0% found this document useful (0 votes)
30 views4 pages

Container Inspection Report

This document summarizes the inspection of a shipping container. It includes details like the container number, size, weight, construction material, and condition. The inspection notes dents, cracks, corrosion and other defects on the exterior and interior. It also lists allowable racking and stacking weights. The results section indicates whether the container was found acceptable or needed repairs.

Uploaded by

amira
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
30 views4 pages

Container Inspection Report

This document summarizes the inspection of a shipping container. It includes details like the container number, size, weight, construction material, and condition. The inspection notes dents, cracks, corrosion and other defects on the exterior and interior. It also lists allowable racking and stacking weights. The results section indicates whether the container was found acceptable or needed repairs.

Uploaded by

amira
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 4

CONTAINER N°: MFG: MFG DATE:

Conteneur n° : Constructeur: Date de constructi


SIZE : 20' 40' ____________ TYPE DRY OPEN TOP
Dimensions: 20' 40' ____________ TYPE SEC TOIT OUVERT
SERIAL N°:
N° de série :
CSC: TARE WT: GROSS WT:
CERTIFICAT D'AGREMENT : TARE : POIDS BRUT :
CUSTOMER: ON HIRE INSERVICE
Client : En location En service
CONSTRUCTION: ALUMINIUM FRP STEEL
Construction :
CONDITIONS
DENTS : I=INSERTED
A1=UP TO 13 MM B=BROKEN,CRACKED L=LOOSE
A2=UP TO 20 MM C=CORROSION M=MISSING
A3 = UP TO 25 MM D=DECALS,F/MARKS N=STAINED
A4 =˃THAN 25 MM G=GOUGED O=OUTSIDE ISO
A5 =˃THAN 40MM H=HOLED P=POORLY
COMMENTS :
Observations :
OUTRIGGER C/MS FORKPOCKETS
TUNNEL RAILS AND STRAPS

RAILS DE TUNNEL DE PORTEFEUILLES ET


CMS EXTÉRIEUR SANGLES

CROSSMEMBERS : CHANNELS STRACKING WEIGHT/POIDS CULTIVANT :


Membres croisés: I-Beams RACKING WEIGHT/POIDS DE FILETAGE :
Z-Beams ALLOWABLE STRACKING WEIGHT FOR/PO
INTERIOR :
Intérieur :
RESULTS OF INSPECTION : ACCEPTABLE REPAIR NECESSARY
Résultats d'inspection : ACCEPTABLE Réparation nécess
SURVEYOR :
DATE:
onstruction: Date :
OP RACK ________________
OUVERT RACK _____________
LOCATION :
Location :
RELEASE N°
UT : NUMERO DE MAINLEVEE :
ICE CONDITION ___________________
service Etat ___________________

SEVERITY
LT=LIGHT
MD=MODERATE
HY=HEAVY
DE ISO
VANT :
AGE :
T FOR/POIDS DE CRAYAGE PERMIS POUR :

CESSARY BEFORE ACCEPTANCE REJECTED


n nécessaire avant acceptation A rejeter
DATE :

You might also like