing, 7) tempering, 8) final inspection, 9) informing relevant parties if not conforming, and 10) dispatch with an invoice if passing inspection. Key details checked include material receipt information and customer name.

Uploaded by

Sandeep Bhargava
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
30 views1 page

Output Shaft Process Flow Chart

Nirupam Engineers provides a process flow chart for manufacturing an output shaft with part number 28350 for their customer Sanauto Engineers. The process involves 10 steps: 1) visual inspection for defects, 2) charge preparation, 3) pre-washing, 4) pre-heating, 5) carburizing and hardening, 6) post-washing, 7) tempering, 8) final inspection, 9) informing relevant parties if not conforming, and 10) dispatch with an invoice if passing inspection. Key details checked include material receipt information and customer name.

Uploaded by

Sandeep Bhargava
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

Nirupam Engineers (P) LTd.

,
Ghaziabad
PROCESS FLOW CHART

Part Name : Output Shaft
Part No.: 28350 Customer :   Sanauto Engineers, Faridabad

Received Via: 
Material Receipt
l SSanauto Challan No: 206 
Ch ll N 206

Visual Check for Inform Sanauto 


Dents & 10 Inspection
Damages. Not OK Representative

OK

OK
20 Charge Preperation

30 Pre Washing

40 Pre Heating

50
Carburizing & Hardening
60

70 Post Washing 

80 Tempering

Inform HOD
Check all CTQ & follow Procedure  for 
90 Final Inspection Not OK
parameters NON Confirming 
Products

OK
100
Dispatched  Via: 
Load  & Despatch
Nirupam Invoice No: 120 
Dated 06‐May‐19

Prepared By : Naveen Bhatt Checked By :  Sandeep Bhargava Approved By : Rishi Bhargava