0% found this document useful (0 votes)
152 views1 page

Quality Control for Fire Hydrant Modifications

The document is a quality control form for modifying a fire hydrant line and fire hydrant at the ORPIC client site near the truck loading area. It lists two welded joints to be inspected using penetrant testing and notes that LPT should be done after root and hot pass welding for the joints.

Uploaded by

vishnu300022
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
152 views1 page

Quality Control for Fire Hydrant Modifications

The document is a quality control form for modifying a fire hydrant line and fire hydrant at the ORPIC client site near the truck loading area. It lists two welded joints to be inspected using penetrant testing and notes that LPT should be done after root and hot pass welding for the joints.

Uploaded by

vishnu300022
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
You are on page 1/ 1

Project: Modification of Fire Hydrant line and Fire Hydrant

Quality Control Form

Client: ORPIC Report No.: PT-03


Contractor: HI TECH Date: 27/01/2019
N.D.T REQUEST Ref. Standard: ASME SEC V Art 6
Ed2015
Page 1 of 1

Doc. No.:

Location / Area: SRIP/ Near Truck Loading Area/ Area 700


Joint N.D.T Welding
Line No./ Joint Welder(s) ID O.D Thk. Insp.
Type Type
Hydrant No. No. (in.) (mm) Report
Item Hot Remark
Root Fill Cap No.
Pass
1 09 B 6 7.11 PT
2 10 B 6 7.11 PT

Technical Comment:
LPT for above mentioned joints after root and hot pass