                                                                                                 DATE
                                                CONCRETE POURING PERMIT
Name of Project/Location         NHA-Butuan City New Villages 3A
Contractor                       Two Aces Construction & Supply
Part of Structure to be poured                                          Estimated Volume (m3)
Station, Limits/Section
Date of Pouring                                                         Time of Pouring
                                                                        Requested by:
                                                                        Contractor :
                                                                                                        (Name and Signature)
                                                             CHECKLIST
             Concrete Vibrator                                                    Field Density Test
             Protective Covering Materials                                        Beam/Cylinder Molds
             Warning Signs/Barricades/Flagmen                                     Curing Materials
             Concrete Saw                                                         Slump Conce
             Concrete Block Spacers                                               Plumbness
                                                                                  Quality of Materials Used (Result of Design/Trial M
             Finishing Tools/Equipment (Screeder, broom, etc.)
                                                                                  Test Reports, etc.)
             Line and Grade alignment (form setting, elevation, etc.)             Lighting system
             Required construction equipment                                      Electrical layout (Roughing ins/embedments)
             Rebars sizes, spacing and number                                     Plumbing layout (Roughing ins/embedments)
             Rebars installation requirements                                     Falsework/formworks adequacy
Checked by:
Materials Engineer                                                                          Date :
                                                  (Name and Signature)
REMARKS/
RECOMMENDATIONS
Project Inspector                                                                           Date :
                                                  (Name and Signature)
REMARKS/
RECOMMENDATIONS
Request :         Disapproved:
REMARKS/
RECOMMENDATIONS
                           EVE RIZALLE LHYN E. BOCO
                                 NHA - Senior Engineer A
                                  (Name and Signature)
                        Accreditation No.
he President
SING AUTHORITY
gional Office
OURING PERMIT
3A
ly
                                 (Name and Signature)
CKLIST
            Field Density Test
            Beam/Cylinder Molds
            Curing Materials
            Slump Conce
            Plumbness
            Quality of Materials Used (Result of Design/Trial Mix,
            Test Reports, etc.)
            Lighting system
            Electrical layout (Roughing ins/embedments)
            Plumbing layout (Roughing ins/embedments)
            Falsework/formworks adequacy
EVE RIZALLE LHYN E. BOCO
  NHA - Senior Engineer A
   (Name and Signature)
                                    NATIONAL HOUSING AUTHORITY
                                                                                      DATE      Nov. 15, 2012
                                             CONCRETE POURING PERMIT
Name of Project/Location         Land Development of NHA-Balangayan Butuan Project, Brgy. Pagatpatan, Butuan City
Contractor                       Regional Infrastructure Development Corporation
Part of Structure to be poured PCCP                          Estimated Volume (m3)                     96.75 cu.m.
Station, Limits/Section
Date of Pouring                  Nov. 16, 2012               Time of Pouring
                                                             Requested by:
                                                             Contractor :          EVAJANE D. BOHOL - RIDC Proj. Engr.
                                                                                             (Name and Signature)
                                                        CHECKLIST
             Concrete Vibrator                                         Field Density Test
             Protective Covering Materials                             Beam/Cylinder Molds
             Warning Signs/Barricades/Flagmen                          Curing Materials
             Concrete Saw                                              Slump Conce
             Concrete Block Spacers                                    Plumbness
             Finishing Tools/Equipment (Screeder, broom,               Quality of Materials Used (Result of Design/Trial Mix,
             etc.)                                                     Test Reports, etc.)
             Line and Grade alignment (form setting,
                                                                       Lighting system
             elevation, etc.)
             Required construction equipment                           Electrical layout (Roughing ins/embedments)
             Rebars sizes, spacing and number                          Plumbing layout (Roughing ins/embedments)
             Rebars installation requirements                          Falsework/formworks adequacy
Checked by:
Materials Engineer                                                               Date :
                                                (Name and Signature)
REMARKS/
RECOMMENDATIONS
Project Inspector                                                                Date :
                                                (Name and Signature)
REMARKS/
RECOMMENDATIONS
REMARKS/
RECOMMENDATIONS
Request :         Disapproved:
REMARKS/
RECOMMENDATIONS
                            SUNDAY N. ARGUILLAS, JR.
                                 NHA - Project Engineer
                                 (Name and Signature)
                        Accreditation No.
atpatan, Butuan City
                           189
96.75 cu.m.                165
OL - RIDC Proj. Engr.
d Signature)
ult of Design/Trial Mix,
embedments)
embedments)
y
LLAS, JR.
ngineer
nature)