Pouring Permits

1. The document is a concrete pouring permit for a project that lists the contractor, location, estimated volume, date and time for the pour. 2. It includes a checklist of required equipment, materials, and safety measures that must be verified before pouring can proceed. 3. Key personnel from the contractor, materials engineer, and project inspector must sign off to approve the pour after checking that all requirements are met.

Uploaded by

JongMagoncia
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
596 views6 pages

Pouring Permits

1. The document is a concrete pouring permit for a project that lists the contractor, location, estimated volume, date and time for the pour. 2. It includes a checklist of required equipment, materials, and safety measures that must be verified before pouring can proceed. 3. Key personnel from the contractor, materials engineer, and project inspector must sign off to approve the pour after checking that all requirements are met.

Uploaded by

JongMagoncia
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 6

CONCRETE POURING PERMIT

Name of Project/Location

Contractor
Part of Structure to be Poured Estimated Volume:
Station Limits/Section
Date of Pouring Time of Pouring
Requested by:

JONATHAN B. ZABALA
Project in- charge
(Contractor)
CHECKLIST
Concrete Vibrator Field Density Test
Protective Covering materials Beam/cylinder
Warning Signs/Barricade Flagmen Curing Materials
Concete Saw Slump cone
Concrete Block Spacers Plumbness
Quality of Materials Used ( Result of Design/Trial
Finishing Tools/Equipment (Screeder, Broom, etc.) mix, Test Reports, etc.)
Line and Grade allignment (Form setting, elevations,
etc.)
Required construction equipment
Rebars sizes, spacing, number
Rebars installation requirements
CHECKED BY:

Materials Engineer ENGR. CHARITO B. OLASO Date


(Name/Signature)
Remarks/Recommendations

Project Inspector ENGR. NILO H. MENDOZA Date


(Name/Signature)
Remarks/Recommendations

REQUEST: APPROVED DISAPPROVED

Remarks/Recommendations

NOTED:
EDGAR D. AGANA, MPA
Provincial Engineer
CONTRACTOR'S NAME/LOGO

WORK REQUEST
NO. _______

Date:

NAME OF PROJECT:

LOCATION:

CONTRACTOR:
WORK TO BE PERFORMED:
SCHEDULE AND DATE:
STATION LIMIT:

REQUESTED BY:

NAME OF REP./ ENGR


(Designation)
(Contractor)

WORK REQUEST APPROVED: REMARKS:

LGU
(Designation)
Project In-charge

NOTED:
CHARITO B. OLASO
Engineer-IV EDGAR D. AGANA, MPA
Chief, Quality Assurance Section Provincial Engineer
CONTRACTOR'S NAME/LOGO

CONCRETE POURING PERMIT


Name of Project/Location

Contractor
Part of Structure to be Poured Estimated Volume:
Station Limits/Section
Date of Pouring Time of Pouring
Requested by:

NAME OF REP./ ENGR


(Designation)
(Contractor)
CHECKLIST
Concrete Vibrator Field Density Test
Protective Covering materials Beam/cylinder
Warning Signs/Barricade Flagmen Curing Materials
Concete Saw Slump cone
Concrete Block Spacers Plumbness
Quality of Materials Used ( Result of Design/Trial
Finishing Tools/Equipment (Screeder, Broom, etc.) mix, Test Reports, etc.)
Line and Grade allignment (Form setting, elevations,
etc.)
Required construction equipment
Rebars sizes, spacing, number
Rebars installation requirements
CHECKED BY:

Materials Engineer ENGR. CHARITO B. OLASO Date


(Name/Signature)
Remarks/Recommendations

Project Inspector LGU ENGR Date


(Name/Signature)
Remarks/Recommendations

REQUEST: APPROVED DISAPPROVED

Remarks/Recommendations
NOTED:
EDGAR D. AGANA, MPA
Provincial Engineer