0% found this document useful (0 votes)
94 views68 pages

Accepted Jobs SM Kashif Total 68

The document provides a summary of 68 accepted jobs for service management (SM). It includes a table listing work orders, descriptions, locations, statuses, service groups, quote dates, and work types. The highest number of accepted jobs are for rectification works (26), followed by repairs (20) and replacements (6).

Uploaded by

Rafeeq Wazir
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
94 views68 pages

Accepted Jobs SM Kashif Total 68

The document provides a summary of 68 accepted jobs for service management (SM). It includes a table listing work orders, descriptions, locations, statuses, service groups, quote dates, and work types. The highest number of accepted jobs are for rectification works (26), followed by repairs (20) and replacements (6).

Uploaded by

Rafeeq Wazir
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 68

Accepted jobs SM

Kashif 68
Total 68

Report SM Accepted jobs


Service Quote Sent Quote Work
SR Work Order Description Location WO Status Quote Status Work Type
Group Date Status Date Category

Access control door to the year


48730 107944 1 area (by the café) is not GWPS APPR SSM 13/06/2019 ACCEPTED 13/06/2019 SM RM
closing properly.
Compressor failed at the new
49099 111608 building staircase needs to be GWPS APPR A-V-MEP 20/06/2019 PENDING SM RM
replace
1000A TPN isolator handle
42018 72438 GWPS APPR A-V-MEP 25/02/2019 ACCEPTED 01/05/2019 SM RM
replacement for capector bank
YEAR 4 D AND YEAR 5 C
WINDOW CATTON IS FALL
46352 95699 GWPS APPR CVL 06/05/2019 ACCEPTED 06/05/2019 SM RM
DOWN NEED TO BE REFIX
ASAP.
Damaged ceiling tiles need to
47364 101490 JCD APPR A-V-CVL 14/05/2019 ACCEPTED 28/05/2019 SM SP
replace in all corridors.
Lab 5 AC compressor is not
49280 111793 JCD APPR A-V-MEP 20/06/2019 PENDING SM RM
working need to check
Lab 9 & 10 AC compressor and
49281 111794 expansion valve is not working JCD APPR A-V-MEP 20/06/2019 PENDING SM RM
need to rectify
SWJCD-002 Replacement of 9
42979 78385 JCD APPR A-V-MEP 24/03/2019 ACCEPTED 01/04/2019 SM SP
nos of Packaged AC in school
Door brackets and opening of
44681 85200 JCD APPR A-V-CVL 02/04/2019 ACCEPTED 09/06/2019 SM RM
emergency door
FAFF after ppm rectification
87342 JCD APPR A-V-SSM 08/04/2019 PENDING SM RM
works
’Recommissioning and
Maintenance of 9 nos of
45614 91418 JCD APPR A-V-MEP 23/04/2019 ACCEPTED 23/04/2019 SM SP
Packaged AC equipment till
end June 2019
Pressure switch need to be
46094 95138 JCD APPR A-V-SSM 01/05/2019 ACCEPTED 09/06/2019 SM RM
replace in fire jockey pump.
Requirement for fire
46476 97234 JCD APPR SSM 02/05/2019 ACCEPTED 13/05/2019 SM RM
extinguisher stand.
Glass Window required in
46825 97518 second floor between sixth JCD APPR A-V-CVL 08/05/2019 ACCEPTED 20/05/2019 SM SP
form ICT and HOD room.
Sport hall package AC
47946 105527 condenser fan motor is faulty JPS APPR A-V-MEP 26/05/2019 ACCEPTED 20/06/2019 SM RM
to be repair.
Main building ground floor Year
1 and Year 2 door finger guard
48623 107837 JPS APPR VAR-CVL 09/06/2019 ACCEPTED 10/06/2019 SM RM
broken need to replace and
need 5 set
after ppm rectification work
107954 JPS APPR SSM 18/06/2019 PENDING SM CM
-sliding door
99350 PPM rectification work JPS APPR A-V-SSM 01/05/2019 PENDING SM RM
Replacement of 2 MCP and 2
47068 99694 JPS APPR A-V-SSM 02/05/2019 ACCEPTED 26/05/2019 SM RM
emergency lights
Additional smoke detectors
45603 114294 OIS APPR SSM 20/06/2019 ACCEPTED 20/06/2019 SM RM
required in various locations
16949 20622 Provide 2 no’s of chairlift OIS APPR A-V-MEP 28/05/2018 ACCEPTED 26/08/2018 SM SP
Need to replace the old lights
45453 90868 with led lights give sufficient OIS APPR A-V-MEP 21/05/2019 ACCEPTED 26/05/2019 SM RM
light in the Ground floor
Blank Need to update
AM Jobs CM PM RM
the work type
Kashif 2 6 20 6
Shehlan 2 0 15 20
Total 4 6 35 26

Report - AM Jobs
Service Quote Sent
No SR Work Order Description Location WO Status Service Type Service Summary
Group Date

Replacement of Pre filters and MR-Submitted Ref no -


1 101541 DAA-N WAPPR AMC A-V-MEP AV-HVAC 19/05/2019
Bag Filters for FAHU - Phase 1 001606
Replacement of Pre Filters and MR-Submitted Ref no -
2 101542 DAA-N WAPPR AMC A-V-MEP AV-HVAC 25/05/2019
Bag filters for Utility block AHU 001607 not 001606
Replacement of Pre filter for MR- Submitted 001608 not
3 101543 DAA-N WAPPR AMC A-V-MEP AV-HVAC 25/05/2019
AHU units in Basement area 001607
Replacement of Pre Filters and
MR-Submitted Ref no -
4 101544 Bag Filters for AHU in Sports DAA-N WAPPR AMC A-V-MEP AV-HVAC 19/05/2019
001609
Block
GF -31 wash room tap not
5 49422 113401 DAA-N WAPPR AMC A-V-MEP AV-PLUM 20/06/2019 Materials
working need to be replace
6 99348 114074 PPM Lift - Monthly DAA-N WAPPR AMC SSM SM-ELEV
PPM Diesel Generator Testing
7 103512 114087 DAA-N WAPPR AMC MEP M-MECH
(20 Minutes) – Monthly
PPM Ladder Inspection –
8 101531 114098 DAA-N WAPPR AMC MEP M-MECH
Monthly
2nd floor and 3rd floor lights
9 49706 114204 not working in front of lift no DAA-N WAPPR AMC A-V-MEP AV-ELEC
03.
Light not working in 2nd floor
10 49707 114321 DAA-N WAPPR AMC A-V-MEP AV-ELEC
accounts office.
11 44766 114341 PPM FAFF - Quarterly DAA-N WAPPR AMC SSM SM-FAS

12 49157 111718 LV room AC not working GFS WAPPR AMC MEP M-HVAC

13 99341 114083 PPM Lift - Monthly GFS WAPPR AMC SSM SM-ELEV

14 44625 114344 PPM FAFF - Quarterly GFS WAPPR AMC SSM SM-FAS
PPM Ladder Inspection –
15 99398 114096 GIS INPRG AMC MEP M-MECH
Monthly
Reinforcement for TV screens
16 49294 111800 at staff rooms need to be GIS WAPPR AMC A-V-CVL AV-CARP
done.
Phase2 GF08 FCU not working
17 49554 113605 GIS WAPPR AMC A-V-MEP AV-HVAC
properly
Require power in admin male
18 49836 114188 GIS WAPPR AMC A-V-MEP AV-ELEC
washroom
Main reception near per desk
19 49969 114326 top Sheikh photos area need GIS WAPPR AMC A-V-CVL AV-PINT
paint
School signage need to
20 49970 114328 remove from the amphitheater GIS WAPPR AMC A-V-CVL AV-PINT
area wall
21 93161 PPM BMS Systems - Quarterly GIS WAPPR AMC SSM SM-BMS

22 97309 114085 PPM Lift - Monthly GWA WAPPR AMC SSM SM-ELEV

Big pool heat cool unit-1 is not


23 49891 114227 GWA WAPPR AMC A-V-MEP AV-HVAC
working. Gas is leaking

24 114343 PPM FAFF - Quarterly GWA WAPPR AMC SSM SM-FAS


5 nos rheem thermostats
25 48279 105807 GWPS WAPPR AMC A-V-MEP AV-HVAC 25/05/2019 waiting for materils
required at new building
FAHU 2 bms control is not
26 48836 109542 GWPS WAPPR AMC A-V-SSM AV-BMS
working need to be fix.
Multi purpose hall packej unit
27 49325 111827 no.7, 1nos. Compressor not GWPS WAPPR AMC A-V-MEP AV-HVAC
working.
Thermostat temperature
28 49701 113934 GWPS WAPPR AMC A-V-MEP AV-HVAC
sensors to be checked.
Main security gate on/off
29 49704 113935 switch is broken need to be GWPS WAPPR AMC A-V-MEP AV-ELEC
replace.
AC motor - S016 is not
30 49712 113954 GWPS WAPPR AMC A-V-MEP AV-HVAC
working.
PPM Ladder Inspection –
31 105601 114094 GWPS WAPPR AMC MEP M-MECH
Monthly
2 nos. Condenser fan blade
32 49793 114135 GWPS WAPPR AMC A-V-MEP AV-HVAC
required.
33 23243 114260 PPM FAFF - Quarterly GWPS WAPPR AMC SSM SM-FAS

34 97307 114086 PPM Lift - Monthly JCD WAPPR AMC SSM SM-ELEV

35 19866 114268 PPM FAFF - Quarterly JCD WAPPR AMC SSM SM-FAS
Security cabinet no. 1 window
36 49684 113917 AC is not working needs to be JPS WAPPR AMC A-V-MEP AV-HVAC
repaired
37 20920 114266 PPM FAFF - Quarterly JPS WAPPR AMC SSM SM-FAS
Swimming pool thermometer
38 49983 114335 JPS WAPPR AMC A-V-MEP AV-SPW
is not working
39 99381 114073 PPM Lift - Monthly LAB WAPPR AMC SSM SM-ELEV

40 44627 114342 PPM FAFF - Quarterly LAB WAPPR AMC SSM SM-FAS
Fcu not working in S091 class
41 49715 113952 MTS WAPPR AMC A-V-MEP AV-HVAC
room
ELCB tripping in second floor A
42 49721 113971 MTS WAPPR AMC A-V-MEP AV-ELEC
block neet to rectify.
43 23236 114264 PPM FAFF - Quarterly MTS WAPPR AMC SSM SM-FAS
Rectification of FAHU - PPM
44 95314 MTS WAPPR AMC A-V-MEP AV-HVAC 19/05/2019 Mr raised 001614
WO-93173
45 99399 114071 PPM Lift - Monthly NMS WAPPR AMC SSM SM-ELEV
PPM Diesel Generator Testing
46 90872 114092 NMS WAPPR AMC MEP M-MECH
(20 Minutes) – Monthly
47 19791 114271 PPM FAFF - Quarterly NMS WAPPR AMC SSM SM-FAS
48 49719 113964 AC temperature need to check NSB WAPPR AMC A-V-MEP AV-HVAC

49 99400 114070 PPM Lift - Monthly NSB WAPPR AMC SSM SM-ELEV
PPM Diesel Generator Testing
50 103495 114089 NSB WAPPR AMC MEP M-MECH
(20 Minutes) – Monthly
51 23240 114262 PPM FAFF - Quarterly NSB WAPPR AMC SSM SM-FAS

52 99401 114068 PPM Lift - Monthly NSG WAPPR AMC SSM SM-ELEV
PPM Diesel Generator Testing
53 103499 114088 NSG WAPPR AMC MEP M-MECH
(20 Minutes) – Monthly
54 23241 114261 PPM FAFF - Quarterly NSG WAPPR AMC SSM SM-FAS

55 19801 114270 PPM FAFF - Quarterly OIS WAPPR AMC SSM SM-FAS
Required to repaired faulty
56 45169 88853 WEK APPR AMC A-V-MEP AV-PLUM 02/05/2019 Quote sent - 2075
urinals.
Need to fully conseild all water
57 49079 111561 tap and drain point in fs area WEK WAPPR AMC A-V-MEP AV-PLUM
and zone 1 & 2 ground floor
Fix the Led Light cover in F029
58 49702 113979 WEK WAPPR AMC A-V-MEP AV-ELEC
at your earliest convenience.
59 93153 114084 PPM Lift - Monthly WEK WAPPR AMC SSM SM-ELEV
PPM Diesel Generator Testing
60 90870 114093 WEK WAPPR AMC MEP M-MECH
(20 Minutes) – Monthly
61 19809 114269 PPM FAFF - Quarterly WEK WAPPR AMC SSM SM-FAS
Required to change FCU motor
62 49921 114297 WEK WAPPR AMC A-V-MEP AV-HVAC
in A111.
Need to replace elcb & mcb in
63 49927 114298 WEK WAPPR AMC A-V-MEP AV-ELEC
DB zone 6 ground floor
Need to replace 26 w lamp in
64 49926 114299 WEK WAPPR AMC A-V-MEP AV-ELEC
washroom
Need to change 60 w circular
65 49925 114302 WEK WAPPR AMC A-V-MEP AV-ELEC
light in corridor
66 99409 114065 PPM Lift - Monthly WIN WAPPR AMC SSM SM-ELEV

67 12822 114273 PPM FAFF - Quarterly WIN WAPPR AMC SSM SM-FAS

68 99410 114064 PPM Lift - Monthly WIS WAPPR AMC SSM SM-ELEV
PPM Diesel Generator Testing
69 95222 114090 WIS WAPPR AMC MEP M-MECH
(20 Minutes) – Monthly
70 23237 114263 PPM FAFF - Quarterly WIS WAPPR AMC SSM SM-FAS

71 99317 PPM rectification of AC units WIS WAPPR AMC MEP M-MECH 19/05/2019 Mr raised 001613
Quote WO Creation Work
Quote Status Work Type Engineer
Status Date Date Category

08/05/2019 AM CM Kashif

08/05/2019 AM CM Kashif

08/05/2019 AM CM Kashif

08/05/2019 AM CM Kashif

16/06/2019 AM RM Kashif

18/06/2019 AM PM Kashif

18/06/2019 AM PM Kashif

18/06/2019 AM PM Kashif

19/06/2019 AM RM Kashif

20/06/2019 AM RM Kashif

20/06/2019 AM PM Kashif

11/06/2019 AM Kashif

18/06/2019 AM PM Kashif

20/06/2019 AM PM Kashif

18/06/2019 AM PM Shehlan

12/06/2019 AM RM Shehlan

17/06/2019 AM RM Shehlan

19/06/2019 AM RM Shehlan

20/06/2019 AM RM Shehlan
20/06/2019 AM RM Shehlan

09/04/2019 AM RM Shehlan

18/06/2019 AM PM Kashif

19/06/2019 AM RM Kashif

20/06/2019 AM PM Kashif

22/05/2019 AM RM Shehlan

02/06/2019 AM RM Shehlan

13/06/2019 AM RM Shehlan

18/06/2019 AM RM Shehlan

18/06/2019 AM RM Shehlan

18/06/2019 AM RM Shehlan

18/06/2019 AM PM Shehlan

19/06/2019 AM RM Shehlan

19/06/2019 AM PM Shehlan

18/06/2019 AM PM Shehlan

19/06/2019 AM PM Shehlan

17/06/2019 AM Shehlan

19/06/2019 AM PM Shehlan

20/06/2019 AM Shehlan

18/06/2019 AM PM Shehlan

20/06/2019 AM PM Shehlan

18/06/2019 AM RM Kashif

18/06/2019 AM RM Kashif

19/06/2019 AM PM Kashif

17/04/2019 AM CM Kashif

18/06/2019 AM PM Shehlan

18/06/2019 AM PM Shehlan

19/06/2019 AM PM Shehlan
18/06/2019 AM Kashif

18/06/2019 AM PM Kashif

18/06/2019 AM PM Kashif

19/06/2019 AM PM Kashif

18/06/2019 AM PM Kashif

18/06/2019 AM PM Kashif

19/06/2019 AM PM Kashif

19/06/2019 AM PM Shehlan

ACCEPTED 07/05/2019 24/03/2019 AM RM Shehlan

10/06/2019 AM RM Shehlan

18/06/2019 AM RM Shehlan

18/06/2019 AM PM Shehlan

18/06/2019 AM PM Shehlan

19/06/2019 AM PM Shehlan

20/06/2019 AM RM Shehlan

20/06/2019 AM RM Shehlan

20/06/2019 AM RM Shehlan

20/06/2019 AM RM Shehlan

18/06/2019 AM PM Kashif

19/06/2019 AM PM Kashif

18/06/2019 AM PM Kashif

18/06/2019 AM PM Kashif

19/06/2019 AM PM Kashif

28/04/2019 AM CM Kashif
Waiting for approval SM Expired
Kashif 70 27
Shehlan 19 4
Total 89

Report SM Waiting for Approval


Service Quote Sent Price
No SR Work Order Description Location WO Status Service Type Service Expired
Group Date Estimate

Fire exit in the ground floor


1 48629 107887 DAA-N WAPPR AMC A-V-CVL AV-MISC 18/06/2019 17/08/2019 977.00
library lock is broken.
Replacing broken urinal divider
2 49256 111773 DAA-N WAPPR AMC A-V-MEP AV-PLUM 18/06/2019 17/08/2019 2,090.05
at SF 014 with new one
Kindly rectify the issue of push
3 45012 90854 bottom of door G 31, F49, at DAA-N WAPPR AMC CVL C-MISC 29/05/2019 28/07/2019 9,200.00
the earliest.
2 recrectable include a door
4 46156 95229 selector for external double DAA-N WAPPR AMC A-V-CVL AV-MSN 29/05/2019 28/07/2019 21,646.10
door
Need to remove Art room2
5 47207 101370 GFS WAPPR AMC CVL C-PINT 12/06/2019 11/08/2019 4,600.00
wall cupboard
SW GFS013 Mid-height
6 49357 111850 handrails for stairwells G to FF GFS WAPPR AMC A-V-CVL AV-MISC 17/06/2019 16/08/2019 25,300.00
for 8 stairwells
Light sensor in year 7E is not
7 43426 82811 GFS WAPPR AMC A-V-SSM AV-LCS 30/05/2019 29/07/2019 4,025.00
working
Building expansion joint
8 45011 87340 support need to fix in year 3N GFS WAPPR AMC CVL C-MISC 11/04/2019 10/06/2019 2,483.30
ceiling
14 nos. fled lights are not
9 47832 103663 GWA WAPPR AMC A-V-MEP AV-ELEC 10/06/2019 09/08/2019 19,255.80
working in sports field
Football court upstand
10 41561 70483 interlock and concreting to be GWA WAPPR AMC A-V-CVL AV-MISC 15/05/2019 14/07/2019 78,236.30
done along with hand rail.
Need to repair the E Block
11 42273 72798 GWA WAPPR AMC A-V-CVL AV-MISC 14/05/2019 13/07/2019 6,538.90
W303 Men’s toilet, broken tile
12 44458 84677 Fountain motor reception area GWA WAPPR AMC A-V-MEP AV-PLUM 08/04/2019 07/06/2019 1,466.25

13 44626 85145 Air quality needs to be done . GWA WAPPR AMC A-V-MEP AV-HVAC 27/03/2019 26/05/2019 10,350.00
Power socket for projector in B
14 45850 93123 GWA WAPPR AMC A-V-MEP AV-HVAC 01/05/2019 30/06/2019 1,769.05
block 1st floor
Networking required between
15 46571 97324 GWA WAPPR AMC A-V-SSM AV-FAS 01/05/2019 30/06/2019 34,500.00
main FACP & 3rd floor FACP
PPM rectification of FAFF
16 99530 GWA WAPPR AMC SSM SM-FAS 14/05/2019 13/07/2019 9,309.25
system as per the Q3 PPM
SWWPS-005 Health & Safety
concern to be replaced
17 47533 103407 GWPS WAPPR AMC SSM SM-CW 17/06/2019 16/08/2019 113,091.00
domestic water tank at roof
top
Quote for Key pad Access
18 47534 103408 GWPS WAPPR AMC SSM SM-ACS 20/06/2019 19/08/2019 59,857.50
control for FS1 & FS2
require 3 numbers 60x60
19 48019 105631 ceiling light at sixth form JCD WAPPR AMC A-V-MEP AV-ELEC 10/06/2019 09/08/2019 1,191.60
staircase please arrange to fix.
Split AC Unit - D2( Pump room
20 48525 107775 JCD WAPPR AMC A-V-MEP AV-HVAC 20/06/2019 19/08/2019 5,751.00
and Security Cabin)
Need a quota for installation of
interlock at swimming pool
21 45375 89360 JCD WAPPR AMC CVL C-MSN 08/05/2019 07/07/2019 12,060.00
area, staff parking, main
entrance area.
Require all three color
22 47280 101357 JPS WAPPR AMC A-V-CVL AV-MISC 17/06/2019 16/08/2019 17,948.71
markers; red, blue and white.
Automatic Sliding door PPM
23 70463 JPS WAPPR AMC A-V-SSM AV-ADOR 14/04/2019 13/06/2019 517.50
rectification works
SECURITY CABIN FRONT
24 46376 95703 LAB WAPPR AMC A-V-CVL AV-CARP 24/04/2019 23/06/2019 1,235.50
SAIDE NEED SHADE
Quote Supply and installation
25 47235 101338 MTS WAPPR AMC A-V-CVL AV-CARP 08/05/2019 07/07/2019 5,750.00
of finger guards
MPH hall 5 no. light now
26 47772 103599 MTS WAPPR AMC A-V-MEP AV-ELEC 30/05/2019 29/07/2019 2,135.13
working need scuffolding
1) FAHU 08 supply fan vfd
fault and need to replace 'D'
27 48686 107898 MTS WAPPR AMC A-V-MEP AV-HVAC 13/06/2019 12/08/2019 4,370.00
block second floor electrical
room.
28 48685 107900 FAHU 04 supply fan vfd faultty MTS WAPPR AMC A-V-MEP AV-HVAC 13/06/2019 12/08/2019 2,990.00

29 49499 113476 Required Internal paint MTS WAPPR AMC CVL C-PINT 17/06/2019 16/08/2019 520,815.45
Repainting works of all
30 40713 66017 MTS WAPPR AMC A-V-CVL AV-PINT 16/02/2019 17/04/2019 15,230.00
staircase handrail
Painting required whole
31 41822 70556 boundary fencing along with MTS WAPPR AMC A-V-CVL AV-PINT 21/02/2019 22/04/2019 32,949.43
gates.
Supply and replacement of
32 43004 76808 damage tiles near reception to MTS WAPPR AMC A-V-CVL AV-MISC 16/03/2019 15/05/2019 25,300.00
gate no 1
Supply and installation of SS
33 43005 76809 fence and 2 side door at MTS WAPPR AMC A-V-CVL AV-MISC 17/03/2019 16/05/2019 23,000.00
swimming pool
SW Quotation for whole school
34 43178 78849 MTS WAPPR VAR VAR-CVL V-PINT 24/03/2019 23/05/2019 583,280.00
external painting.
SW Quotation for internal
35 43179 78851 MTS WAPPR VAR VAR-CVL V-PINT 17/03/2019 16/05/2019 793,500.00
painting
SW Outside tiles work gate no
36 43419 80546 MTS WAPPR AMC A-V-CVL AV-MSN 15/05/2019 14/07/2019 18,831.25
6
Glass partition required admin
37 43713 81051 MTS WAPPR AMC A-V-CVL AV-MISC 20/03/2019 19/05/2019 6,247.38
operation office.
Supply and installation of glass
38 43978 82776 partition and window at MTS WAPPR AMC A-V-CVL AV-MISC 24/04/2019 23/06/2019 22,712.00
Library.
Supply and installation of
39 43980 82777 MTS WAPPR AMC A-V-CVL AV-MISC 16/05/2019 15/07/2019 11,385.41
folding type partition at Library
Need to replace broken tiles
40 44779 87171 MTS WAPPR AMC CVL C-MSN 27/03/2019 26/05/2019 4,341.60
around reception area
Please kindly provide us the
41 44865 87243 quotation forreplacement of MTS WAPPR AMC SSM SM-CW 24/04/2019 23/06/2019 4,960.00
carpet in parents cafe.
Glass partition required in
42 44783 87244 MTS WAPPR AMC VAR-CVL V-MISC 24/04/2019 23/06/2019 10,580.00
admin parents waiting area.
Fs library and 2nd floor lift
43 45461 90911 MTS WAPPR AMC CVL C-CARP 15/04/2019 14/06/2019 1,049.60
corridor ceiling damage.
one of our class room need to
44 46718 97433 MTS WAPPR AMC CVL C-CARP 17/06/2019 16/08/2019 80,816.25
conversion on dance studio.
Class room conversion into
45 46721 97435 MTS WAPPR AMC CVL C-CARP 14/05/2019 13/07/2019 3,008.40
fitness room
Metal fence required 2nd floor
46 46734 97439 MTS WAPPR AMC A-V-CVL AV-MISC 07/05/2019 06/07/2019 6,727.50
F block crossway
Metal fence around primary
47 46733 97441 MTS WAPPR AMC A-V-CVL AV-MISC 07/05/2019 06/07/2019 7,245.00
library outside balcony
48 46765 97468 Astrotruf required at roof slab MTS WAPPR AMC A-V-CVL AV-SFLR 02/05/2019 01/07/2019 55,545.00
Kitchen cabinet required with
49 46767 97469 MTS WAPPR AMC A-V-CVL AV-MISC 30/05/2019 29/07/2019 30,406.00
counter at lab
Repair of damage classroom
50 47148 99775 MTS WAPPR AMC CVL C-CARP 21/05/2019 20/07/2019 3,933.75
cupboard and student lockers
Phase 1 rooptop booster pump
51 47229 101298 NMS WAPPR AMC A-V-MEP AV-PLUM 16/05/2019 15/07/2019 4,140.00
is not working
Taps 10 Pcs. in different
52 46803 101439 washrooms ( heavy leakage) NMS WAPPR AMC A-V-MEP AV-PLUM 17/06/2019 16/08/2019 2,872.50
required
3rd floor D block students
53 48572 107806 washroom 2 WC back support NSB WAPPR AMC A-V-MEP AV-PLUM 11/06/2019 10/08/2019 390.35
is broken need to fix
SW Parking area Inter lock -
54 49264 111777 NSB WAPPR AMC A-V-CVL AV-MISC 20/06/2019 19/08/2019 2,897.10
D2
55 78836 PPM rectification of chiller NSB WAPPR AMC SSM SM-CHIL 01/05/2019 30/06/2019 10,412.10
Exhaust fan need to be fixed in
56 43052 80952 NSB WAPPR AMC A-V-MEP AV-HVAC 08/05/2019 07/07/2019 3,220.00
chemistry lab
Please check on blow issue
57 45014 87278 NSB WAPPR AMC A-V-MEP AV-ELEC 29/05/2019 28/07/2019 14,051.62
urgently in NSB astroturf.
Requirement for additional
58 46910 99520 NSB WAPPR AMC VAR-SSM V-PAVA 16/05/2019 15/07/2019 18,400.00
speaker’s
Pole lights not working in the
59 47448 101554 NSG WAPPR AMC A-V-MEP AV-ELEC 19/05/2019 18/07/2019 6,625.90
playground area.
Supply and replacement of
60 48009 105618 defective power supply unit for NSG WAPPR AMC SSM SM-FAS 20/05/2019 19/07/2019 12,535.00
the FACP.
Booster pump is not working in
61 48165 105696 NSG WAPPR AMC A-V-MEP AV-SPW 30/05/2019 29/07/2019 1,207.50
kids swimming pool
FCU motor need to rewind in
62 48166 105697 NSG WAPPR AMC A-V-MEP AV-HVAC 27/05/2019 26/07/2019 184.00
staffroom second floor.
Sliding door in main entrance
63 48635 107853 NSG WAPPR AMC A-V-SSM AV-ADOR 17/06/2019 16/08/2019 4,140.00
is not working properly.
SW Parking area Inter lock -
64 49263 111776 NSG WAPPR AMC A-V-CVL AV-MISC 20/06/2019 19/08/2019 2,897.10
D2
Swimming pool, heat cool unit
65 44192 82952 NSG WAPPR AMC A-V-MEP AV-HVAC 23/04/2019 22/06/2019 12,666.32
is not working.
Concrait base broken on roof
66 44044 84644 NSG WAPPR AMC CVL C-MSN 27/03/2019 26/05/2019 244.34
top
Finger guard damaged in
67 44631 85205 NSG WAPPR AMC CVL C-CARP 27/03/2019 26/05/2019 3,055.00
different areas.
We have waterlogged in Astor
68 45101 87348 turf as a result of no proper NSG WAPPR AMC CVL C-MSN 23/04/2019 22/06/2019 1,265.25
drainage
Replacement of floor machines
69 45073 87349 for glass door at the clinic and NSG WAPPR AMC A-V-CVL AV-CARP 23/04/2019 22/06/2019 1,943.75
KG lobby entrance.
70 45364 89327 Doors with issues NSG WAPPR AMC A-V-CVL AV-CARP 15/04/2019 14/06/2019 2,498.00
Ground floor block B exit door
71 45195 89363 NSG WAPPR VAR CVL C-CARP 24/04/2019 23/06/2019 195.50
broken.
FENCE COVERING AT FIELD
72 45552 91327 NSG WAPPR AMC A-V-CVL AV-MISC 15/04/2019 14/06/2019 27,600.00
AREA
Arabic logo need to install in
73 45705 91480 NSG WAPPR AMC CVL C-CARP 15/04/2019 14/06/2019 810.00
2nd floor
FAHU block C MCC room unit
74 47002 99536 NSG WAPPR AMC A-V-MEP AV-HVAC 15/05/2019 14/07/2019 2,548.40
VFD is faulty.
Building Fabric Survey Report
75 41707 70496 OIS WAPPR AMC A-V-CVL AV-MISC 16/05/2019 15/07/2019 48,702.50
(5.3) Expansion joint
after ppm rectification work-
76 105835 WEK WAPPR AMC SSM SM-CHIL 29/05/2019 28/07/2019 31,740.00
chiller
Need to remove water from
77 48522 107757 water tank 1 and 2 for water WEK WAPPR AMC A-V-MEP AV-PLUM 17/06/2019 16/08/2019 9,982.00
tank cleaning
Patch-up work and filling of
78 36587 46827 holes on wall required ASAP on WEK WAPPR AMC A-V-CVL AV-MSN 26/03/2019 25/05/2019 909,420.00
full school.
79 44187 82944 Timers required for strip lights WEK WAPPR AMC A-V-MEP AV-ELEC 27/03/2019 26/05/2019 17,339.05
Required to fixed heat wheel &
80 45994 93553 motor foundation of FAHU WEK WAPPR AMC A-V-MEP AV-HVAC 15/05/2019 14/07/2019 60,950.00
01,02,04 & 14.
Replace the fire alarm control
81 46207 95258 WEK WAPPR AMC SSM SM-FAS 14/05/2019 13/07/2019 20,136.40
panel GF to FF
82 46942 99428 Required burner for gas heater WEK WAPPR AMC A-V-MEP AV-SPW 10/06/2019 09/08/2019 31,050.00
Need install access control in
83 47093 99724 wooden door in ground floor WEK WAPPR AMC A-V-SSM AV-ACS 20/05/2019 19/07/2019 15,295.00
zone 6
FM 200 system installation,
84 45604 91373 WIN WAPPR AMC A-V-SSM AV-FAS 24/04/2019 23/06/2019 68,941.75
testing and commissioning.
Sewage pump 1&2 not
85 47090 99720 WIN WAPPR AMC A-V-MEP AV-PLUM 29/05/2019 28/07/2019 19,550.00
working near canteen Area
Change the erupted and
86 43772 82782 broken marble floor tiles in the WIS WAPPR AMC A-V-CVL AV-MSN 09/04/2019 08/06/2019 25,033.90
reception.
87 44397 84612 New drain jet machine WIS WAPPR AMC A-V-MEP AV-PLUM 24/04/2019 23/06/2019 29,785.00
Drain line leakage in year 5
88 45534 91298 WIS WAPPR AMC A-V-MEP AV-PLUM 30/04/2019 29/06/2019 690.00
corridor water cooler.
Science labs Fully refurb - on
89 46829 97527 WIS WAPPR AMC A-V-CVL AV-MISC 19/06/2019 18/08/2019 1,423,056.00
going already
pproval
Quote WO Creation Work
Summary Quote Status Work Type Engineer
Status Date Date Category

Quote sent - 2635 PENDING 29/05/2019 SM RM Kashif

Quote sent - 2650 PENDING 12/06/2019 SM RM Kashif

Quote sent - 2390 PENDING 30/03/2019 SM RM Kashif

Quote sent - 2413 PENDING 15/04/2019 SM RM Kashif

Quote sent - 2486 PENDING 06/05/2019 SM RM Kashif

Quote sent - 2594 PENDING 13/06/2019 SM SP Kashif

Quote sent - 2464 PENDING 04/03/2019 SM RM Kashif

Quote sent - 1504 PENDING 21/03/2019 SM SP Kashif

Quote sent - 2468 PENDING 16/05/2019 SM RM Kashif

Quote sent - 1795 PENDING 22/01/2019 SM SP Kashif

Quote sent - 2146 PENDING 02/02/2019 SM SP Kashif

Quote sent - 1385 PENDING 11/03/2019 SM RM Kashif

Quote sent - 1384 PENDING 13/03/2019 SM SP Kashif

Quote sent - 1936 PENDING 09/04/2019 SM RM Kashif

Quote sent - 1969 PENDING 22/04/2019 SM RM Kashif

Quote sent - 2184 PENDING 30/04/2019 SM CM Kashif

Quote sent - 2552 PENDING 12/05/2019 SM RM Shehlan

Quote sent - 2632 PENDING 12/05/2019 SM RM Shehlan


Quote sent - 2487 PENDING 20/05/2019 SM RM Shehlan

Quote sent - 2629 PENDING 26/05/2019 SM RM Shehlan

Quote sent - 2106 PENDING 28/03/2019 SM SP Shehlan

Quote sent - 2606 PENDING 05/05/2019 SM RM Shehlan

FM-QT-19-JPS-HS-0352 PENDING 21/01/2019 SM CM Shehlan

Quote sent - 1877 PENDING 18/04/2019 SM RM Shehlan

Quote sent - 2108 PENDING 05/05/2019 SM RM Kashif

Quote sent - 2431 PENDING 14/05/2019 SM RM Kashif

Quote sent - 2535 PENDING 29/05/2019 SM RM Kashif

Quote sent - 2534 PENDING 29/05/2019 SM RM Kashif

Quote sent - 2637 PENDING 16/06/2019 SM SP Kashif

Quote sent # 329 PENDING 06/01/2019 SM SP Kashif

Quote sent 819 PENDING 23/01/2019 SM SP Kashif

Quote sent - 1152 PENDING 13/02/2019 SM SP Kashif

Quote sent - 1203 PENDING 13/02/2019 SM SP Kashif

Quote sent - 1211 PENDING 19/02/2019 SM SP Kashif

Quote sent - 1284 PENDING 19/02/2019 SM SP Kashif

Quote sent - 2171 PENDING 24/02/2019 SM SP Kashif

Quote sent - 1340 PENDING 27/02/2019 SM SP Kashif

Quote sent - 1622 PENDING 03/03/2019 SM SP Kashif

Quote sent - 2259 PENDING 03/03/2019 SM SP Kashif

Quote sent - 1439 PENDING 19/03/2019 SM SP Kashif

Quote sent - 1788 PENDING 19/03/2019 SM SP Kashif

Quote sent - 1654 PENDING 19/03/2019 SM SP Kashif


Quote sent - 1674 PENDING 31/03/2019 SM SP Kashif

Quote sent - 2620 PENDING 24/04/2019 SM RM Kashif

Quote sent - 2182 PENDING 24/04/2019 SM RM Kashif

Quote sent- 2094 PENDING 24/04/2019 SM RM Kashif

Quote sent - 2093 PENDING 24/04/2019 SM RM Kashif

Quote sent - 2046 PENDING 24/04/2019 SM RM Kashif

Quote sent - 2414 PENDING 24/04/2019 SM RM Kashif

Quote sent - 2296 PENDING 02/05/2019 SM RM Kashif

Quote sent - 2282 PENDING 05/05/2019 SM RM Shehlan

Quote sent - 2293 PENDING 06/05/2019 SM SP Shehlan

Quote sent - 2518 PENDING 27/05/2019 SM CM Kashif

Quote sent - 2677 PENDING 12/06/2019 SM SP Kashif

Quote sent - 2003 R1 PENDING 18/02/2019 SM RM Kashif

Quote sent - 2123 PENDING 25/02/2019 SM Kashif

Quote sent - 2216 PENDING 20/03/2019 SM RM Kashif

Quote sent - 2272 PENDING 30/04/2019 SM Kashif

Quote sent - 2306 PENDING 08/05/2019 SM Kashif

Quote sent - 2323 PENDING 20/05/2019 SM RM Kashif

Quote sent - 2449 PENDING 21/05/2019 SM RM Kashif

Quote sent - 2377 PENDING 21/05/2019 SM RM Kashif

Quote sent - 48635 WO-


PENDING 28/05/2019 SM RM Kashif
107853

Quote sent - 2682 PENDING 12/06/2019 SM SP Kashif

Quote sent - 1712 PENDING 05/03/2019 SM Kashif

Quote sent - 1408 PENDING 11/03/2019 SM RM Kashif

Quote sent - 1438 PENDING 14/03/2019 SM SP Kashif

Quote sent - 1783 PENDING 21/03/2019 SM RM Kashif


Quote sent - 1506 PENDING 21/03/2019 SM SP Kashif

Quote sent - 1690 PENDING 28/03/2019 SM RM Kashif

Quote sent - 1721 PENDING 28/03/2019 SM RM Kashif

Quote sent - 1665 PENDING 02/04/2019 SM SP Kashif

Quote sent - 1652 PENDING 04/04/2019 SM RM Kashif

Quote sent - 2181 PENDING 30/04/2019 SM Kashif

Quote sent - 0742 PENDING 22/01/2019 SM SP Shehlan

Quote sent - 2423 PENDING 22/05/2019 SM CM Shehlan

Quote sent - 2524 PENDING 26/05/2019 SM RM Shehlan

Quote sent - 1420 PENDING 13/10/2018 SM SP Shehlan

Quote sent - 1433 PENDING 05/03/2019 SM RM Shehlan

Quote sent - 2188 PENDING 13/04/2019 SM Shehlan

Quote sent - 2169 PENDING 16/04/2019 SM RM Shehlan

Quote sent - 2473 PENDING 29/04/2019 SM CM Shehlan

Quote sent - 2248 PENDING 02/05/2019 SM SP Shehlan

Quote sent - 1803 PENDING 02/04/2019 SM RM Kashif

Quote sent - 2298 PENDING 02/05/2019 SM RM Kashif

Quote sent - 1502 PENDING 03/03/2019 SM Kashif

Quote sent - 1734 PENDING 10/03/2019 SM Kashif

Quote sent - 1776 PENDING 01/04/2019 SM Kashif

Quote sent - 2220R1 PENDING 25/04/2019 SM SP Kashif


SM Not Quoted Apr-19 May-19 Jun-19
Kashif 94 4 15 74
Shehlan 106 0 64 42
Total 200

Report SM Not Quoted


Service Quote Sent Price
No SR Work Order Description Location WO Status Service Type Service
Group Date Estimate

Repair work requested for


6 48983 111208 DAA-N WAPPR AMC A-V-CVL AV-MISC 10/06/2019
broken wash basin in SF-32.
Installation of additional tap
7 48981 111209 requested at third-floor room DAA-N WAPPR AMC A-V-MEP AV-PLUM 11/06/2019
no T80
Requested repair work for
8 49115 111641 broken wash basin of second DAA-N WAPPR AMC A-V-CVL AV-MISC 11/06/2019
floor SF 09 boys washroom
SWDAA-004 Swimming pool
9 49382 111861 heater burner replacement DAA-N WAPPR AMC A-V-SSM AV-LPG 13/06/2019
requested
Lights to be fixed on the first
10 49396 113402 DAA-N WAPPR AMC A-V-MEP AV-ELEC
floor canteen
11 49580 114160 SW DAA007 Wash room - D3 DAA-N WAPPR AMC A-V-CVL AV-MISC
SW DAA006 Parking area Inter
12 49579 114162 DAA-N WAPPR AMC A-V-CVL AV-MISC
lock - D3
SW DAA005 Expansion Joints
13 49578 114163 DAA-N WAPPR AMC A-V-CVL AV-MISC
Internal - D3
SW DAA004 Pool Heater
14 49577 114164 DAA-N WAPPR AMC A-V-SSM AV-LPG
replacement
SW DAA003 Expansion joint
15 49576 114165 DAA-N WAPPR AMC A-V-CVL AV-MISC
External - D3
Condensation from labs and
16 49568 114167 DAA-N WAPPR AMC A-V-MEP AV-HVAC
the corridors exhaust fan duct
Required quote for installation
of power sockets in 10
21 49019 111239 GFS WAPPR AMC A-V-MEP AV-ELEC 19/06/2019
different location on 2nd and
3rd floor.
22 49265 111778 SW Bus parking area Inter lock GFS WAPPR AMC A-V-CVL AV-MISC 13/06/2019
SW GFS024 Remodel Store
adjacent to Clinic to house
23 49605 113905 GFS WAPPR AMC CVL C-MISC
autoclave and secure medicine
cabinet
SW GFS020 Add partition and
additional door to SF Staff
24 49596 113906 GFS WAPPR AMC CVL C-MISC 20/06/2019
Room 01 to create new Store
Room
SW GFS018 MPH backstage
25 49595 113909 changing - combine into single GFS WAPPR AMC CVL C-MISC 20/06/2019
space PE office
SW GFS010 Remodel FF
'Arabic Rooms 02 and 03' to
26 49592 113914 GFS WAPPR AMC CVL C-MISC 20/06/2019
create 3 learning spaces for
'Small Steps'
SW GFS016 Create new FS
27 49593 113916 Store room within section of GFS WAPPR AMC A-V-CVL AV-MISC 20/06/2019
FS Entrance
SW GFS017 Remodel TF
Library Small Group Rooms 01
28 49594 113932 GFS WAPPR AMC A-V-CVL AV-MISC 18/06/2019
and 02 to create single Store
Room
SW GFS019 Construct 'Water
29 49604 114155 Bottle Store' within second FS GFS WAPPR AMC CVL C-MSN
Entrance - joinery item
SW GFS015 Expansion joint
30 49603 114156 GFS WAPPR AMC CVL C-MISC
External - D3
SW GFS014 Expansion Joints
31 49602 114157 GFS WAPPR AMC CVL C-MISC
Internal - D3
SW GFS008 Bus parking
32 49601 114158 Interlock - widen path and GFS WAPPR AMC A-V-CVL AV-MISC
sunken area due to water tank
SW GFS003 Speakers for FAFF
33 49598 114159 System - clinic, drivers block, GFS WAPPR AMC SSM SM-FFS
changing rooms, roof
SW GFS009 Dubai Civil
34 49591 114161 GFS WAPPR AMC A-V-CVL AV-MISC
Defence - inspection works
SW GFS005 Remove corridor
walls from 'Common Rooms' to
35 49589 114168 GFS WAPPR AMC A-V-CVL AV-MISC
give single large 6th form
space
Generator battery need to
36 49815 114169 replace as of now generator is GFS WAPPR AMC A-V-MEP AV-ELEC
in off mode
SW GFS001 New FS Library
37 49588 114170 GFS WAPPR AMC A-V-CVL AV-MISC
space
SW GFS021 Add office space
38 49597 114180 GFS WAPPR AMC CVL C-MSN
in the above 6th form space
Water tank no. 2 drain line
39 49082 111556 GIS APPR AMC A-V-MEP AV-PLUM 12/06/2019 4,500.00
handle not working properly
Glass door floor machine is not
47 49083 111557 working properly in swimming GIS WAPPR AMC A-V-CVL AV-CARP 18/06/2019
pool GF 89
Main swimming pool one down
48 49113 111630 light damaged needs to be GIS WAPPR AMC A-V-MEP AV-SPW 18/06/2019
changed
Baby changing facility for the
small baby in female
49 49262 111786 GIS WAPPR AMC A-V-CVL AV-MSN
washroom inside at the main
reception
Basketball hoops need to
50 49340 111845 GIS WAPPR AMC A-V-CVL AV-CARP 19/06/2019
check
Door handle loose in GF
51 49473 113427 44,staircase 6 second floor and GIS WAPPR AMC A-V-CVL AV-CARP
staircase 7 first floor
FACP panel showing regularly
52 49477 113454 GIS WAPPR AMC A-V-SSM AV-FAS
faults in Phase1 FCC room
Ply need to be change in KG
53 49527 113510 GIS WAPPR AMC A-V-CVL AV-CARP
ground floor 29
Noise coming from air curtain
54 49555 113656 GIS WAPPR AMC A-V-MEP AV-HVAC
in Phase1 staircase 3 GF
AC not working in Changing
55 48967 111198 GWA APPR AMC A-V-MEP AV-HVAC 20/06/2019 650.00
Room D006
Squash court package unit AC
56 49021 111238 GWA APPR AMC A-V-MEP AV-HVAC 18/06/2019 450.00
not working
E215 AC not working need to
57 49372 111854 GWA APPR AMC A-V-MEP AV-HVAC 19/06/2019 8,500.00
check and fix asap.
AC is not working in E block
58 49816 114205 3rd floor passage as PCB is GWA APPR AMC A-V-MEP AV-HVAC 19/06/2019 1,900.00
broken
AHU is not working in B block
59 49890 114226 GWA APPR AMC A-V-MEP AV-HVAC 23/06/2019 6,000.00
2nd floor library.
Gypsum wall broken near
61 49090 111564 service lift C-block 3rd floor GWA WAPPR AMC A-V-CVL AV-CARP
passage
13amps double power sockets
62 49089 111565 GWA WAPPR AMC A-V-MEP AV-HVAC
required at E-211
SW-GWA-001 Class room Paint
63 49390 111864 GWA WAPPR AMC A-V-CVL AV-PINT 13/06/2019
– C2
SW GWA010 Expansion joint
64 49615 113941 GWA WAPPR AMC A-V-CVL AV-MISC
External - C2
SW GWA018 Redesign of
65 49614 113942 ‘Maker Space’ as ‘Entrepreneur GWA WAPPR AMC A-V-CVL AV-MISC
Centre’
SW GWA019 Construction of
66 49613 113943 GWA WAPPR AMC A-V-CVL AV-MISC
new office for ASA Coordinator
SW GWA008 Expansion Joints
67 49612 113944 GWA WAPPR AMC A-V-CVL AV-MISC
Internal - C2
SW GWA002 Corridor Painting
68 49611 113945 GWA WAPPR AMC CVL C-MISC
- C2

SW GWA001 Class Room Paint


69 49610 113946 GWA WAPPR AMC A-V-CVL AV-PINT
- C2

AC is not working in E block


70 50020 115836 3rd floor E 314 the PCB is GWA WAPPR AMC A-V-MEP AV-HVAC
broken.
Quote to replace the 2 TON AC
unit in the F046 - with 5 TON
78 48770 108001 GWPS WAPPR AMC A-V-MEP AV-HVAC 16/06/2019
unit as the current unit is not
cooling
Year 1 boys toilet door frame
79 49462 113462 GWPS WAPPR AMC CVL C-CARP
needs to be fixed
Lv room penal 2 capacitor
80 49528 113513 GWPS WAPPR AMC A-V-MEP AV-ELEC
bank not working properly
FS2 g and d toilet finger guard
81 50007 115843 GWPS WAPPR AMC CVL C-CARP
is broken need to be replace.
SW - DT Workshops - MEP
90 48842 109581 JCD WAPPR VAR VAR-MEP V-MECH
upgrades required.
Zebra crossing lights are not
96 49034 111544 JPS WAPPR AMC A-V-MEP AV-ELEC
working properly
Need to replace the fence for
97 49302 111848 swimming pool towards JPS WAPPR AMC VAR-MEP V-MECH
football field
Required spikes on swimming
98 49511 113527 pool shower area on small wall JPS WAPPR AMC VAR-SSM V-OSPW
to stop the birds from nesting
SW JPS006 Ablution Area
99 49616 113918 JPS WAPPR AMC A-V-SSM AV-CW
addition to FF toilet
SW JPS007 Upgrade Clinic WC
100 49617 113919 JPS WAPPR AMC CVL C-MISC
- Accessible
A toilet to be added to the
101 49725 113965 JPS WAPPR AMC VAR-CVL V-MISC
classroom 2G
Year 1 and 2 toilet near light
102 49770 114038 JPS WAPPR AMC A-V-MEP AV-ELEC
switch needs to be separated
Pump room dosing system is
103 49982 114334 JPS WAPPR AMC A-V-MEP AV-SPW
not working
Installation of fingers guards 5
105 49278 111792 nos 180 degree at outside play LAB APPR AMC CVL C-CARP 16/06/2019 2,000.00
area
Need to change the pressure
106 49841 114192 LAB APPR AMC MEP M-PLUM 19/06/2019 1,200.00
tank
Installation of corner guards
108 49279 111791 LAB WAPPR AMC CVL C-CARP 13/06/2019
1x1 at classroom window
Requested additional power
109 49000 111219 socket for pace clock in MTS APPR AMC A-V-MEP AV-ELEC 17/06/2019 1,200.00
swimming pool
Need 2no new door closer
111 49160 111716 female support staff room G- MTS WAPPR AMC CVL C-CARP 13/06/2019
178 / G-179
SW MTS002 External Painting
112 49628 113893 MTS WAPPR AMC CVL C-PINT
- D3
SW MTS003 Corridor Painting
113 49629 113894 MTS WAPPR AMC CVL C-PINT
- D3
SW MTS006 Expansion joint
114 49634 113895 MTS WAPPR AMC CVL C-MSN
External - D3
SW MTS005 Wash room ceiling
115 49633 113896 MTS WAPPR AMC CVL C-PINT
- D3
SW MTS004 Corridor Ceiling -
116 49630 113897 MTS WAPPR AMC CVL C-CARP
D3
SW MTS009 3G Artificial pitch
117 49636 113898 MTS WAPPR AMC CVL C-SFLR
repair
Need to replace the chiller flow
118 49811 114147 NMS APPR AMC A-V-SSM AV-CHIL 20/06/2019 3,600.00
sensor.
Gate number 7 security room
119 49910 114290 NMS APPR AMC A-V-MEP AV-HVAC 20/06/2019 1,000.00
AC is not working.
Sewage tank cleaning and
140 49480 113456 NMS WAPPR AMC A-V-MEP AV-PLUM 16/06/2019
decreasing and sluge removal
Need to repair gully trap
141 49548 113530 NMS WAPPR AMC A-V-CVL AV-MISC
manhole concrete
SW NSB001 Painting of
142 49315 111817 external area along with NSB WAPPR AMC A-V-CVL AV-PINT 13/06/2019
jetting of façade
FC11 Classroom FCU motor
143 49336 111829 NSB WAPPR AMC A-V-MEP AV-HVAC
burned need to replaced
Swimming pool booster pump
144 49335 111830 NSB WAPPR AMC A-V-MEP AV-SPW
burned need to replaced
Ceiling broken at various
145 49847 114207 NSB WAPPR AMC A-V-CVL AV-CARP
location
SW NSB002 Parking area Inter
146 49638 114209 NSB WAPPR AMC A-V-CVL AV-CARP
lock - D3
SW NSB001 External Painting -
147 49637 114210 NSB WAPPR AMC CVL C-PINT
D3
Addressable sounder faulty
149 49030 111232 need to be replace in external NSG WAPPR AMC A-V-SSM AV-FAS
area
SW NSG002 Painting of
150 49316 111818 external area along with NSG WAPPR AMC A-V-CVL AV-PINT 13/06/2019
jetting of façade
Sliding door on main entrance
151 49342 111840 is malfunctioning need to NSG WAPPR AMC A-V-SSM AV-ADOR
check
SW NSG003 Parking area Inter
152 49640 114041 NSG WAPPR AMC CVL C-MISC
lock - D2
SW NSG002 External Painting
153 49639 114042 NSG WAPPR AMC A-V-CVL AV-MISC
- D3
Additional smoke detectors
154 45603 114294 OIS APPR AMC SSM SM-FAS 20/06/2019 21,000.00
required in various locations
Need to rectify damage shade
170 48901 109602 WEK WAPPR AMC A-V-CVL AV-MISC
in zone 1 internal area
Required to change 15 nos
W/B push tap as per below A
171 48904 109603 WEK WAPPR AMC A-V-MEP AV-PLUM
007-2,A 108-1,B 003-02,B
104-1,D 003-02,D 005-
Need to install corner guard in
172 48935 111153 WEK WAPPR AMC A-V-CVL AV-CARP 12/06/2019
FS area
Need to replace damage
173 49080 111560 cladding in zone 2 internal play WEK WAPPR AMC A-V-CVL AV-MISC
area
Need to rectification staircase
174 49130 111674 WEK WAPPR AMC A-V-CVL AV-CARP
exit wooden door
SW WEK001 Sports upgrade to
175 49655 113980 3G pitch only (no natural WEK WAPPR AMC A-V-CVL AV-SFLR
grass)
SW WEK006 Equipment -
Building (Unexpected
176 49654 113981 WEK WAPPR AMC A-V-MEP AV-MECH
Replacement of Bldg.
Equipment)
Need to remove sitting area
177 49809 114146 near swimming pool for pest WEK WAPPR AMC A-V-CVL AV-CARP
control.
Required to change damage
178 49855 114220 WEK WAPPR AMC A-V-CVL AV-CARP
gypsum ceiling in D 119&120
Need to hide all water cooler
179 49854 114221 WEK WAPPR AMC A-V-CVL AV-MSN
point in all location
Required to change all damage
180 49853 114222 WEK WAPPR AMC A-V-CVL AV-CARP
finger gourd
Dosing system is not working
181 50004 115829 WEK WAPPR AMC A-V-MEP AV-SPW
normally need to check
Need to replace faulty led
lights in primary and
182 49561 113880 WIN WAPPR AMC A-V-MEP AV-ELEC 17/06/2019
secondary building class room
and corridor
SW WIN002 Parking area Inter
183 49653 113931 WIN WAPPR AMC A-V-CVL AV-MISC 23/06/2019
lock - D3
Need to make new 3nos
gypsum wall with wooden door
184 50022 115837 WIN WAPPR AMC A-V-CVL AV-CARP 23/06/2019
in secondary building staff
rooms
One of the sliding doors
185 48813 109541 (G101) is faulty needs WIS APPR AMC SSM SM-ADOR 10/06/2019 3,500.00
rectification
Quotation for New glass door
189 49134 111712 in Foundation stage staff WIS WAPPR AMC A-V-CVL AV-CARP 15/06/2019
room.
Metal tray for the AC unit in
190 49447 113413 WIS WAPPR AMC A-V-MEP AV-HVAC 20/06/2019
year 4 class room
Relocate the exhaust fan in the
191 49471 113448 DT class room to the workshop WIS WAPPR AMC A-V-MEP AV-ELEC 18/06/2019
next door
Quotation for finger guards for
192 49481 113501 all primary class rooms Year 1 WIS WAPPR AMC A-V-CVL AV-CARP 17/06/2019
till 4
New window is required for the
193 49482 113502 secondary clinic facing the WIS WAPPR AMC A-V-CVL AV-MSN 17/06/2019
indoor swimming pool
Floor tiles broken in various
194 49742 113997 WIS WAPPR AMC A-V-CVL AV-MSN
locations in the school
Faulty compressor of the AC
195 49851 114217 unit in the indoor swimming WIS WAPPR AMC A-V-MEP AV-HVAC 20/06/2019
pool needs rectification

: Modification of TORO unit


162 38381 48362 WEK APPR AMC A-V-MEP AV-HVAC 02/06/2019 28,000.00
swimming pool area
uoted
Quote WO Creation Work
Summary Quote Status Work Type Engineer
Status Date Date Category

SSR SUBMITTED TO
09/06/2019 SM RM Kashif
PROCUREMENT

SSR SUBMITTED TO
09/06/2019 SM RM Kashif
PROCUREMENT

SSR SUBMITTED TOB


11/06/2019 SM RM Kashif
PROCUREMENT

SSR Submitted to proc 13/06/2019 SM RM Kashif

16/06/2019 SM RM Kashif

19/06/2019 SM RM Kashif

19/06/2019 SM RM Kashif

19/06/2019 SM RM Kashif

19/06/2019 SM RM Kashif

19/06/2019 SM RM Kashif

19/06/2019 SM RM Kashif

site survey has been


submitted to procurement 10/06/2019 SM RM Kashif
dated:19/06/19
SSR Submitted to proc 12/06/2019 SM SP Kashif

17/06/2019 SM Kashif

SSR Submitted to proc 17/06/2019 SM SP Kashif

SSR Submitted to proc 17/06/2019 SM SP Kashif

SSR Submitted to proc 17/06/2019 SM SP Kashif


SSR Submitted to proc 17/06/2019 SM SP Kashif

SSR Submitted to proc 18/06/2019 SM SP Kashif

19/06/2019 SM Kashif

19/06/2019 SM Kashif

19/06/2019 SM Kashif

19/06/2019 SM Kashif

19/06/2019 SM Kashif

19/06/2019 SM Kashif

19/06/2019 SM Kashif

19/06/2019 SM Kashif

19/06/2019 SM Kashif

19/06/2019 SM Kashif

Budgetary Price ACCEPTED 12/06/2019 10/06/2019 SM RM Shehlan

ssr submitted to proc


10/06/2019 SM RM Shehlan
17/06/2019

ssr submitted to proc


10/06/2019 SM RM Shehlan
17/06/2019

12/06/2019 SM RM Shehlan

ssr submitted to procu 13/06/2019 SM RM Shehlan

16/06/2019 SM RM Shehlan

16/06/2019 SM RM Shehlan

17/06/2019 SM RM Shehlan

17/06/2019 SM RM Shehlan

Budgetary Price ACCEPTED 20/06/2019 09/06/2019 SM RM Kashif


Budgetary Price ACCEPTED 18/06/2019 10/06/2019 SM RM Kashif

Budgetary Price ACCEPTED 19/06/2019 13/06/2019 SM RM Kashif

Budgetary Price ACCEPTED 19/06/2019 19/06/2019 SM RM Kashif

Budgetary Price ACCEPTED 23/06/2019 19/06/2019 SM RM Kashif

10/06/2019 SM RM Kashif

10/06/2019 SM RM Kashif

SSR Submitted to proc 13/06/2019 SM SP Kashif

18/06/2019 SM SP Kashif

18/06/2019 SM SP Kashif

18/06/2019 SM SP Kashif

18/06/2019 SM RM Kashif

18/06/2019 SM SP Kashif

18/06/2019 SM SP Kashif

22/06/2019 SM RM Kashif

SSR Submitted to proc 01/06/2019 SM RM Shehlan

16/06/2019 SM RM Shehlan

17/06/2019 SM RM Shehlan

23/06/2019 SM RM Shehlan

02/06/2019 SM SP Shehlan

10/06/2019 SM Shehlan

13/06/2019 SM Shehlan

17/06/2019 SM Shehlan

17/06/2019 SM Shehlan
17/06/2019 SM Shehlan

18/06/2019 SM Shehlan

18/06/2019 SM Shehlan

20/06/2019 SM Shehlan

Budgetary Price ACCEPTED 16/06/2019 12/06/2019 SM SP Shehlan

Budgetary Price ACCEPTED 19/06/2019 19/06/2019 SM RM Shehlan

SSR Submitted to proc 12/06/2019 SM SP Shehlan

Budgetary Price ACCEPTED 17/06/2019 09/06/2019 SM RM Kashif

SSR SUBMITTED TO
11/06/2019 SM RM Kashif
PROCUREMENT

17/06/2019 SM RM Kashif

17/06/2019 SM RM Kashif

17/06/2019 SM RM Kashif

17/06/2019 SM RM Kashif

17/06/2019 SM RM Kashif

17/06/2019 SM RM Kashif

Budgetary Price ACCEPTED 20/06/2019 19/06/2019 SM RM Shehlan

Budgetary Price ACCEPTED 20/06/2019 20/06/2019 SM RM Shehlan

SSR Submitted to proc


16/06/2019 SM RM Shehlan
16/06/2019

17/06/2019 SM Shehlan

SSR Submitted to proc 13/06/2019 SM SP Kashif

13/06/2019 SM Kashif

13/06/2019 SM Kashif

19/06/2019 SM Kashif

19/06/2019 SM Kashif

19/06/2019 SM Kashif
10/06/2019 SM Kashif

SSR Submitted to proc 13/06/2019 SM SP Kashif

13/06/2019 SM RM Kashif

18/06/2019 SM RM Kashif

18/06/2019 SM RM Kashif

Budgetary Price ACCEPTED 20/06/2019 20/06/2019 SM RM Shehlan

06/06/2019 SM Shehlan

07/06/2019 SM Shehlan

SSR Submitted to proc 09/06/2019 SM RM Shehlan

10/06/2019 SM RM Shehlan

11/06/2019 SM RM Shehlan

18/06/2019 SM Shehlan

18/06/2019 SM Shehlan

19/06/2019 SM RM Shehlan

19/06/2019 SM RM Shehlan

19/06/2019 SM RM Shehlan

19/06/2019 SM RM Shehlan

22/06/2019 SM RM Shehlan

ssr submitted to procurement 17/06/2019 SM RM Kashif

SSR Submitted to proc 18/06/2019 SM RM Kashif

SSR SUBMITTED TO
22/06/2019 SM RM Kashif
PROCUREMENT
Budgetary Price ACCEPTED 10/06/2019 02/06/2019 SM RM Kashif

SSR SUBMITTED TO
11/06/2019 SM RM Kashif
PROCUREMENT

SSR submitted to procurement 16/06/2019 SM RM Kashif

ssr submitted to procurement 16/06/2019 SM RM Kashif

SSR submitted to procurement 16/06/2019 SM RM Kashif

SSR submitted to procurement 16/06/2019 SM RM Kashif

18/06/2019 SM Kashif

SSR SUBMITTED TO
19/06/2019 SM RM Kashif
PROCUREMENT

Budgetary Price ACCEPTED 02/06/2019 11/11/2018 SM RM Shehlan


Report
Service Quote Sent Price
No SR Work Order Description Location WO Status Service Type Service
Group Date Estimate
High school disabled toilets
1 47233 101310 have mold grown on the DAA-N APPR AMC A-V-CVL AV-CARP 19/05/2019 938.08
ceiling
Phase 1 rooftop pump room
2 47391 101499 pressure tank need to be DAA-N APPR AMC A-V-MEP AV-PLUM 27/05/2019 1,804.35
replace
Room no SF-13 female wash
3 47625 103437 room gypsum wall damage DAA-N APPR AMC A-V-CVL AV-CARP 15/05/2019 517.06
need to be repair.
Quotations for swimming pool
4 48000 105637 DAA-N APPR AMC A-V-CVL AV-MISC 12/06/2019 3,910.00
gate
Lift display is not working
5 48839 109546 DAA-N APPR AMC SSM SM-ELEV 12/06/2019 29,307.75
needs to be rectified
Second floor bridge glass
6 48918 111089 panel is broken need to be DAA-N APPR AMC A-V-CVL AV-MISC 17/06/2019 1,840.00
replace.
Deluge system leakage need
7 49026 111663 DAA-N APPR AMC A-V-SSM AV-FFS 17/06/2019 2,760.00
to be rectify.
Swimming pool shade hook
8 42578 76619 DAA-N APPR AMC A-V-CVL AV-MISC 23/05/2019 77,970.00
need to fix
boiler gas tank and pipelines
9 41920 90859 DAA-N APPR AMC A-V-SSM AV-LPG 23/04/2019 2,288.50
for leakage
Need 2 Disable parking spots
10 45939 93211 to be painted in the SLT car DAA-N APPR AMC A-V-CVL AV-MSN 24/04/2019 3,812.38
park
Water Tank reffiling after
11 95182 DAA-N APPR AMC A-V-SSM AV-WTC 23/04/2019 8,832.00
celaning
Quotation request remove 2
12 46364 95719 DAA-N APPR AMC A-V-CVL AV-CARP 02/05/2019 1,530.90
gypsum wall MS offices
Create a middle school library
13 46361 95722 DAA-N APPR AMC A-V-CVL AV-CARP 08/05/2019 14,375.00
office
Rectification of chiller as per
14 97408 DAA-N APPR AMC SSM SM-CHIL 30/04/2019 7,897.05
april PPM
15 47338 101470 Rising damp in clinic DAA-N WAPPR AMC A-V-CVL AV-MISC
Quotation for basketball court
16 47319 101529 DAA-N WAPPR AMC A-V-CVL AV-MISC
repairs.
Replacement of Pre filters and
17 101541 DAA-N WAPPR AMC A-V-MEP AV-HVAC 19/05/2019
Bag Filters for FAHU - Phase 1
Replacement of Pre Filters and
18 101542 DAA-N WAPPR AMC A-V-MEP AV-HVAC 25/05/2019
Bag filters for Utility block AHU
Replacement of Pre filter for
19 101543 DAA-N WAPPR AMC A-V-MEP AV-HVAC 25/05/2019
AHU units in Basement area
Replacement of Pre Filters and
20 101544 Bag Filters for AHU in Sports DAA-N WAPPR AMC A-V-MEP AV-HVAC 19/05/2019
Block
Outdoor Wi-Fi for the Football
21 47320 101568 DAA-N WAPPR AMC A-V-CVL AV-MISC
field
Swimming pool damp
22 47982 105638 DAA-N WAPPR AMC A-V-MEP AV-SPW
throughout changing rooms
Fire exit in the ground floor
23 48629 107887 DAA-N WAPPR AMC A-V-CVL AV-MISC 18/06/2019 977.00
library lock is broken.
24 48504 107939 Pool water leaking DAA-N WAPPR AMC A-V-CVL AV-MSN 30/05/2019
Repair work requested for
25 48983 111208 DAA-N WAPPR AMC A-V-CVL AV-MISC 10/06/2019
broken wash basin in SF-32.
Installation of additional tap
26 48981 111209 requested at third-floor room DAA-N WAPPR AMC A-V-MEP AV-PLUM 11/06/2019
no T80
Requested repair work for
27 49115 111641 broken wash basin of second DAA-N WAPPR AMC A-V-CVL AV-MISC 11/06/2019
floor SF 09 boys washroom
Replacing broken urinal divider
28 49256 111773 DAA-N WAPPR AMC A-V-MEP AV-PLUM 18/06/2019 2,090.05
at SF 014 with new one
SWDAA-004 Swimming pool
29 49382 111861 heater burner replacement DAA-N WAPPR AMC A-V-SSM AV-LPG 13/06/2019
requested
GF -31 wash room tap not
30 49422 113401 DAA-N WAPPR AMC A-V-MEP AV-PLUM 20/06/2019
working need to be replace
Lights to be fixed on the first
31 49396 113402 DAA-N WAPPR AMC A-V-MEP AV-ELEC
floor canteen
32 99348 114074 PPM Lift - Monthly DAA-N WAPPR AMC SSM SM-ELEV
PPM Diesel Generator Testing
33 103512 114087 DAA-N WAPPR AMC MEP M-MECH
(20 Minutes) – Monthly
PPM Ladder Inspection –
34 101531 114098 DAA-N WAPPR AMC MEP M-MECH
Monthly
35 49580 114160 SW DAA007 Wash room - D3 DAA-N WAPPR AMC A-V-CVL AV-MISC
SW DAA006 Parking area Inter
36 49579 114162 DAA-N WAPPR AMC A-V-CVL AV-MISC
lock - D3
SW DAA005 Expansion Joints
37 49578 114163 DAA-N WAPPR AMC A-V-CVL AV-MISC
Internal - D3
SW DAA004 Pool Heater
38 49577 114164 DAA-N WAPPR AMC A-V-SSM AV-LPG
replacement
SW DAA003 Expansion joint
39 49576 114165 DAA-N WAPPR AMC A-V-CVL AV-MISC
External - D3
Condensation from labs and
40 49568 114167 DAA-N WAPPR AMC A-V-MEP AV-HVAC
the corridors exhaust fan duct
2nd floor and 3rd floor lights
41 49706 114204 not working in front of lift no DAA-N WAPPR AMC A-V-MEP AV-ELEC
03.
Light not working in 2nd floor
42 49707 114321 DAA-N WAPPR AMC A-V-MEP AV-ELEC
accounts office.
43 44766 114341 PPM FAFF - Quarterly DAA-N WAPPR AMC SSM SM-FAS
Kindly rectify the issue of push
44 45012 90854 bottom of door G 31, F49, at DAA-N WAPPR AMC CVL C-MISC 29/05/2019 9,200.00
the earliest.
2 recrectable include a door
45 46156 95229 selector for external double DAA-N WAPPR AMC A-V-CVL AV-MSN 29/05/2019 21,646.10
door
First floor link bridge ceiling
46 48007 105640 GFS APPR AMC CVL C-CARP 10/06/2019 1,389.45
damage need to check asap
Water level indicator pipe of
47 48467 107774 GFS APPR AMC MEP M-PLUM 12/06/2019 1,150.00
phase 1 roof tank is not clear,
The door frame of FS2P is
48 43610 80956 damaged, Please do needful at GFS APPR AMC A-V-CVL AV-CARP 10/03/2019 1,157.25
earliest.
Aluminum glass door & window
49 44030 84648 GFS APPR AMC A-V-CVL AV-CARP 15/04/2019 6,573.00
rectification
Water leaking from corridor
50 45402 95063 second floor ceiling and MPH GFS APPR AMC CVL C-MISC 24/04/2019 499.25
store room
51 46306 95676 Quotation for Finger guards GFS APPR AMC A-V-CVL AV-CARP 30/04/2019 4,289.50
100 nos ceiling tiles needs to
52 46818 97515 GFS APPR AMC A-V-CVL AV-CARP 30/04/2019 1,333.50
be replaced
Rectification of FAFF system as
53 99450 GFS APPR AMC SSM SM-FAS 28/05/2019 4,996.75
per Q3
The master clock are not
54 47062 99716 GFS APPR AMC A-V-SSM AV-MCS 12/06/2019 2,185.00
working in year 2M and 6H
Need to remove Art room2
55 47207 101370 GFS WAPPR AMC CVL C-PINT 12/06/2019 4,600.00
wall cupboard
Problem with FCU at various
56 47826 103659 GFS WAPPR AMC A-V-SSM AV-BMS
locations
Replace/repair damaged
57 47801 103660 GFS WAPPR AMC CVL C-MSN
building expansion joint
Phase 1 roof top floor damage
58 48008 105639 GFS WAPPR AMC CVL C-MSN
is damage need to check
Unable to control the FCU
59 107422 temperatures. Controller GFS WAPPR AMC SSM SM-BMS 26/05/2019
defective
Required quote for installation
of power sockets in 10
60 49019 111239 GFS WAPPR AMC A-V-MEP AV-ELEC 19/06/2019
different location on 2nd and
3rd floor.
61 49157 111718 LV room AC not working GFS WAPPR AMC MEP M-HVAC

62 49265 111778 SW Bus parking area Inter lock GFS WAPPR AMC A-V-CVL AV-MISC 13/06/2019
SW GFS013 Mid-height
63 49357 111850 handrails for stairwells G to FF GFS WAPPR AMC A-V-CVL AV-MISC 17/06/2019 25,300.00
for 8 stairwells
SW GFS024 Remodel Store
adjacent to Clinic to house
64 49605 113905 GFS WAPPR AMC CVL C-MISC
autoclave and secure medicine
cabinet
SW GFS020 Add partition and
additional door to SF Staff
65 49596 113906 GFS WAPPR AMC CVL C-MISC 20/06/2019
Room 01 to create new Store
Room
SW GFS018 MPH backstage
66 49595 113909 changing - combine into single GFS WAPPR AMC CVL C-MISC 20/06/2019
space PE office
SW GFS010 Remodel FF
'Arabic Rooms 02 and 03' to
67 49592 113914 GFS WAPPR AMC CVL C-MISC 20/06/2019
create 3 learning spaces for
'Small Steps'
SW GFS016 Create new FS
68 49593 113916 Store room within section of GFS WAPPR AMC A-V-CVL AV-MISC 20/06/2019
FS Entrance
SW GFS017 Remodel TF
Library Small Group Rooms 01
69 49594 113932 GFS WAPPR AMC A-V-CVL AV-MISC 18/06/2019
and 02 to create single Store
Room
70 99341 114083 PPM Lift - Monthly GFS WAPPR AMC SSM SM-ELEV
SW GFS019 Construct 'Water
71 49604 114155 Bottle Store' within second FS GFS WAPPR AMC CVL C-MSN
Entrance - joinery item
SW GFS015 Expansion joint
72 49603 114156 GFS WAPPR AMC CVL C-MISC
External - D3
SW GFS014 Expansion Joints
73 49602 114157 GFS WAPPR AMC CVL C-MISC
Internal - D3
SW GFS008 Bus parking
74 49601 114158 Interlock - widen path and GFS WAPPR AMC A-V-CVL AV-MISC
sunken area due to water tank
SW GFS003 Speakers for FAFF
75 49598 114159 System - clinic, drivers block, GFS WAPPR AMC SSM SM-FFS
changing rooms, roof
SW GFS009 Dubai Civil
76 49591 114161 GFS WAPPR AMC A-V-CVL AV-MISC
Defence - inspection works
SW GFS005 Remove corridor
walls from 'Common Rooms' to
77 49589 114168 GFS WAPPR AMC A-V-CVL AV-MISC
give single large 6th form
space
Generator battery need to
78 49815 114169 replace as of now generator is GFS WAPPR AMC A-V-MEP AV-ELEC
in off mode
SW GFS001 New FS Library
79 49588 114170 GFS WAPPR AMC A-V-CVL AV-MISC
space
SW GFS021 Add office space
80 49597 114180 GFS WAPPR AMC CVL C-MSN
in the above 6th form space
81 44625 114344 PPM FAFF - Quarterly GFS WAPPR AMC SSM SM-FAS
Light sensor in year 7E is not
82 43426 82811 GFS WAPPR AMC A-V-SSM AV-LCS 30/05/2019 4,025.00
working
Building expansion joint
83 45011 87340 support need to fix in year 3N GFS WAPPR AMC CVL C-MISC 11/04/2019 2,483.30
ceiling
Need to Replace Automatic
Glass Door Floor Machine in
84 47423 101538 GIS APPR AMC A-V-CVL AV-CARP 29/05/2019 2,227.50
MYP Music and Parent Cafe
Doors
Reception sliding door air
85 47964 105581 curtain need to be GIS APPR AMC A-V-SSM AV-ADOR 27/05/2019 805.00
automatically on & off
Washbasin mixers not working
86 47965 105582 GIS APPR AMC A-V-MEP AV-PLUM 10/06/2019 2,982.50
properly in phase - 2

Replacement of spare parts for


87 47991 105613 GIS APPR AMC A-V-SSM AV-FAS 23/05/2019 3,795.00
FAFF

Internal areas damage


88 48087 105683 GIS APPR AMC A-V-CVL AV-CARP 12/06/2019 9,775.00
rectification needed due to rain
Water tank no. 2 drain line
89 49082 111556 GIS APPR AMC A-V-MEP AV-PLUM 12/06/2019 4,500.00
handle not working properly
Phase 1 first floor room
90 43093 78353 number 53 lighting sensor not GIS APPR AMC A-V-SSM AV-LCS 24/02/2019 3,220.00
working
Need to change the washbin
91 43958 82733 mixer in driver room and GIS APPR AMC A-V-MEP AV-PLUM 29/04/2019 3,473.00
swimming pool washroom.
Floor crack near phase 2 1st
92 43938 82738 GIS APPR AMC A-V-CVL AV-MSN 17/03/2019 3,001.50
floor play area entrance
Need to fix censor tap in
93 45849 93111 GIS APPR AMC A-V-MEP AV-PLUM 01/05/2019 2,890.90
prayer room
Kick plates needed in various
94 45911 93188 GIS APPR AMC A-V-CVL AV-CARP 24/04/2019 3,776.50
area
Wooden doors need to be
95 46198 95252 repair and paint in admin GIS APPR AMC A-V-CVL AV-CARP 08/05/2019 630.11
areas
Need to check multi foot valve
96 46879 99339 GIS APPR AMC A-V-MEP AV-SPW 07/05/2019 857.50
small pool pump room
After ppm rectification work
97 105839 GIS INPRG AMC SSM SM-CHIL 29/05/2019 6,877.00
-chiller
PPM Ladder Inspection –
98 99398 114096 GIS INPRG AMC MEP M-MECH
Monthly
EPDM rubber damaged in big
99 47569 103392 GIS WAPPR AMC A-V-SSM AV-AT 13/05/2019
football pitch
Phase 02 ground floor male
100 47839 103647 changing room wooden door GIS WAPPR AMC A-V-CVL AV-CARP 28/05/2019
damaged need to be repair.
101 48328 105865 SW - Roof waterproofing - D3 GIS WAPPR AMC A-V-CVL AV-MSN

102 48332 105866 SW - External Painting - D3 GIS WAPPR AMC A-V-CVL AV-PINT

103 48331 105867 SW - Wash Room Ceiling - D3 GIS WAPPR AMC A-V-CVL AV-CARP
SW - Parking area Inter lock -
104 48336 105868 GIS WAPPR AMC A-V-CVL AV-MSN
D3
Rectification and replacement
105 48771 107965 GIS WAPPR AMC A-V-MEP AV-MECH 30/05/2019
of solar water heater system
Glass door floor machine is not
106 49083 111557 working properly in swimming GIS WAPPR AMC A-V-CVL AV-CARP 18/06/2019
pool GF 89
Main swimming pool one down
107 49113 111630 light damaged needs to be GIS WAPPR AMC A-V-MEP AV-SPW 18/06/2019
changed
Baby changing facility for the
small baby in female
108 49262 111786 GIS WAPPR AMC A-V-CVL AV-MSN
washroom inside at the main
reception
Reinforcement for TV screens
109 49294 111800 at staff rooms need to be GIS WAPPR AMC A-V-CVL AV-CARP
done.
Basketball hoops need to
110 49340 111845 GIS WAPPR AMC A-V-CVL AV-CARP 19/06/2019
check
Door handle loose in GF
111 49473 113427 44,staircase 6 second floor and GIS WAPPR AMC A-V-CVL AV-CARP
staircase 7 first floor
FACP panel showing regularly
112 49477 113454 GIS WAPPR AMC A-V-SSM AV-FAS
faults in Phase1 FCC room
Ply need to be change in KG
113 49527 113510 GIS WAPPR AMC A-V-CVL AV-CARP
ground floor 29
Phase2 GF08 FCU not working
114 49554 113605 GIS WAPPR AMC A-V-MEP AV-HVAC
properly
Noise coming from air curtain
115 49555 113656 GIS WAPPR AMC A-V-MEP AV-HVAC
in Phase1 staircase 3 GF
Require power in admin male
116 49836 114188 GIS WAPPR AMC A-V-MEP AV-ELEC
washroom
Main reception near per desk
117 49969 114326 top Sheikh photos area need GIS WAPPR AMC A-V-CVL AV-PINT
paint
School signage need to
118 49970 114328 remove from the amphitheater GIS WAPPR AMC A-V-CVL AV-PINT
area wall
119 93161 PPM BMS Systems - Quarterly GIS WAPPR AMC SSM SM-BMS
Platform for kiln in C block 2nd
120 47440 101562 GWA APPR AMC A-V-CVL AV-MISC 12/06/2019 1,172.20
floor art room C 201
FAHU-2 cooling unit no. 1A
121 47834 103661 GWA APPR AMC A-V-MEP AV-HVAC 27/05/2019 281.75
condenser fan motor is broken.
Water tank leaking
122 48938 111163 ( SWGWA003 ) need to fix the GWA APPR AMC A-V-MEP AV-PLUM 17/06/2019 17,250.00
it
AC not working in Changing
123 48967 111198 GWA APPR AMC A-V-MEP AV-HVAC 20/06/2019 650.00
Room D006
Squash court package unit AC
124 49021 111238 GWA APPR AMC A-V-MEP AV-HVAC 18/06/2019 450.00
not working
D Block FAHU airblower broken
125 49164 111721 GWA APPR AMC A-V-MEP AV-HVAC 20/06/2019 1,265.00
canteen extension
E215 AC not working need to
126 49372 111854 GWA APPR AMC A-V-MEP AV-HVAC 19/06/2019 8,500.00
check and fix asap.
AC is not working in E block
127 49816 114205 3rd floor passage as PCB is GWA APPR AMC A-V-MEP AV-HVAC 19/06/2019 1,900.00
broken
AHU is not working in B block
128 49890 114226 GWA APPR AMC A-V-MEP AV-HVAC 23/06/2019 6,000.00
2nd floor library.
SW385 Speakers need to be
installed E block ground floor
129 33335 43649 GWA APPR AMC A-V-SSM AV-PAVA 25/10/2018 14,547.50
DT rooms, in front of
secondary building...
Need to change the main
entrance door to a thick glass
130 41436 70379 GWA APPR AMC A-V-CVL AV-MISC 30/04/2019 52,227.65
aluminum framed automatic
sliding door
131 45047 87308 Fire water tank re construction GWA APPR AMC A-V-MEP AV-PLUM 22/04/2019 62,100.00
Water leaking from the rooftop
132 45498 91275 in planetarium office near GWA APPR AMC A-V-CVL AV-MISC 15/04/2019 1,003.00
library.
We need to reinforce
gypsumwall in E block 3rd
133 45676 91468 GWA APPR AMC A-V-CVL AV-MISC 08/04/2019 459.90
floor E 311. Please take
necessary action on this.
Required disabled parking next
134 46962 99448 to gate no. 4 (with signboard GWA APPR AMC A-V-CVL AV-MISC 20/05/2019 4,324.60
and line marketing)
14 nos. fled lights are not
135 47832 103663 GWA WAPPR AMC A-V-MEP AV-ELEC 10/06/2019 19,255.80
working in sports field
Access control and fire alarm
136 48085 105684 GWA WAPPR AMC A-V-SSM AV-ACS
connection for 3 doors.
Gypsum wall broken near
137 49090 111564 service lift C-block 3rd floor GWA WAPPR AMC A-V-CVL AV-CARP
passage
13amps double power sockets
138 49089 111565 GWA WAPPR AMC A-V-MEP AV-HVAC
required at E-211
SW-GWA-001 Class room Paint
139 49390 111864 GWA WAPPR AMC A-V-CVL AV-PINT 13/06/2019
– C2
SW GWA010 Expansion joint
140 49615 113941 GWA WAPPR AMC A-V-CVL AV-MISC
External - C2
SW GWA018 Redesign of
141 49614 113942 ‘Maker Space’ as ‘Entrepreneur GWA WAPPR AMC A-V-CVL AV-MISC
Centre’
SW GWA019 Construction of
142 49613 113943 GWA WAPPR AMC A-V-CVL AV-MISC
new office for ASA Coordinator
SW GWA008 Expansion Joints
143 49612 113944 GWA WAPPR AMC A-V-CVL AV-MISC
Internal - C2
SW GWA002 Corridor Painting
144 49611 113945 GWA WAPPR AMC CVL C-MISC
- C2

SW GWA001 Class Room Paint


145 49610 113946 GWA WAPPR AMC A-V-CVL AV-PINT
- C2

146 97309 114085 PPM Lift - Monthly GWA WAPPR AMC SSM SM-ELEV

Big pool heat cool unit-1 is not


147 49891 114227 GWA WAPPR AMC A-V-MEP AV-HVAC
working. Gas is leaking

148 114343 PPM FAFF - Quarterly GWA WAPPR AMC SSM SM-FAS
AC is not working in E block
149 50020 115836 3rd floor E 314 the PCB is GWA WAPPR AMC A-V-MEP AV-HVAC
broken.
Football court upstand
150 41561 70483 interlock and concreting to be GWA WAPPR AMC A-V-CVL AV-MISC 15/05/2019 78,236.30
done along with hand rail.
Need to repair the E Block
151 42273 72798 GWA WAPPR AMC A-V-CVL AV-MISC 14/05/2019 6,538.90
W303 Men’s toilet, broken tile
152 44458 84677 Fountain motor reception area GWA WAPPR AMC A-V-MEP AV-PLUM 08/04/2019 1,466.25

153 44626 85145 Air quality needs to be done . GWA WAPPR AMC A-V-MEP AV-HVAC 27/03/2019 10,350.00
Power socket for projector in B
154 45850 93123 GWA WAPPR AMC A-V-MEP AV-HVAC 01/05/2019 1,769.05
block 1st floor
Networking required between
155 46571 97324 GWA WAPPR AMC A-V-SSM AV-FAS 01/05/2019 34,500.00
main FACP & 3rd floor FACP
PPM rectification of FAFF
156 99530 GWA WAPPR AMC SSM SM-FAS 14/05/2019 9,309.25
system as per the Q3 PPM
Access control door to the year
157 48730 107944 1 area (by the café) is not GWPS APPR AMC SSM SM-ACS 13/06/2019 1,069.00
closing properly.
Compressor failed at the new
158 49099 111608 building staircase needs to be GWPS APPR AMC A-V-MEP AV-HVAC 20/06/2019 1,345.50
replace
1000A TPN isolator handle
159 42018 72438 GWPS APPR AMC A-V-MEP AV-ELEC 25/02/2019 7,820.00
replacement for capector bank
YEAR 4 D AND YEAR 5 C
WINDOW CATTON IS FALL
160 46352 95699 GWPS APPR AMC CVL C-CARP 06/05/2019 120.50
DOWN NEED TO BE REFIX
ASAP.
Required quotation for new
161 47532 103404 GWPS WAPPR AMC CVL C-MISC
flooring area.
Quote for putting in new
162 47536 103405 GWPS WAPPR AMC CVL C-MISC
flooring in ICT lab
SWWPS-005 Health & Safety
concern to be replaced
163 47533 103407 GWPS WAPPR AMC SSM SM-CW 17/06/2019 113,091.00
domestic water tank at roof
top
Quote for Key pad Access
164 47534 103408 GWPS WAPPR AMC SSM SM-ACS 20/06/2019 59,857.50
control for FS1 & FS2
Difficulty with the AC unit in
165 47957 105535 GWPS WAPPR AMC A-V-MEP AV-HVAC
FS2H classroom
5 nos rheem thermostats
166 48279 105807 GWPS WAPPR AMC A-V-MEP AV-HVAC 25/05/2019
required at new building
SW - Potable/ Domestic Water
167 48378 107401 GWPS WAPPR AMC A-V-MEP AV-PLUM
Tank - D2
SW - LV Switch gears
168 48377 107402 GWPS WAPPR AMC A-V-MEP AV-ELEC
(MDB/SMDB/DB) - C2
Wooden window sill on the
169 48727 107943 year 5/6 staircase (near to the GWPS WAPPR AMC CVL C-CARP 10/06/2019
Discovery Room 2)
Vinyl flooring need of repair in
170 48766 107961 year 4 classroom F058 - year GWPS WAPPR AMC CVL C-MISC
4c
Quote to replace the 2 TON AC
unit in the F046 - with 5 TON
171 48770 108001 GWPS WAPPR AMC A-V-MEP AV-HVAC 16/06/2019
unit as the current unit is not
cooling
FAHU 2 bms control is not
172 48836 109542 GWPS WAPPR AMC A-V-SSM AV-BMS
working need to be fix.
Multi purpose hall packej unit
173 49325 111827 no.7, 1nos. Compressor not GWPS WAPPR AMC A-V-MEP AV-HVAC
working.
Year 1 boys toilet door frame
174 49462 113462 GWPS WAPPR AMC CVL C-CARP
needs to be fixed
Lv room penal 2 capacitor
175 49528 113513 GWPS WAPPR AMC A-V-MEP AV-ELEC
bank not working properly
Thermostat temperature
176 49701 113934 GWPS WAPPR AMC A-V-MEP AV-HVAC
sensors to be checked.
Main security gate on/off
177 49704 113935 switch is broken need to be GWPS WAPPR AMC A-V-MEP AV-ELEC
replace.
AC motor - S016 is not
178 49712 113954 GWPS WAPPR AMC A-V-MEP AV-HVAC
working.
PPM Ladder Inspection –
179 105601 114094 GWPS WAPPR AMC MEP M-MECH
Monthly
2 nos. Condenser fan blade
180 49793 114135 GWPS WAPPR AMC A-V-MEP AV-HVAC
required.
181 23243 114260 PPM FAFF - Quarterly GWPS WAPPR AMC SSM SM-FAS
FS2 g and d toilet finger guard
182 50007 115843 GWPS WAPPR AMC CVL C-CARP
is broken need to be replace.
Package AC units on the old
183 47051 99689 building is damaged and GWPS WAPPR AMC A-V-MEP AV-HVAC 05/05/2019
leaking
Damaged ceiling tiles need to
184 47364 101490 JCD APPR AMC A-V-CVL AV-CARP 14/05/2019 1,179.00
replace in all corridors.
Lab 5 AC compressor is not
185 49280 111793 JCD APPR AMC A-V-MEP AV-HVAC 20/06/2019 1,903.25
working need to check
Lab 9 & 10 AC compressor and
186 49281 111794 expansion valve is not working JCD APPR AMC A-V-MEP AV-HVAC 20/06/2019 3,076.25
need to rectify
SWJCD-002 Replacement of 9
187 42979 78385 JCD APPR AMC A-V-MEP AV-HVAC 24/03/2019 710,419.00
nos of Packaged AC in school
Door brackets and opening of
188 44681 85200 JCD APPR AMC A-V-CVL AV-CARP 02/04/2019 3,220.00
emergency door
FAFF after ppm rectification
189 87342 JCD APPR AMC A-V-SSM AV-FFS 08/04/2019 9,918.75
works
’Recommissioning and
Maintenance of 9 nos of
190 45614 91418 JCD APPR AMC A-V-MEP AV-HVAC 23/04/2019 23,644.00
Packaged AC equipment till
end June 2019
Pressure switch need to be
191 46094 95138 JCD APPR AMC A-V-SSM AV-FFS 01/05/2019 2,139.00
replace in fire jockey pump.
Requirement for fire
192 46476 97234 JCD APPR AMC SSM SM-FFS 02/05/2019 4,559.75
extinguisher stand.
Glass Window required in
193 46825 97518 second floor between sixth JCD APPR AMC A-V-CVL AV-CARP 08/05/2019 3,164.95
form ICT and HOD room.
Fire panel showing pre warning
194 47223 101299 JCD WAPPR AMC A-V-SSM AV-FAS 14/05/2019
alarm need to check
Put 6 no. dual sockets in G8
195 47530 101612 class room ground floor JCD WAPPR AMC A-V-MEP AV-ELEC 25/05/2019
English corridor
require 3 numbers 60x60
196 48019 105631 ceiling light at sixth form JCD WAPPR AMC A-V-MEP AV-ELEC 10/06/2019 1,191.60
staircase please arrange to fix.
Quote for pergola painting
197 48099 105665 from reception outside area to JCD WAPPR AMC A-V-CVL AV-PINT 27/05/2019
sports hall foyer
Panel board messaging wrong
198 48244 105783 location could you please JCD WAPPR AMC A-V-SSM AV-FAS
inform to naffco team.
199 48337 105894 SW - Boundary wall - D3 JCD WAPPR AMC A-V-CVL AV-MISC

200 48338 105896 SW - Flag Pole - D3 JCD WAPPR AMC A-V-CVL AV-MISC

201 48339 105897 SW - Entrance Step - D3 JCD WAPPR AMC A-V-CVL AV-MISC
Split AC Unit - D2( Pump room
202 48525 107775 JCD WAPPR AMC A-V-MEP AV-HVAC 20/06/2019 5,751.00
and Security Cabin)
SW - DT Workshops - MEP
203 48842 109581 JCD WAPPR VAR VAR-MEP V-MECH
upgrades required.
204 97307 114086 PPM Lift - Monthly JCD WAPPR AMC SSM SM-ELEV

205 19866 114268 PPM FAFF - Quarterly JCD WAPPR AMC SSM SM-FAS
Need a quota for installation of
interlock at swimming pool
206 45375 89360 JCD WAPPR AMC CVL C-MSN 08/05/2019 12,060.00
area, staff parking, main
entrance area.
Sport hall package AC
207 47946 105527 condenser fan motor is faulty JPS APPR AMC A-V-MEP AV-HVAC 26/05/2019 247.25
to be repair.
Main building ground floor Year
1 and Year 2 door finger guard
208 48623 107837 JPS APPR AMC VAR-CVL V-CARP 09/06/2019 793.50
broken need to replace and
need 5 set
after ppm rectification work
209 107954 JPS APPR AMC SSM SM-ADOR 18/06/2019 517.50
-sliding door
210 99350 PPM rectification work JPS APPR AMC A-V-SSM AV-FAS 01/05/2019 3,639.75
Replacement of 2 MCP and 2
211 47068 99694 JPS APPR AMC A-V-SSM AV-FAS 02/05/2019 3,341.50
emergency lights
Require all three color
212 47280 101357 JPS WAPPR AMC A-V-CVL AV-MISC 17/06/2019 17,948.71
markers; red, blue and white.
213 46989 101379 Vinyl flooring around school JPS WAPPR AMC CVL C-MISC
Year 1 boys toilet cubicles
214 47803 103643 partition doors needs to be JPS WAPPR AMC A-V-CVL AV-CARP 30/05/2019
cover from bottom side
215 48340 105876 SW - Drainage - D3 JPS WAPPR AMC A-V-MEP AV-PLUM

216 48341 105878 SW - Boundary Wall - D3 JPS WAPPR AMC A-V-MEP AV-ELEC
JPS Zebra crossing lights are
217 48752 107996 JPS WAPPR AMC SSM SM-LCS
not working properly
Zebra crossing lights are not
218 49034 111544 JPS WAPPR AMC A-V-MEP AV-ELEC
working properly
Need to replace the fence for
219 49302 111848 swimming pool towards JPS WAPPR AMC VAR-MEP V-MECH
football field
Required spikes on swimming
220 49511 113527 pool shower area on small wall JPS WAPPR AMC VAR-SSM V-OSPW
to stop the birds from nesting
Security cabinet no. 1 window
221 49684 113917 AC is not working needs to be JPS WAPPR AMC A-V-MEP AV-HVAC
repaired
SW JPS006 Ablution Area
222 49616 113918 JPS WAPPR AMC A-V-SSM AV-CW
addition to FF toilet
SW JPS007 Upgrade Clinic WC
223 49617 113919 JPS WAPPR AMC CVL C-MISC
- Accessible
A toilet to be added to the
224 49725 113965 JPS WAPPR AMC VAR-CVL V-MISC
classroom 2G
Year 1 and 2 toilet near light
225 49770 114038 JPS WAPPR AMC A-V-MEP AV-ELEC
switch needs to be separated
226 20920 114266 PPM FAFF - Quarterly JPS WAPPR AMC SSM SM-FAS
Pump room dosing system is
227 49982 114334 JPS WAPPR AMC A-V-MEP AV-SPW
not working
Swimming pool thermometer
228 49983 114335 JPS WAPPR AMC A-V-MEP AV-SPW
is not working
Automatic Sliding door PPM
229 70463 JPS WAPPR AMC A-V-SSM AV-ADOR 14/04/2019 517.50
rectification works
Sports hall AC ducting are
230 47161 99783 JPS WAPPR AMC A-V-MEP AV-HVAC 05/05/2019
damage and some leakage
Table glass of security is
231 48312 105841 LAB APPR AMC A-V-CVL AV-CARP 12/06/2019 287.50
broken need to change
Need to change spare parts for
232 48655 107873 LAB APPR AMC A-V-SSM AV-FAS 09/06/2019 592.25
FAFF
Installation of fingers guards 5
233 49278 111792 nos 180 degree at outside play LAB APPR AMC CVL C-CARP 16/06/2019 2,000.00
area
Need to change the pressure
234 49841 114192 LAB APPR AMC MEP M-PLUM 19/06/2019 1,200.00
tank
235 44217 83008 Anti slip protection in stair LAB APPR AMC A-V-CVL AV-MISC 20/03/2019 816.75
NEED TO REPAINT STAIR
236 46379 95706 LAB APPR AMC A-V-CVL AV-PINT 14/05/2019 5,946.88
CASE SAIDE
SW - Parking area Inter lock -
237 48344 105911 LAB WAPPR AMC A-V-CVL AV-MSN
D3
Installation of corner guards
238 49279 111791 LAB WAPPR AMC CVL C-CARP 13/06/2019
1x1 at classroom window
239 99381 114073 PPM Lift - Monthly LAB WAPPR AMC SSM SM-ELEV

240 44627 114342 PPM FAFF - Quarterly LAB WAPPR AMC SSM SM-FAS
SECURITY CABIN FRONT
241 46376 95703 LAB WAPPR AMC A-V-CVL AV-CARP 24/04/2019 1,235.50
SAIDE NEED SHADE
242 105617 Rectification of fahu actuator MTS APPR AMC MEP M-HVAC 30/05/2019 4,942.50
Requested additional power
243 49000 111219 socket for pace clock in MTS APPR AMC A-V-MEP AV-ELEC 17/06/2019 1,200.00
swimming pool
Staircase no 1 second flood
244 44379 84732 exit door push bar handle MTS APPR AMC CVL C-MISC 09/04/2019 980.89
damage
Third floor T-014 aluminium
245 45332 89314 MTS APPR AMC A-V-CVL AV-CARP 27/05/2019 977.50
door handle damage.
F-112 & F-121 & F-063
246 45104 89339 MTS APPR AMC CVL C-CARP 21/05/2019 6,152.50
wooden door frame damage.
Canteen aluminium glass door
247 45662 91444 MTS APPR AMC A-V-CVL AV-CARP 02/05/2019 1,725.00
2no not properly closing
First floor MPH wooden door
248 45663 91473 damage and 5no door closer MTS APPR AMC CVL C-CARP 02/05/2019 5,671.00
not working.
13 nos urinal sensor not
working (C / D / F block and
249 45778 93012 MTS APPR AMC A-V-MEP AV-PLUM 02/05/2019 9,523.15
swimming pool boys
washroom.
FAHU no 4, 6, 9, 10 Heat
250 46087 95129 wheel motor neet to rewinding MTS APPR AMC A-V-MEP AV-HVAC 29/04/2019 506.00
4nos
Sliding window lock broken
251 46268 95310 and washroom door not proper MTS APPR AMC CVL C-CARP 06/05/2019 893.80
closed.
looking for repair and some
252 46329 95679 changes for our counter desk MTS APPR AMC CVL C-CARP 07/05/2019 2,948.24
in primary library.
Security cabin gypsum wall
253 46267 95732 damage and need to be MTS APPR AMC CVL C-CARP 01/05/2019 1,052.75
painted
Removal of corridor bench
254 46552 97300 attached to a wall at location MTS APPR AMC CVL C-CARP 29/05/2019 1,091.50
year 1 corridor
Aluminium door handle
255 46728 97440 damage (S-033, G-126, G- MTS APPR AMC A-V-CVL AV-CARP 20/06/2019 3,622.50
091, G-115)
Need additional central AC
duct and additional 2 no. data
256 46865 99315 MTS APPR AMC A-V-MEP AV-HVAC 15/05/2019 4,490.65
pot and 2 no. power socket
cabin no G121
Quote Supply and installation
257 47235 101338 MTS WAPPR AMC A-V-CVL AV-CARP 08/05/2019 5,750.00
of finger guards
MPH hall 5 no. light now
258 47772 103599 MTS WAPPR AMC A-V-MEP AV-ELEC 30/05/2019 2,135.13
working need scuffolding
Controller malfunctioning
259 107429 MTS WAPPR AMC A-V-SSM AV-BMS 26/05/2019
needs to be replaced QTY 10
1) FAHU 08 supply fan vfd
fault and need to replace 'D'
260 48686 107898 MTS WAPPR AMC A-V-MEP AV-HVAC 13/06/2019 4,370.00
block second floor electrical
room.
261 48685 107900 FAHU 04 supply fan vfd faultty MTS WAPPR AMC A-V-MEP AV-HVAC 13/06/2019 2,990.00
Need 2no new door closer
262 49160 111716 female support staff room G- MTS WAPPR AMC CVL C-CARP 13/06/2019
178 / G-179
263 49499 113476 Required Internal paint MTS WAPPR AMC CVL C-PINT 17/06/2019 520,815.45
SW MTS002 External Painting
264 49628 113893 MTS WAPPR AMC CVL C-PINT
- D3
SW MTS003 Corridor Painting
265 49629 113894 MTS WAPPR AMC CVL C-PINT
- D3
SW MTS006 Expansion joint
266 49634 113895 MTS WAPPR AMC CVL C-MSN
External - D3
SW MTS005 Wash room ceiling
267 49633 113896 MTS WAPPR AMC CVL C-PINT
- D3
SW MTS004 Corridor Ceiling -
268 49630 113897 MTS WAPPR AMC CVL C-CARP
D3
SW MTS009 3G Artificial pitch
269 49636 113898 MTS WAPPR AMC CVL C-SFLR
repair
Fcu not working in S091 class
270 49715 113952 MTS WAPPR AMC A-V-MEP AV-HVAC
room
ELCB tripping in second floor A
271 49721 113971 MTS WAPPR AMC A-V-MEP AV-ELEC
block neet to rectify.
272 23236 114264 PPM FAFF - Quarterly MTS WAPPR AMC SSM SM-FAS
Repainting works of all
273 40713 66017 MTS WAPPR AMC A-V-CVL AV-PINT 16/02/2019 15,230.00
staircase handrail
Painting required whole
274 41822 70556 boundary fencing along with MTS WAPPR AMC A-V-CVL AV-PINT 21/02/2019 32,949.43
gates.
Supply and replacement of
275 43004 76808 damage tiles near reception to MTS WAPPR AMC A-V-CVL AV-MISC 16/03/2019 25,300.00
gate no 1
Supply and installation of SS
276 43005 76809 fence and 2 side door at MTS WAPPR AMC A-V-CVL AV-MISC 17/03/2019 23,000.00
swimming pool
SW Quotation for whole school
277 43178 78849 MTS WAPPR VAR VAR-CVL V-PINT 24/03/2019 583,280.00
external painting.
SW Quotation for internal
278 43179 78851 MTS WAPPR VAR VAR-CVL V-PINT 17/03/2019 793,500.00
painting
SW Outside tiles work gate no
279 43419 80546 MTS WAPPR AMC A-V-CVL AV-MSN 15/05/2019 18,831.25
6
Glass partition required admin
280 43713 81051 MTS WAPPR AMC A-V-CVL AV-MISC 20/03/2019 6,247.38
operation office.
Supply and installation of glass
281 43978 82776 partition and window at MTS WAPPR AMC A-V-CVL AV-MISC 24/04/2019 22,712.00
Library.
Supply and installation of
282 43980 82777 MTS WAPPR AMC A-V-CVL AV-MISC 16/05/2019 11,385.41
folding type partition at Library
Need to replace broken tiles
283 44779 87171 MTS WAPPR AMC CVL C-MSN 27/03/2019 4,341.60
around reception area
Please kindly provide us the
284 44865 87243 quotation forreplacement of MTS WAPPR AMC SSM SM-CW 24/04/2019 4,960.00
carpet in parents cafe.
Glass partition required in
285 44783 87244 MTS WAPPR AMC VAR-CVL V-MISC 24/04/2019 10,580.00
admin parents waiting area.
Fs library and 2nd floor lift
286 45461 90911 MTS WAPPR AMC CVL C-CARP 15/04/2019 1,049.60
corridor ceiling damage.
Rectification of FAHU - PPM
287 95314 MTS WAPPR AMC A-V-MEP AV-HVAC 19/05/2019
WO-93173
one of our class room need to
288 46718 97433 MTS WAPPR AMC CVL C-CARP 17/06/2019 80,816.25
conversion on dance studio.
Class room conversion into
289 46721 97435 MTS WAPPR AMC CVL C-CARP 14/05/2019 3,008.40
fitness room
Metal fence required 2nd floor
290 46734 97439 MTS WAPPR AMC A-V-CVL AV-MISC 07/05/2019 6,727.50
F block crossway
Metal fence around primary
291 46733 97441 MTS WAPPR AMC A-V-CVL AV-MISC 07/05/2019 7,245.00
library outside balcony
292 46765 97468 Astrotruf required at roof slab MTS WAPPR AMC A-V-CVL AV-SFLR 02/05/2019 55,545.00
Kitchen cabinet required with
293 46767 97469 MTS WAPPR AMC A-V-CVL AV-MISC 30/05/2019 30,406.00
counter at lab
Repair of damage classroom
294 47148 99775 MTS WAPPR AMC CVL C-CARP 21/05/2019 3,933.75
cupboard and student lockers
After ppm Rectification work-
295 105840 NMS APPR AMC SSM SM-CHIL 29/05/2019 5,485.00
chiller
296 48547 107776 interface the lit to FAFF NMS APPR AMC A-V-SSM AV-FAS 30/05/2019 3,047.50

297 48768 107963 Need the refile fire cylinder NMS APPR AMC SSM SM-FAS 10/06/2019 276.00
Need to replace the chiller flow
298 49811 114147 NMS APPR AMC A-V-SSM AV-CHIL 20/06/2019 3,600.00
sensor.
Gate number 7 security room
299 49910 114290 NMS APPR AMC A-V-MEP AV-HVAC 20/06/2019 1,000.00
AC is not working.
Phase 1 rooptop booster pump
300 47229 101298 NMS WAPPR AMC A-V-MEP AV-PLUM 16/05/2019 4,140.00
is not working
School Entrance tiles to be
301 42560 101427 NMS WAPPR AMC A-V-CVL AV-MISC
changed.
Main reception staircase tiles
302 44501 101430 NMS WAPPR AMC A-V-CVL AV-MSN
are damaged.
303 45387 101431 Leakage due to rain NMS WAPPR AMC A-V-CVL AV-MISC
Taps 10 Pcs. in different
304 46803 101439 washrooms ( heavy leakage) NMS WAPPR AMC A-V-MEP AV-PLUM 17/06/2019 2,872.50
required
Insulation of solar tank above
305 46828 101441 NMS WAPPR AMC A-V-MEP AV-PLUM 30/05/2019
swimming pool has come off
Repair and painting work
306 46938 101443 required for wooden doors in NMS WAPPR AMC A-V-CVL AV-CARP 09/06/2019
both Phase-1 & Phase-2
Need to fix new pipeline in
307 47347 101472 NMS WAPPR AMC A-V-MEP AV-PLUM 22/05/2019
phase 1 rooftop in water tank
Need to basketball pole
308 47845 103657 NMS WAPPR AMC A-V-CVL AV-PINT 29/05/2019
painting
309 48345 105873 SW - Roof waterproofing - D3 NMS WAPPR AMC A-V-CVL AV-MISC

310 48346 105874 SW - Wooden Doors - D3 NMS WAPPR AMC A-V-CVL AV-CARP

311 48350 105875 SW - Boundary wall - D3 NMS WAPPR AMC A-V-CVL AV-MISC

312 48361 105877 SW - External Painting - D3 NMS WAPPR AMC A-V-CVL AV-PINT
SW - Expansion Joints Internal
313 48362 105879 NMS WAPPR AMC A-V-CVL AV-MISC
- D3
SW - Expansion joint External
314 48367 105883 NMS WAPPR AMC A-V-CVL AV-MISC
- D3
315 48348 105885 SW - Field Area Fence - D3 NMS WAPPR AMC A-V-CVL AV-CARP
SW - External running track -
316 48365 105886 NMS WAPPR AMC A-V-CVL AV-PINT
D3
SW - External Sports flooring -
317 48364 105887 NMS WAPPR AMC A-V-CVL AV-MISC
D3
SW - External Fabric Shade -
318 48366 105889 NMS WAPPR AMC A-V-SSM AV-CW
D3
Required service for all
319 48567 107835 Classrooms & washrooms door NMS WAPPR AMC A-V-CVL AV-CARP
.
Need to install PAVA speakers
320 48740 107948 NMS WAPPR AMC A-V-CVL AV-CARP
across classroom and school.
Flood light across school and
321 48741 107953 NMS WAPPR AMC A-V-MEP AV-ELEC
tennis court
Sewage tank cleaning and
322 49480 113456 NMS WAPPR AMC A-V-MEP AV-PLUM 16/06/2019
decreasing and sluge removal
Need to repair gully trap
323 49548 113530 NMS WAPPR AMC A-V-CVL AV-MISC
manhole concrete
324 99399 114071 PPM Lift - Monthly NMS WAPPR AMC SSM SM-ELEV
PPM Diesel Generator Testing
325 90872 114092 NMS WAPPR AMC MEP M-MECH
(20 Minutes) – Monthly
326 19791 114271 PPM FAFF - Quarterly NMS WAPPR AMC SSM SM-FAS
First floor library FCU motor
327 48161 105691 NSB APPR AMC A-V-MEP AV-HVAC 27/05/2019 184.00
burn
Tiles broken at swimming pool
328 48311 105815 NSB APPR AMC A-V-CVL AV-MSN 13/06/2019 1,081.25
area
3rd floor D block students
329 48572 107806 washroom 2 WC back support NSB WAPPR AMC A-V-MEP AV-PLUM 11/06/2019 390.35
is broken need to fix
SW Parking area Inter lock -
330 49264 111777 NSB WAPPR AMC A-V-CVL AV-MISC 20/06/2019 2,897.10
D2
SW NSB001 Painting of
331 49315 111817 external area along with NSB WAPPR AMC A-V-CVL AV-PINT 13/06/2019
jetting of façade
FC11 Classroom FCU motor
332 49336 111829 NSB WAPPR AMC A-V-MEP AV-HVAC
burned need to replaced
Swimming pool booster pump
333 49335 111830 NSB WAPPR AMC A-V-MEP AV-SPW
burned need to replaced
334 49719 113964 AC temperature need to check NSB WAPPR AMC A-V-MEP AV-HVAC

335 99400 114070 PPM Lift - Monthly NSB WAPPR AMC SSM SM-ELEV
PPM Diesel Generator Testing
336 103495 114089 NSB WAPPR AMC MEP M-MECH
(20 Minutes) – Monthly
Ceiling broken at various
337 49847 114207 NSB WAPPR AMC A-V-CVL AV-CARP
location
SW NSB002 Parking area Inter
338 49638 114209 NSB WAPPR AMC A-V-CVL AV-CARP
lock - D3
SW NSB001 External Painting -
339 49637 114210 NSB WAPPR AMC CVL C-PINT
D3
340 23240 114262 PPM FAFF - Quarterly NSB WAPPR AMC SSM SM-FAS

341 78836 PPM rectification of chiller NSB WAPPR AMC SSM SM-CHIL 01/05/2019 10,412.10
Exhaust fan need to be fixed in
342 43052 80952 NSB WAPPR AMC A-V-MEP AV-HVAC 08/05/2019 3,220.00
chemistry lab
Please check on blow issue
343 45014 87278 NSB WAPPR AMC A-V-MEP AV-ELEC 29/05/2019 14,051.62
urgently in NSB astroturf.
Requirement for additional
344 46910 99520 NSB WAPPR AMC VAR-SSM V-PAVA 16/05/2019 18,400.00
speaker’s
Broken tiles in the swimming
345 48310 105814 NSG APPR AMC CVL C-MSN 29/05/2019 776.00
pool area
FACP showing batteries fault
346 46672 97407 NSG APPR AMC A-V-SSM AV-FAS 01/05/2019 218.50
so it needs to be replaced
Pole lights not working in the
347 47448 101554 NSG WAPPR AMC A-V-MEP AV-ELEC 19/05/2019 6,625.90
playground area.
Supply and replacement of
348 48009 105618 defective power supply unit for NSG WAPPR AMC SSM SM-FAS 20/05/2019 12,535.00
the FACP.
Booster pump is not working in
349 48165 105696 NSG WAPPR AMC A-V-MEP AV-SPW 30/05/2019 1,207.50
kids swimming pool
FCU motor need to rewind in
350 48166 105697 NSG WAPPR AMC A-V-MEP AV-HVAC 27/05/2019 184.00
staffroom second floor.
All the access door alignment
351 48503 107755 NSG WAPPR AMC CVL C-CARP
needs to be checked
Sliding door in main entrance
352 48635 107853 NSG WAPPR AMC A-V-SSM AV-ADOR 17/06/2019 4,140.00
is not working properly.
Addressable sounder faulty
353 49030 111232 need to be replace in external NSG WAPPR AMC A-V-SSM AV-FAS
area
SW Parking area Inter lock -
354 49263 111776 NSG WAPPR AMC A-V-CVL AV-MISC 20/06/2019 2,897.10
D2
SW NSG002 Painting of
355 49316 111818 external area along with NSG WAPPR AMC A-V-CVL AV-PINT 13/06/2019
jetting of façade
Sliding door on main entrance
356 49342 111840 is malfunctioning need to NSG WAPPR AMC A-V-SSM AV-ADOR
check
SW NSG003 Parking area Inter
357 49640 114041 NSG WAPPR AMC CVL C-MISC
lock - D2
SW NSG002 External Painting
358 49639 114042 NSG WAPPR AMC A-V-CVL AV-MISC
- D3
359 99401 114068 PPM Lift - Monthly NSG WAPPR AMC SSM SM-ELEV
PPM Diesel Generator Testing
360 103499 114088 NSG WAPPR AMC MEP M-MECH
(20 Minutes) – Monthly
361 23241 114261 PPM FAFF - Quarterly NSG WAPPR AMC SSM SM-FAS
Swimming pool, heat cool unit
362 44192 82952 NSG WAPPR AMC A-V-MEP AV-HVAC 23/04/2019 12,666.32
is not working.
Concrait base broken on roof
363 44044 84644 NSG WAPPR AMC CVL C-MSN 27/03/2019 244.34
top
Finger guard damaged in
364 44631 85205 NSG WAPPR AMC CVL C-CARP 27/03/2019 3,055.00
different areas.
We have waterlogged in Astor
365 45101 87348 turf as a result of no proper NSG WAPPR AMC CVL C-MSN 23/04/2019 1,265.25
drainage
Replacement of floor machines
366 45073 87349 for glass door at the clinic and NSG WAPPR AMC A-V-CVL AV-CARP 23/04/2019 1,943.75
KG lobby entrance.
367 45364 89327 Doors with issues NSG WAPPR AMC A-V-CVL AV-CARP 15/04/2019 2,498.00
Ground floor block B exit door
368 45195 89363 NSG WAPPR VAR CVL C-CARP 24/04/2019 195.50
broken.
FENCE COVERING AT FIELD
369 45552 91327 NSG WAPPR AMC A-V-CVL AV-MISC 15/04/2019 27,600.00
AREA
Arabic logo need to install in
370 45705 91480 NSG WAPPR AMC CVL C-CARP 15/04/2019 810.00
2nd floor
FAHU block C MCC room unit
371 47002 99536 NSG WAPPR AMC A-V-MEP AV-HVAC 15/05/2019 2,548.40
VFD is faulty.
Additional smoke detectors
372 45603 114294 OIS APPR AMC SSM SM-FAS 20/06/2019 21,000.00
required in various locations
373 16949 20622 Provide 2 no’s of chairlift OIS APPR AMC A-V-MEP AV-MECH 28/05/2018 166,557.61
Need to replace the old lights
374 45453 90868 with led lights give sufficient OIS APPR AMC A-V-MEP AV-ELEC 21/05/2019 8,572.50
light in the Ground floor
First floor in Boys Entrance –
375 47552 103385 OIS WAPPR AMC A-V-MEP AV-HVAC
front and back - 2 Nos
AC installation in Second floor
376 47553 103386 Boys Entrance – front and OIS WAPPR AMC A-V-MEP AV-HVAC
back - 2 Nos
AC installation in Second floor
377 47555 103387 OIS WAPPR AMC A-V-MEP AV-HVAC
(Girls entrance) Front-1Nos
AC installation in First floor
378 47554 103388 (Girls entrance) Front and OIS WAPPR AMC A-V-MEP AV-HVAC
back - 2 Nos
SW - LV Switch gears
379 48372 105890 OIS WAPPR AMC A-V-MEP AV-ELEC
(MDB/SMDB/DB) - C2
380 48529 107801 SW - Split AC unit - D2 OIS WAPPR AMC A-V-MEP AV-HVAC 18/06/2019
Exhaust blower motor not
381 48568 107802 OIS WAPPR AMC A-V-MEP AV-ELEC 13/06/2019
working
382 19801 114270 PPM FAFF - Quarterly OIS WAPPR AMC SSM SM-FAS
Building Fabric Survey Report
383 41707 70496 OIS WAPPR AMC A-V-CVL AV-MISC 16/05/2019 48,702.50
(5.3) Expansion joint
Required to change damage of
384 47259 101342 WEK APPR AMC A-V-CVL AV-CARP 23/05/2019 2,415.00
wooden door in six form
Requested to fixed water
385 47635 103460 resistant board in near WEK APPR AMC A-V-CVL AV-MISC 21/05/2019 1,725.25
Swimming pool staircase.
Required to change 3 nos
386 48489 107753 WEK APPR AMC A-V-MEP AV-HVAC 10/06/2019 1,742.25
actuator of FAHU
: Modification of TORO unit
387 38381 48362 WEK APPR AMC A-V-MEP AV-HVAC 02/06/2019 28,000.00
swimming pool area
Required to refixed shade near
388 44038 82825 WEK APPR AMC A-V-CVL AV-MISC 14/05/2019 7,130.00
zone 5
Required to repaired faulty
389 45169 88853 WEK APPR AMC A-V-MEP AV-PLUM 02/05/2019 4,438.80
urinals.
chiller ppm rectification work-
390 91438 WEK APPR AMC VAR-SSM V-CHIL 01/05/2019 20,361.90
wek
Required to check all wooden
391 45990 93541 WEK APPR AMC A-V-CVL AV-CARP 08/05/2019 1,344.25
& aluminium door handle
Wooden Skirting required for
392 46216 95279 WEK APPR AMC A-V-CVL AV-CARP 27/05/2019 1,358.40
various areas
Need To Paint All Fire Pipe Line
393 46472 97230 WEK APPR AMC A-V-CVL AV-PINT 14/05/2019 711.98
( Swimming Pool Rooftop )
Needs replaced 3
nos.aluminium door floor
394 46786 97477 WEK APPR AMC A-V-CVL AV-CARP 08/05/2019 2,299.00
machine & repair for ground
floor zone 2, zone 3/6, zone 7
Pest control need to be done in
395 47993 105614 WEK WAPPR AMC A-V-SSM AV-PC
the student toilets outside DT
SW - Required roof
396 48056 105649 WEK WAPPR AMC A-V-CVL AV-MSN
waterproofing - D3
SW - Required expansion joint
397 48057 105650 WEK WAPPR AMC A-V-CVL AV-MSN
external - D3
after ppm rectification work-
398 105835 WEK WAPPR AMC SSM SM-CHIL 29/05/2019 31,740.00
chiller
SW - External Fabric Shade -
399 48375 105904 WEK WAPPR AMC A-V-CVL AV-MISC
D3
SW - External running track -
400 48373 105905 WEK WAPPR AMC A-V-CVL AV-PINT
D3
SW - External Sports flooring -
401 48370 105906 WEK WAPPR AMC A-V-CVL AV-SFLR
D3
402 48369 105907 SW - Class Room Ceiling - D3 WEK WAPPR AMC A-V-CVL AV-CARP
Need to remove water from
403 48522 107757 water tank 1 and 2 for water WEK WAPPR AMC A-V-MEP AV-PLUM 17/06/2019 9,982.00
tank cleaning
404 48368 107841 SW - External Painting - D3 WEK WAPPR AMC A-V-CVL AV-PINT
Need to rectify damage shade
405 48901 109602 WEK WAPPR AMC A-V-CVL AV-MISC
in zone 1 internal area
Required to change 15 nos
W/B push tap as per below A
406 48904 109603 WEK WAPPR AMC A-V-MEP AV-PLUM
007-2,A 108-1,B 003-02,B
104-1,D 003-02,D 005-
Need to install corner guard in
407 48935 111153 WEK WAPPR AMC A-V-CVL AV-CARP 12/06/2019
FS area
Need to replace damage
408 49080 111560 cladding in zone 2 internal play WEK WAPPR AMC A-V-CVL AV-MISC
area
Need to fully conseild all water
409 49079 111561 tap and drain point in fs area WEK WAPPR AMC A-V-MEP AV-PLUM
and zone 1 & 2 ground floor
Need to rectification staircase
410 49130 111674 WEK WAPPR AMC A-V-CVL AV-CARP
exit wooden door
Fix the Led Light cover in F029
411 49702 113979 WEK WAPPR AMC A-V-MEP AV-ELEC
at your earliest convenience.
SW WEK001 Sports upgrade to
412 49655 113980 3G pitch only (no natural WEK WAPPR AMC A-V-CVL AV-SFLR
grass)
SW WEK006 Equipment -
Building (Unexpected
413 49654 113981 WEK WAPPR AMC A-V-MEP AV-MECH
Replacement of Bldg.
Equipment)
414 93153 114084 PPM Lift - Monthly WEK WAPPR AMC SSM SM-ELEV
PPM Diesel Generator Testing
415 90870 114093 WEK WAPPR AMC MEP M-MECH
(20 Minutes) – Monthly
Need to remove sitting area
416 49809 114146 near swimming pool for pest WEK WAPPR AMC A-V-CVL AV-CARP
control.
Required to change damage
417 49855 114220 WEK WAPPR AMC A-V-CVL AV-CARP
gypsum ceiling in D 119&120
Need to hide all water cooler
418 49854 114221 WEK WAPPR AMC A-V-CVL AV-MSN
point in all location
Required to change all damage
419 49853 114222 WEK WAPPR AMC A-V-CVL AV-CARP
finger gourd
420 19809 114269 PPM FAFF - Quarterly WEK WAPPR AMC SSM SM-FAS
Required to change FCU motor
421 49921 114297 WEK WAPPR AMC A-V-MEP AV-HVAC
in A111.
Need to replace elcb & mcb in
422 49927 114298 WEK WAPPR AMC A-V-MEP AV-ELEC
DB zone 6 ground floor
Need to replace 26 w lamp in
423 49926 114299 WEK WAPPR AMC A-V-MEP AV-ELEC
washroom
Need to change 60 w circular
424 49925 114302 WEK WAPPR AMC A-V-MEP AV-ELEC
light in corridor
Dosing system is not working
425 50004 115829 WEK WAPPR AMC A-V-MEP AV-SPW
normally need to check
Patch-up work and filling of
426 36587 46827 holes on wall required ASAP on WEK WAPPR AMC A-V-CVL AV-MSN 26/03/2019 909,420.00
full school.
427 44187 82944 Timers required for strip lights WEK WAPPR AMC A-V-MEP AV-ELEC 27/03/2019 17,339.05
Required to fixed heat wheel &
428 45994 93553 motor foundation of FAHU WEK WAPPR AMC A-V-MEP AV-HVAC 15/05/2019 60,950.00
01,02,04 & 14.
Replace the fire alarm control
429 46207 95258 WEK WAPPR AMC SSM SM-FAS 14/05/2019 20,136.40
panel GF to FF
430 46942 99428 Required burner for gas heater WEK WAPPR AMC A-V-MEP AV-SPW 10/06/2019 31,050.00
Need install access control in
431 47093 99724 wooden door in ground floor WEK WAPPR AMC A-V-SSM AV-ACS 20/05/2019 15,295.00
zone 6
Secondary building water
432 47380 101493 WIN APPR AMC A-V-MEP AV-ELEC 29/05/2019 4,370.00
booster pump is not working
Rectification of H&S System by
433 105626 replacing the defective parts WIN APPR AMC SSM SM-FAS 29/05/2019 7,906.25
(FAS)
Supply and installation of MS
434 35102 45226 powder coated handrail for WIN APPR AMC A-V-CVL AV-MISC 08/10/2018 11,790.45
MPH stage both sides
Need to Check primary
435 37870 47881 building Exspension Joints WIN APPR AMC A-V-CVL AV-MSN 07/02/2019 9,200.00
there is some Crack
Need to replace faulty led
lights in primary and
436 49561 113880 WIN WAPPR AMC A-V-MEP AV-ELEC 17/06/2019
secondary building class room
and corridor
SW WIN002 Parking area Inter
437 49653 113931 WIN WAPPR AMC A-V-CVL AV-MISC 23/06/2019
lock - D3
438 99409 114065 PPM Lift - Monthly WIN WAPPR AMC SSM SM-ELEV

439 12822 114273 PPM FAFF - Quarterly WIN WAPPR AMC SSM SM-FAS
Need to make new 3nos
gypsum wall with wooden door
440 50022 115837 WIN WAPPR AMC A-V-CVL AV-CARP 23/06/2019
in secondary building staff
rooms
FM 200 system installation,
441 45604 91373 WIN WAPPR AMC A-V-SSM AV-FAS 24/04/2019 68,941.75
testing and commissioning.
Sewage pump 1&2 not
442 47090 99720 WIN WAPPR AMC A-V-MEP AV-PLUM 29/05/2019 19,550.00
working near canteen Area
New battery charger for fire
443 47648 103466 WIS APPR AMC A-V-SSM AV-FFS 29/05/2019 2,070.00
pump
One of the sliding doors
444 48813 109541 (G101) is faulty needs WIS APPR AMC SSM SM-ADOR 10/06/2019 3,500.00
rectification
Please arrange to repair the
445 44387 84609 damaged AC duct for Sports WIS APPR AMC A-V-MEP AV-HVAC 01/05/2019 5,175.00
hall.
Please arrange to repair the
446 44390 84610 damaged AC duct for Falcon WIS APPR AMC A-V-MEP AV-HVAC 30/04/2019 575.00
centre.
Please arrange to repair the
447 44391 84611 damaged AC duct for WIS APPR AMC A-V-MEP AV-HVAC 01/05/2019 4,140.00
Observatory.
Erupted wall tiles in year 2
448 45366 89329 WIS APPR AMC CVL C-MSN 08/04/2019 253.08
boys toilet.
Quotation for installing LED
449 45926 93193 WIS APPR AMC A-V-MEP AV-ELEC 30/05/2019 3,970.95
lights in D block.
Sliding door in reception is not
450 47255 101344 WIS WAPPR AMC SSM SM-ADOR 16/06/2019
working properly
Required to cover the package
451 47612 103451 AC duct to prevent birds WIS WAPPR AMC A-V-CVL AV-CARP
entering the sports hall.
New flag pole in front of the
452 47949 105539 WIS WAPPR AMC A-V-CVL AV-MISC
school
Quotation for New glass door
453 49134 111712 in Foundation stage staff WIS WAPPR AMC A-V-CVL AV-CARP 15/06/2019
room.
Metal tray for the AC unit in
454 49447 113413 WIS WAPPR AMC A-V-MEP AV-HVAC 20/06/2019
year 4 class room
Relocate the exhaust fan in the
455 49471 113448 DT class room to the workshop WIS WAPPR AMC A-V-MEP AV-ELEC 18/06/2019
next door
Quotation for finger guards for
456 49481 113501 all primary class rooms Year 1 WIS WAPPR AMC A-V-CVL AV-CARP 17/06/2019
till 4
New window is required for the
457 49482 113502 secondary clinic facing the WIS WAPPR AMC A-V-CVL AV-MSN 17/06/2019
indoor swimming pool
Floor tiles broken in various
458 49742 113997 WIS WAPPR AMC A-V-CVL AV-MSN
locations in the school
459 99410 114064 PPM Lift - Monthly WIS WAPPR AMC SSM SM-ELEV
PPM Diesel Generator Testing
460 95222 114090 WIS WAPPR AMC MEP M-MECH
(20 Minutes) – Monthly
Faulty compressor of the AC
461 49851 114217 unit in the indoor swimming WIS WAPPR AMC A-V-MEP AV-HVAC 20/06/2019
pool needs rectification
462 23237 114263 PPM FAFF - Quarterly WIS WAPPR AMC SSM SM-FAS
Change the erupted and
463 43772 82782 broken marble floor tiles in the WIS WAPPR AMC A-V-CVL AV-MSN 09/04/2019 25,033.90
reception.
464 44397 84612 New drain jet machine WIS WAPPR AMC A-V-MEP AV-PLUM 24/04/2019 29,785.00
Drain line leakage in year 5
465 45534 91298 WIS WAPPR AMC A-V-MEP AV-PLUM 30/04/2019 690.00
corridor water cooler.
SW - To set up basement
466 46822 97519 music room as storage (items WIS WAPPR AMC A-V-CVL AV-MISC 30/05/2019
from the parking)
SW - To change media area
467 46823 97520 ground floor as 3 music rooms WIS WAPPR AMC A-V-CVL AV-MISC 30/05/2019
- individual practice rooms
SW - ICT 1,2,3, renovation
468 46824 97521 WIS WAPPR AMC A-V-CVL AV-MISC 30/05/2019
work
SW - Renovation of
469 46826 97523 WIS WAPPR AMC A-V-CVL AV-MISC 30/05/2019
observatory at second floor
SW - ICT 4,5 becomes part of
470 46831 97524 WIS WAPPR AMC A-V-CVL AV-MISC 30/05/2019
the Falcon center
Science labs Fully refurb - on
471 46829 97527 WIS WAPPR AMC A-V-CVL AV-MISC 19/06/2019 1,423,056.00
going already
472 99317 PPM rectification of AC units WIS WAPPR AMC MEP M-MECH 19/05/2019
Quote WO Creation Work
Summary Quote Status Work Type Engineer
Status Date Date Category

Quote sent - 2253 ACCEPTED 30/05/2019 05/05/2019 SM RM Kashif

Quote sent - 2338 ACCEPTED 27/05/2019 07/05/2019 SM RM Kashif

Quote sent - 2224 ACCEPTED 30/05/2019 12/05/2019 SM RM Kashif

Quote sent - 2493 ACCEPTED 23/06/2019 20/05/2019 SM RM Kashif

Quote sent - 2516 ACCEPTED 12/06/2019 02/06/2019 SM CM Kashif

Quote sent - 2590 ACCEPTED 17/06/2019 08/06/2019 SM RM Kashif

Quote sent - 2568 ACCEPTED 17/06/2019 11/06/2019 SM RM Kashif

QTn ref 2339 ACCEPTED 16/06/2019 10/02/2019 SM RM Kashif

Quote sent - 1800 ACCEPTED 10/06/2019 30/03/2019 SM RM Kashif

Quote sent - 1825 ACCEPTED 30/05/2019 10/04/2019 SM RM Kashif

Quote sent - 1845 PENDING 15/04/2019 SM RM Kashif

Quote sent - 2036 ACCEPTED 16/06/2019 18/04/2019 SM RM Kashif

Quote sent - 2100 ACCEPTED 30/05/2019 18/04/2019 SM RM Kashif

Quote sent - 1895 PENDING 23/04/2019 SM CM Kashif

07/05/2019 SM RM Kashif

08/05/2019 SM RM Kashif

MR-Submitted Ref no -
08/05/2019 AM CM Kashif
001606
MR-Submitted Ref no -
08/05/2019 AM CM Kashif
001607 not 001606
MR- Submitted 001608 not
08/05/2019 AM CM Kashif
001607

MR-Submitted Ref no -
08/05/2019 AM CM Kashif
001609

09/05/2019 SM RM Kashif

20/05/2019 SM RM Kashif

Quote sent - 2635 PENDING 29/05/2019 SM RM Kashif


SSR Submitted to proc 30/05/2019 SM RM Kashif
SSR SUBMITTED TO
09/06/2019 SM RM Kashif
PROCUREMENT

SSR SUBMITTED TO
09/06/2019 SM RM Kashif
PROCUREMENT

SSR SUBMITTED TOB


11/06/2019 SM RM Kashif
PROCUREMENT

Quote sent - 2650 PENDING 12/06/2019 SM RM Kashif

SSR Submitted to proc 13/06/2019 SM RM Kashif

Materials 16/06/2019 AM RM Kashif

16/06/2019 SM RM Kashif

18/06/2019 AM PM Kashif

18/06/2019 AM PM Kashif

18/06/2019 AM PM Kashif

19/06/2019 SM RM Kashif

19/06/2019 SM RM Kashif

19/06/2019 SM RM Kashif

19/06/2019 SM RM Kashif

19/06/2019 SM RM Kashif

19/06/2019 SM RM Kashif

19/06/2019 AM RM Kashif

20/06/2019 AM RM Kashif

20/06/2019 AM PM Kashif

Quote sent - 2390 PENDING 30/03/2019 SM RM Kashif

Quote sent - 2413 PENDING 15/04/2019 SM RM Kashif

Quote sent - 2474 ACCEPTED 17/06/2019 20/05/2019 SM RM Kashif

Quote sent - 2525 ACCEPTED 17/06/2019 26/05/2019 SM CM Kashif

Quote sent - 1029 ACCEPTED 19/03/2019 26/02/2019 SM SP Kashif


Quote sent - 1538 ACCEPTED 18/04/2019 11/03/2019 SM RM Kashif

Quote sent - 1861 ACCEPTED 01/05/2019 14/04/2019 SM RM Kashif

Quote sent - 1914 ACCEPTED 01/05/2019 17/04/2019 SM RM Kashif

Quote sent - 1912 ACCEPTED 01/05/2019 25/04/2019 SM RM Kashif

Quote sent - 2095 R1 PENDING 29/04/2019 SM CM Kashif

Quote sent - 2514 ACCEPTED 17/06/2019 02/05/2019 SM CM Kashif

Quote sent - 2486 PENDING 06/05/2019 SM RM Kashif

16/05/2019 SM Kashif

16/05/2019 SM Kashif

20/05/2019 SM Kashif

SSR Submitted to proc 26/05/2019 SM CM Kashif

site survey has been


submitted to procurement 10/06/2019 SM RM Kashif
dated:19/06/19
11/06/2019 AM Kashif

SSR Submitted to proc 12/06/2019 SM SP Kashif

Quote sent - 2594 PENDING 13/06/2019 SM SP Kashif

17/06/2019 SM Kashif

SSR Submitted to proc 17/06/2019 SM SP Kashif

SSR Submitted to proc 17/06/2019 SM SP Kashif

SSR Submitted to proc 17/06/2019 SM SP Kashif

SSR Submitted to proc 17/06/2019 SM SP Kashif

SSR Submitted to proc 18/06/2019 SM SP Kashif

18/06/2019 AM PM Kashif
19/06/2019 SM Kashif

19/06/2019 SM Kashif

19/06/2019 SM Kashif

19/06/2019 SM Kashif

19/06/2019 SM Kashif

19/06/2019 SM Kashif

19/06/2019 SM Kashif

19/06/2019 SM Kashif

19/06/2019 SM Kashif

19/06/2019 SM Kashif

20/06/2019 AM PM Kashif

Quote sent - 2464 PENDING 04/03/2019 SM RM Kashif

Quote sent - 1504 PENDING 21/03/2019 SM SP Kashif

Quote sent - 2343 ACCEPTED 29/05/2019 08/05/2019 SM RM Shehlan

Quote sent - 2430 ACCEPTED 27/05/2019 19/05/2019 SM RM Shehlan

Quote sent - 2446 ACCEPTED 11/06/2019 19/05/2019 SM RM Shehlan

FM-QT-19- GIS- HS-2370


Replacement of Spare Parts ACCEPTED 26/05/2019 19/05/2019 SM RM Shehlan
SR-47991 WO 105613

Quote sent - 2553 ACCEPTED 16/06/2019 21/05/2019 SM RM Shehlan

Budgetary Price ACCEPTED 12/06/2019 10/06/2019 SM RM Shehlan

FM-QT-19-GIS-HS-0833 ACCEPTED 25/02/2019 16/02/2019 SM RM Shehlan

Quote sent - 1387 ACCEPTED 30/04/2019 03/03/2019 SM RM Shehlan

Quote sent - 1268 ACCEPTED 21/03/2019 03/03/2019 SM SP Shehlan


Quote sent -1975 ACCEPTED 01/05/2019 09/04/2019 SM RM Shehlan

Quote sent - 1824 ACCEPTED 13/05/2019 10/04/2019 SM RM Shehlan

Quote sent - 2131 ACCEPTED 12/05/2019 16/04/2019 SM RM Shehlan

Quote sent - 2114 ACCEPTED 02/06/2019 28/04/2019 SM RM Shehlan

Quote sent - 2421 PENDING 22/05/2019 SM CM Shehlan

18/06/2019 AM PM Shehlan

SSR Submitted on 12/05/2019 11/05/2019 SM RM Shehlan

SSR SUBMITTED ON
16/05/2019 SM RM Shehlan
28/05/019

23/05/2019 SM RM Shehlan

23/05/2019 SM RM Shehlan

23/05/2019 SM RM Shehlan

23/05/2019 SM RM Shehlan

SSRsubmitted to proc 30/05/2019 SM CM Shehlan

ssr submitted to proc


10/06/2019 SM RM Shehlan
17/06/2019

ssr submitted to proc


10/06/2019 SM RM Shehlan
17/06/2019

12/06/2019 SM RM Shehlan

12/06/2019 AM RM Shehlan

ssr submitted to procu 13/06/2019 SM RM Shehlan

16/06/2019 SM RM Shehlan

16/06/2019 SM RM Shehlan

17/06/2019 SM RM Shehlan

17/06/2019 AM RM Shehlan

17/06/2019 SM RM Shehlan

19/06/2019 AM RM Shehlan

20/06/2019 AM RM Shehlan
20/06/2019 AM RM Shehlan

09/04/2019 AM RM Shehlan

Quote sent - 2517 ACCEPTED 13/06/2019 08/05/2019 SM RM Kashif

Quote sent - 2378 PENDING 16/05/2019 SM RM Kashif

Quote sent - 2621 ACCEPTED 17/06/2019 09/06/2019 SM SP Kashif

Budgetary Price ACCEPTED 20/06/2019 09/06/2019 SM RM Kashif

Budgetary Price ACCEPTED 18/06/2019 10/06/2019 SM RM Kashif

Quote sent - 2655 PENDING 11/06/2019 SM RM Kashif

Budgetary Price ACCEPTED 19/06/2019 13/06/2019 SM RM Kashif

Budgetary Price ACCEPTED 19/06/2019 19/06/2019 SM RM Kashif

Budgetary Price ACCEPTED 23/06/2019 19/06/2019 SM RM Kashif

FM-QT-18-GWA-HS-3498 R1 ACCEPTED 25/10/2018 26/08/2018 SM RM Kashif

Quote sent - 0815 ACCEPTED 12/06/2019 20/01/2019 SM SP Kashif

Quote sent - 1731 ACCEPTED 22/04/2019 20/03/2019 SM SP Kashif

Quote sent - 1691 ACCEPTED 15/04/2019 01/04/2019 SM SP Kashif

Quote sent - 1653 ACCEPTED 08/04/2019 04/04/2019 SM RM Kashif

Quote sent - 2109 ACCEPTED 26/05/2019 29/04/2019 SM RM Kashif

Quote sent - 2468 PENDING 16/05/2019 SM RM Kashif

21/05/2019 SM Kashif

10/06/2019 SM RM Kashif

10/06/2019 SM RM Kashif

SSR Submitted to proc 13/06/2019 SM SP Kashif

18/06/2019 SM SP Kashif
18/06/2019 SM SP Kashif

18/06/2019 SM SP Kashif

18/06/2019 SM RM Kashif

18/06/2019 SM SP Kashif

18/06/2019 SM SP Kashif

18/06/2019 AM PM Kashif

19/06/2019 AM RM Kashif

20/06/2019 AM PM Kashif

22/06/2019 SM RM Kashif

Quote sent - 1795 PENDING 22/01/2019 SM SP Kashif

Quote sent - 2146 PENDING 02/02/2019 SM SP Kashif

Quote sent - 1385 PENDING 11/03/2019 SM RM Kashif

Quote sent - 1384 PENDING 13/03/2019 SM SP Kashif

Quote sent - 1936 PENDING 09/04/2019 SM RM Kashif

Quote sent - 1969 PENDING 22/04/2019 SM RM Kashif

Quote sent - 2184 PENDING 30/04/2019 SM CM Kashif

Quote sent - 2536 ACCEPTED 13/06/2019 30/05/2019 SM RM Shehlan

Quote sent - 2652 PENDING 10/06/2019 SM RM Shehlan

FM-QT-19-GWPS-HS-0799 ACCEPTED 01/05/2019 27/01/2019 SM RM Shehlan

Quote sent - 2098 ACCEPTED 06/05/2019 18/04/2019 SM RM Shehlan

12/05/2019 SM Shehlan

12/05/2019 SM RM Shehlan

Quote sent - 2552 PENDING 12/05/2019 SM RM Shehlan

Quote sent - 2632 PENDING 12/05/2019 SM RM Shehlan


19/05/2019 SM RM Shehlan

waiting for materils 22/05/2019 AM RM Shehlan

25/05/2019 SM RM Shehlan

25/05/2019 SM RM Shehlan

Mr. Bijay need to Submit the


30/05/2019 SM RM Shehlan
SSR for this WO

30/05/2019 SM RM Shehlan

SSR Submitted to proc 01/06/2019 SM RM Shehlan

02/06/2019 AM RM Shehlan

13/06/2019 AM RM Shehlan

16/06/2019 SM RM Shehlan

17/06/2019 SM RM Shehlan

18/06/2019 AM RM Shehlan

18/06/2019 AM RM Shehlan

18/06/2019 AM RM Shehlan

18/06/2019 AM PM Shehlan

19/06/2019 AM RM Shehlan

19/06/2019 AM PM Shehlan

23/06/2019 SM RM Shehlan

SSR Submited 01/05/2019 SM RM Shehlan

Quote sent - 2168 ACCEPTED 28/05/2019 07/05/2019 SM SP Shehlan

Quote sent - 2649 PENDING 12/06/2019 SM RM Shehlan

Quote sent - 2651 PENDING 12/06/2019 SM RM Shehlan

Quote sent - 1198 R1 ACCEPTED 01/04/2019 17/02/2019 SM SP Shehlan

Quote sent - 1542 ACCEPTED 09/06/2019 14/03/2019 SM RM Shehlan


Quote sent - 1499 PENDING 21/03/2019 SM RM Shehlan

Quote sent - 1656 ACCEPTED 23/04/2019 03/04/2019 SM SP Shehlan

Quote sent - 1951 ACCEPTED 09/06/2019 14/04/2019 SM RM Shehlan

Quote sent - 2059 ACCEPTED 13/05/2019 20/04/2019 SM RM Shehlan

Quote sent - 1999 ACCEPTED 20/05/2019 25/04/2019 SM SP Shehlan

SSR submitted on 14/05/2019 05/05/2019 SM RM Shehlan

SSR submitted on 22/05/2019 09/05/2019 SM RM Shehlan

Quote sent - 2487 PENDING 20/05/2019 SM RM Shehlan

ssr submiotted on 27/05/2019 20/05/2019 SM RM Shehlan

22/05/2019 SM RM Shehlan

23/05/2019 SM RM Shehlan

23/05/2019 SM RM Shehlan

23/05/2019 SM RM Shehlan

Quote sent - 2629 PENDING 26/05/2019 SM RM Shehlan

02/06/2019 SM SP Shehlan

18/06/2019 AM PM Shehlan

19/06/2019 AM PM Shehlan

Quote sent - 2106 PENDING 28/03/2019 SM SP Shehlan

Quote sent - 2369 ACCEPTED 20/06/2019 19/05/2019 SM RM Shehlan

Quote sent - 2507 ACCEPTED 10/06/2019 28/05/2019 SM RM Shehlan

Quote sent - 2629 PENDING 30/05/2019 SM CM Shehlan

Quote sent - 2007 PENDING 28/04/2019 SM RM Shehlan

Quote sent - 2067 ACCEPTED 26/05/2019 01/05/2019 SM RM Shehlan

Quote sent - 2606 PENDING 05/05/2019 SM RM Shehlan


06/05/2019 SM SP Shehlan

waiting scope clarification


16/05/2019 SM RM Shehlan
from amsf

23/05/2019 SM RM Shehlan

23/05/2019 SM RM Shehlan

30/05/2019 SM Shehlan

10/06/2019 SM Shehlan

13/06/2019 SM Shehlan

17/06/2019 SM Shehlan

17/06/2019 AM Shehlan

17/06/2019 SM Shehlan

17/06/2019 SM Shehlan

18/06/2019 SM Shehlan

18/06/2019 SM Shehlan

19/06/2019 AM PM Shehlan

20/06/2019 SM Shehlan

20/06/2019 AM Shehlan

FM-QT-19-JPS-HS-0352 PENDING 21/01/2019 SM CM Shehlan

ssr submited 02/05/2019 SM Shehlan

Quote sent - 2546 ACCEPTED 17/06/2019 22/05/2019 SM RM Shehlan

Quote sent - 2483 ACCEPTED 17/06/2019 28/05/2019 SM RM Shehlan

Budgetary Price ACCEPTED 16/06/2019 12/06/2019 SM SP Shehlan

Budgetary Price ACCEPTED 19/06/2019 19/06/2019 SM RM Shehlan

Quote sent - 1224 ACCEPTED 09/04/2019 07/03/2019 SM SP Shehlan

Quote sent - 1950 ACCEPTED 17/06/2019 18/04/2019 SM RM Shehlan

23/05/2019 SM RM Shehlan

SSR Submitted to proc 12/06/2019 SM SP Shehlan


18/06/2019 AM PM Shehlan

20/06/2019 AM PM Shehlan

Quote sent - 1877 PENDING 18/04/2019 SM RM Shehlan

Quote sent - 2442 PENDING 20/05/2019 SM CM Kashif

Budgetary Price ACCEPTED 17/06/2019 09/06/2019 SM RM Kashif

Quote sent - 1460 ACCEPTED 16/04/2019 12/03/2019 SM RM Kashif

Quote sent - 2408 ACCEPTED 13/06/2019 27/03/2019 SM RM Kashif

Quote sent - 2039 ACCEPTED 26/05/2019 28/03/2019 SM SP Kashif

Quote sent - 2054 ACCEPTED 06/05/2019 04/04/2019 SM RM Kashif

Quote sent - 2058 ACCEPTED 06/05/2019 04/04/2019 SM Kashif

Quote sent - 2060 ACCEPTED 06/05/2019 07/04/2019 SM Kashif

Quote sent - 1919 ACCEPTED 12/05/2019 14/04/2019 SM RM Kashif

Quote sent - 2071 ACCEPTED 08/05/2019 17/04/2019 SM RM Kashif

Quote sent - 2032 ACCEPTED 13/05/2019 18/04/2019 SM RM Kashif

Quote sent - 2026 ACCEPTED 06/05/2019 18/04/2019 SM RM Kashif

Quote sent - 2405 ACCEPTED 09/06/2019 22/04/2019 SM RM Kashif

Quote sent - 2127 R1 PENDING 24/04/2019 SM RM Kashif

Quote sent - 2166 ACCEPTED 26/05/2019 28/04/2019 SM RM Kashif

Quote sent - 2108 PENDING 05/05/2019 SM RM Kashif

Quote sent - 2431 PENDING 14/05/2019 SM RM Kashif

SSR Submitted to proc 26/05/2019 SM CM Kashif

Quote sent - 2535 PENDING 29/05/2019 SM RM Kashif

Quote sent - 2534 PENDING 29/05/2019 SM RM Kashif


SSR SUBMITTED TO
11/06/2019 SM RM Kashif
PROCUREMENT

Quote sent - 2637 PENDING 16/06/2019 SM SP Kashif

17/06/2019 SM RM Kashif

17/06/2019 SM RM Kashif

17/06/2019 SM RM Kashif

17/06/2019 SM RM Kashif

17/06/2019 SM RM Kashif

17/06/2019 SM RM Kashif

18/06/2019 AM RM Kashif

18/06/2019 AM RM Kashif

19/06/2019 AM PM Kashif

Quote sent # 329 PENDING 06/01/2019 SM SP Kashif

Quote sent 819 PENDING 23/01/2019 SM SP Kashif

Quote sent - 1152 PENDING 13/02/2019 SM SP Kashif

Quote sent - 1203 PENDING 13/02/2019 SM SP Kashif

Quote sent - 1211 PENDING 19/02/2019 SM SP Kashif

Quote sent - 1284 PENDING 19/02/2019 SM SP Kashif

Quote sent - 2171 PENDING 24/02/2019 SM SP Kashif

Quote sent - 1340 PENDING 27/02/2019 SM SP Kashif

Quote sent - 1622 PENDING 03/03/2019 SM SP Kashif

Quote sent - 2259 PENDING 03/03/2019 SM SP Kashif

Quote sent - 1439 PENDING 19/03/2019 SM SP Kashif

Quote sent - 1788 PENDING 19/03/2019 SM SP Kashif

Quote sent - 1654 PENDING 19/03/2019 SM SP Kashif

Quote sent - 1674 PENDING 31/03/2019 SM SP Kashif


Mr raised 001614 17/04/2019 AM CM Kashif

Quote sent - 2620 PENDING 24/04/2019 SM RM Kashif

Quote sent - 2182 PENDING 24/04/2019 SM RM Kashif

Quote sent- 2094 PENDING 24/04/2019 SM RM Kashif

Quote sent - 2093 PENDING 24/04/2019 SM RM Kashif

Quote sent - 2046 PENDING 24/04/2019 SM RM Kashif

Quote sent - 2414 PENDING 24/04/2019 SM RM Kashif

Quote sent - 2296 PENDING 02/05/2019 SM RM Kashif

Quote sent - 2422 PENDING 22/05/2019 SM CM Shehlan

Quote sent - 2439 ACCEPTED 10/06/2019 26/05/2019 SM RM Shehlan

Quote sent - 2515 ACCEPTED 12/06/2019 30/05/2019 SM RM Shehlan

Budgetary Price ACCEPTED 20/06/2019 19/06/2019 SM RM Shehlan

Budgetary Price ACCEPTED 20/06/2019 20/06/2019 SM RM Shehlan

Quote sent - 2282 PENDING 05/05/2019 SM RM Shehlan

06/05/2019 SM Shehlan

06/05/2019 SM Shehlan

06/05/2019 SM Shehlan

Quote sent - 2293 PENDING 06/05/2019 SM SP Shehlan

ssr submited to proc 06/05/2019 SM RM Shehlan

SSR Submitted to proc on 26-


06/05/2019 SM RM Shehlan
May-19

Ssr submitted on 19/05/02019 07/05/2019 SM RM Shehlan

ssr submitted on 28/05/0219 16/05/2019 SM RM Shehlan

23/05/2019 SM Shehlan

23/05/2019 SM Shehlan

23/05/2019 SM Shehlan

23/05/2019 SM Shehlan

23/05/2019 SM Shehlan

23/05/2019 SM Shehlan
23/05/2019 SM Shehlan

23/05/2019 SM Shehlan

23/05/2019 SM Shehlan

23/05/2019 SM Shehlan

28/05/2019 SM Shehlan

30/05/2019 SM RM Shehlan

30/05/2019 SM Shehlan

SSR Submitted to proc


16/06/2019 SM RM Shehlan
16/06/2019

17/06/2019 SM Shehlan

18/06/2019 AM PM Shehlan

18/06/2019 AM PM Shehlan

19/06/2019 AM PM Shehlan

Quote sent - 2375 ACCEPTED 13/06/2019 21/05/2019 SM RM Kashif

Quote sent - 2519 ACCEPTED 13/06/2019 22/05/2019 SM CM Kashif

Quote sent - 2518 PENDING 27/05/2019 SM CM Kashif

Quote sent - 2677 PENDING 12/06/2019 SM SP Kashif

SSR Submitted to proc 13/06/2019 SM SP Kashif

13/06/2019 SM Kashif

13/06/2019 SM Kashif

18/06/2019 AM Kashif

18/06/2019 AM PM Kashif

18/06/2019 AM PM Kashif

19/06/2019 SM Kashif

19/06/2019 SM Kashif

19/06/2019 SM Kashif

19/06/2019 AM PM Kashif

Quote sent - 2003 R1 PENDING 18/02/2019 SM RM Kashif

Quote sent - 2123 PENDING 25/02/2019 SM Kashif


Quote sent - 2216 PENDING 20/03/2019 SM RM Kashif

Quote sent - 2272 PENDING 30/04/2019 SM Kashif

Quote sent - 2419 ACCEPTED 09/06/2019 22/05/2019 SM RM Kashif

Quote sent - 2002 PENDING 23/04/2019 SM Kashif

Quote sent - 2306 PENDING 08/05/2019 SM Kashif

Quote sent - 2323 PENDING 20/05/2019 SM RM Kashif

Quote sent - 2449 PENDING 21/05/2019 SM RM Kashif

Quote sent - 2377 PENDING 21/05/2019 SM RM Kashif

26/05/2019 SM RM Kashif

Quote sent - 48635 WO-


PENDING 28/05/2019 SM RM Kashif
107853

10/06/2019 SM Kashif

Quote sent - 2682 PENDING 12/06/2019 SM SP Kashif

SSR Submitted to proc 13/06/2019 SM SP Kashif

13/06/2019 SM RM Kashif

18/06/2019 SM RM Kashif

18/06/2019 SM RM Kashif

18/06/2019 AM PM Kashif

18/06/2019 AM PM Kashif

19/06/2019 AM PM Kashif

Quote sent - 1712 PENDING 05/03/2019 SM Kashif

Quote sent - 1408 PENDING 11/03/2019 SM RM Kashif

Quote sent - 1438 PENDING 14/03/2019 SM SP Kashif

Quote sent - 1783 PENDING 21/03/2019 SM RM Kashif

Quote sent - 1506 PENDING 21/03/2019 SM SP Kashif

Quote sent - 1690 PENDING 28/03/2019 SM RM Kashif


Quote sent - 1721 PENDING 28/03/2019 SM RM Kashif

Quote sent - 1665 PENDING 02/04/2019 SM SP Kashif

Quote sent - 1652 PENDING 04/04/2019 SM RM Kashif

Quote sent - 2181 PENDING 30/04/2019 SM Kashif

Budgetary Price ACCEPTED 20/06/2019 20/06/2019 SM RM Shehlan

Quote sent - 1971 ACCEPTED 26/08/2018 24/12/2017 SM SP Shehlan

Quote sent - 1640 r1 ACCEPTED 26/05/2019 31/03/2019 SM RM Shehlan

11/05/2019 SM Shehlan

11/05/2019 SM Shehlan

11/05/2019 SM Shehlan

11/05/2019 SM Shehlan

23/05/2019 SM Shehlan

SSR Submitted to PROC 27/05/2019 SM RM Shehlan

ssr sumeted purcurmet 27/05/2019 SM RM Shehlan

19/06/2019 AM PM Shehlan

Quote sent - 0742 PENDING 22/01/2019 SM SP Shehlan

Quote sent - 2371 ACCEPTED 26/05/2019 05/05/2019 SM RM Shehlan

Quote sent - 2319 ACCEPTED 21/05/2019 12/05/2019 SM RM Shehlan

Quote sent - 2494 ACCEPTED 11/06/2019 26/05/2019 SM RM Shehlan

Budgetary Price ACCEPTED 02/06/2019 11/11/2018 SM RM Shehlan

Quote sent - 2203 ACCEPTED 22/05/2019 04/03/2019 SM RM Shehlan

Quote sent - 2075 ACCEPTED 07/05/2019 24/03/2019 AM RM Shehlan

Quote sent - 1956 PENDING 04/04/2019 SM CM Shehlan

Quote sent - 2143 ACCEPTED 09/05/2019 11/04/2019 SM Shehlan

Quote sent - 2065 R1 ACCEPTED 27/05/2019 16/04/2019 SM RM Shehlan

Quote sent - 2211 ACCEPTED 29/05/2019 20/04/2019 SM RM Shehlan


Quote sent - 2122 ACCEPTED 08/05/2019 25/04/2019 SM RM Shehlan

20/05/2019 SM Shehlan

20/05/2019 SM RM Shehlan

20/05/2019 SM RM Shehlan

Quote sent - 2423 PENDING 22/05/2019 SM CM Shehlan

23/05/2019 SM Shehlan

23/05/2019 SM Shehlan

23/05/2019 SM Shehlan

23/05/2019 SM Shehlan

Quote sent - 2524 PENDING 26/05/2019 SM RM Shehlan

28/05/2019 SM Shehlan

06/06/2019 SM Shehlan

07/06/2019 SM Shehlan

SSR Submitted to proc 09/06/2019 SM RM Shehlan

10/06/2019 SM RM Shehlan

10/06/2019 AM RM Shehlan

11/06/2019 SM RM Shehlan

18/06/2019 AM RM Shehlan

18/06/2019 SM Shehlan

18/06/2019 SM Shehlan

18/06/2019 AM PM Shehlan

18/06/2019 AM PM Shehlan

19/06/2019 SM RM Shehlan
19/06/2019 SM RM Shehlan

19/06/2019 SM RM Shehlan

19/06/2019 SM RM Shehlan

19/06/2019 AM PM Shehlan

20/06/2019 AM RM Shehlan

20/06/2019 AM RM Shehlan

20/06/2019 AM RM Shehlan

20/06/2019 AM RM Shehlan

22/06/2019 SM RM Shehlan

Quote sent - 1420 PENDING 13/10/2018 SM SP Shehlan

Quote sent - 1433 PENDING 05/03/2019 SM RM Shehlan

Quote sent - 2188 PENDING 13/04/2019 SM Shehlan

Quote sent - 2169 PENDING 16/04/2019 SM RM Shehlan

Quote sent - 2473 PENDING 29/04/2019 SM CM Shehlan

Quote sent - 2248 PENDING 02/05/2019 SM SP Shehlan

Quote sent - 2387 ACCEPTED 09/06/2019 07/05/2019 SM CM Kashif

Quote sent - 2399 PENDING 20/05/2019 SM CM Kashif

Quote sent # 4182 ACCEPTED 01/11/2018 17/09/2018 SM SP Kashif

Quote sent # 623 ACCEPTED 03/03/2019 31/10/2018 SM SP Kashif

ssr submitted to procurement 17/06/2019 SM RM Kashif

SSR Submitted to proc 18/06/2019 SM RM Kashif

18/06/2019 AM PM Kashif

19/06/2019 AM PM Kashif

SSR SUBMITTED TO
22/06/2019 SM RM Kashif
PROCUREMENT
Quote sent - 1803 PENDING 02/04/2019 SM RM Kashif

Quote sent - 2298 PENDING 02/05/2019 SM RM Kashif

Quote sent - 2350 ACCEPTED 30/05/2019 12/05/2019 SM CM Kashif

Budgetary Price ACCEPTED 10/06/2019 02/06/2019 SM RM Kashif

Quote sent - 1924 ACCEPTED 05/05/2019 10/03/2019 SM Kashif

Quote sent - 1926 ACCEPTED 01/05/2019 10/03/2019 SM Kashif

Quote sent - 1925 ACCEPTED 05/05/2019 10/03/2019 SM Kashif

Quote sent - 1613 ACCEPTED 09/04/2019 28/03/2019 SM Kashif

Quote sent - 1933 ACCEPTED 02/06/2019 10/04/2019 SM RM Kashif

ssr submitted to procurement 05/05/2019 SM RM Kashif

12/05/2019 SM Kashif

19/05/2019 SM RM Kashif

SSR SUBMITTED TO
11/06/2019 SM RM Kashif
PROCUREMENT

SSR submitted to procurement 16/06/2019 SM RM Kashif

ssr submitted to procurement 16/06/2019 SM RM Kashif

SSR submitted to procurement 16/06/2019 SM RM Kashif

SSR submitted to procurement 16/06/2019 SM RM Kashif

18/06/2019 SM Kashif

18/06/2019 AM PM Kashif

18/06/2019 AM PM Kashif

SSR SUBMITTED TO
19/06/2019 SM RM Kashif
PROCUREMENT

19/06/2019 AM PM Kashif

Quote sent - 1502 PENDING 03/03/2019 SM Kashif

Quote sent - 1734 PENDING 10/03/2019 SM Kashif


Quote sent - 1776 PENDING 01/04/2019 SM Kashif

SSR Returned to Proc for


25/04/2019 SM RM Kashif
Subcon Quote - 26/05/19

SSR Returned to Proc for


25/04/2019 SM RM Kashif
Subcon Quote - 26/05/19

SSR Returned to Proc for


25/04/2019 SM RM Kashif
Subcon Quote - 26/05/19
SSR Returned to Proc for
25/04/2019 SM RM Kashif
Subcon Quote - 26/05/19
SSR Returned to Proc for
25/04/2019 SM RM Kashif
Subcon Quote - 26/05/19

Quote sent - 2220R1 PENDING 25/04/2019 SM SP Kashif

Mr raised 001613 28/04/2019 AM CM Kashif