0% found this document useful (0 votes)
400 views6 pages

Interior Fit-Out Project Costs

The document provides a cost estimate for an interior fit out project located in existing structures. It includes unit rates for general requirements, walls, ceilings, floors, finishes, doors and windows, electrical, mechanical, and relocation requirements. The costs are based on unit rates for materials, labor, markup for labor contractors and finders fee, VAT, and unit cost.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
400 views6 pages

Interior Fit-Out Project Costs

The document provides a cost estimate for an interior fit out project located in existing structures. It includes unit rates for general requirements, walls, ceilings, floors, finishes, doors and windows, electrical, mechanical, and relocation requirements. The costs are based on unit rates for materials, labor, markup for labor contractors and finders fee, VAT, and unit cost.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
You are on page 1/ 6

Project: INTERIOR FIT OUT PROJECT

Location: Existing Structures


CONSTRUCTION COST / UNIT
Work Description: General Construction
Date: July 13,2015
UNIT RATE
ITEM DESCRIPTION
UNIT MATERIAL LABOR

GENERAL REQUIREMENTS - BASE ON TOTAL FLOOR AREA


A ) Applicable only 500 sq & Up - Areas Below 500 sq will
be higher
1 Mobilization / Demobilization sq m 54.17
2 Temporary Facilities sq m 70.83
3 C.A.R.I. ( Contractors All Risk Insurance ) sq m 235.07
4 Surety Bond sq m 44.08
5 Guaranty Bond sq m 23.51
6 Construction Boands sq m Always by owner for Existing & Ope
7 Municipal Permits / Occupancy permit sq m 425.00
8 As-built plans ( Small & Large Scale ) lot 30,000.00
9 Safety Requirements PPE'S sq m 150.00
10 Temporary Power & Water Always by owner for Existing & Ope
11 Desing & Working Drawings sq m 5% of Total Project Cost ( Negotiable
B WALLS - BASE ON REQUIRED PARTITION WALL
Single Wall Partitions ( Perimeter Walls Most
1 Establishement Always Require Secondary Wall )

Drywall Wall - Gypsum board on metal Framing - For


1.1 Walls sq m 432.58 240.00
in Paint finishes
Drywall Wall - 3/4 Plyboard on metal Framing - For walls
1.2 w/ attachement such as cabinets, modules, laminated sq m 795.84 200.00
finsh walls, glass coat and etc )
2 Partition Walls
Drywall Wall - Both Face Gypsum board on metal
2.1 Framing sq m 579.51 280.00
- For Walls in Paint finishes

Drywall Wall -Both Face 3/4 Plyboard on metal Framing -


2.2 For walls w/ attachement such as cabinets, modules, sq m 1,306.04 260.00
laminated finsh walls, glass coat and etc )

3 CHB Wall Partitions


3.1 CHB Laying sq m 671.56 180.00
3.2 Plastering sq m 245.50 180.00
4 Water Proofing
Membrain type - Torch Application sq m 560.00 300.00
C CEILING - BASE ON REQUIRED CEILING AREA
Gypsum board on metal Framing - Flat sq m 421.88 220.00
Gypsum board on metal Framing - w/ Cove Lighting sq m 411.49 273.02
Accoustical board Ceiling sq m 485.16 220.00
3/4 Plyboard on metal Framing - For ceiling w/ special sq m 915.22 220.00
treament or attachements
D FLOOR
Floor topping - Most establishment requires floor topping sq m 245.50 180.00
in preparation to Floor Fnishes
E FINISHES
1 WALLS BASE ON WALLS REQUIRED FINISHES
1.1 Frosik Sticker sq m 1,700.00 395.00
1.2 Laminates sq m 1,357.00 395.00
1.3 Veneer ( Varies Depending on Materials ) sq m 2,994.79 395.00
1.4 Glass Coat sq m 3,228.00 395.00
1.5 Engineered Wood sq m 5,140.00 500.00
1.6 ACP sq m 2,100.00 500.00
1.7 Tiles ( Porcelain Tiles ) sq m 1,200.00 500.00
1.8 Base boards 4"
ACP - 4" lm 450.00 202.50
Stainless lm 708.00 318.60
Aluminum lm 390.63 175.78
Wooden lm 250.00 112.50
2 CEILING - BASE ON CEILING REQUIRED FINISHES
1.1 Frosik Sticker sq m 1,700.00 395.00
1.2 Laminates sq m 1,357.00 395.00
1.3 Veneer ( Varies Depending on Materials ) sq m 2,994.79 395.00
1.4 Trilles sq m 3,605.77 850.00
1.5 ACP sq m 2,100.00 500.00
3 FLOOR - BASE ON FLOOR REQUIRED FINISHES
1.1 Tiles ( Porcelain Tiles ) sq m 1,200.00 500.00
1.2 Engineered Wood sq m 5,140.00 500.00
1.3 Laminated Flooring sq m 750.00 200.00
1.4 Carpet Tiles sq m 1,800.00 150.00
1.5 Vinyl Tiles - 1.3 mm sq m 272.55 150.00
4 PAINTING - BASE ON REQUIRED PAINTED AREA
Walls - Boysen / Davies Paint sq m 160.00 216.00
Ceiling - B0ysen / Davies Paint sq m 160.00 216.00
Wood Stain / Varnish sq m 200.00 270.00
Paint finishes in lacquer paint sq m 250.00 337.50
F DOORS & WINDOWS
Door - 2.40 m Hieght w/ Standard door Accesories
( Hinges, Door Closer, lockset )
1 leaf swing Wooden Doors in Laminate Finish set 16,150.00 2,500.00
1- Leaf Wooden Doors in Frostik Stiker Finihes set 16,150.00 2,500.00
1- Leaf Wooden Doors in paint Finishes set 14,150.00 2,500.00
1- Leaf Metal Doors in paint Finishes set 16,400.00 2,500.00
1- Leaf Fire Exit Doors in paint Finishes set 20,900.00 2,500.00
1- Leaf Swing Glass Door Frameless Tempered 12 mm set 48,750.00 4,875.00

G Windows - 2.40 m Hieght BASE ON GLASS WALL


REQUIREMENT - INTERIOR
12 mm Frameless Tempered Fixed Glass Partitions sq m 6,500.00 650.00

ELECTRICAL REQUIREMENT - (FEEDER LINE & LIGHTING


H sq m 1,977.71 889.97
FIXTURES EXCLUDED ) BASE ON TOTAL FLOOR AREA

MECHANICAL - REQUIREMENTS BASE ON TOTAL FLOOR


I sq m 7,910.78 837.06
AREA

RELOCATION ADDITIONAL AFSS BASE ON TOTAL FLOOR


G sq m 413.68 186.15
AREA

RELOCATION ADDITIONAL SMOKE DETECTOR BASE ON


K sq m 105.02 47.26
TOTAL FLOOR AREA
eral Construction

UNIT RATE
TOTAL COST
MARK UP for L Cont & Finders VAT ( 12% of L, Mark UNIT COST
& M 15% Fee 5% up & Cont.

8.13 2.71 7.80 72.80


10.63 3.54 10.20 95.20
35.26 11.75 33.85 315.94
6.61 2.20 6.35 59.24
3.53 1.18 3.39 31.59
Always by owner for Existing & Operational Bulding
63.75 21.25 61.20 571.20
4,500.00 1,500.00 4,320.00 40,320.00
22.50 7.50 21.60 201.60
Always by owner for Existing & Operational Bulding
5% of Total Project Cost ( Negotiable )

100.89 33.63 44.94 852.03

149.38 49.79 47.90 1,242.91

128.93 42.98 54.23 1,085.65

234.91 78.30 68.79 1,948.04

127.73 42.58 42.04 1,063.90


63.83 21.28 31.81 542.41

129.00 43.00 56.64 1,088.64

96.28 32.09 41.81 812.06


102.68 34.23 49.19 870.60
105.77 35.26 43.32 889.52
170.28 56.76 53.65 1,415.91

63.83 21.28 31.81 542.41

314.25 104.75 97.68 2,611.68


262.80 87.60 89.45 2,191.85
508.47 169.49 128.76 4,196.51
543.45 181.15 134.35 4,481.95
846.00 282.00 195.36 6,963.36
390.00 130.00 122.40 3,242.40
255.00 85.00 100.80 2,140.80

97.88 32.63 39.96 822.96


153.99 51.33 62.87 1,294.79
84.96 28.32 34.69 714.38
54.38 18.13 22.20 457.20

314.25 104.75 97.68 2,611.68


262.80 87.60 89.45 2,191.85
508.47 169.49 128.76 4,196.51
668.37 222.79 208.94 5,555.86
390.00 130.00 122.40 3,242.40

255.00 85.00 100.80 2,140.80


846.00 282.00 195.36 6,963.36
142.50 47.50 46.80 1,186.80
292.50 97.50 64.80 2,404.80
63.38 21.13 28.14 535.20

56.40 18.80 34.94 486.14


56.40 18.80 34.94 486.14
70.50 23.50 43.68 607.68
88.13 29.38 54.60 759.60

2,797.50 932.50 747.60 23,127.60


2,797.50 932.50 747.60 23,127.60
2,497.50 832.50 699.60 20,679.60
2,835.00 945.00 753.60 23,433.60
3,510.00 1,170.00 861.60 28,941.60
8,043.75 2,681.25 1,872.00 66,222.00

1,072.50 357.50 249.60 8,829.60

430.15 143.38 175.62 3,616.84

1,312.18 437.39 310.40 10,807.81

89.97 29.99 36.73 756.53

22.84 7.61 9.33 192.06


Project: INTERIOR FIT OUT PROJECT
Location: Existing Structures
CONSTRUCTION COST / UNIT
Work Description: General Construction
Date: July 13,2015
UNIT RATE TOTAL COST UNIT
ITEM DESCRIPTION UNIT
MATERIAL LABOR VALUE ADDED TAX COST
GENERAL REQUIREMENTS - BASE ON TOTAL FLOOR AREA
A ) Applicable only 500 sq & Up - Areas Below 500 sq will
be higher
1 Mobilization / Demobilization sq m - 65.00 7.80 72.80
2 Temporary Facilities sq m - 85.00 10.20 95.20
3 C.A.R.I. ( Contractors All Risk Insurance ) sq m - 282.09 33.85 315.94
4 Surety Bond sq m - 52.89 6.35 59.24
5 Guaranty Bond sq m - 28.21 3.39 31.59
6 Construction Boands sq m - Always by owner for Existing & Operational Bulding
7 Municipal Permits / Occupancy permit sq m - 510.00 61.20 571.20
8 As-built plans ( Small & Large Scale ) lot - 36,000.00 4,320.00 40,320.00
9 Safety Requirements PPE'S sq m - 180.00 21.60 201.60
10 Temporary Power & Water Always by owner for Existing & Operational Bulding
11 Desing & Working Drawings sq m - 5% of Total Project Cost ( Negotiable )
B WALLS - BASE ON REQUIRED PARTITION WALL
1 Single Wall Partitions ( Perimeter Walls Most
Establishement Always Require Secondary Wall )
Drywall Wall - Gypsum board on metal Framing - For
1.1 Walls in Paint finishes sq m 519.09 288.00 44.94 852.03

Drywall Wall - 3/4 Plyboard on metal Framing - For walls


1.2 w/ attachement such as cabinets, modules, laminated sq m 955.01 240.00 47.90 1,242.91
finsh walls, glass coat and etc )
2 Partition Walls - - -
Drywall Wall - Both Face Gypsum board on metal
2.1 Framing - For Walls in Paint finishes sq m 695.42 336.00 54.23 1,085.65

Drywall Wall -Both Face 3/4 Plyboard on metal Framing -


2.2 For walls w/ attachement such as cabinets, modules, sq m 1,567.25 312.00 68.79 1,948.04
laminated finsh walls, glass coat and etc )

3 CHB Wall Partitions - -


3.1 CHB Laying sq m 805.87 216.00 42.04 1,063.90
3.2 Plastering sq m 294.60 216.00 31.81 542.41
4 Water Proofing - - -
Membrain type - Torch Application sq m 672.00 360.00 56.64 1,088.64
C CEILING - BASE ON REQUIRED CEILING AREA
Gypsum board on metal Framing - Flat sq m 506.25 264.00 41.81 812.06
Gypsum board on metal Framing - w/ Cove Lighting sq m 493.79 327.63 49.19 870.60
Accoustical board Ceiling sq m 582.19 264.00 43.32 889.52
3/4 Plyboard on metal Framing - For ceiling w/ special
treament or attachements sq m 1,098.26 264.00 53.65 1,415.91
D FLOOR
Floor topping - Most establishment requires floor topping sq m 294.60 216.00 31.81 542.41
in preparation to Floor Fnishes
E FINISHES
1 WALLS BASE ON WALLS REQUIRED FINISHES
1.1 Frosik Sticker sq m 2,040.00 474.00 97.68 2,611.68
1.2 Laminates sq m 1,628.40 474.00 89.45 2,191.85
1.3 Veneer ( Varies Depending on Materials ) sq m 3,593.75 474.00 128.76 4,196.51
1.4 Glass Coat sq m 3,873.60 474.00 134.35 4,481.95
1.5 Engineered Wood sq m 6,168.00 600.00 195.36 6,963.36
1.6 ACP sq m 2,520.00 600.00 122.40 3,242.40
1.7 Tiles ( Porcelain Tiles ) sq m 1,440.00 600.00 100.80 2,140.80
1.8 Base boards 4" - -
ACP - 4" lm 540.00 243.00 39.96 822.96
Stainless lm 849.60 382.32 62.87 1,294.79
Aluminum lm 468.75 210.94 34.69 714.38
Wooden lm 300.00 135.00 22.20 457.20
2 CEILING - BASE ON CEILING REQUIRED FINISHES
1.1 Frosik Sticker sq m 2,040.00 474.00 97.68 2,611.68
1.2 Laminates sq m 1,628.40 474.00 89.45 2,191.85
1.3 Veneer ( Varies Depending on Materials ) sq m 3,593.75 474.00 128.76 4,196.51
1.4 Trilles sq m 4,326.92 1,020.00 208.94 5,555.86
1.5 ACP sq m 2,520.00 600.00 122.40 3,242.40
3 FLOOR - BASE ON FLOOR REQUIRED FINISHES
1.1 Tiles ( Porcelain Tiles ) sq m 1,440.00 600.00 100.80 2,140.80
1.2 Engineered Wood sq m 6,168.00 600.00 195.36 6,963.36
1.3 Laminated Flooring sq m 900.00 240.00 46.80 1,186.80
1.4 Carpet Tiles sq m 2,160.00 180.00 64.80 2,404.80
1.5 Vinyl Tiles - 1.3 mm sq m 327.06 180.00 28.14 535.20
4 PAINTING - BASE ON REQUIRED PAINTED AREA
Walls - Boysen / Davies Paint sq m 192.00 259.20 34.94 486.14
Ceiling - B0ysen / Davies Paint sq m 192.00 259.20 34.94 486.14
Wood Stain / Varnish sq m 240.00 324.00 43.68 607.68
Paint finishes in lacquer paint sq m 300.00 405.00 54.60 759.60
F DOORS & WINDOWS
Door - 2.40 m Hieght w/ Standard door Accesories
( Hinges, Door Closer, lockset )
1 leaf swing Wooden Doors in Laminate Finish set 19,380.00 3,000.00 747.60 23,127.60
1- Leaf Wooden Doors in Frostik Stiker Finihes set 19,380.00 3,000.00 747.60 23,127.60
1- Leaf Wooden Doors in paint Finishes set 16,980.00 3,000.00 699.60 20,679.60
1- Leaf Metal Doors in paint Finishes set 19,680.00 3,000.00 753.60 23,433.60
1- Leaf Fire Exit Doors in paint Finishes set 25,080.00 3,000.00 861.60 28,941.60
1- Leaf Swing Glass Door Frameless Tempered 12 mm set 58,500.00 5,850.00 1,872.00 66,222.00

Windows - 2.40 m Hieght BASE ON GLASS WALL


G REQUIREMENT - INTERIOR
12 mm Frameless Tempered Fixed Glass Partitions sq m 7,800.00 780.00 249.60 8,829.60

ELECTRICAL REQUIREMENT - (FEEDER LINE & LIGHTING


H FIXTURES EXCLUDED ) BASE ON TOTAL FLOOR AREA sq m 2,373.26 1,067.97 175.62 3,616.84

MECHANICAL - REQUIREMENTS BASE ON TOTAL FLOOR


I AREA sq m 9,492.94 1,004.48 310.40 10,807.81

RELOCATION ADDITIONAL AFSS BASE ON TOTAL FLOOR


G AREA sq m 496.41 223.38 36.73 756.53

RELOCATION ADDITIONAL SMOKE DETECTOR BASE ON


K TOTAL FLOOR AREA sq m 126.02 56.71 9.33 192.06