Inspection Report for HPCL Project

1) TUV Control conducted a final inspection of materials supplied by M/s Dee development limited for L & T Hydrocarbon Engineering's VISAKH REFINERY MODERNIZATION PROJECT. 2) Inspection activities included mechanical testing, thickness checks, dimensional checks, visual checks, DP testing, and review of documents like MTC, test reports, and NDT reports. 3) All inspection results and document reviews were found to meet specification requirements. The materials were accepted by TUV Control with no non-conformities raised.

Uploaded by

Mohit Goswami
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
100% found this document useful (1 vote)
392 views5 pages

Inspection Report for HPCL Project

1) TUV Control conducted a final inspection of materials supplied by M/s Dee development limited for L & T Hydrocarbon Engineering's VISAKH REFINERY MODERNIZATION PROJECT. 2) Inspection activities included mechanical testing, thickness checks, dimensional checks, visual checks, DP testing, and review of documents like MTC, test reports, and NDT reports. 3) All inspection results and document reviews were found to meet specification requirements. The materials were accepted by TUV Control with no non-conformities raised.

Uploaded by

Mohit Goswami
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 5

VISIT REPORT

TUV Control No.: TUV SAP No: Branch: NOIDA Report No: LTHE-
8116916039 FCHCU -52414-IR-16
OWNER: HPCL Inspection Notification HPCL-HCUV/NOI/3522 R0
Number(s) Dt. 01.11.19

Client : Contractor L & T Hydrocarbon Engineering, Project: VISAKH REFINERY


Baroda MODERNIZATION PROJECT
PMC Name (if any) Engineers India Limited Package
FCHCU

Vendor Name M/s Dee development limited Client’s PO No.(on vendor) REFINERY/75000-52414/PAS
Dt. 17.11.18
Sub Vendor Name: Vendor’s PO No. on sub
(if applicable) : vendor

Place/Address of Tatarpur, Palwal


Inspection: Inspection Date: 01.11.19 & 02.11.19
(2Mandays)

Stage of inspection:
 Kick-off / Pre-inspection meeting  Material Identification  Interim stage

 Document review  Final  Re-inspection

Sr. No P. O. item no. SAP CODE Item Description PO Quantity Quantity Quantity Remarks
(Unit) offered Accepted

1. As per attached offer list-2, Dt. 01.11.19

Reference Documents:
Sr. No LTHE Document LTHE document no. Approver Approval Status Date
Title (Specify the details)

1 QAP B016-VRMP-LT-000-QC-QD- EIL & CODE 1 28.02.18


0017 REV 0 APPROVED
TUV 06.03.18

2 Specification B016-HCUV-LT-503-PP-SP-
EIL CODE 1 17-05-18
0002 REV 2

Disclaimer: This issue of inspection report does not relieve the Supplier / Manufacturer from their responsibility towards the Client to supply t he item(s) concerned in
Full compliance with requirements of its order specification.

Distribution list:  Client,  Vendor,  TUV Branch

Form No. : F / INSP/VR / 11 – R6 Revision Date: 23/11/2017 Page 1 of 5


VISIT REPORT

Inspection Activities carried out / Remarks:-


1) ITP Clause No.9(a) & (C)- Mechanical testing (Tensile & Hardness) & IGC Practice E- Bend test at 20X magnification & micro at
250X magnification checked at TUV stamped samples & found as per requirement.

2) ITP Clause No.11(a)- Thickness checked @ 10% by thickness gauge at elbow bends portion (05 points) and found to meet the
requirement.

3) ITP Clause No.11(b) -Visually checked for Surface finishes and found no injurious defect.

4) ITP Clause No.11(c)- Dimensional checked @ 10% randomly, found to meet the specification requirement.

5) ITP Clause No.11(d)- DPT witnessed @10 % on bevel edge on SS material and found no relevant indications.

6) ITP Clause No.11(e)-PMI witnessed @ 20% on SS material & and found to meet the requirement.

7) ITP Clause No.8(a)- RT film reviewed & found as per requirement.

8) ITP Clause No. 11(g)-Marking of the item verified randomly and found as per requirement.

9) ITP Clause No.12-Stamping checked on item and found acceptable.

Documents reviewed / Remarks :

1) MTC reviewed and found as per requirement.

2) Dimension, PMI, Chemical & NDT reports reviewed and found in order.

3) Ferrite content on weld deposit report reviewed & found as per requirement.

Details of Instrument / Equipment used in Inspection:


NABL / OTHER NON-NABL
CERTIFYING
SR INSTRUMENT / EQUIPMENT INSTRUMENT VALIDITY CERTIFICATE No. BODIES
NO.
RANGE
DETAIL ID UPTO WITH DATE Please Tick whichever is applicable
See Note : 1 See Note: 2
1 Measuring Tape 0-3000 mm MT03TC-01 13.05.20 VCS/05/4324 

2 Height Gauge 0-600 mm HG-04 14.04.20 VCS/04/4000 

3 Vernier Caliper 0-600 mm 12009581 29.08.20 VCS/08/5257 Dt. 


30.08.2019
4 UTM 0-20 KN UTN-20 24.10.20 CTS/2019/OCT/ 
NABL/00274
5 Thickness 0-100 mm 2017A-K002 16.12.19 VCS-12-2735 Dt. 
17.12.2018
6 PMI ---- 812643 07.07.20 Tii/CAL/DEE/392 
Dt. 08-07-19
*Notes :
1) Other Certifying bodies are: NPL-India, CIPM (International Committee for Weights & Measures), ILAC & APLAC MRA Signatories.
2) In case of Non-NABL, please write the acceptance clause, as per TUV Work Instructions:WI-INSP-63, R0 (Work Instructions - Policy on Measurement Traceability as per NABCB)

Conclusion (Accepted/Accepted with comments/Rejected/ Other comments (please specify): ACCEPTED.

Disclaimer: This issue of inspection report does not relieve the Supplier / Manufacturer from their responsibility towards the Client to supply the item(s) concerned in
Full compliance with requirements of its order specification.

Distribution list:  Client,  Vendor,  TUV Branch

Form No. : F / INSP/VR / 11 – R6 Revision Date: 23/11/2017 Page 2 of 5


VISIT REPORT
Identification of inspected item / Equipment: Witnessed material Double Hard stamped as” ‘’ and Single hard
stamp for remaining for identification.

Areas of concern : -

Non Conformities Raised (if any) (mention NCR nos.): NIL


Attachments (Vendor records, NCR’s, Deviation requests etc.): Internal inspection reports

Name of Inspector : Banvarilal Singh Date: 02.11.19

Signature & TUV stamp:

Vendor signature & stamp (where applicable) :

Disclaimer: This issue of inspection report does not relieve the Supplier / Manufacturer from their responsibility towards the Client to supply the item(s) concerned in
Full compliance with requirements of its order specification.

Distribution list:  Client,  Vendor,  TUV Branch

Form No. : F / INSP/VR / 11 – R6 Revision Date: 23/11/2017 Page 3 of 5


VISIT REPORT

Marking check Dimension check

Degree Thickness (D-meter)

Elongation Bend Test

Disclaimer: This issue of inspection report does not relieve the Supplier / Manufacturer from their responsibility towards the Client to supply the item(s) concerned in
Full compliance with requirements of its order specification.

Distribution list:  Client,  Vendor,  TUV Branch

Form No. : F / INSP/VR / 11 – R6 Revision Date: 23/11/2017 Page 4 of 5


VISIT REPORT

PMI check PMI check

DPT Check DPT Check

Disclaimer: This issue of inspection report does not relieve the Supplier / Manufacturer from their responsibility towards the Client to supply the item(s) concerned in
Full compliance with requirements of its order specification.

Distribution list:  Client,  Vendor,  TUV Branch

Form No. : F / INSP/VR / 11 – R6 Revision Date: 23/11/2017 Page 5 of 5