0% found this document useful (0 votes)
35 views83 pages

Water Tank 29.4

Uploaded by

ARUNKUMAR K
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
35 views83 pages

Water Tank 29.4

Uploaded by

ARUNKUMAR K
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 83

Project SEWAGE TREATMENT FACILITIES

Rev Date
Client STEEL AUTHORITY OF INDIA

Subject ANALYSIS AND DESIGN OF SLUDGE DRIYING BED & DIGESTOR TANK 0 4.12.12

Description Results
Remarks

S.No Descripition of work Page No

1 DESIGN OF SLUDGE DRIYING BED -TANK-1 1

2 DESIGN OF SLUDGE DRIYING BED -TANK-2 8

3 DESIGN OF DIGESTOR TANK 14


Project SEWAGE TREATMENT FACILITIES
Client STEEL AUTHORITY OF INDIA
Subject ANALYSIS AND DESIGN OF SLUDGE DRIYING BED & DIGESTOR TANK
1.0 DESIGN OF SLUDGE DRIYING BED
Design parametere :
It is a rectangular tank of size
TANK-1 4.00 m x 4.00 m x 4.85 m

Finsihed Ground Level ( FGL ) : - 78.00 m Lvl

Top level of Tank wall : - 97.85 m Lvl

Top of Base Slab : - 93.00 m Lvl

Size of theTank : 4.00 m x 4.00 m

Height of the tank : 4.85 m

Unit weight of concrete 25.00 KN /m3

Unit weight of water 9.81 KN /m3

Free board of Water tank 0.30 m

- 97.85 m Lvl

.
0.30 m

4.85 m 4.85 m

4.55 m

- 93.00
0.30 m

4.00

The thickness of Base raft has to be provided

Materials Concrete M 25

1
Project SEWAGE TREATMENT FACILITIES
Client STEEL AUTHORITY OF INDIA
Subject ANALYSIS AND DESIGN OF SLUDGE DRIYING BED & DIGESTOR TANK
Steel Fe 415

GL - IL = 4.55

Total Thickness Of Base Slab = 0.300

Unit weight Reinforced Concrete = 25.0

Upward pressure

Upward pressure (4.54999999999999+0.3)


4.25 x 9.81 41.69

2
Project SEWAGE TREATMENT FACILITIES
Client STEEL AUTHORITY OF INDIA
Subject ANALYSIS AND DESIGN OF SLUDGE DRIYING BED & DIGESTOR TANK
Downward pressure

Weight of Slab (0.3*25) = 0.30 x 25.00 7.5

Total Downward Pressure 7.5

Net upward pressure on slab 41.69 - 7.50 = 49.19


[ Downward presure - Upward pressure] (Acting Upwards)

Note : The base slab is designed for the net pressure acting upwards

DESIGN OF BASE SLAB

Net upward pressure on slab = 49.19 kN/m2


Here the aspect ratio Ly/Lx is less than 2 and hence the slab is designed as a two way slab.

Four Edges Discontinuous:

Basic dimensions of slab = Lx Ly


1.00 m 2.00 m
Basic Ly/Lx ratio = 2.0 >=2
Hence designed as two way slab
Clear cover to reinforcement d' = 25
Provided overall depth D = 230
Effective depth d = 269
Diameter of bar f = 12

Grade of Concrete fck = 25


Grade of Steel fy = 415

Load calculation :
Total upward pressure on slab = 49.19

Moment and Area of Steel calculations:

Span Moment Mu
Coefficient kN.m

3
Project SEWAGE TREATMENT FACILITIES
Client STEEL AUTHORITY OF INDIA
Subject ANALYSIS AND DESIGN OF SLUDGE DRIYING BED & DIGESTOR TANK
shorter ax neg 0.000 0.00
ax pos 0.056 2.75
longer ay neg 0.000 0.00
ay pos 0.056 2.75

Depth required at base Moment Consideration

d = 2.75 x 106 44.5 mm


1000 x 1.39 =

Hence provide 300 mm @ bottom

4
Project SEWAGE TREATMENT FACILITIES
Client STEEL AUTHORITY OF INDIA
Subject ANALYSIS AND DESIGN OF SLUDGE DRIYING BED & DIGESTOR TANK
Effectiv depth = 300 -25-12/2 = 269 mm

Moment and Area of Steel calculations:

MH = 2.75 kN-m

Ast = 2.75 x 106


150x0.9x269
Ast = 70.19 mm2

For 300 mm the req. percentage is 0.254 %


Provide Minimum area of steel
Min Ast = 0.254 1000 x (1/2) x 269
100
Ast = 380.4 mm2

Ast reqd Min Ast Dia of bar Spacing Ast pro


On each
mm² Face mm mm mm²
70.19 380 10 200 392.70
392.70
Hence provide 10 mm dia at 200 mm spacing
Design Of Wall
Soil Data :
Safe Bearing Capacity as per Soil = 100.00
Report

Assume Thickness of Wall @ Top : = 0.250

Assume Thickness of Wall @ Bottom : = 0.250

Size of Tank = 4.10

MOMENT COEFFICIENT FOR VERTICAL REINFORCEMENT

CASE 1 :
Base is Fixed & Top free

Max Vertical Moment @ base on water face :

Mvi = K x 9.81 x H3 K value from Table 3


IS-3370 Part IV 1967
= 26.05 kN-m k =0.0282

5
Project SEWAGE TREATMENT FACILITIES
Client STEEL AUTHORITY OF INDIA
Subject ANALYSIS AND DESIGN OF SLUDGE DRIYING BED & DIGESTOR TANK

Max Vertical Moment @ 4.85 m from top on water face :

Mvi = K x 9.81 x H3 K value from Table 3


IS-3370 Part IV 1967
= 3.83 kN-m k =0.0041

Max Vertical Moment @ base away from water face :

Mvo = K x 9.81 x H3 K value from Table 3


IS-3370 Part IV 1967
= 6.03 kN-m k =0.0065

6
Project SEWAGE TREATMENT FACILITIES
Client STEEL AUTHORITY OF INDIA
Subject ANALYSIS AND DESIGN OF SLUDGE DRIYING BED & DIGESTOR TANK

Max Vertical Moment @ 4.85 m from top away from water face :

Mvo = K x 9.81 x H3 K value from Table 3


IS-3370 Part IV 1967
= 1.28 kN-m k =0.0014

From the Above Two Cases

Max Vertical Moment @ base on water face : 26.05

Max Vertical Moment @ 4.85 m from top on water face : 3.83

Max Vertical Moment @ base away from water face : 6.03

Max Vertical Moment @ 4.85 m from top away from water f 1.28

Depth required at base Moment Consideration

d = 26.05 x 106 = 136.72 mm


1000x 1.39

Hence provide 240 mm @ bottom

Depth required at Top Moment Consideration

d = 3.83 x 106 = 52.42 mm


1000 x 1.39

Hence provide 240 mm @ top

Provide thickness @ botttom as 240 mm


Provide thickness @ top as 240 mm
Effec. Depth =240 - 40 - 5 209 mm @ bottom
Effec. Depth =240 -40 - 5 209 mm @ Top

VERTICAL REINFORCEMENT ON WATER FACE @ BASE

Moment and Area of Steel calculations:


Mvi = 26.05 kN-m

7
Project SEWAGE TREATMENT FACILITIES
Client STEEL AUTHORITY OF INDIA
Subject ANALYSIS AND DESIGN OF SLUDGE DRIYING BED & DIGESTOR TANK

Ast = 26.05 x 106


150x0.9x 209

Ast = 952.9 mm2

By Interpolation from IS 3370 Page 13


0.30% for 100 mm
0.20% for 450 mm

For 240 mm the req. percentage is 0.260 %


Provide Minimum area of steel
Min Ast = 0.260 1000 x (1/2) x 240
100

8
Project SEWAGE TREATMENT FACILITIES
Client STEEL AUTHORITY OF INDIA
Subject ANALYSIS AND DESIGN OF SLUDGE DRIYING BED & DIGESTOR TANK

Ast = 312.00 mm2


Ast reqd Min Ast Dia of bar Spacing Ast pro
mm² mm² mm mm mm²
953 312 16 200 1005.31
1005.31
Provide 16 mm dia at 200 mm spacing

VERTICAL REINFORCEMENT ON WATER FACE @ 4.85 m FROM TOP


Moment and Area of Steel calculations:
Mvi = 3.83 kN-m

Ast = 3.83 x 106


150x1.4x 209

Ast required = 87.64 mm2

By Interpolation from IS 3370 Page 13


0.30% for 100 mm
0.20% for 450 mm
For 240 mm the req. percentage is 0.260 %
Provide Minimum area of steel
Min Ast = 0.260x 1000 x (1/2) x 240
100
Ast = 312.00 mm2
Ast reqd Min Ast Dia of bar Spacing Ast pro
mm² mm² mm mm mm²
87.64 312.00 16 200 1005.31

Hence provide 16 mm dia at 200 mm spacing

VERTICAL REINFORCEMENT AWAY FROM WATER FACE @ BASE


Moment and Area of Steel calculations:
Mvo = 6.03 kN-m

Ast = 6.03 x 106


190x1x 209 mm
Ast = 155.36 mm2

Ast reqd MIN Dia of bar Spacing Ast pro


mm² Ast mm mm mm²
155.36 312.00 12 200 565.49

9
Project SEWAGE TREATMENT FACILITIES
Client STEEL AUTHORITY OF INDIA
Subject ANALYSIS AND DESIGN OF SLUDGE DRIYING BED & DIGESTOR TANK

Hence provide 12 mm dia at 200 mm spacing


VERTICAL REINFORCEMENT AWAY FROM WATER FACE @ 4.85 m
Moment and Area of Steel calculations:
Mvo = 1.28 kN-m
Ast = 1.28 x 106
190x1x 209 mm
Ast = 32.89 mm2

Ast reqd MIN Dia of bar Spacing Ast pro


mm² Ast mm mm mm²
32.89 312.00 12 200 565.49

Hence provide 12 mm dia at 200 mm spacing

10
Project SEWAGE TREATMENT FACILITIES
Client STEEL AUTHORITY OF INDIA
Subject ANALYSIS AND DESIGN OF SLUDGE DRIYING BED & DIGESTOR TANK

MOMENT COEFFICIENT FOR HORIZONTAL REINFORCEMENT


x5 x2 x1 x3, x4
CASE 1 :
Base is Fixed & Top free

Max Horizontal Moment @ base on water face :

MHI = K x 9.81 x H3 K value from Table 3


IS-3370 Part IV 1967
= 4.37 kN-m k =0.0039

Max Horizontal Moment @ 4.85 m from top on water face :

MHI = K x 9.81 x H3 K value from Table 3


IS-3370 Part IV 1967
= 13.49 kN-m k =0.0121

Max Horizontal Moment @ base away from water face :

MHO = K x 9.81 x H3 K value from Table 3


IS-3370 Part IV 1967
= 2.40 kN-m k =0.0021

Max Horizontal Moment @ 4.85 m from top away from water face :

MHO = K x 9.81 x H3 K value from Table 3


IS-3370 Part IV 1967
= 8.42 kN-m k =0.0075

From the Above Two Cases

Max Horizontal Moment : at base 4.37


Max Horizontal Moment : at top 13.49

Depth required at Top from Horizontal Moment Consideration


d = 6.744 x 106 = 69.56 mm
1000 x 1.39

Hence provide 240 mm @ top

Provide thickness @ top as 240 mm

11
Project SEWAGE TREATMENT FACILITIES
Client STEEL AUTHORITY OF INDIA
Subject ANALYSIS AND DESIGN OF SLUDGE DRIYING BED & DIGESTOR TANK
Effec. Depth =240 - 50 - 5 209 mm @ Top

HORIZONTAL REINFORCEMENT @ BASE

Moment and Area of Steel calculations:


MH = 4.37 kN-m

Ast = 4.37 x 106


150x1.4x 209

Ast = 100.07 mm2


Ast on
Eachface = 50.04 mm2

12
Project SEWAGE TREATMENT FACILITIES
Client STEEL AUTHORITY OF INDIA
Subject ANALYSIS AND DESIGN OF SLUDGE DRIYING BED & DIGESTOR TANK

Ast reqd MIN Dia of bar Spacing Ast pro


mm² Ast mm mm mm²
50.04 312.00 12 200 565.49
565.49
Hence provide 12 mm dia at 200 mm spacing

HORIZONTAL REINFORCEMENT @ Top

Moment and Area of Steel calculations:


MH = 13.49 kN-m

Ast = 13.49 x 106


150x1.4x 209 mm

Ast = 308.66 mm2


Ast on
Eachface = 154.33 mm2

Ast reqd MIN Dia of bar Spacing Ast pro


mm² Ast mm mm mm²
154.33 312.00 12 200 565.49

565.49
Hence provide 12 mm dia at 200 mm spacing

CHECK FOR UPLIFT:

Downward load:
Wall allround = 16.960 X 0.24 X 4.85 X 25 =
Base slab = 4.480 X 4.480 X 0.30 X 25 =
Total Downward load =

Upward Pressure:
Total area x ht x unit wt. of water

4.480 X 4.480 X 4.850 X 9.81 =

Uplift = Total Downward load


Total Upward load

13
Project SEWAGE TREATMENT FACILITIES
Client STEEL AUTHORITY OF INDIA
Subject ANALYSIS AND DESIGN OF SLUDGE DRIYING BED & DIGESTOR TANK
Uplift = 0.67 %
>1.20% UNSAFE

14
Rev Date

ESTOR TANK 0 4.12.12

15
Rev Date

ESTOR TANK 0 4.12.12

kN/m2 .

kN/m2

16
Rev Date

ESTOR TANK 0 4.12.12

kN/m2

kN/m2

kN/m2
cting Upwards)

d as a two way slab.

two way
d as two way slab
mm
mm
mm
mm

N/mm²
N/mm²

kN/m²

17
Rev Date

ESTOR TANK 0 4.12.12

SAFE

18
Rev Date

ESTOR TANK 0 4.12.12

Min. Reinforcement
100 450 300 mm
0.325 0.2 0.254

AS PER IS 1370 PART I


for 100 mm - 0.3 %
for 450 mm - 0.2 %

SAFE

KN / m2

x4m b= 4.10 m
a= 4.85 m

b/a = 0.8

K - BY INTERPOLATION
0.75 1 0.845
0.024 0.035 0.0282
Y=0 , X/a=1

19
Rev Date

ESTOR TANK 0 4.12.12

K - BY INTERPOLATION
0.75 1 0.845
0.003 0.006 0.0041
Y=b/2 , X/a=1/2

K - BY INTERPOLATION
0.75 1 0.845
0.005 0.009 0.0065
Y=0 , X/a=1/2

20
Rev Date

ESTOR TANK 0 4.12.12

K - BY INTERPOLATION
0.75 1 0.845
0.001 0.002 0.00138
Y=0 , X/a=1/4

kN-m

kN-m

kN-m

kN-m

SAFE

SAFE

21
Rev Date

ESTOR TANK 0 4.12.12

Min. Reinforcement
100 450 240 mm
0.3 0.2 0.260

AS PER IS 1370 PART IV


for 100 mm - 0.3 %
for 450 mm - 0.2 %

22
Rev Date

ESTOR TANK 0 4.12.12

SAFE

Min. Reinforcement
100 450 240 mm
0.3 0.2 0.260

AS PER IS 1370 PART IV


for 100 mm - 0.3 %
for 450 mm - 0.2 %

SAFE

SAFE

23
Rev Date

ESTOR TANK 0 4.12.12

FROM TOP

SAFE

24
Rev Date

ESTOR TANK 0 4.12.12

K - BY INTERPOLATION
0.75 1 0.845
0.002 0.007 0.0039
Y=b/2 , X/a=0

K - BY INTERPOLATION
0.75 1 0.845
0.009 0.017 0.0121
Y=b/2 , X/a=1/2

K - BY INTERPOLATION
0.75 1 0.845
0.001 0.004 0.0021
Y=0 , X/a=0

K - BY INTERPOLATION
0.75 1 0.845
0.006 0.01 0.0075
Y=0 , X/a=1/2

kN-m
kN-m

SAFE

25
Rev Date

ESTOR TANK 0 4.12.12

26
Rev Date

ESTOR TANK 0 4.12.12

SAFE

SAFE

493.54 kN
150.53 kN
644.06 kN

954.92 kN

27
Rev Date

ESTOR TANK 0 4.12.12

28
Project SEWAGE TREATMENT FACILITIES

Client STEEL AUTHORITY OF INDIA


SLUDGE DRIYING BED
Subject

1.1 DESIGN OF SLUDGE DRIYING BED

Design parametere :

It is a rectangular tank of size


TANK-2 2.605 m x 2.00 m x 1.30 m

Finsihed Ground Level ( FGL ) : - 0.50 m Lvl

Top level of Tank wall : - 0.50 m Lvl

Top of Base Slab : - 1.80 m Lvl

Size of theTank : 2.605 m x 2.00 m

Height of the tank : 1.30 m

Unit weight of concrete 25.00 KN /m3

Unit weight of water 9.81 KN /m3

Free board of Water tank 0.15 m

- 0.50 m Lvl

.
0.15 m

1.30 m 1.30 m

1.15 m

- 1.80
0.23 m

2.61

The thickness of Base raft has to be provided

Materials Concrete M 25
Steel Fe 415

GL - IL = 1.15 m

Total Thickness Of Base Slab = 0.230 m

Unit weight Reinforced Concrete = 25.0 kN/m2

Upward pressure

8
Project SEWAGE TREATMENT FACILITIES

Client STEEL AUTHORITY OF INDIA


SLUDGE DRIYING BED
Subject

Upward pressure (1.15+0.23) 0.92 x 9.81 9.03 kN/m2

Downward pressure

Weight of Slab (0.23*25) = 0.23 x 25.00 5.75 kN/m2

Total Downward Pressure 5.75 kN/m2

9
Project SEWAGE TREATMENT FACILITIES

Client STEEL AUTHORITY OF INDIA


SLUDGE DRIYING BED
Subject

Net upward pressure on slab 9.03 - 5.75 = 14.78 kN/m2


[ Downward presure - Upward pressure] (Acting Upwards)

Note : The base slab is designed for the net pressure acting upwards

DESIGN OF BASE SLAB


Net upward pressure on slab = 14.78 kN/m2
Here the aspect ratio Ly/Lx is less than 2 and hence the slab is designed as a two way slab.

Four Edges Discontinuous:

Basic dimensions of slab = Lx Ly


2.00 m 2.605 m
Basic Ly/Lx ratio = 1.3 < 2 two way
Hence designed as two way slab
Clear cover to reinforcement d' = 25 mm
Provided overall depth D = 230 mm
Effective depth d = 200 mm
Diameter of bar f = 10 mm

Grade of Concrete fck = 25 N/mm²


Grade of Steel fy = 415 N/mm²

Load calculation :
Total upward pressure on slab = 14.78 kN/m²

Moment and Area of Steel calculations:

Span Moment Mu
Coefficient kN.m
shorter ax neg 0.000 0.00
ax pos 0.079 4.67
longer ay neg 0.000 0.00
ay pos 0.056 3.31

Depth required at base Moment Consideration

d = 4.67 x 106 57.9 mm


1000 x 1.39 =

Hence provide 230 mm @ bottom SAFE

Effectiv depth = 230 -25-10/2 = 200 mm

Moment and Area of Steel calculations:

MH = 4.67 kN-m
Min. Reinforcement

10
Project SEWAGE TREATMENT FACILITIES

Client STEEL AUTHORITY OF INDIA


SLUDGE DRIYING BED
Subject
Ast = 4.67 x 106 100
150x0.9x200 0.325
Ast = 155.17 mm2

For 230 mm the req. percentage is 0.279 % AS PER IS 1370 PAR


Provide Minimum area of steel for 100 mm - 0.3 %
Min Ast = 0.279 x 1000 x (1/2) x 200 for 450 mm - 0.2 %
100
Ast = 320.4 mm2

11
Project SEWAGE TREATMENT FACILITIES

Client STEEL AUTHORITY OF INDIA


SLUDGE DRIYING BED
Subject
Ast reqd Min Ast Dia of bar Spacing Ast pro
On each
mm² Face mm mm mm²
155.17 320 10 200 392.70
392.70 SAFE
Hence provide 10 mm dia at 200 mm spacing
Design Of Wall
Soil Data :
Safe Bearing Capacity as per Soil = 200 KN / m2
Report

Assume Thickness of Wall @ Top : = 0.150 m

Assume Thickness of Wall @ Bottom : = 0.150 m

Size of Tank = 2.61 x 2.00 m

MOMENT COEFFICIENT FOR VERTICAL REINFORCEMENT

CASE 1 :
Base is Fixed & Top free K - BY INTERPOLATIO
2
Max Vertical Moment @ base on water face : 0.086
Y=0 , X/a=1
Mvi = K x 9.81 x H3 K value from Table 3
IS-3370 Part IV 1967
= 1.86 kN-m k =0.0862

Max Vertical Moment @ 1.30 m from top on water face : K - BY INTERPOLATIO


2
Mvi = K x 9.81 x H3 K value from Table 3 0.100
IS-3370 Part IV 1967 Y=b/2 , X/a=1/2
= 1.48 kN-m k =0.0993

Max Vertical Moment @ base away from water face : K - BY INTERPOLATIO


2
Mvo = K x 9.81 x H3 K value from Table 3 0.015
IS-3370 Part IV 1967 Y=0 , X/a=1/2
= 0.22 kN-m k =0.0150

Max Vertical Moment @ 1.30 m from top away from water face : K - BY INTERPOLATIO
2
Mvo = K x 9.81 x H3 K value from Table 3 0.013
IS-3370 Part IV 1967 Y=0 , X/a=1/4
= 0.19 kN-m k =0.0130

From the Above Two Cases


Max Vertical Moment @ base on water face : 1.86 kN-m

Max Vertical Moment @ 1.30 m from top on water face : 1.48 kN-m

Max Vertical Moment @ base away from water face : 0.22 kN-m

12
Project SEWAGE TREATMENT FACILITIES

Client STEEL AUTHORITY OF INDIA


SLUDGE DRIYING BED
Subject

Max Vertical Moment @ 1.30 m from top away from water face : 0.19 kN-m

Depth required at base Moment Consideration


d = 1.86 x 106 = 36.50 mm
1000x 1.39

Hence provide 150 mm @ bottom SAFE

13
Project SEWAGE TREATMENT FACILITIES

Client STEEL AUTHORITY OF INDIA


SLUDGE DRIYING BED
Subject

Depth required at Top Moment Consideration

d = 1.48 x 106 = 32.60 mm


1000 x 1.39
Hence provide 150 mm @ top SAFE

Provide thickness @ botttom as 150 mm


Provide thickness @ top as 150 mm
Effec. Depth =150 - 40 - 5 120 mm @ bottom
Effec. Depth =150 -40 - 5 120 mm @ Top

VERTICAL REINFORCEMENT ON WATER FACE @ BASE

Moment and Area of Steel calculations:


Mvi = 1.86 kN-m

Ast = 1.86 x 106


150x0.9x 120

Ast = 118.3 mm2 Min. Reinforcement


100
By Interpolation from IS 3370 Page 13 0.3
0.30% for 100 mm
0.20% for 450 mm

For 150 mm the req. percentage is 0.286 % AS PER IS 1370 PART IV


Provide Minimum area of steel for 100 mm - 0.3 %
Min Ast = 0.286 x 1000 x (1/2) x 150 for 450 mm - 0.2 %
100

Ast = 428.6 mm2


Ast reqd Min Ast Dia of bar Spacing Ast pro
mm² mm² mm mm mm²
118 429 10 150 523.60
523.60 SAFE
H Provide 10 mm dia at 150 mm spacing

VERTICAL REINFORCEMENT ON WATER FACE @ 1.30 m FROM TOP


Moment and Area of Steel calculations:
Mvi = 1.48 kN-m
Ast = 1.48 x 106
150x1.4x 120

Ast required = 59.06 mm2 Min. Reinforcement


100
By Interpolation from IS 3370 Page 13 0.3
0.30% for 100 mm
0.20% for 450 mm
For 150 mm the req. percentage is 0.286 % AS PER IS 1370 PART IV
Provide Minimum area of steel for 100 mm - 0.3 %
Min Ast = 0.286 x 1000 x (1/2) x 150 for 450 mm - 0.2 %
100

14
Project SEWAGE TREATMENT FACILITIES

Client STEEL AUTHORITY OF INDIA


SLUDGE DRIYING BED
Subject
Ast = 214 mm2
Ast reqd Min Ast Dia of bar Spacing Ast pro
mm² mm² mm mm mm²
59.06 214.29 10 150 523.60 SAFE

Hence provide 10 mm dia at 150 mm spacing

VERTICAL REINFORCEMENT AWAY FROM WATER FACE @ BASE


Moment and Area of Steel calculations:
Mvo = 0.22 kN-m

15
Project SEWAGE TREATMENT FACILITIES

Client STEEL AUTHORITY OF INDIA


SLUDGE DRIYING BED
Subject

Ast = 0.22 x 106


190x1x 120 mm
Ast = 10.02 mm2

Ast reqd MIN Dia of bar Spacing Ast pro


mm² Ast mm mm mm²
10.02 428.57 10 150 523.60 SAFE

Hence provide 10 mm dia at 150 mm spacing


VERTICAL REINFORCEMENT AWAY FROM WATER FACE @ 1.30 m FROM TOP
Moment and Area of Steel calculations:
Mvo = 0.19 kN-m
Ast = 0.19 x 106
190x1x 120 mm
Ast = 8.70 mm2

Ast reqd MIN Dia of bar Spacing Ast pro


mm² Ast mm mm mm²
8.70 214.29 10 150 523.60 SAFE

Hence provide 10 mm dia at 150 mm spacing

MOMENT COEFFICIENT FOR HORIZONTAL REINFORCEMENT


x5 x2 x1 x3, x4
CASE 1 :
Base is Fixed & Top free
Max Horizontal Moment @ base on water face : K - BY INTERPOLATIO
2
MHI = K x 9.81 x H3 K value from Table 3 0.06
IS-3370 Part IV 1967 Y=b/2 , X/a=0
= 1.30 kN-m k =0.06011

Max Horizontal Moment @ 1.30 m from top on water face : K - BY INTERPOLATIO


2
MHI = K x 9.81 x H3 K value from Table 3 0.049
IS-3370 Part IV 1967 Y=b/2 , X/a=1/2
= 1.06 kN-m k =0.04903

Max Horizontal Moment @ base away from water face :


K - BY INTERPOLATIO
MHO = K x 9.81 x H3 K value from Table 3 2
IS-3370 Part IV 1967 0.027
= 0.58 kN-m k =0.02700 Y=0 , X/a=0

Max Horizontal Moment @ 1.30 m from top away from water face :
K - BY INTERPOLATIO
MHO = K x 9.81 x H 3
K value from Table 3 2
IS-3370 Part IV 1967 0.016
= 0.34 kN-m k =0.01598 Y=0 , X/a=1/2

From the Above Two Cases

16
Project SEWAGE TREATMENT FACILITIES

Client STEEL AUTHORITY OF INDIA


SLUDGE DRIYING BED
Subject
Max Horizontal Moment : at base 1.30 kN-m
Max Horizontal Moment : at top 1.06 kN-m

Depth required at Top from Horizontal Moment Consideration


d = 0.648 x 106 = 21.56 mm
1000 x 1.39

Hence provide 150 mm @ top SAFE


Provide thickness @ top as 150 mm
Effec. Depth =150 - 50 - 5 120 mm @ Top

17
Project SEWAGE TREATMENT FACILITIES

Client STEEL AUTHORITY OF INDIA


SLUDGE DRIYING BED
Subject

HORIZONTAL REINFORCEMENT @ BASE

Moment and Area of Steel calculations:


MH = 1.30 kN-m

Ast = 1.30 x 106


150x1.4x 120

Ast = 51.63 mm2


Ast on
Eachface = 25.82 mm2

Ast reqd MIN Dia of bar Spacing Ast pro .


mm² Ast mm mm mm²
25.82 428.57 10 175 448.80
448.80 SAFE
Hence provide 10 mm dia at 175 mm spacing

HORIZONTAL REINFORCEMENT @ Top

Moment and Area of Steel calculations:


MH = 1.06 kN-m

Ast = 1.06 x 106


150x1.4x 120 mm
Ast = 42.12 mm2
Ast on
Eachface = 21.06 mm2

Ast reqd MIN Dia of bar Spacing Ast pro


mm² Ast mm mm mm²
21.06 214.29 10 175 448.80

448.80 SAFE
Hence provide 10 mm dia at 175 mm spacing

CHECK FOR UPLIFT:


Downward load:
Wall allround = 9.810 X 0.15 X 1.30 X x 25 = 47.82
Base slab = 2.905 X 2.30 X 0.23 X x 25 = 38.42
Projection 11.610 X 0.15 X 1.30 X x 18 = 40.75
Total Downward load 126.99
Upward Pressure:
Total area x ht x unit wt. of water

2.905 X 2.300 X 1.300 X 9.81 = 85.21

Uplift = Total Downward load


Total Upward load
18
Project SEWAGE TREATMENT FACILITIES

Client STEEL AUTHORITY OF INDIA


SLUDGE DRIYING BED
Subject

Uplift = 1.49 %
>1.20% HENCE SAFE

19
Rev Date

0 4.12.12

20
Rev Date

0 4.12.12

21
Rev Date

0 4.12.12

Min. Reinforcement

22
Rev Date

0 4.12.12
450 230 mm
0.2 0.279

AS PER IS 1370 PAR


for 100 mm - 0.3 %
for 450 mm - 0.2 %

23
Rev Date

0 4.12.12

b= 2.61 m
a= 1.30 m

b/a = 2.004

K - BY INTERPOLATION
2.5 2.004
0.108 0.0862
Y=0 , X/a=1

K - BY INTERPOLATION
2.5 2.004
0.011 0.0993
Y=b/2 , X/a=1/2

K - BY INTERPOLATION
2.5 2.004
0.011 0.0150
Y=0 , X/a=1/2

K - BY INTERPOLATION
2.5 2.004
0.012 0.01299
Y=0 , X/a=1/4

24
Rev Date

0 4.12.12

25
Rev Date

0 4.12.12

Min. Reinforcement
450 150 mm
0.2 0.286

S PER IS 1370 PART IV


for 100 mm - 0.3 %
for 450 mm - 0.2 %

Min. Reinforcement
450 150 mm
0.2 0.286

AS PER IS 1370 PART IV


for 100 mm - 0.3 %
for 450 mm - 0.2 %

26
Rev Date

0 4.12.12

27
Rev Date

0 4.12.12

FROM TOP

K - BY INTERPOLATION
2.5 2.004
0.074 0.0601
Y=b/2 , X/a=0

K - BY INTERPOLATION
2.5 2.004
0.053 0.0490
Y=b/2 , X/a=1/2

K - BY INTERPOLATION
2.5 2.004
0.027 0.0270
Y=0 , X/a=0

K - BY INTERPOLATION
2.5 2.004
0.014 0.0160
Y=0 , X/a=1/2

28
Rev Date

0 4.12.12

29
Rev Date

0 4.12.12

kN
kN
kN

kN

30
Rev Date

0 4.12.12

31
PROJECT SEWAGE TREATMENT PLAT EQUIPMENT FOUNDATION OF TANK 4,5,6 & 14
CLINT BHEL TRICHY , THRUMAYAM

Description :

It is a rectangular tank of size


6.00 m x 2.00 m x 4.30 m

Note : It is designed as a water retaining Structure for cracked condition .


The structure is shoud checked for Uplift

Finsihed Ground Level ( FGL ) : - 100.70 m Lvl

Top level of Tank wall : - 104.10 m Lvl

Top of Base Slab : - 99.80 m Lvl

Size of theTank : 6.00 m x 2.00 m

Height of the tank : 4.30 m

Unit weight of concrete 25.00 KN /m3

Unit weight of water 9.81 KN /m3

Free board of Water tank 0.30 m

+ 104.10 m Lvl

.
0.30 m
4.30 m 4.30 m

4.00 m

+ 99.80
0.30 m

6.00 ALL DIMENSION AND LEVELS ARE IN

The thickness of Base raft has to be provided


PROJECT SEWAGE TREATMENT PLAT EQUIPMENT FOUNDATION OF TANK 4,5,6 & 14
CLINT BHEL TRICHY , THRUMAYAM
Materials Concrete M 25
Steel Fe 415

GL - IL = 4.00

Total Thickness Of Base Slab = 0.30

Unit weight Reinforced Concrete = 25.0

Upward pressure

Upward pressure (4+0.3) = 4.00 x 9.81 39.24


PROJECT SEWAGE TREATMENT PLAT EQUIPMENT FOUNDATION OF TANK 4,5,6 & 14
CLINT BHEL TRICHY , THRUMAYAM
Downward pressure

Weight of Slab (0.3*25) = 0.30 x 25.00 7.5

Total Downward Pressure 7.5

Net upward pressure on slab = 39.24 - 7.50 = 46.74


[ Downward presure - Upward pressure] (Acting Upwards)

Note : The base slab is designed for the net pressure acting upwards

DESIGN OF BASE SLAB

Net upward pressure on slab = 46.74 kN/m2


Here the aspect ratio Ly/Lx is less than 2 and hence the slab is designed as a one way slab.

Four Edges Discontinuous:

Basic dimensions of slab = Lx Ly


2.00 m 6.00 m
Basic Ly/Lx ratio = 3.000 >=2
Hence designed as two way slab
Clear cover to reinforcement d' = 25
Provided overall depth D = 350
Effective depth d = 270
Diameter of bar f = 10

Grade of Concrete fck = 25


Grade of Steel fy = 415

Load calculation :

Total upward pressure on slab = 46.74

Moment and Area of Steel calculations:

Span Moment Mu
Coefficient kN.m
PROJECT SEWAGE TREATMENT PLAT EQUIPMENT FOUNDATION OF TANK 4,5,6 & 14
CLINT BHEL TRICHY , THRUMAYAM
shorter ax neg 0.000 0.00
ax pos 0.125 23.37
longer ay neg 0.000 0.00
ay pos 0.125 23.37

Depth required at base Moment Consideration

d = 23.37 x 106 = 129.5 mm


1000 x 1.39

Hence provide 300 mm @ bottom


PROJECT SEWAGE TREATMENT PLAT EQUIPMENT FOUNDATION OF TANK 4,5,6 & 14
CLINT BHEL TRICHY , THRUMAYAM
Effectiv depth = 300 -25-10/2 = 270 mm

Moment and Area of Steel calculations:

MH = 23.37 kN-m

Ast = 23.37 x 106


150x0.9x270
Ast = 595.47 mm2

For 300 mm the req. percentage is 0.254 %


Provide Minimum area of steel for 100 mm - 0.3 %
Min Ast = 0.254 1000 x (1/2) x 270
100

Ast = 380.4 mm2

Ast reqd Min Ast Dia of bar Spacing Ast pro


On each
mm² Face mm mm mm²
595.47 380 12 150 753.98
753.98
Hence provide 12 mm dia at 150 mm spacing

Design Of Wall

Soil Data :
Safe Bearing Capacity as per Soil = 150.00
Report

Assume Thickness of Wall @ Top : = 0.250

Assume Thickness of Wall @ Bottom : = 0.250

Size of Tank = 6.00

MOMENT COEFFICIENT FOR VERTICAL REINFORCEMENT

CASE 1 :
Base is Fixed & Top free

Max Vertical Moment @ base on water face :


Y=0 , X/a=1
PROJECT SEWAGE TREATMENT PLAT EQUIPMENT FOUNDATION OF TANK 4,5,6 & 14
CLINT BHEL TRICHY , THRUMAYAM
Mvi = K x 9.81 x H3 K value from Table 3
IS-3370 Part IV 1967
= 34.25 kN-m k =0.0546

Max Vertical Moment @ 4.30 m from top on water face :

Mvi = K x 9.81 x H3 K value from Table 3


IS-3370 Part IV 1967 Y=b/2 , X/a=1/2
= 4.76 kN-m k =0.0076

Max Vertical Moment @ base away from water face :

Mvo = K x 9.81 x H3 K value from Table 3


IS-3370 Part IV 1967 Y=0 , X/a=1/2
= 9.52 kN-m k =0.0152
PROJECT SEWAGE TREATMENT PLAT EQUIPMENT FOUNDATION OF TANK 4,5,6 & 14
CLINT BHEL TRICHY , THRUMAYAM

Max Vertical Moment @ 4.30 m from top away from water face :

Mvo = K x 9.81 x H3 K value from Table 3


IS-3370 Part IV 1967 Y=0 , X/a=1/4
= 4.23 kN-m k =0.0067

From the Above Two Cases

Max Vertical Moment @ base on water face : 34.25

Max Vertical Moment @ 4.30 m from top on water face : 4.76

Max Vertical Moment @ base away from water face : 9.52

Max Vertical Moment @ 4.30 m from top away from water f 4.23

Depth required at base Moment Consideration

d = 34.25 x 106 = 156.8 mm


1000x 1.39

Hence provide 250 mm @ bottom

Depth required at Top Moment Consideration

d = 4.76 x 106 = 58.44 mm


1000 x 1.39

Hence provide 250 mm @ top

Provide thickness @ botttom as 250 mm


Provide thickness @ top as 250 mm

Effec. Depth =250 - 40 - 5 220 mm @ bottom


Effec. Depth =250 -40 - 5 220 mm @ Top

VERTICAL REINFORCEMENT ON WATER FACE @ BASE

Moment and Area of Steel calculations:


PROJECT SEWAGE TREATMENT PLAT EQUIPMENT FOUNDATION OF TANK 4,5,6 & 14
CLINT BHEL TRICHY , THRUMAYAM
Mvi = 34.25 kN-m

Ast = 34.25 x 106


150x0.9x 220

Ast = 1130.16 mm2

By Interpolation from IS 3370 Page 13


0.30% for 100 mm
0.20% for 450 mm

For 250 mm the req. percentage is 0.257 %


Provide Minimum area of steel
Min Ast = 0.257 1000 x (1/2) x 250
100
PROJECT SEWAGE TREATMENT PLAT EQUIPMENT FOUNDATION OF TANK 4,5,6 & 14
CLINT BHEL TRICHY , THRUMAYAM

Ast = 321.43 mm2


Ast reqd Min Ast Dia of bar Spacing Ast pro
mm² mm² mm mm mm²
1130.16 321.43 12 100 1130.97
1130.97
Provide 12 mm dia at 100 mm spacing

VERTICAL REINFORCEMENT on WATER FACE@ 4.30 m FROM TOP


Moment and Area of Steel calculations:
Mvi = 4.76 kN-m

Ast = 4.76 x 106


150x1.4x 220

Ast required = 103.48 mm2

By Interpolation from IS 3370 Page 13


0.30% for 100 mm
0.20% for 450 mm
For 250 mm the req. percentage is 0.257 %
Provide Minimum area of steel
Min Ast = 0.257x 1000 x (1/2) x 250
100
Ast = 321.43 mm2

Ast reqd Min Ast Dia of bar Spacing Ast pro


mm² mm² mm mm mm²
103.48 321.43 12 200 565.49

Hence provide 12 mm dia at 200 mm spacing

VERTICAL REINFORCEMENT AWAY FROM WATER FACE @ BASE


Moment and Area of Steel calculations:
Mvo = 9.52 kN-m

Ast = 9.52 x 106


190x1x 220 mm
Ast = 233.00 mm2

Ast reqd MIN Dia of bar Spacing Ast pro


mm² Ast mm mm mm²
233.00 321.43 12 200 565.49
PROJECT SEWAGE TREATMENT PLAT EQUIPMENT FOUNDATION OF TANK 4,5,6 & 14
CLINT BHEL TRICHY , THRUMAYAM

Hence provide 12 mm dia at 200 mm spacing

VERTICAL REINFORCEMENT AWAY FROM WATER FACE @ 4.30 m


Moment and Area of Steel calculations:
Mvo = 4.23 kN-m

Ast = 4.23 x 106


190x1x 220 mm
Ast = 103.63 mm2

Ast reqd MIN Dia of bar Spacing Ast pro


mm² Ast mm mm mm²
103.63 321.43 12 200 565.49

Hence provide 12 mm dia at 200 mm spacing


PROJECT SEWAGE TREATMENT PLAT EQUIPMENT FOUNDATION OF TANK 4,5,6 & 14
CLINT BHEL TRICHY , THRUMAYAM

x5 x2 x1 x3, x4
MOMENT COEFFICIENT FOR HORIZONTAL REINFORCEMENT

CASE 1 :
Base is Fixed & Top free

Max Horizontal Moment @ base on water face :

MHI = K x 9.81 x H3 K value from Table 3


IS-3370 Part IV 1967 Y=b/2 , X/a=0
= 27.61 kN-m k =0.03540

Max Horizontal Moment @ 4.30 m from top on water face :

MHI = K x 9.81 x H3 K value from Table 3


IS-3370 Part IV 1967 Y=b/2 , X/a=1/2
= 29.49 kN-m k =0.03781

Max Horizontal Moment @ base away from water face :

MHO = K x 9.81 x H3 K value from Table 3


IS-3370 Part IV 1967
= 14.42 kN-m k =0.01849 Y=0 , X/a=0

Max Horizontal Moment @ 4.30 m from top away from water face :

MHO = K x 9.81 x H3 K value from Table 3


IS-3370 Part IV 1967
= 12.15 kN-m k =0.01558 Y=0 , X/a=1/2

From the Above Two Cases

Max Horizontal Moment : at base 27.61


Max Horizontal Moment : at top 29.49

Depth required at Top from Horizontal Moment Consideration

d = 14.747 x 106 = 102.86 mm


1000 x 1.39

Hence provide 250 mm @ top


PROJECT SEWAGE TREATMENT PLAT EQUIPMENT FOUNDATION OF TANK 4,5,6 & 14
CLINT BHEL TRICHY , THRUMAYAM
Provide thickness @ top as 250 mm

Effec. Depth =250 - 50 - 5 220 mm @ Top

HORIZONTAL REINFORCEMENT @ BASE

Moment and Area of Steel calculations:


MH = 27.61 kN-m

Ast = 27.61 x 106


150x1.4x 220

Ast = 600.20 mm2


Ast on
Eachface = 300.10 mm2
PROJECT SEWAGE TREATMENT PLAT EQUIPMENT FOUNDATION OF TANK 4,5,6 & 14
CLINT BHEL TRICHY , THRUMAYAM

Ast reqd MIN Dia of bar Spacing Ast pro


mm² Ast mm mm mm²
300.10 321.43 10 175 448.80
448.80
Hence provide 10 mm dia at 175 mm spacing

HORIZONTAL REINFORCEMENT @ Top

Moment and Area of Steel calculations:


MH = 29.49 kN-m

Ast = 29.49 x 106


150x1.4x 220 mm

Ast = 641.21 mm2


Ast on
Eachface = 320.60 mm2

Ast reqd MIN Dia of bar Spacing Ast pro


mm² Ast mm mm mm²
320.60 321.43 10 175 448.80
0 1 0.00
448.80
Hence provide 10 mm dia at 175 mm spacing

Check Uplift Calculation : x5 x2 x1 x3, x2


x5 x4 x1 x3, x4

Down Ward Weight of tank :

Self wt. of tank wall


((6.00 +0.25)+(2+.25))x2 =17 m x4.30m x 0.25x25 kn/m3 = 456.88

Self wt. of tank base slab


6.50 x 6.50 x 0.3 = 316.88

Self wt. of soil allround


(6.0 x 2+0.50 0.3) x 0.9 x0.30 x18 kn/m3 = 42.76
816.51

Weiht of water :
6.50 x 6.50 x 1.1 x 9.81 kn/cu.m) = 455.920
PROJECT SEWAGE TREATMENT PLAT EQUIPMENT FOUNDATION OF TANK 4,5,6 & 14
CLINT BHEL TRICHY , THRUMAYAM
816.51
Uplift =
455.920

= 1.79

Hence Safe
ANK 4,5,6 & 14

DIMENSION AND LEVELS ARE IN M


ANK 4,5,6 & 14

kN/m2 .

kN/m2
ANK 4,5,6 & 14

kN/m2

kN/m2

kN/m2
ting Upwards)

as a one way slab.

One Way
as two way slab
mm
mm
mm
mm

N/mm²
N/mm²

kN/m²
ANK 4,5,6 & 14

SAFE
ANK 4,5,6 & 14

Min. Reinforcement
100 450 300 mm
0.325 0.2 0.25357

AS PER IS 1370 PART IV


for 100 mm - 0.3 %
for 450 mm - 0.2 %

SAFE

KN / m2 (Assume )

x 2.00 m b= 6.00 m
a= 4.30 m

b/a = 1.4

K - BY INTERPOLATION
1.5 1.25 1.395
0.06 0.047 0.0546
Y=0 , X/a=1
ANK 4,5,6 & 14

K - BY INTERPOLATION
1.5 1.25 1.395
0.008 0.007 0.00758
Y=b/2 , X/a=1/2

K - BY INTERPOLATION
1.5 1.25 1.395
0.016 0.014 0.01516
Y=0 , X/a=1/2
ANK 4,5,6 & 14

K - BY INTERPOLATION
1.5 1.25 1.395
0.008 0.005 0.00674
Y=0 , X/a=1/4

kN-m

kN-m

kN-m

kN-m

SAFE

SAFE
ANK 4,5,6 & 14

Min. Reinforcement
100 450 250 mm
0.3 0.2 0.257

AS PER IS 1370 PART IV


for 100 mm - 0.3 %
for 450 mm - 0.2 %
ANK 4,5,6 & 14

SAFE

Min. Reinforcement
100 450 250 mm
0.3 0.2 0.257

AS PER IS 1370 PART IV


for 100 mm - 0.3 %
for 450 mm - 0.2 %

SAFE

SAFE
ANK 4,5,6 & 14

FROM TOP

SAFE
ANK 4,5,6 & 14

K - BY INTERPOLATION
1.5 1.25 1.395
0.04 0.029 0.0354
Y=b/2 , X/a=0

K - BY INTERPOLATION
1.5 1.25 1.395
0.042 0.032 0.0378
Y=b/2 , X/a=1/2

K - BY INTERPOLATION
1.5 1.25 1.395
0.021 0.015 0.0185
Y=0 , X/a=0

K - BY INTERPOLATION
1.5 1.25 1.395
0.016 0.015 0.0156
Y=0 , X/a=1/2

kN-m
kN-m

SAFE
ANK 4,5,6 & 14
ANK 4,5,6 & 14

SAFE

SAFE

x3, x4 w4

KN

KN
ANK 4,5,6 & 14

> 1.20
Horizontal Vertical Horizontal
Node L/C Fx kN Fy kN Fz kN
1100 1.0 D.L + 0.3 L.L
0.689 9.542 0.284 1 WEIGHT 10.515
2100 1.0 D.L + 0.3 L.L
0.491 9.542 0.847 2 WEIGHT 10.88
3100 1.0 D.L + 0.3 L.L
0.057 29.832 3.926 3 WEIGHT 33.815
4100 1.0 D.L + 0.3 L.L
1.153 38.228 0.362 4 WEIGHT 39.743
5100 1.0 D.L + 0.3 L.L
0.268 29.594 0.134 5 WEIGHT 29.996
6100 1.0 D.L + 0.3 L.L
0.997 58.513 0.151 6 WEIGHT 59.661
7100 1.0 D.L + 0.3 L.L
0.071 29.537 1.034 7 WEIGHT 30.642
8100 1.0 D.L + 0.3 L.L
0.944 58.578 0.244 8 WEIGHT 59.766
9100 1.0 D.L + 0.3 44.552
L.L 158.734 39.571 9 WEIGHT 242.857
10100 1.0 D.L + 0.3 42.979
L.L 164.918 43.808 10 WEIGHT 251.705
13100 1.0 D.L + 0.3 L.L
0.689 9.542 0.291 13 WEIGHT 10.522
14100 1.0 D.L + 0.3 L.L
0.491 9.542 1.156 14 WEIGHT 11.189
15100 1.0 D.L + 0.3 L.L
0.057 29.82 3.934 15 WEIGHT 33.811
16100 1.0 D.L + 0.3 L.L
1.153 46.459 0.226 16 WEIGHT 47.838
17100 1.0 D.L + 0.3 L.L
0.268 29.597 0.152 17 WEIGHT 30.017
18100 1.0 D.L + 0.3 L.L
0.997 58.585 0.047 18 WEIGHT 59.629
19100 1.0 D.L + 0.3 L.L
0.07 29.603 0.486 19 WEIGHT 30.159
20100 1.0 D.L + 0.3 L.L
0.944 58.57 0.218 20 WEIGHT 59.732
21100 1.0 D.L + 0.3 44.539
L.L 158.987 39.007 21 WEIGHT 242.533
22100 1.0 D.L + 0.3 L.L43 164.908 43.84 22 WEIGHT 251.748
25100 1.0 D.L + 0.3 L.L
1.116 37.559 0.82 25 WEIGHT 39.495
26100 1.0 D.L + 0.3 L.L
0.032 37.565 0.172 26 WEIGHT 37.769
27100 1.0 D.L + 0.3 L.L
1.161 30.046 1.275 27 WEIGHT 32.482
29100 1.0 D.L + 0.3 L.L
1.116 37.56 0.842 29 WEIGHT 39.518
30100 1.0 D.L + 0.3 L.L
0.032 37.554 0.083 30 WEIGHT 37.669
31100 1.0 D.L + 0.3 L.L
1.16 38.411 1.319 31 WEIGHT 40.89
649100 1.0 D.L + 0.3 29.809
L.L 123.708 29.623 649 WEIGHT 183.14
650100 1.0 D.L + 0.3 29.544
L.L 123.72 29.679 650 WEIGHT 182.943
651100 1.0 D.L + 0.3 29.813
L.L 123.635 29.604 651 WEIGHT 183.052
652100 1.0 D.L + 0.3 L.L
29.52 123.695 29.683 652 WEIGHT 182.898

You might also like