0% found this document useful (0 votes)
684 views1 page

Modular Kitchen Quotation Details

The document is a proposal from S.G. Interior & Modular Kitchen for a modular kitchen for a client named Mr. Nilesh Rewale in Andheri that provides an estimate breakdown of materials, accessories, hardware, appliances and labor costs totaling Rs. 185,000 with terms of 75% advance payment, 20% before delivery, and 5% after installation.

Uploaded by

Sandesh Patil
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
684 views1 page

Modular Kitchen Quotation Details

The document is a proposal from S.G. Interior & Modular Kitchen for a modular kitchen for a client named Mr. Nilesh Rewale in Andheri that provides an estimate breakdown of materials, accessories, hardware, appliances and labor costs totaling Rs. 185,000 with terms of 75% advance payment, 20% before delivery, and 5% after installation.

Uploaded by

Sandesh Patil
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

S.G.

INTERIOR & MODULAR KITCHEN

PROPOSAL MODULAR KITCHEN Date : 24-Jun-19

NAME MR. Nilesh Rewale


ADDRESS Andheri

CONTACT NUMBERS

Kitchen Details
Base Marine ply with Laminet Glass DEALER SIDE
Wall unit Aluminium Stick Profile with Backpainted Glass Handles G-Section Handle
Loft Marine ply with Laminet Pelmet N/A
Shutter Colour Cornice N/A
Carcass MR PLY Spot Light N/A
Shutter Design 4SEB PL Lights N/A
Accessories SS 304 10 NOS. Kitchen CIVIL-MODULAR

Estimate
S.no Description Amount
1 Panel &Shelves 29395
2 Shutters 55974
3 Handles 8400
4 Pest Control 0
5 Accessories 31262
6 Hardware 24661
7 Wall Hanging Accessories 0

8 Spot Light
9 Pelmet Light
Sum Above 149691
Site Visit Charges 0 0
CASH DISCOUNT 10.0% -14969
Gross Total 134722
10 CHIMNEY 20490 18440
LUMEX 60 AUTOCLEAN (KAFF)
Discount 10.0%
11 HOB  19990 17990
HBR 604 A (KAFF)
Discount 10.0%
12 DISHWASHER 0 0
0
0 0.0%
13 OVEN 0 0
0
0 0.0%
14 SINK 0 0
0
0 0.0%
15 LABOUR & TRANSPORT LABOUR  16672
Grand Total 187824
FINAL AMOUNT 185000
Terms & Conditions:
1. Payment should be made 75% advance. 75%Advance 138750
2. The balance 20% before delivery 5% after installation. 20% Before Delivery 37000
3. One year free servise. 5% After instalation 9250
4. Work time 20days from advance.
5. Marin ply door water proof warranty.
6. Electric,Plumbing & Civil Area not include.
7. SS 304 Life time warranty for rusting.
8. Fictional warranty for GERMAN FITTING hardware.
9. This quotation is valid for one month only
Accepted
Thanking You,

Designer Customer's Signature

You might also like