Ramen Nagi: Solution Offering Presented To
Ramen Nagi: Solution Offering Presented To
Ramen Nagi
Attention:
25 July 2019
Genie Technologies, Inc. is pleased to submit this proposal for implementation services of Microsoft
Dynamics NAV 2018 to Starbucks Coffee Philippines.
The solution that we offer is one that allows your business to get up and running quickly using Microsoft
Dynamics NAV 2018 as the platform that integrates the enterprise, linking relevant processes, monitoring
compliance, and consolidating information for statutory and management reporting. NAV 2018 provides
businesses an adaptable, scalable system with familiar tools to help improve productivity, automate
business processes, enhance software familiarity, adoption and usability, achieve the insights needed to
drive success, and manage changes and growth.
We believe that Starbucks Coffee Philippines has much to gain by leveraging on our huge understanding
of the retail industry and our actual collective knowledge and experiences in ERP implementations using
Microsoft as technology platform.
Enclosed is our solution footprint and investment brief for your in-depth evaluation. We will be glad to
entertain any questions or clarifications regarding the proposal at any time most convenient to you.
Elisa Galang
Business Unit Head-MS Dynamics
Genie Technologies, Inc.
This proposal is presented on the understanding that it is a confidential document due to its proprietary
content to GTI Technologies, Inc. (GTI) and those of our technology and solutions partners.
The content of this document remain the property of GTI and shall be kept confidential within authorized
personnel for the purpose of evaluation. No part of this document shall be reproduced, or its contents be
disclosed to any party, in part or in whole, for any purpose without the express written consent of GTI.
The materials and recommendations for equipment, programs, and services contained in this proposal are
estimates based on information that has been furnished to us and on our evaluations. While we believe
our estimates to be sound, the degree of success with which such equipment, software programs, and
services can be applied to data processing is dependent on numerous factors, many of which are not under
the control of GTI. Therefore, our estimates as to the results to be obtained must not be regarded as
expressed or implied warranties.
The information described in this document are not to be used or disclosed except to the recipient’s
employees, officers, and agents or contractors engaged in evaluating this proposal and who are subject to
appropriate written undertakings consistent with these confidentiality and usage restrictions. Note that
expressed information in this document is for information purposes only. GTI disclaims all warranties,
express or limited, including, but not limited, to the implied warranties of accuracy and fitness for a
particular purpose.
Trademarks
Every effort has been made to identify trademark information in the accompanying documents. However,
this information may unintentionally have been omitted in referencing particular product(s). Product
names that are not noted are registered trademark or trademarks of their respective holders.
DOCUMENT CONTROL
                                                 TABLE OF CONTENTS
1     EXECUTIVE SUMMARY ................................................................................................................ 6
2     PROJECT OBJECTIVES .................................................................................................................. 7
3     PROJECT SCOPE.......................................................................................................................... 8
    3.1       Architecture and Functional Scope....................................................................................... 8
    3.2       Scope of Services .............................................................................................................. 12
    3.3       Post Implementation Support ............................................................................................ 15
4     PROJECT PARTNER: GENIE TECHNOLOGIES, INC. ........................................................................ 16
    4.1       Our Solution Offerings:...................................................................................................... 16
    4.2       Our Partners and Affiliations:............................................................................................. 17
5     METHODOLOGY: MICROSOFT DYNAMICS SURESTEP .................................................................. 18
    5.1       Sure Step Methodology 5 Implementation Phases: ............................................................. 18
    5.2       Sure Step Methodology Project Types: ............................................................................... 19
6     PROJECT PLAN AND TIMELINE ................................................................................................... 21
    6.1       Milestones and Timeline ................................................................................................... 21
    6.2       Work breakdown Structure ............................................................................................... 21
    6.3       Project Organization ......................................................................................................... 22
    6.4       Project Risk Management.................................................................................................. 24
7     INVESTMENT DETAILS............................................................................................................... 28
8     TERMS AND CONDITIONS ......................................................................................................... 30
9     INTELLECTUAL PROPERTY PROTECTION ..................................................................................... 32
10         ACCEPTANCE ........................................................................................................................ 33
11         APPENDIX A: SYSTEM REQUIREMENTS ................................................................................... 34
    11.1      Dynamics NAV Server Components .................................................................................... 34
    11.2      Dynamics NAV Windows Client Requirements .................................................................... 36
12         APPENDIX B: ANNUAL MAINTENANCE ................................................................................... 39
1 EXECUTIVE SUMMARY
Genie Technologies, Inc. (hereinafter known as ‘GTI’) is pleased to present to Starbucks Coffee Philippines
(hereinafter known as ‘Client’) a proposal to implement Microsoft Dynamics NAV 2018 solution.
Client, a member of the Rustan Group of Companies is the authorized licensee of Starbucks Retail Business
in the Philippines. The first Starbucks store opened on December 4, 1997 at 6750, Ayala Avenue. Since
then, over 300 stores have opened with its continuous commitment to offer customers the world’s best
coffee and the finest coffee experience.
The primary objective of this proposal is to consult, implement and provide post implementation support
services for Dynamics NAV 2018 standard modules including POS-Interface requirement and potential
customizations specifically suited to automate the following processes:
             o    Procurement
             o    Inventory
             o    Warehouse
             o    Financial Management
                        Payables
                        Receivables
                        Cash Management
                        General Ledger
                        Fixed Asset
             o    Materials Requirements Planning
             o    Bill of Materials
             o    Statutory and Management Reporting
             o    Integration with Store Point of Sale Operations System (LS NAV)
All integration and customization requirements not identified in this proposal will require collaboration
and approval between both parties to identify whether billable or not before carrying out.
This implementation of Dynamics NAV 2018 applies to an on premise set-up for 1 company, one physical
server and location and one production database. Any additional configuration not described herein will
require collaboration and approval between both parties to determine impact to timeline and budget
before execution.
2 PROJECT OBJECTIVES
This proposal aims to:
Optimize the full capabilities of Microsoft Dynamics NAV to complement the operational
requirements of Company.
    Recommend available features within Microsoft Navision that GTI has determined to be either
       essential, useful or optional to the operations of the company
    Recommend “work-around” configurations on where standard configuration is not available in
       the current Microsoft Navision version but has an alternative approach within the standard
       configuration of the system
    Provide customizations on where company has deemed to be a necessary feature/ function
Exercise the best practice implementation approach and effectively recommending various Business
Process Re-Engineering
     Recommend standard procedures and system configurations within the Microsoft Navision
     Minimize enhancement and customization to the “must have” items and functionalities
        whenever available and applicable
     Recommend the optimum IT infrastructure acceptable to company in relation to performance
        vis-a vis cost effectiveness
Develop a sustainable solution footprint and IT Roadmap that would support the needs of the business
both in the present and foreseeable future.
3 PROJECT SCOPE
3.1       Architecture and Functional Scope
Microsoft Dynamics NAV 2018 is the chosen solution of Client for their ERP implementation requirement.
Dynamics NAV is multi-language, multi-currency business management solution that helps small and mid-
size companies worldwide manage their accounting and finances, supply chain, and operations.
Microsoft Dynamics NAV will be configured for Client on premise, for one company, in a single physical
server, single database platform where access from local area network and, if required, from different
remote locations will be made possible via internet connection. It has to be emphasized in this case that
productivity and efficiency of use of the system may be affected by the corresponding availability of the
internet band-with.
This scope of work identifies and documents as many of the customer’s high-level requirements as
possible, Functional and Non-Functional (i.e. technical) and any Integration and Interface requirements
that will be important factors of consideration for the customer’s evaluation and decision on their ERP
solution. The scope of this project is derived from the following:
          A high level scoping activity conducted that is intended to examine the as-is processes selected
           for potential implementation, to ensure that the chosen Microsoft Dynamics product can support
           those processes. Highlighted from this activity is the discovery of below challenges with the
           current NAV set-up:
               •       Tedious process in ordering and consolidation using excel templates.
               •       Cost of Goods Sold is being computed manually outside NAV.
             •        Use of other systems outside of NAV resulting to disparate solutions for Financials,
                      Supply Chain & Sales despite having an ERP system in place.
             •        Subsidiary Ledger is not equal to General Ledger.
             •        Limitation of the lower version of NAV system resulting to users experiencing table
                      locking when posting transactions simultaneously.
             •        Posting of transactions takes a very long time to process.
             •        Deficient system controls with the use of various uploading tools that are directly
                      updating the NAV tables and with all users having full access to all areas of the system
             •        No ranking or prioritization method being used for warehouse let down process
             •        Replenishment of regular orders are done manually
        Reply to the Request for Proposal (RFP) document provided by Client. However, items identified
         as requiring customization in the RFP will require further understanding and analysis and is not
         included as part of the scope of work of this engagement nor in the commercial details of this
         document.
Establishing the scope of work on the 2 above considerations, Microsoft Dynamics NAV will be
implemented base on a centralized back-office system configuration which means that Client will have a
centralized access to standard NAV 2018 modules with features and function configured to serve as basis
of information for:
   Financial Management. Gain a comprehensive view of financial data across the organization with
    end-to-end integration. Modules covered are:
        o General Ledger and Budgets
        o Accounts Receivables and Collection
        o Accounts Payables and Disbursements
        o Bank Management and Reconciliation
        o Debit and Credit Memos
        o Fixed Asset Management
        o Allocations and Periodic Entries
        o Periodic and Year-End Closing
        o Financial Reporting – Statutory (BIR) and Management
   Supply Chain. Provides inventory management for single or multi-site warehouses in addition to
    handling order processing and demand planning. Goods on hand can be matched to customer
    demand while reducing inventory and distribution costs. Warehouse processes can be integrated with
    the rest of the customer business to better manage goods, space, and costs. Demand can be satisfied
    with multiple planning options and tracking of utilization and materials costs. Manage requisition
    through purchasing by deploying standardized processes, including approval workflows with enforced
    approval limits. Modules covered are:
        o Sales Order Management
    Interface. Part of the scope of work and solution footprint also includes transfer of sales and
     inventory transactions from the point of sale system to back office ERP Microsoft Dynamics NAV via
     Navision Interface Manager (NIM). The NIM allows the automatic transfer of POS transactions from
     Aloha to equivalent NAV financial entries including Sales and Payments (different Tenders), Sales
     Returns and Exchange, Cost of Sales, Production Entries. The interface covers:
        o    Data movement:
                     Data from stores is assumed to be consolidated in the Aloha database at
                       headquarters.
                     From the Aloha database at HQ, data is sent to the Navision Interface Manager
                       (NIM) where set-up for the interface is configured and data mapping process
                       transpires.
                     From NIM, data is sent to NAV Staging table for validation then posted to the
                       Sales and Item Journals with the option for automatic posting to update
                       subsidiary and general ledgers immediately.
        o   Interchange of Information:
                      Between Aloha and MS Dynamics NAV
                      Automatic and unattended interchange
                      Manual interchange available
                      Aloha and MS Dynamics NAV databases updated directly
                      Duplicates automatically avoided
        o   NIM Configuration:
                    Determine which Aloha POS transactions go to which table in MS Dynamics NAV
                        including identification of Journals, Store Dimension, Posting Set-ups and GL
                        Account mapping
                    Define frequency of interchanges
Below is an illustration of the macro level solution footprint recommended to Client for this project:
    Business Forms and Reports Inclusion. The Standard forms and reports available in NAV
     2018 is recommended to be utilized. It is also recommended that Account Schedules and
     Analysis by Dimensions be maximized as a reporting tool and be used to generate financial
     reports unique to Client. Any business form or report not standard in NAV 2018 or not
     identified to be part of customization covered in this documentation is going to be treated
     as a separate and engagement and will be billable to the client.
     Statutory Reporting. The scope of work and commercial details covered in this engagement will
      include objects and implementation services for BIR CAS Compliance Pack for NAV 2018 nor services
      to migrate the BIR Objects from the company’s existing version of MS Dynamics NAV to NAV 2018.
      The GTI BIR Pack should it be decide to be part of the engagement includes the following:
        o   Books of Accounts
                      Purchase Journal                                     Cash Disbursement Journal
                      Purchase Book                                        Cash Receipts Journal
                      Sales Journal                                        Inventory Book
                      Sales Book                                           Credit Memo
                      General Journal                                      Debit Memo
                      General Ledger
    Installation. One time installation of Microsoft Dynamics NAV 2018 application in three (3)
     environments – Test, Development and Production is included in this engagement. Reinstallation
     regardless of cause or reason is billable.
    Training. GTI will provide a one-time training base on the included functional scope of work
     including:
       o System Administration – Installation, Data Migration, Security Roles and Permissions
       o Core Team Training where users will be trained for the management and utilization of the
            configured system.
       o Assistance during End User Training where Core Team members are expected to prime the
            activity and configure the training according to the to the needs pf their end users and assess
            their readiness as internal champions of the system.
        GTI assumes that Client will provide the facilities and equipment for the success of the training
        activities:
            o Training Facility
                     Training Room
                     White Board with markers and eraser
                     Multi-media Projector and screen
            o    Training Equipment
                      Workstations for the attendees
                      Workstation for the instructor
                      Network access
                      Printer and paper
    Customizations. The following list of items were identified as part of customization requirements
     included in this engagement. The customizations are categorized into: Business Forms, Report,
     Logic, Utility and Module
                      Business Forms. Client has the option to align data to existing pre-printed forms
                         or create an entirely new report layout to be printed directly from the system
                             1. Purchase Requisition
                             2. Purchase Order
                             3. Warehouse Receiving Report
                             4. Sales Invoice
                             5. Delivery Receipt
                             6. Official Receipt
                             7. Acknowledgement Receipt
                             8. Billing Statement
       This engagement includes local support services commencing immediately after Go-Live and valid
       only for a year. GTI SLA includes a limited number of call, email and onsite man-hour visits which
       may be allocated to address reported incidents, annual system health check or training:
        Total number of combined call and email incidents reported       40 incidents per year
        Total number of combine call and email inquiries reported        20 inquiries per year
        Total number of onsite visit                                     96 hours per year*
      *Minimum of 4 hours per visit. Please see Appendix B under “GENIE TECHNOLOGIES SERVICE LEVEL
      AGREEMENT (SLA) DETAILS’ for further information.
      For additional support service requirements other than what is described above, client may opt to
      avail of any of the following GTI SLA packages:
Today, GTI provides an end-to-end, comprehensive, and fully integrated business solutions, along with
the industries’ best practices, to maximize its clients’ business growth. Over the years, it has successfully
implemented hundreds d distribution industries, but in other industries such as Food and Beverage,
Hospitality, Consumer of projects, not just in the Retail goods, Financial Services, Utilities, Public Sector,
Manufacturing, among others.
GTI stands at the frontline of global technology, bringing the latest solutions designed to suit business
needs. We partnered with the following world class solutions – Microsoft, RetailPro, NCR, Qlik, JDA, and
Ramco, covering industry needs such as Retail, Hospitality, Consumer Goods, Financial Services, Utilities,
Manufacturing, among others. Our strategic partners also include HP, Epson and Philippine Retailers
Association.
Sure Step Methodology can be used for projects encompassing large, medium, and small end-to-
engagement. The methodology provides different project types to suit implementation engagement, as
well as optional offerings to assist during Diagnostic and Optimization.
Sure Step Methodology offers 5 different project types and has six phases.
The Analysis, Design, Development, Deployment and Operation phases represent the five implementation
phases of the Sure Step Methodology.
          Analysis Phase. In this phase the project is kicked off and the baseline scope is established. The
           Functional Requirements Document gets signed off in this phase and the Final Fit Gap Analysis is
           also completed.
          Design Phase. This phase features the initiation of Design documents for the Solution, including
           any customizations.
          Development Phase. Majority of the work is done in the Development phase, which culminates
           with the completion of solution setup and configuration, as well any customization of the solution.
           All customization code is frozen for deployment at the end of this phase.
          Deployment Phase. Key activities in the Deployment phase include User Training, User
           Acceptance Testing, and the Go-Live of the solution.
          Operation Phase. Finally, in the Operation phase, the solution is stabilized during the immediate
           post go-live period, and the solution is transitioned to Support.
     Standard. The Standard project type is a lean approach for implementing Microsoft Dynamics
      solutions at a single site.
     Rapid. The Rapid project type depicts an accelerated approach for implementing Microsoft Dynamics
      solutions with minimal or no customizations.
     Enterprise. The Enterprise project type represents a standardized approach for implementing
      Microsoft Dynamics solutions in complex single-site deployments, or in global/multi-site organization
      wherein country/site specific unique business needs have to be factored on top of a core solution.
     Agile. The Agile project type represents a flexible and collaborative approach to implementing
      Microsoft Dynamics Solutions at a single site requiring specific features and moderate-to-complex
      customizations. While the Standard, Rapid, Enterprise and Upgrade project types are waterfall-based,
      the Agile project type uses the Sprint cycle approach to solution deployment.
     Upgrade. The Upgrade project type describes the approach for bringing an existing Microsoft
      Dynamics solution to a subsequent release of that solution. This approach starts with a Technical
      Upgrade to address moving existing functionality to the subsequent release. Any new functionality
      desired is then deployed using the above project types, Rapid, Standard, Agile or Enterprise.
The Standard, Rapid, Enterprise, and Upgrade project types are waterfall-based, and have all five phases.
In contrast, the Agile project type does not have any distinct phases for Analysis thru Development – it
does include Development and Operation phases however.
STANDARD project type will be applied in implementing Dynamics NAV to Client which applies to a project
to be implemented at a single site and requiring specific features and moderate-to-complex customizations.
The standard project type is typically used in implementation projects where one or more of the
following circumstances exist:
      Customer specific features
      Moderate-to-complex customizations
      ISV Solution included
      Simple-to-complicated infrastructure
      Customer specific integrations or interfaces to third-party systems
      Simple-to-complex data migration
      Medium-to-large number of users
The foundation for the Standard implementation scenario includes the activities in the Diagnostic
phase. Activities such as Requirements and Process Review, Fit Gap and Solution Blueprint, Architecture
Assessment, and Scoping Assessment result in a clear understanding of the customer requirements and
success factors, which forms the basis of the implementation.
This methodology consist of a proven approach to implement Dynamics NAV is not intended to form a
rigid structure that leaves the client no room for flexibility. It is a guide to raise the success factor of the
project while still taking into consideration the specific need of the client and the project team.
The project is estimated to be completed within 6-8 month. The Project plan below is an initial guide and
projection of the activities and may be subjected to possible changes. Actual dates will be finalized
immediately after the project kick-off including target start and go-live date with the latter having
dependency on the agreed frequency of meetups and availability of the identified project team members.
The major activities in each implementation phase are described below. A sign-off at the end of each
milestone is required before moving to the next phase of the implementation. This ensures that the
project stays within the agreed scope, timeline and budget.
           Phase 2: Design
               Installation of Sandbox and Production Environments
               System Configuration and Provisioning for Customization Requirement
               Design Integration and Interfaces Components
               Upload Subset of Data for Prototyping
               Prototyping
               Presentation of Initial Design
               Documentation - Functional Requirements Document (FRD)
               Design Phase Complete: Steering Committee Meeting; Phase 2 Sign-off
           Phase 3: Development
               Develop Custom Requirements
               System Configuration resulting from prototyping
               Preparation for Core Team Training
               Conduct Core Team Training
               Recalibrate Sandbox for User Acceptance Testing – First Pass
               Conduct UAT First Pass
               Recalibrate Sandbox considering results of UAT First Pass
               Conduct UAT Second Pass
               Configure Sandbox base on Result of UAT Second Pass
               Development Phase Complete: Steering Committee Meeting & Phase 3 Sign-off
           Phase 4: Deployment
               Configure Production Environment base on UAT Final Pass
               Final Data Migration-Master files
               Execute Core Team Lead End User Training
               Go-Live Readiness Check: Go or No Go
               Final Data Migration to Prod - Beginning Balances
               Back up Prod Environment
               Deployment Phase Complete: Steering Committee Meeting
           Phase 5: GO-LIVE Operation Handholding
               Handholding Activities
               First Month post Go-Live Closing Activities
               Project Closure Documentation and Transition to Support
Before engaging with the project, it should be clearly defined who is allocated to the required roles from
both the consulting organization and the customer. This will eliminate potential conflicts over
responsibilities and subsequent misunderstandings as the project progresses. The skill sets of the
proposed team should be reviewed to ensure that all skill requirements are met. Any additional skills
required should be noted, and a training and/or recruitment plan should be defined accordingly whenever
necessary.
Consulting Roles:
Customer Roles:
Before the project kicks off, project guidelines referring to resource management, standard of
communication, issue management, time and cost management, and conditions of satisfaction must be
set and agreed to avoid implementation creeps.
Project Team Members. Customer shall provide resource for every required project role. Changes to the
project organizational structure or team member’s unconstructive attitude and indecisiveness towards
the project may impact the successful completion of the project.
     It is imperative that everybody in the team has a comprehensive view of the background of the
        project, the business reasons for undertaking the implementation, and any other valuable
        information regarding Business Processes—high-level Functional, non-Functional (IT), and
        Integration and Interface requirements.
     It is also very important that the team have a good understanding of the current Information
        Services/Information Technology (IS/IT) landscape, as well as the short- and long-term IS/IT
        strategies. This will help to get the buy in of the team and the users and avoid misaligned
        recommendation and other problems.
     The client’s project organization structure is expected to remain intact for the duration of the
        project. Team members are expected to be available throughout the duration of the project to
        assist GTI with functional and technical requirements and design validation, attend project
        meetings, participate in issue resolutions, review and validate documents for sign-off. They may
        even be required to be pulled out of their daily tasks to concentrate on their implementation
        duties and deliverables. The team member’s project assignment and activities may be recorded
        as additional skills in their 201 file for commendation or even additional incentive to encourage
        and foster positive results to the project.
     It is the responsibility of the Core Team to train additional resources or retrain old users. GTI shall
        provide full training to the Core team member by assigning one trainer and 2 assistants for 8
        attendees for each functional area. GTI shall provide 1 application consultant to assist the Core
        Team during End-user training. Any additional resource or services beyond this shall be billable.
     GTI will provide a project team consisting of experienced consultants who will do the project
        according to a detailed project plan that will be agreed upon with client.
     GTI shall address fully and in a timely manner all issues referring to consultant’s performance or
        attitude GTI shall investigate and take corrective measures as deemed necessary.
Technical Resources. Although the scope of work has been identified, there may be requirements and
deliverables outside the project scope that may affect the success of the project. This includes the
availability of hardware and other software required to run the application. If customer requires GTI to
manage these out of scope activities, GTI shall bill Client separately.
        Appropriate hardware and software for the development, testing and production environments,
         including facilities and equipment, must be available in time for use in the project activities where
         they will be required.
        Client will assume responsibility for implementation and maintenance of network environment,
         communications, operating system, SQL database, application and database servers.
        Safekeeping of all software licenses, maintenance and upkeep of hardware, network and
         database shall be the responsibility of the client.
Change Management. The crucial part of any project is with defining and controlling what is in scope and
what is out of scope. It is helpful to plan and document how project scope will be defined, verified,
managed and controlled by the project management team. Clear and precise scoping leads to customer
acceptance and satisfaction.
It is a known fact that Issues can arise any time after starting the project. Critical issues would affect time,
scope, budget or quality of the project and need to be resolved in an appropriate time frame. The project
team needs to be proactive in managing issues rather than reactive. A solid issue management can make
the difference between project success and failure.
A formal issue management process should be used to handle important issues and to synchronize with
scope, time and cost management. Planning and managing of issues should be part of the overall project
management and it should be in agreement with the Customer Project Manager.
        Managing issues proactively is key. If issues are ignored or not resolved in the timeframe needed,
         this could have further negative impacts to the project.
        Make issues visible to the appropriate team members and stakeholders for an understanding and
         to get the required support.
        Consider the impact of issues on legal and contractual requirements.
        Consider the impact of issues on the projects scope, timeline and budget.
Ay issue arising that is identified to be out of scope or any additions, deletions, modifications which has
risen from a decision or milestone that has already been signed-off will require in writing a Change Order
Request. GTI will have no obligation to render additional services or execute any Change Order Request
by the client’s designated Project Manager unless the rationale behind the request has been established,
a technical and functional impact assessment done and both parties has come to an agreement on the
impact affecting commercial and timeline. Both parties shall follow below procedure and use the Change
Order Request Document (CORD):
    1. Customer shall Identify and use the CORD to document the request
    2. GTI shall communicate functional and technical impact of each CORD
    3. Both parties shall assess and prioritize all CORDs submitted.
    4. GTI shall provide estimated man-day and cost required for the effort of each CORD
    5. Both parties shall sign the CORD before execution indicating approval to execute and charge for
       the additional services.
    6. Deliver, test, and report progress
    7. Accept, deploy and communicate change resolution.
When the change resolution has been provided for testing, client has the obligation to update GTI in
writing within 3 days of receipt indicating acceptance or requirement to revise the change resolution,
otherwise GTI will deem the resolution as accepted and shall proceed to bill the client.
Data Management. Migration of data from the source or legacy systems is the final critical phase of the
project and is the key to success as well as user adoption. Data migration should not be underestimated
as this is the most common set-back of system implementation. Data migrated into Production has to be
timed accurately so as to ensure that users see the most recent data when the system is available to them.
        Client will be provided with the template for uploading the data into NAV.
        Client has the sole responsibility to prepare, scrub, update and validate the data that goes into
         the template as well as when it has been uploaded into the system. It is assumed that the data
         provided is accurate. GTI personnel will not be held responsible for the accuracy or validity of the
         data.
        An initial migration of data into test environment shall be provided by the client for training and
         UAT activities. For purposes of testing, initial set of static data (Master-files) and one-month of
         transactional data will be required.
        An initial migration of data into the production environment will be performed post UAT
         acceptance to avoid overloading the systems over the go-live weekend and is typically done a
         week before the actual go-live. This data typically includes static data or what are commonly
         referred to as Master-files. These typically includes:
              o Chart of Accounts
              o Banks
              o Customer
              o Vendor
              o Item
              o Set-up data requirement such as Dimensions, Posting Groups, Payment methods, etc.
        The final data migration is done over the weekend prior to go-live. Since most of the initial data
         is already loaded before go-live, the final data load will take into account final beginning balances
         only. This concept expedites the migration process and eliminates last-minute glitches that can
         jeopardize the cutover. It is mandatory to lock the system from end users while the final data
         migration tasks are being performed.
        For both the initial and final data migration, a sign-off document will be required. Any additional
         services for data migration once sign-off has been rendered shall be billable.
7 INVESTMENT DETAILS
The investment details covers implementation services for functional scope of work described in this
document. The implementation services is based on a fixed scope and fixed price and do not include any
license or post implementation services component.
Important Notes:
   The Annual Microsoft Business Ready Enhancement Plan (BREP) which is equivalent to 16% of the
    undiscounted license list price is not part of this engagement’s commercial details. Obligation to
    provide post implementation support services will require Client to renew with and pay GTI the MS
    BREP which may require Client to accomplish a Change Partner Agreement in favor of Genie
    Technologies, Inc. and submit to Microsoft.
   GTI Service Level Agreement which is an agreement for customers to avail of GTI’s post
    implementation support services is included as part of the scope of work and the commercial details
    of this engagement. The GTI SLA will commence from the Go-Live date and is consumable within 1
    year period
   Implementation services commences 5 to 10 days from receipt of signed agreement and settlement
    of first billing.
   Prices stated herein are all VAT INCCLUSIVE and valid only for a period of thirty (30) days from the
    date of proposal. Applicable VAT % and other government mandated taxes shall be applied
    accordingly whenever mandatory and settled by the client.
     Above pricing details do not include values for Hardware and other Operating Systems required to
      run the applications described.
     All payments must be in US dollars otherwise customer shall use the GTI provided foreign exchange
      rate which is slightly higher than prevailing exchange rate.
 Payment Terms:
GTI has the right to pull out services if sign-off documents are not refused without warrant or payment
for previous phase is not received on due date. If client decides to delay a specific activity in a particular
phase or in extreme cases the entire project, client would still need to execute a conditional sign off and
still liable to pay completed phases including the man-days for activities performed in the phase where
project was cut-off. Client can only withhold payment for rendered services that are not rendered.
Overdue Payments
Client shall promptly pay GTI the amount invoiced in accordance with the Payment Terms as set above. If
full payment is not received within seven (7) business days from the date of receipt of invoice (counter
date), Client agrees to compensate GTI with a late payment fee of two percent (2%) per month calculated
from the invoice date until the date the payment of invoice amount is received in full.
Property
The Client agrees that upon signing and installation it is only licensed to the use of the software
applications. All ownership and intellectual proprietary rights to all appropriate application and program
codes shall remain the sole property of their respective authors.
Warranty
Warranty is not covered in the scope of this engagement nor in the commercial details of this document.
However, if the software program product was purchased from GTI including MS BREP and GTI SLA, it is
delivered with a combined one (1)-year maintenance warranty from Microsoft and services from GTI
which shall commence from the date of System Acceptance and end one (1) year after. Software
Warranty will cover bugs fixes and/or enhancements.
The following services are covered during the Warranty Period include:
•       On-Site Support;
•       Telephone Support;
•       E-Mail Support; and
•       FNAV -Support.
Services do not include out-of-scope consulting works, additional training, data migration and encoding.
Out-of-Pocket Expense
For implementations and post implementation support activities, out-of-pocket expenses covering all
mode of transportation, accommodation, per diem of consultant if outside the Philippines (depending on
country), food allowance, and laundry (whenever applicable) will be shouldered by client otherwise are
chargeable to the client on a cost reimbursement basis and invoiced separately.
Start of implementation
Implementation activities shall start between five (5) to ten (10) days from receipt of first payment.
Corresponding Purchase Order must be provided to GTI to commence work.
Project Suspension
Should the implementation schedule be delayed due to circumstances particular to the Client like delays
caused by in unavailability resource staff or absence of required equipment or inability to make scheduled
payments, etc., and such delay resulted in there being no implementation work possible for more than a
month, then GTI shall ask the Client to sign a Work Suspension Order. At the resumption of the project,
GTI will bill the Client for re-mobilization costs equivalent to five (5) man-days based on prevailing rate at
the time of resumption of implementation.
Working Hours
Working hours for onsite project implementation will be Monday to Friday, 9am to 6pm only. Any work
on weekends or beyond official working hours shall be communicated and included into the man days, if
it’s not yet included in the project plan. Additional work beyond the official working hours will be billable
to the client including overtime pay whenever applicable.
Additional Man-days
Any additional man-days / scope of work, not outlined, will be charged additional based on prior approval
of the client and acceptance by GTI. This includes both onsite and offsite activities.
Non-Hire
Both parties shall not hire personnel from the other party during the subsistence of the contract and for
a period of two years from the date of any of the personnel on either organizations leaving their respective
companies.
Interruption of Work
Delay in work due to reasons extraneous to Genie Technologies Inc. (e.g., non-availability of personnel or
required infrastructure etc.), which leads to proportionate extension of the project duration, will be
chargeable extra.
Force Majeure
Genie Technologies Inc. will not be responsible for the delays due to Acts of God, violence, strikes, civil
commotion, war, floods etc., that have direct impact on execution of the project.
Project Completion
Upon implementation, Client and Genie Technologies, Inc. will sign a Joint Project Completion document,
thereby signaling the end of the project.
10 ACCEPTANCE
Microsoft Dynamics NAV software licenses including maintenance there upon, are non-refundable and
non-returnable. Client ownership of the licenses and all obligations deemed thereof takes place upon
delivery and installation of the licenses by GTI’s authorized representative at the Client’s provided physical
server regardless of the completion of the software implementation. Client must ensure and maintain the
favorable condition of the physical server as Genietech will not be held responsible for the maintenance
of the hardware as well as the retrieval or provision of a copy of Software and Licenses for re-installation.
Genie Technologies, Inc. will not be held responsible for the safekeeping of the customer licenses nor the
refund of the investment value of software licenses in case Client decides to terminate the use of the
software.
The software is deemed up and running after the Handholding Phase and Client starts generating actual
transactions. An Acceptance Document will be signed by both parties, Genietech and Client.
If any intermediate system or document is submitted for sign-off/approval, objections, if any, should be
raised within 5 working days; failing which, it will be treated as, such a system or document, is accepted
by the Client.
By signing this document, Company confirms that all information are correct and presented in accordance
to their requirements and is endorsing an affirmative reply to this proposal by awarding the project to
Genie Technologies, Inc.
Conforme:
___________________________
Mr. Frank Vibar
CIO
Starbucks Coffee Philippines
Noted:
___________________________
Mahesh Gopinath
Chief Operations Officer
Genie Technologies, Inc.
    A. Dynamics NAV Server Requirements. The following table shows the minimum system
       requirements for Microsoft Dynamics NAV Server.
   Additional                         Dynamics NAV Setup installs the following software if it is not already
   information                         present on the target computer:
                                         o Microsoft .NET Framework 4.7.
                                         o Windows Identity Framework.
   Web server                           Internet Information Server 10, Internet Information Server 8.5, or
                                         Internet Information Server 8.0.
The following table shows the minimum system requirements for Dynamics NAV database components
for SQL Server.
   Service Packs and          Unless explicitly stated, all released Service Packs and Cumulative Updates
   Cumulative                 of the above Microsoft SQL Server versions are supported. It is
   Updates                    recommended to always be on the latest released Service Pack and
                              Cumulative Update.
   Additional                 Dynamics NAV Setup installs the following software if it is not already
   information                present on the target computer:
                                     this case you should exit Setup and then update the operating
                                     system on the computer to one that does support SQL Server 2016
                                     Express. Then run Setup again.
The following table shows the minimum system requirements for the Dynamics NAV Help Server.
   Web server                    Internet Information Server 10, Internet Information Server 8.5, or
                                  Internet Information Server 8.0.
   Additional                    Dynamics NAV Setup installs the following software if it is not already
   information                    present on the target computer.
                                    o Microsoft .NET Framework 4.7.
                                    o Internet Information Server 10, Internet Information Server 8.5,
                                        or Internet Information Server 8.0 depending on the operating
                                        system, with the required features enabled.
                                 Windows Search must be enabled on the computer that you install the
                                  Dynamics NAV Help Server on. If you install on Windows Server 2012,
                                  and Windows Search is not enabled as a file service, Dynamics NAV
                                  Setup adds the service. However, the changes do not take effect until
                                  the computer has restarted.
The following table shows the minimum system requirements for the Microsoft Dynamics NAV Windows
client.
   Outlook client                          Microsoft Office 365, Microsoft Office 2016, Microsoft Office
   integration and mail                     2013 Service Pack 1 (SP1), or Microsoft Office 2010 Service Pack
   merge                                    2 (SP2).
   Import and export with                  Microsoft Office 2016, Microsoft Office 2013 SP1, Microsoft
   Microsoft Excel and                      Office 2010 SP2, or Microsoft Office 365.
   Office XML, and
   SharePoint links
   OneNote integration                     Microsoft Office 2016, Microsoft Office 2013 SP1, or Microsoft
                                            Office 2010 SP2.
   Additional information                  Dynamics NAV Setup installs the following software if it is not
                                            already present in the target computer:
                                               o Microsoft .NET Framework 4.7.
                                           The Microsoft Dynamics NAV Windows client is available in a
                                            32-bit version and 64-bit version. On a 32-bit Windows
                                            operating system, the 32-bit version is run. On a 64-bit
                                            Windows operating system, the 64-bit version is run by default;
                                            however, you can also run the 32-bit version if it is required.
                                           Dynamics NAV Setup can only install the Excel Add-in if Excel is
                                            present on the target computer.
                                           Outlook synchronization is not supported on 64-bit versions of
                                            Office.
Your annual Business Ready Enhancement Plan is part of your relationship with Microsoft and provides
the foundation level of service for your Microsoft Dynamics solution. It enables you to realize the full
potential of your solution throughout your lifetime as a Microsoft Dynamics customer. Through the broad
range of benefits (including important software updates, knowledge bases and training benefits), you can
increase your Microsoft Dynamics solution value, protect your investment, and drive greater productivity
as you plan, deploy and use your solution.
        Customer Source It is your one-stop resource for your Business Ready Enhancement Plan benefits.
         Microsoft’s goal is to help you get the most out of your software investment. Customer Source is
         particularly easy to navigate and you can quickly find valuable information at your convenience
         24 hours a day. After which, be sure to visit the ‘Customer Source Help and How-To Resources’
         page where you can learn how to take advantage of the resources made available to you.
        Version Upgrades and Product Updates
        Service Packs and Hot Fixes
        Customer Source
        Knowledge Base
        Online Training Content (including E-Learning, training materials and learning plans)
        Investment Protection (formerly called Transformational Assurance)
        Transition Investment Credit
        Microsoft Support Lifecycle
        Protected List Price
          Total number of combined call and email incidents reported               40 incidents per year
          Total number of combine call and email inquiries reported                20 inquiries per year
          Total number of onsite visit                                             96 hours per year*
         Client may utilize the 96 hours for onsite visit for any of the following activities:
             1. On-site issue resolution (minimum of 4 hours)
             2. Refresher Training (minimum of 8 hours)
             3. Mid-year or End of Year System Audit (minimum of 8 hours)
* For on-site support visits in excess of the free 96 man-hours, client may opt for additional support man-
hours on an on-call basis.
* For clients outside the Philippines, for onsite man-days for support activities, client will have to shoulder
all out of pocket expenses including but not limited to airfare and airport transfer travel expenses, hotel
accommodation and per diem.
         This is an automated system used to handle queries and reporting in simplified manner. It is a
         centralized helpdesk system that manages support requirements as well as “Client-GTI”
         interaction internally.
Features include:
            Support Ticketing System - Creates a ticket number for every customer incident
            Web Online. - Clients can access the system anywhere, anytime
            Email Interface - Client can use their favorite email account to respond and get updates from
             Webtac
            Group Managed Client
            Ticket deadlines and escalations
            Ticket attachments
         Support Cases must be reported to GTI via the dedicated support telephone number 846-1239
         loc. 839 or email address dynamics.suport@gti.com.ph. Only authorized and assigned Technical
         Contact from the Client may report Support Cases.
D. Response Times
         GTI will respond, within the maximum Initial Response Times set forth in the table below, to any
         Support Case reported by a Technical Contact in accordance with Reporting Support Cases policy.
         Response time is at regular working hours from Monday to Friday 9:00am – 6:00pm. Special
         considerations will be given for cases given on weekends.
E. Severity Level
         GTI will determine the severity level of any Support Case in its reasonable discretion and convey
         this to client to set expectations.
         “Support Case” means a single, reproducible issue or problem with the operation of the Software.
         Examples of Support Cases include, without limitation, Errors and problems encountered as a
         result of improper installation, configuration or operation of the Software.
F. Escalation.
         GTI will use commercially reasonable efforts to resolve Support Cases reported by a Technical
         Contact as soon as reasonably practicable. In addition, GTI provides for escalation to Microsoft,
         depending on the severity level of the reported Support Case and the length of time the Support
         Case remains unresolved following GTI’s initial response.
The following are NOT covered by warranty and are chargeable to the client’s account:
    1. Man-days for new and additional customizations with Change Order Request Document (CORD)
       will be charged separately at $350 per man-day plus 6% SLA Fee prorated to GTI SLA anniversary
       date.
    2. Repair of Non-GENIE TECHNOLOGIES, INC. provided hardware or software.
    3. Repair of damaged / corrupted data or reinstallation of software due to the following reasons:
            a. Virus infection
            b. Improper use and/or shutdown of the system including power failures and fluctuations
            c. Accidental deletions of system files or data
            d. Unauthorized modifications
           e. Any problem caused by software not installed by GENIE TECHNOLOGIES, INC. authorized
                personnel
           f. Enhancements and modifications of the system after acceptance
    4. In case the user was not able to back up files, GENIE TECHNOLOGIES, INC. will not be liable in case
       of data loss due to viruses and file corruption due to power failure and improper operations.