Departmental Study
Departmental Study
                  Akanksha Sharma
                  Vicky Kumar Anand
      Bachelor of Fashion Technology (2015-2019)
National Institute of Fashion Technology (NIFT), MUMBAI
                                                   1|Page
Table of Contents
ACKNOWLEDGEMENT ..................................................................................................................... 5
ABOUT THE COMPANY .................................................................................................................... 6
HISTORY ......................................................................................................................................... 6
CRESCENT FASHION & DESIGN LTD. ................................................................................................. 6
Products and customers .................................................................................................................. 7
DELIVERY SCHEDULE ....................................................................................................................... 7
DELIVERY METHODS & AVERAGE TIME TO ANY PORT ...................................................................... 7
DEPARTMENT DISTRIBUTION IN THE PLANT..................................................................................... 8
DEPARTMENTAL STUDY .................................................................................................................. 9
   MERCHANDISING ........................................................................................................................ 9
       Department structure ........................................................................................................................ 9
       Work flow of department ................................................................................................................ 10
       Merchandising activities .................................................................................................................. 10
       Procedure For Costing...................................................................................................................... 10
       Documentation in merchandising department ............................................................................... 12
   CENTRAL SAMPLING .................................................................................................................. 13
       Purpose of Sampling ........................................................................................................................ 13
       Stages of sampling ........................................................................................................................... 13
       Sampling activities ........................................................................................................................... 16
       Manpower Distribution.................................................................................................................... 16
       Types of machines in centralized sampling ..................................................................................... 17
   CENTRAL PLANNING .................................................................................................................. 18
       Department structure ...................................................................................................................... 18
       Process Flow..................................................................................................................................... 18
       Roles and Responsibilities ................................................................................................................ 19
       Department wise lead time ............................................................................................................. 21
   INDUSTRIAL ENGINEERING DEPARTMENT .................................................................................. 22
       Checklist ........................................................................................................................................... 22
       Process Flow..................................................................................................................................... 23
       Line setup process............................................................................................................................ 24
       Roles and responsibilities................................................................................................................. 24
       Operation Bulletin............................................................................................................................ 25
       OB Preparation................................................................................................................................. 25
       Formulas Chart ................................................................................................................................. 26
                                                                                                                                          2|Page
FABRIC AND TRIMS STORE ......................................................................................................... 28
   Fabric in warding process ................................................................................................................ 28
   Trims in warding process ................................................................................................................. 29
(CAD) COMPUTER AIDED DESIGN DEPARTMENT......................................................................... 31
   Work flow......................................................................................................................................... 31
SPREADING & CUTTING DEPARTMENT ....................................................................................... 33
   Work flow......................................................................................................................................... 33
   INTELLOCUT ..................................................................................................................................... 35
   Activities ........................................................................................................................................... 38
   LIST OF MACHINERY ......................................................................................................................... 39
SEWING SECTION ...................................................................................................................... 40
   Activities in sewing room ................................................................................................................. 40
   Machine types .................................................................................................................................. 40
   WORK FLOW OF DEPARTMENT ....................................................................................................... 41
   Checklists (Documents & reports) ................................................................................................... 42
WASHING DEPARTMENT ........................................................................................................... 43
   Introduction ..................................................................................................................................... 43
   Process Flow..................................................................................................................................... 43
   Wet Processes .................................................................................................................................. 44
   Dry processing.................................................................................................................................. 45
   Types of Machines ........................................................................................................................... 45
   Chemicals used ................................................................................................................................ 46
   Enzymes ........................................................................................................................................... 47
   Chemicals used in Final wash ........................................................................................................... 47
FINISHING DEPARTMENT ........................................................................................................... 48
   Checklists ......................................................................................................................................... 48
   Machine/Equipment Details ............................................................................................................ 48
   Work flow......................................................................................................................................... 49
PACKAGING DEPARTMENT ........................................................................................................ 50
   Checklists ......................................................................................................................................... 50
   Process flow of packaging ................................................................................................................ 50
QUALITY DEPARTMENT ............................................................................................................. 51
   Quality Assurance check points ....................................................................................................... 51
   Quality Assurance Department manpower distribution (per shift)................................................. 52
   Quality Control check points ............................................................................................................ 53
                                                                                                                                          3|Page
   TYPES OF DEFECTS ........................................................................................................................... 53
   Quality Control Department manpower distribution (per shift) ..................................................... 54
MAINTENANCE.......................................................................................................................... 54
   Yearly Maintenance plan ................................................................................................................. 55
WAREHOUSE ............................................................................................................................. 56
   Work flow of Warehouse ................................................................................................................. 56
PROJECT I - Cutting project..........................................................................................................57
APPENDIX - I...............................................................................................................................123
                                                                                                                                 4|Page
                                     ACKNOWLEDGEMENT
Apart from our joint efforts, the success of this whole internship and projects depended largely on
the encouragement and guidance of many others. We take this opportunity to express our gratitude
to the people who have been instrumental in the successful completion of the project and whose
contribution in assorted ways to the internship project deserves special mention.
We would like to express our immense gratitude and sincere appreciation to BGMEA university,
Dhaka for giving us an opportunity to pursue our apparel internship at one of the highly esteemed
organization.
Firstly we would like to thank our mentor Mr. Shivendra Shukla General Manager of CFDL level 1
unit of Beximco for his immense support, guidance and supervision at every point of our internship
period that not only helped us in accomplishing our project but also made us understand the actual
scenario of working in a garment industry.
Also, we would like to record our deepest sense of gratitude to Mr. Mazhar, from the central
industrial engineering department of Beximco, for his supervision, advice, valuable support and
guidance from the very early stage of the course of our internship, which enabled us to proceed in
the right direction and accomplish the mission of our visit. We are thereby thankful to him for taking
the pain to go through the project and make necessary corrections as and when needed.
We would like to thank our college mentor, Mr. Ranjan kumar Saha for always being available to
address any doubts concerning the internship and guiding us along the way. It is because of his
guidance and constant supervision that we have been able to collect and learn the required
information regarding our project.
We would also express our sincere thanks to Mr. Namzul (IE) and Mr. Ripon (Planning) for their co-
operation and precious inputs on each and every step of our internship.
Finally, we would like to thank everybody who was important to the successful realization of this
internship, as well as expressing an apology that we could not mention everyone here.
Thank You!
                                                                                        5|Page
ABOUT THE COMPANY
The Bangladesh Export Company Limited, commonly known by its trade name BEXIMCO, is
a multinational conglomerate holding company headquartered in Dhaka, Bangladesh. It was
founded in the 1970s. Beximco is Bangladesh's largest conglomerate, with the largest market
capitalisation on the country's stock market. BEXIMCO's subsidiaries export products to 103
countries worldwide. It has retail outlets in South Asia and Eastern Europe.
Beximco operates one of the largest integrated textile production businesses in Asia. It is also a
major global exporter of Jute yarn. Its chief manufacturing base is the Beximco Industrial Park
in Gazipur, Bangladesh. Beximco has in-house textile and apparel units.
Under Beximco group, other than textiles there are10 apparel manufacturing units with centralised
merchandising, Fabric and trim store, sampling, CAD, Embroidery, Laboratory, washing and
warehouse.
HISTORY
The company was founded by brothers A. S. F. Rahman and Salman F Rahman in 1972, soon after
the establishment of the Bangladeshi Republic. Their family was earlier engaged in the jute industry
of East Pakistan, which once the world's largest jute producer and exporter. The family business was
affected by a nationalisation program in Bangladesh during the early 1970s. However, with free
market reforms in the late 1970s and 1980s, the family regained many of their businesses.
Since the 1970s, Beximco has been a pioneer in Bangladeshi industry, including the modern textile
sector, pharmaceuticals, ceramics and information and communication technology.
In 2005, Beximco Pharma became the first Bangladeshi company to list on the Alternative
Investment Market of the London Stock Exchange. It also opened its first overseas retail outlet with
the launch of the Yellow clothing brand in Karachi, Pakistan. Yellow has since expanded to several
Bangladeshi and Pakistani cities. In 2009, Shinepukur Ceramics opened a showroom in Moscow,
Russia. In 2010, the company acquired stakes in several major Bangladeshi businesses, including IFIC
Bank, GMG Airlines, The Independent newspaper and Unique Hotels and Resorts.
The company is considered to enjoy close connections with the Awami League, with Salman F
Rahman serving as a Private Sector Development Affairs Adviser to Prime Minister and Bangladesh
Awami League President Sheikh Hasina, the current Prime Minister of Bangladesh.
                                                                                      6|Page
   Chief Executive Officer ( CEO)        Mr. Sayed Naved Husain
   Head of Factory                       SHIVENDRA SHUKLA
                                         General Manager
   Factory Address                       Crescent Fashion & Design Ltd.
                                         Beximco Industrial Park
                                         Sarabo, Kashimpur, Gazipur, Bangladesh
                                         Tel: (880-2)5 8618220-7, 57701186, 57701165-6
                                         Fax: (880-2) 7701164
   Date of Incorporation                 September 2003
DELIVERY SCHEDULE
Average Processing Time (from Approval to Ready for Shipment) that is lead time is generally 60-
120 days.
                                                    Country
                                        USA                      Europe
                     Method
                                 Sea          Air         Sea             Air
                         Days   30-35         3-7        30-37            2-5
                                                                                      7|Page
DEPARTMENT DISTRIBUTION IN THE PLANT
        SL No           Departments                   Heads
          1           General Manager          Mr. Shivendra Shukla
          2           Factory Manager              Mr. Zahidul
          3      Warehouse and Raw materials        Mr. Akiad
          4            Merchandising                Ms. Maria
          5           Sampling and CAD               Mr. Ravi
          6            Marker making                Mr. Syed
          7             Maintenance                Mr. Aminul
          8               Planning                  Mr. Sirish
          9         Industrial Engineering          Mr. Biswa
         10           Human Resource                Mr. Sayed
         11                Cutting                Mr. Delahadali
         12                Sewing              Mr. Mukhtar &Kabir
         13               Finishing                Mr. Ahasan
         14              Embroidery             Mr. Aminul Islam
         15               Washing                   Mr. Jawad
         16           Quality assurance             Mr. Reza
                                                                      8|Page
                                    DEPARTMENTAL STUDY
MERCHANDISING
Merchandiser is the interface between Buyer & production team. Department is responsible from
order analysis to shipment. The merchandiser’s role is to oversee the order right from the time the
order is received from the buyer till calculating the account profitability and shipment. A garments
merchandiser in order to complete the order coordinates with buyer, various departments within
the organization, suppliers, and job worker’s logistics outside the company. BEXIMCO majorly caters
to following buyers from different countris
Department structure
Continent head
                                                                                      9|Page
Work flow of department
Merchandising activities
 To get order: Buyer directly communicates with the merchandiser in order to place the order.
  Fixed buyers are allotted to merchandisers and the communication is between the buyer and
  that particular merchant.
 Costing and Negotiation: Costing of the garment in bulk is calculated on the basis of quality
  of material and their requirement in the garment. It is one of the most important activities of
  the merchandiser. To arrive at a perfect price to be quoted to the buyer, following points are
  taken into consideration
  1.   Merchandiser prepares requisitions for fabric, trims and accessories after receiving tech
       pack, or sketch, whichever is available at the time. Latest version of document is to be
       used as reference. After every update from buyer, this step is to be repeated and due
       processes followed in course thereof
  3.   Procurement users check if trims and accessories are available, if costing data is available,
       they enter costing details, else supplier is asked to provide price.
4. Fabric Mills provide fabric cost for pocketing, shell, interlining fabrics.
  5.   IE provides SMV values based on sample, sketch and quantity (if available). SMV should
       be reviewed and revised if needed in case of any changes in these values. Washing IE
       personnel will collect Washing cost from RRWL in case of washed garments and provide
                                                                                        10 | P a g e
      cost breakup for washing. If subcontract cost is associated, same should be informed to
      merchandiser.
 6.   MIS collects fabric cost from mills and consumption figures from CAD. Fabric costing
      information in the form of fabric cost sheet is shared with fabric team in merchandising.
 7.   Commercial, financial and logistics cost, if any, are obtained from respective departments.
      Merchandiser collates the information and builds initial costing. Pre costing should be ready
      before order negotiation with buyer, approximate values can be used where actual costs are
      not available, especially in the case of trims
 8.   Costing may get revised in the process of order negotiation and sample approvals, in such
      cases approval must be taken by merchandiser from CEO, in case CEO is not available COO
      approval may be taken. If approval is obtained, it is submitted to buyer for approval.
 Fabric/garment package test: For the final confirmation of order, fabric is sent for testing in
  nominated laboratory where shade, tearing strength, colour fastness is test and report is sent
  to buyer. Example- Nominated lab for C & A buyer is Bureau veritas, SGS, Intratec
 Order confirmation: After the approval of all the samples, the order is confirmed by the buyer.
  Merchandiser receives the PO sheet. Merchandising department communicates with planning
  and production departments and decides for the possible delivery date for the required
  quantity.
 Fabric and trims booking: Once the order is confirmed, fabric and trims are booked and fabric
  sample is sent for lap dip.
 Preparing the bill of material: This enlists all the different materials required for making the
  garment.
 Execution: Merchandising department communicates with the buyer QA during the production.
  He gets the approval of the quality or any changes in the garment.
 Shipment of goods: According to delivery date the goods are shipped on time. Documentation
  department is informed about the delivery date, the quantity etc. In case of any delay, goods
  are sent through air on the company’s cost. For each order, the merchant has to prepare a file
  containing all the details and relevant documents which is passed on to the subsequent stages
  in the production process for reference purposes.
                                                                                    11 | P a g e
Documentation in merchandising department
                                                                                 12 | P a g e
CENTRAL SAMPLING
Sampling of garments is given great emphasis. It determines the approval of future orders from
buyers and fetches business for a garment manufacturing or export company. Sampling is one of key
elements of the pre-production processes in a garment industry. Before a manufacturer produces
bulk orders, a prior sampling of styles is done to get approvals and jumpstart the fabrication of
garments.
There is a separate Centralised sampling department in Beximco which deals with sampling
procedures and deals with merchandisers and production team for all the unit under Beximco.
Purpose of Sampling
      To allow the buyer to judge the production capabilities of the manufacturer.
      To provide a means for making revisions in the bulk production process.
      To let the manufacturer estimate the thread and fabric consumption, and develop cost
         quotations.
Stages of sampling
Proto Sample
Fit Sample
Shipment Sample
                                                                                  13 | P a g e
1. Proto sample:
Sampling department gets the Tech pack given by the buyer and a request form from the
merchandising department for making the Fit sample. This is the first sample in the sampling
stages. This sample is made with the already available fabric which is the nearest substitute of
the actual fabric to be used. The styling and construction has to be same. The order is not yet
confirmed from the buyer’s end.
2. Development sample: Merchandising team gives request form and buyer's comment on fit
sample to the sampling department. According to comments given by buyers, development
sample is made and sent to the buyer.
3. Fit sample: Once Development sample is approved, fit sample is made with actual
measurement. It is made to finalise the fit and construction. It is made on the actual fabric. If the
buyer is not satisfied with the fit of the sample, he asks for adjustments in the measurements.
Modification on the pattern is done to get desired fit of the garment. Sometimes, the fit sample
has to be made 2-3 times before the buyer gives the approval.
The order is confirmed once the Fit sample is approved. The manufacturer then places the order
with the fabric supplier for the next sampling stages as well as for the bulk production.
                                                                                         14 | P a g e
4. PP (Pre-Production) sample
This sample is made with actual fabric, trims and accessories and made by sampling team of
CFDL Level-1. PP sample must be approved by buyer or buying house merchants (technical
persons) prior to proceeding actual production.
This sample is made with actual fabric, trims and accessories and made by sampling team of
CFDL Level-1.This is made to check graded patterns in all the sizes.
This sample is made by sampling team of CFDL Level-1.This is made during the bulk production of
garments.
                                                                                        15 | P a g e
Sampling activities
                                                           Handovers the
  Planners read and              Planners gives                                       Merchandisers send
                                                         basket with marker
 understand the tech           patterns and tech                                        the sample to
                                                         and fabric to cutting
        pack                    pack to bag man                                            buyers
                                                             supervisors
                                                            Handovers the
  Planners give tech            Final patters are          basket with trims,         Planners gives the
  pack and details to           handed over to            cut panels and tech             sample to
   pattern makers                   planners                pack to sewing              merchandisers
                                                              supervisors
Manpower Distribution
                                 General manager                                 1
                                  No of Planners                                 8
                               No of pattern makers                              42
                                  No of bag man                                  5
                             No of Cutting Supervisors                           1
                               Manpower in cutting                               19
                        No of cutting machine straight knife                     3
                        No of cutting machine round knife                        3
                                No of cutting table                              4
                               No of lines in sewing                             20
                             No of machine in sewing                            364
                              Total machine operator                            129
                                                                                         16 | P a g e
Types of machines in centralized sampling
There are 20 regular and 1 specialised central line in the sampling department which is dedicated
to develop samples at all the stages for all the units under Beximco. All 20 lines in sewing floor is
dedicated to different buyers.
                                                                                          17 | P a g e
CENTRAL PLANNING
 The central planning department of Beximco is responsible for planning of the production of
  every style by reviewing its feasibility and available capacity of all the 6 units of Beximco.
 The apparel planning of all the 6 units under central planning is being headed by Mr. Shirish
  Gupta (Sr. Manager) and Mr Nalinda (Planning Manager).
 MQM (Machine Queue Management) software is used by planners for scheduling of various
  DPI (order)
Department structure
                                                                                                                MQM
                                                                                                               planner
                                                          Senior
                                          Apparel                        Planning           Planning
                                                         Planning
                                          Planner                        Manager            Incharge
                                                         Manager
                         Central                                                                              Datatex
       COO
                        Planning                                                                              operator
                                           Textile
                                          Planners
Process Flow
                                                                       if any problem
  Generate an article                                                occurs then again
                                                                    inform dispo maker                    If not then
   according to YY                     DISPO number                                                     Monthly plan
       (fabric                                                        to modify dispo-
                                          creation                    again start fabric               issued in three
    consumption)                                                                                              ways
                                                                       dispo creation
                                                                                                         18 | P a g e
 Roles and Responsibilities
 Drafting of yearly business plan: Based on previous years’ buyer-wise production and revenue
  generation, targeted product wise, buyer wise sales and revenue generation for current is
  determined and capacity is made available based on that.
 Co-ordinating with merchandisers: The capacity booking for a booking for a particular order is
  done by the merchandiser on a particular date for a particular factory only after approval of
  central planning. Central planning studies the ongoing and upcoming orders buyer wise gives the
  priority according to the ex-factory date and then approves the order booking and dpi creation to
  merchandiser.
 DISPO creation: Based on article code of a particular order generated by merchandiser and YY
  approval (IE calculates SMV, fabric and trims consumption), DISPO (Datatex index system for
  purchase order) number is created based on trim and fabric booking receipt.
 Reverse calculation of every order is done based on order ex-factory date and process wise lead
  time and based on that factory wise sewing line plan, cutting plan, finishing plan are made.
 Making of monthly plan: Provisional monthly plan is made based on available order of a
  particular season and then this plan sent to respective general managers of every factory and
  review of that plan is done if any changes are suggested by general manager then again a final
  freeze capacity plan is made and sent to factory 5 days prior to line start.
 MQM schedule: Using MQM software (Material queue management), scheduling of orders in
  factory sewing line is done by the central planning team.
   This MQM software is designed in co-ordination with datatex software. As soon as dispo number
  is created in datatex, the order is directly available in bin section of MQM of a particular factory
  and is ready to load. So based on monthly available orders, scheduling is done.
 Order cancellation report: If any order gets cancelled due to any reason, central planning need
  to cancel the DISPO number, prepare loss statement report and consider it in capacity booking
  statements and monthly plans.
 Update booking board: The order booking board is updated and refreshed twice a day and that
  window is visible directly to chairman, CEO, COO and all the respective merchandisers.
 Tracking of production: The planned production and achieved production of every order in every
  factory is compared and variance report is made for every factory and reasons are identified for
  any major variances based on which losses are calculated and actions are taken.
                                                                                        19 | P a g e
 Co-ordinating with fabric planning and procurement team: The material inward plan date is
  given by fabric planning and procurement based on cutting date is fixed and in case of any delay,
  changes in the monthly plan are made after co-ordinating with the respective teams.
 Monitor pending process flow: Continuous monitoring of order production stage is tracked and
  is made to follow the plan as much as possible.
                                                                                      20 | P a g e
                     Department wise lead time
Fabric store
5 days
Cutting section
                            If value
Embroidery section             add               Printing section
                            process
2 days 2 days
Sewing section
                                  2 days              Special
                                                                    1
                                                     wash
                                                                    day
                                                             6         Normal
                           After sewing                      days      wash
                            value add
                                                   Washing
                             process               section          4
                                                             1      day
                                                             day     Garment
                                                     Denim          dyeing
                                                    wash
                       Finishing section
                            Quality
                            control
                                   1
                                   day
                           Buyer Qc
                          inspection
Ex - Factory
                                                                      21 | P a g e
 INDUSTRIAL ENGINEERING DEPARTMENT
 The I.E. department is headed by Mr. Viswa and has got Mr. Mazhar as Executive. The job of this
 department is to plan for style allocation in the line, the layout plan, standard minutes calculation,
 formulation of operation breakdown, costing of CMT as per SAM, R&D and work study
 applications.
 Basically, the IE department is divide into two parts:
 a) Central IE: The department that is manages and heads the factory IE of all the 6 units.
 b) Factory IE: The department that manages the job and responsibilities of one particular floor.
 Checklist
 A) Central I.E
B) Factory I.E:
                                                                                          22 | P a g e
       12.                Operator Skill Matrix                             Output
       13.            Operator up gradation report                          Output
       14.               Line efficiency report                             Output
       15.               Capacity study report                              Output
       16.             Hourly production report                             Output
       17.              Style wise output report                            Output
Process Flow
Start
Capacity study
Efficiency calculation
                                                                                        23 | P a g e
Line setup process
Operation Bulletin
It is prepared in the excel format where in all the operations involved in that garment making are
listed out along with SAM of the operation and machines required for those operation. Operation
bulletin also contains some other parameters as follows:
OB Preparation
 Step 1: Prepare the operation breakdown for the garment.
 Step 2: Identify the machine type required along with folders, guides or attachments based on
  the seams needed to produce the required style.
 Step 3: Enter the SMV value of the operation from the GSD software available.
 Step 4: calculate production/hr @ 100% and target efficiency from the formula:
  -Calculated Production/Hour @100% efficiency= 60/operation SMV @100% efficiency
                                                                                     25 | P a g e
     -Calculated Production/Hour @target efficiency= 60/operation SMV @target efficiency
    Step 5: Calculate number of machines required.
     -Calculated Machine number= (SMV @target efficiency*Daily production target/total minutes
     in a shift day)
    Step 6: The actual no of machines required is determined by rounding off the theoretical no of
     machines.
    Step 7: Calculate estimated production per hour:
     -Estimated Production/Hour = (No. of machine assigned * Hourly target qty.)/Calculated no. of
     machines.
    Step 8: Create a machine summary table. This table will help you to quickly find how many
     actual machines are required for each machine types.
Formulas Chart
1. Daily Line Target = (Total working minutes in a day X No. of operators in a line X Line
   efficiency %) /Garment SMV
2. Individual operator target = (Total working minutes in a day X line efficiency %) /Operation
   SMV
3. Individual operator Efficiency% = (units produced X operation SMV X 100)/Total minutes
   worked
7. Line WIP (work in process) = Total pieces lie on the line for a particular order line
10. Cost per minute = Total cost incurred in manpower / Total available minutes in a shift/
    number of manpower
11. Production Cost pet unit = Total cost incurred in production in a day/ no. of garment
    produced in a day
12. Man to Machine ratio = Total manpower of the factory / Total number of Sewing
    machines(utilized)
                                                                                              26 | P a g e
                              LEARNING CURVE FOR THE NEW STYLES FROM 100% SMV
                          1st        2nd                                            4th        5th
                                                          3rd Day
                          Day        Day                                            Day        Day
   Below 18.00            35 %       45 %                   70 %                   75%                    PAHF/PANT
                                                                                                                                Shorts/
   18.00-30.00            25 %       35 %                   70 %                                          PAHF/PANT
                                                                                                                                 Pant
                                                                                                                                Shorts/
   30.01-35.00            20 %       40 %                   55 %                   65 %                   PAHF/PANT
                                                                                                                                 Pant
                                                    Trousers/Chino
                                                    pant/Dress Pant
   Below 25.00            20 %       35 %                   45 %                   70 %                        TRSR
   25.00-30.00            15 %       35 %                   45 %                   65 %                        TRSR
   30.00-35.00            15 %       30 %                   45 %                   65 %                        TRSR
   35.01-45.00            10 %       20 %                   40 %                   65 %                        TRSR             Trouser
                                                       Fashion Pant
   Below 20.00            20 %       35 %                   50 %                   70 %                       PANF
   20.00-30.00            15 %       30 %                   45 %                   65 %                       PANF
   30.00-40.00            10 %       25 %                   40 %                   60 %                       PANF
   40.00 Above            0%         15 %                   30 %                   45 %       60 %            PANF
                                                       Cargo Pants
                                                                                                                                 Cargo
   Below 35.00            15 %       30 %                   45 %                   65 %                       CARG
                                                                                                                                 Pants
                                                                                                                                 Cargo
   35.01-45.00            10 %       20 %                   40 %                   60 %       65 %            CARG
                                                                                                                                 Pants
                                                                                                                                 Cargo
   45.01-55.00            10 %       20 %                   35 %                   55 %       60 %            CARG
                                                                                                                                 Pants
                                                                                                                                 Cargo
   55.00-65.00            0%         10 %                   25 %                   40 %       55 %            CARG
                                                                                                                                 Pants
                                                                                                                                 Cargo
   65.00 Above            0%         5%                     20 %                   45 %       50 %            CARG
                                                                                                                                 Pants
                                                           Skirts
   Below 18.00            30 %       40 %                   65 %                                               SKRT              Skirts
   18.00-30.00            20 %       30 %                   45 %                   65 %                        SKRT              Skirts
   30.01-35.00            15 %       25 %                   45 %                   65 %                        SKRT              Skirts
     35 Above             10%        20%                    40%                    60%                         SKRT              Skirts
Note:
1. If new input is similar to running style and need not change machine layout then first output of new style will be considered as
of 2nd Day.
2. Changes from top to bottom, bottom to top, bottom to Jacket, Woven to Knit and Knit to Woven, then above learning curve
will not be applicable.
3.For matching of check, plaid, stripes, naps and in case of fabric like double layer, tensil, viscose, satin etc, learning curve will be
given on the basis of complicacy of fittings and matching.
                                                                                                                    27 | P a g e
  FABRIC AND TRIMS STORE
  Almost 85% fabrics used in CFDL is in-house manufactured in the company named Beximco
  Textiles limited (BTL), Beximco Knitting limited (BKL) and Beximco denim limited (BDL). Trims like
  labels are also manufactured in-house and other trims are outsourced from local or international
  markets.(Majorly trims are outsourced from Hong-Kong, China, Indonesia etc)
  In Beximco, there is one central fabric and one trim store which caters to requirements of all the
  apparel division under Beximco. and there is one separate fabric and trim store which is for all 5
  factories of CFDL. Central stores issues fabric and trims to factory store according to planning
  given by central planning department.
           Factory store
           check Quality                                                        Merchandiser coordinates with
                                                                                procurement team and makes
                                                                                the material available
Not OK                               OK
                                                                                                        28 | P a g e
Trims in warding process
                                                                                  29 | P a g e
Trim Inspection     Trim card
report
                                       30 | P a g e
(CAD) COMPUTER AIDED DESIGN DEPARTMENT
Purpose of CAD Department
Work flow
       Mode of spreading
       Width of the fabric available
       Shade variation
       Shrinkage along warp and weft
       Size ratio required
       Visual inspection
       Style name
       Marker type
       Total garment patterns
       Sizes
       Width of marker
       Marker length
       Marker efficiency
       Date of print
                                                                                   32 | P a g e
SPREADING & CUTTING DEPARTMENT
This department is headed by Mr. Delahadali, as a cutting manager. The job of this department is to
convert fabric in to cut panels. It has got three manual spreading tables with end cutting machines.
Cutting is one of the major process in garments manufacturing. Here garment parts are cut
according to the pattern.
Work flow
                                                                                         Bundles sent
                                                                                          for sewing
     Swatches send for                 Receives graded              Ticketing on the
      Shrinkage test                  patterns from CAD                  panels
                                         department
                                                                                         Recutting for
       Sample blanket is                                                                   defected
       made and sent for             Sends shrinkage and
                                                                    Quality check of     panels from
        checking shade              shade variation reports
                                                                        panels            remanant
          variations                  to CAD department
                                                                                            fabric
Receipt of Fabric
                                                                                       33 | P a g e
             Shrinkage report
             Colour fastness report
Fabric relaxation
When the fabric comes from the dyeing and finishing, the fabric
remains a slightly hot. In dryer, stenter and compactor heat is
applied on fabric. So moisture is removed from the fabric and it is
not in actual condition. But if we keep the fabric in normal
temperature and pressure for a certain time, the fabric absorbs
moisture from the atmosphere and regains its original nature. This
process is called fabric relaxation. Another cause of fabric
relaxation is to maintain the dimensional stability of produced
garments.
In CFDL Fabric is relaxed generally for 5-6 hours. During this this activity with of different fabric
rolls are also checked and confirmed. They also cut the swatches of different fabric rolls for
shrinkage and shade blanket test.
Fabric Inspection
4 point system is used for fabric inspection. Fabric check is generally done in central store or in the
beximco textile itself if the fabric is coming from BTL (Beximco Textiles limited or BDL (Beximco
Dyeing limited).
Shrinkage test
Shrinkage is the process in which a fabric becomes smaller than its original size, usually through
the process of laundry. Shrinkage test is done in initial phase only so that changes can be done in
the pattern according to results. The results of shrinkage test includes lengthwise and width wise
variation in fabric after test.
Basically shrinkage is checked by comparison of fabric of before wash and after wash. Shrinkage
testing is done by two methods
                                                                                             34 | P a g e
Procedure:
     Sample size of more than 35cm in length and 35cm in width taken from every roll of fabric.
     Marking of 35cm square is done and then over locking in done on each and every sample
      for protecting the raw edges.
     Sample sent for washing followed by steaming and ironing.
     Final measurement is taken length wise and width wise.
      Putting the values in the above mentioned equation shrinkage percentage is obtained in
      both length and width wise.
Observations:
       Direction               Shrinkage in cm
       Length                  0-4
       Width                   8-12
      Direction               Shrinkage in cm
      Length                  0-3
      Width                   0-3
                                                                Quality control supervisor analysing
                                                                         the shade blanket
 Shade Blanket: Square Swatches of various lot/rolls of
  fabric of same style no. are collected and stitched together using over lock m/c and is sent to the
  washing. Later, after wash shade variations in the sample is checked.
 Shade Band: Swatches of various lot/rolls of fabric of same style no. are collected and washed
  and then compare the shade variation with before wash swatch with the after wash swatch
  and shrinkage% is checked.
INTELLOCUT
IntelloCut is an enterprise material management system for the sewn product industry. It saves
direct raw material, effort and time at multiple stages of production. IntelloCut software is
developed by Threadsol Softwares Pvt. Ltd.
                                                                                        35 | P a g e
In BEXIMCO Intellocut software was installed in 2017. Its prime features are:
1. Accurate Estimations:
 Intello Cut helps to estimate fabric requirement accurately with the help of its advanced
  algorithms and actual data analysis.
 Helps in estimating the actual needed fabric - no more, no less and least wastage.
2. Cut plan
 Generates the most suitable and optimized cut plan from millions of possible combinations. In
  just one click!
 The solution has been specially designed to handle multiple colours, multiple fabrics, large
  quantities, large number of sizes and quantities with no ratio
 Intello Cut provides options to enter preferred markers; make manual changes and reuse
  historical data from a library of markers.
3. Fabric Grouping
 Groups similar width, shade and shrinkage in order to ensure high standards of quality and
  increased profitability.
 User can choose multiple levels of grouping based on fabric width, shade, shrinkage (length and
  width) and fabric delivery dates
 Intello Cut also provides specialized grouping for stock fabrics to ensure minimum groups
  considering first in first out (FIFO) based fabric storage duration.
 User friendly drag and drop based editing options for manual changes in fabric grouping.
4. Roll Allocation
 Allocates fabric rolls in a single click. Analyzes, creates and re-adjusts to ensure minimum end-
  bits and wastage.
5. Remnants
 Plans fabric till the last end bit easily yet effectively with just a single click of a button.
6. Reporting
 Gives complete control over factory's practices by getting real time status and complete
  tracking.
                                                                                               36 | P a g e
Work-flow of Intellocut software
                   Insert total
                                                                            Insert data of
                 order quantity ,              INTELLOCUT
                                                                           remnant fabric
                 fabric type, size              SOFTWARE                   from each roll
                 and colour ratio
Spreading
The normally used spreading mode is NOW/FOW i.e. nap one way and face one way. The machine
used for cutting is straight knife. This department has got a system of 100% inspection of cut
panels and the panels with either of fabric or cutting defect is replaced on the part change table.
Spreading of the lay is done manually by the help of six helpers and spreading supervisors. Out of
six, two helpers are at the two ends of the lay from which one use the round knife to cut the fabric
and another will work as end catcher. Three (depending on the lay length) helpers are used to
                                                                                             37 | P a g e
removes the wrinkles and creases while spreading the fabric with the help of carton stick. One
helper is used to grab the fabric end from one end and give it to end catcher.
The number of plies in one lay and the lay length are pre decided in the marker planning. The
cutting loss is around 2-3%. The wastages come out to be 15%, the wastage is sold off. (Depending
on the size of the remaining cut pieces).
In case of different shades or colours, some spreading sheet must be used for accurate ticketing
and bundling. Example: For one lay of 100 plies of 11 yards length (1 yards equals to 36 inches) the
average time for spreading is 30 – 40 minutes and for cutting, ittake20 - 30 minutes.
       1. Purchase Order
       2. Style Number
       3. Lay Number
       4. Lay method –Face up / Face to face
       5. Fabric type –Shell/ Lining /Interlining / Fusing
       6. Colour / Shade
       7. Lot quantity
       8. Marker name
       9. Marker length
       10. Lay length
       11. Usable fabric width
       12. No of plies to be spread
       13. Consumption
    Activities
   Spreading operator observes lay report generated from CAD section for above-mentioned
    detail.
   Operator receives fabric roll from fabric receipt section as per lay details.
   Operator sets the machine parameter as per lay details. For instance, lay length, no of plies;
    spreading method and end catcher start point.
   Operator observe fabric behaviour i.e.
               o Fabric composition
               o Stretch -warp way & weft way
               o Fabric stability
   Operator spreads one ply and check marker length and width of fabric
   Operator spreads 2 to 3 plies & observes for wrinkle or stretch of fabric. Accordingly, he adjusts
    the counter weights in forward or backward direction.
   After completion of each roll; operator mentions following details in INTELLOCUT spreading /
    laying report:-
                                                                                          38 | P a g e
          o    Roll reference number
          o    Fabric roll width
          o    Fabric usable width
          o    Fabric roll length
          o    Colour /shade code
          o    Usage in Yards
          o    Balance quantity in Yards and inches
LIST OF MACHINERY
   SL No       M/C Name                  Brand / Model No   Total M/C Qty
                                                                         39 | P a g e
SEWING SECTION
The objective of sewing production process is to do perform sewing as per desired quality and
meet all production targets. Sewing section in the unit consists of two sections which
accommodate about 600 machines and distributed into 10 lines (Lines 1 to 5 has overhead
material handling system i.e. unit production system while line 6 to 10 follow manual progressive
bundle system).
Each line has 1 line chief and 2 supervisors monitoring the production and trying to balance the
line. There is 1 input man in each line which collects cut panels from cutting department and
sewing trims from trim store and feeds to line.
Machine types
SL No Machine
                                                                                     40 | P a g e
                                     WORK FLOW OF DEPARTMENT
OK
                                         Thread trimming
                                        inside and outside
                                                                   Not OK
                                                                               Send in line
                                   Perform end line QC check
                                                                              for alterations
                                                  OK
                                                                                         41 | P a g e
Checklists (Documents & reports)
     13     QC Checklist                                            In-Process
     14     Inline Quality Report (Front Part)                      In-Process
     15     Bundle Control Chart (Front Part)                       In-Process
     16     Inline Quality Report (Back Part)                       In-Process
     17     Bundle Control Chart (Back Part)                        In-Process
     18     Inline Quality Report (Assembly)                        In-Process
     19     Traffic Light Report                                    In-Process
     20     Daily Sewing Maintenance Log                            In-Process
     21     Corrective Action Report                                In-Process
     22     End Line Quality Report                                   Output
     23     QA Report                                                 Output
     24     Input-Output Register (per Shift)                         Output
     25     Pre and Post wash Measurement                             Output
                                                                                 42 | P a g e
WASHING DEPARTMENT
Garments pass through various handling processes, which may render them dirty and stain,
thereby reducing their aesthetic appeal. To restore this aesthetic value, they are subjected to
cleansing process like washing and dry cleaning (PERC). Garments are sent for washing by the
production department as per the buyer’s requirement. Normally the fabrics are not asked to go
for wash by the buyer. Whether the fabric department may internally sent it a number of other
reasons.
Introduction
    Beximco has a washing plant named RR washing ltd which performs the various dry and wet
     processing activity of all 6 units and of all the products having denim, woven or knitting
     material.
    The capacity of this plant is 60,000 garment / shift
    Machine capacity: 60-120kg
    Average Through-put time:
      1. Garment dyeing: 3hrs
      2. Dry + wet processing: 1hr 30 min
    The washing machines used are equipped for garment dyeing as well as normal washing.
     Thus garment dyeing is also done when required.
    The recipes for washing and dyeing etc are developed by the testing lab during the testing of
     the fabric and then handed to the washing department.
    Average cost of washing/garment: 40-80 cent.
    Total Manpower involved: 500
Process Flow
            Bulk
                                    Pre wash             Dry processing               batch
        washing/Dyein
                                   inspection             (if required)            preparartion
              g
                                                                                      43 | P a g e
Wet Processes
2. Stone Wash:
   This wash uses pumice stones added during the washing of products to act as an abradant. A more
   or less uniform and prominent fading is seen in this wash. The degree of fading depends upon the
   product to stone ratio, washing time, size of stones and load of product. Rotary type of drum is
   used for about 1-2 hrs. Generally, 1-2 kgs. of stones is used for 1kg of product. It is usually carried
   out with enzyme wash.
3. Enzyme wash:
   Here enzymes are used to give even fading in the garment as enzyme attack the dye same at
   every place. The fading depends on the time, type of enzyme used. Cellulase enzymes are
   natural proteins which are used in denim garment processing to get stone wash look on to the
   denim garments without using stones or reducing the use of pumice stone. Cellulase attacks
   primarily on the surface of the cellulose fiber, leaving the interior of the fibre as it is, by
   removing the indigo present in the surface layer of fiber. Temperature is maintained at 40
   degree Celsius.
5. Bleaching:
   Here the colour is intentionally faded by using the indigo dye with the Chlorine bleaches. The
   garment fading depends the time of exposure to bleach while a prolonged exposure can
   hamper the quality of fabric. This also depends on the liquor ratio. It can be done by various
   bleaching agents such as Sodium hypo chlorite or Potassium permanganate. For neutralization
   of bleach Meta bisulphate chemical is used. Temperature for bleaching is 50 degree Celsius.
6. Dyeing:
   Piece dyeing is done using direct, discharge, sulphur, pigment or reactive dyes as per the
   buyer requirement and required temperature for dyeing is 60-70 degree Celsius.
                                                                                             44 | P a g e
Dry processing
1. Hand Scraping: Here denim is scraped or rubbed with sand paper. It abrades the denim yarn
   and makes the fabric look lighter in shade. The type of sand paper to be used depends on the
   look required. Scraping is also used here to develop chevrons. For light 400 or 600 are used and
   for heavy 320 or 220 are used.
   Types of emery papers used in company are -220-very hard, 320-hard, 400-smooth, 600-very
   smooth
2. Whiskering: These are the horizontal fold marks on front of the trouser by using scraping
   method. A sand paper is rubbed on the fabric in the form of lines to create more natural look.
   Here design pattern of desired design is made on the mould which is placed on planks. Workers
   put mould in the denim to make whiskers.
3. Tagging: Here fabric folds are held together with the help of plastic tags. The tagged fabric is
   undergoes scraping or washing to make the fabric folds look prominent. The fabric is first
   folded in desired pleats and tagged with plastic tags and washed. It removes indigo dye from
   the exposed fabric and gives prominent fabric and prominent fold marks.
4. Tearing: It can be done by various methods. The machines for effects are grinding machine and
   pumice stone machine with whose help effects the desired effects are achieved. In hand
   grinding garment is slightly damaged by removing surface yarn with the help of hand grinding
   machine. Mark on the garment is grinded by hand grinding machine. In Wheel grinding the
   edges of the garment like edge of the waist band, bottom hem, front pocket , back pocket/back
   pocket cover are grinded by wheel grinding machine. Before washing grinding is done on
   pocket corners or bottom hems and after wash it is done on surface of the body.
5. PP Spray: This wash is used to fade put the color randomly in from the garment which is hung
   over vertical Penequins. Spray gun is used to spray KMnO4 to make out the required design.
   KMnO4 oxidizes the dye from the applied area hence fading of color takes place. For
   neutralisation of KMnO4, oxo-ammonium sulphate is used.
Types of Machines
Horizontal Washing Machine - This machine is being used for washing garments and fabric rolls.
Normal wash, hard wash, enzyme wash, softener wash, bleaching for dye stripping are done is this
machine. Dyeing of greige fabric also takes place. The smaller capacity horizontal washing
machine is used for sampling department. Total number of machine: 30
                                                                                       45 | P a g e
Front Loading Washing Machine - This machine is used for washing garments only. All types of
wash like normal, enzyme and softener wash can be done in this too. Fabric lots are not washed in
this machine because the fabric lots get entangled in front loaded machines. Total number of
front load machine: 45
Hydro-Extractor - The garments are wrung in these machines to remove excess water after
washing. The garments are spun in a drum, which rotates at high speed squeezing the water out
of them. This process takes about 2-3 minutes. Total number of hydro extractor machine: 17
Tumble Dryer - This machine evaporates out all the left over water from the garments making
rendering them completely dry. To prevent distortion of the knit garments often they are dried
flat i.e. they are laid out flat on racks in open and the remaining water is left to evaporate
naturally. According to the behavior the choice for drying method is made. Total number of
machine: 50
PERC Machine - This machine is used for dry-cleaning process. It uses steam, air pressure, Per
chloro Ethane solution and a specified temperature for different types of fabric garments. All the
processes including washing, drain, hydro, dry clean and cooling occur in the same machine.
Chemicals used
             SR No                Description                           Type
               1.                 Acetic acid                           Acid
               2.              Sodium sulphate                           Salt
               3.             Sodium Carbonate                         Alkali
               4.             Sodium Hydroxide                         Alkali
               5.                Caustic Soda                          Alkali
               6.              Sodium sulphite                         Alkali
               7.          Sodium meta-bisulphite                   Neutralizer
               8.             Lava cone mex-02                      Neutralizer
               9.       Hydroxyl ammonium sulphate                  Neutralizer
              10.                  Citric acid                          Acid
              11.             Sodium perborate                       Detergent
              12.           Bleach singclone-65%                  Bleach Chlorine
              13.                 Bleach K.C.I                    Bleach Chlorine
              14.          Hydrogen Peroxide-50%                      Oxidiser
              15.               Pumice stone                           Stone
              16.     Potassium Permanganate (potash)             Oxidising agent
              17.                 Sultafon D1                        Detergent
              18.                Rewash APT                          Detergent
              19.                Fortress GDP                      Anti backstain
              20.       Seyko sperse SPW 801 CONC                  Anti backstain
                                                                                      46 | P a g e
Enzymes
                    SR No             Name                Function
                     1.          Ecozyme 15L         Bio polishing agent
                     2.            Hidros ted           Bio polishing
                     3           Ecozyme ultra        Neutral Enzyme
                     4.           Lerzyme 330         Neutral Enzyme
                     5.        Lava cell NHC cold     Neutral Enzyme
                     6.           Denilite 11S         Laccas Enzyme
                     7.           GZyme ultra             Amylase
SR No Name Function
                                                                                   47 | P a g e
FINISHING DEPARTMENT
The process of making garments ready for packing process after they are received from washing or
sewing section by cutting loose threads, ironing . label attaching etc. and performing related
leading to achieving desired getup.
The main objective of finishing process is to perform finishing operations and make all garments
received from washing or sewing line (in case of non-wash) ready for packaging as per the buyer
requirements within the stipulated time.
Checklists
  SR No                           Name                             Input/In-Process/Output
    1                 Chalan (from washing section)                          Input
     2            Output register (from sewing section)                       Input
Machine/Equipment Details
                  SR No                      Name                   Quantity
                                    Single needle lockstitch
                    1.                                                 13
                                            machine
                    2.                      Over lock                   2
                                  Primary and Secondary QC
                    3.                                                 33
                                              Table
                     4.                  QA Audit table                1
                     5.              Button attach machine             8
                     6.            Staple tag attach machine           4
                     7.            Steam Iron and Iron Table           16
                     8.           Garment stock keeping bins           10
                     9.                   Long Tables                  9
                    10.             Thread sucking machine             3
                    11.             Metal detector machine             1
                    12              Primary Trimming Table             3
                    13               Secondary Trim Table              3
                    14               Shade Mending Table               2
                                                                                         48 | P a g e
Work flow
                                                                                              Get up QC
     Primary QC check                       Inside Ironing for
                                               pocket bag
 (Checking of inside part of
  front and back) to see if
                                   No                                               Final Audit checking (2 hours)
    alteration is required
   Yes
                                          Pocket bag Cleaning (Only
                                              for stone washed                      Make hang tag and waist tag
  Garments are sent                                garment)
    to alteration
                                                                                                    49 | P a g e
PACKAGING DEPARTMENT
Packaging process is carried out as per agreed upon buyer requirements in order to send the
finished goods to customers packed as required within the given time while maintaining quality
standards and standing up to inspection from buyers or their representatives.
The main objective of packaging is to ensure that finished goods are as per buyer specifications,
therefore they can pass buyer inspections that the packing is done as specified and that they may
be shipped in time as per schedule made by planning.
Checklists
   SR No                             Name                          Input/In-Process/Output
     1                        Approved Sample                                Input
     2                   Folding Approval/Tech pack                          Input
     3                         Purchase order                                Input
     4                      Poly complete Report                          In-process
     5                            Tracking list                           In-process
     6                           Inline Report                            In-process
     7                            Audit report                            In-process
     8                         System Challan                             In -process
     9                 Store register for finished goods                  In-process
    10                          Packaging List                              Output
    11                     Final Inspection report                          Output
    12                         Rework Record                              In-process
             Provide clear
                                         Print carton labelling         Prepare carton for
       instruction for packing
                                         sticker and paste on         loading at designated
            including ratio
                                                 carton                    holding area
        information from ERP
                                                                                       50 | P a g e
QUALITY DEPARTMENT
The quality department is headed by Mr. Ashoka, Quality Manager. The job of this department is
to ensure that the garment should meet all the quality specifications. This department is further
divided into Quality Assurance department which includes all those planned and systematic
actions necessary to provide adequate confidence that a product or service will satisfy given
requirements for quality and Quality Control department whose responsibility is to look after all
the activities undertaken to fulfil requirements of quality.
The quality checkers are trained as soon as the new style arrives in the factory about how they are
to check the garment.
   Trim store - QA executive checks 10% of trims as per approval given by merchandiser, It is
    only accepted if defect% is zero, if not, whole received quantity is checked.
   Cutting
     1. Marker Audit - Before spreading, markers are checked for various parameters like
          marker width, marker length, size ratio and number of panels and garments, all the
          details should match lay slip generated by Intellocut.
     2. Spreading Audit- No. of plies, length and width of ply, shade segregation is checked
          during spreading.
     3. After cutting Audit - after cutting of the each lay, bundle is checked for miss cut, ragged
          cutting, notches, remnants and patterns.
     4. Panel Audit - After numbering and bundling, 6% of cut panels are checked for fabric
          defects from each bundle and it is only accepted if defect% is zero, if not, whole bundle
          is checked.
   Sewing
     1. End line audit - There are two QA table set for 10 lines (1 for 5 lines), 20% of each
          bundle is checked. Different defects code and garments part code is given in the format.
          If defect% is more than zero, then whole bundle is checked by QC and Re-audit is done.
     2. Traffic light - The Traffic Light system is used to identify and solve quality issues at an
          operator or sewing station level. The QC personnel responsible for Traffic Light check
          should randomly check each operator’s work at least 5 times in a shift. (Between two
          hour of intervals)
     From the start of the shift, the QC personnel should check every operation sequentially
      against operation spec sheet and visual standard. The last bundle produced by each
      operator is checked.
     6 pieces are selected at random from the same bundle. If more than one defect is found
      then the bundle is rejected; the QC personnel should inform the line chief immediately
                                                                                        51 | P a g e
      who should decide necessary course of action; if needed he will escalate the matter on
      urgent basis.
     The traffic light chart will start at yellow and move to Red or Green, but never directly
      between Red and Green. Example is given below:
          1st Check -> One or more faults -> Red
          2nd Check -> Zero or no fault -> Red
          3rd Check -> No fault -> Yellow
          4th Check -> No fault -> Green
          5th Check -> No fault -> Green
          6th Check -> One or more faults -> Yellow
    Finishing
         1. 2 hour audit - In every two hours, garments finished are checked by QA checks, this
              is done on 1.5 AQL which is more tighter.
         2. Day final audit - Audit is performed by opening 10% of the cartons, in case the
              results are below AQL of 1.5, then 100% recheck is done.
         3. Third party audit- In this audit, Buyer's nominated executive checks random goods
              and company's QA assist him and makes the final report.
                                                                                    52 | P a g e
Quality Control check points
In Quality control , all the processes are 100% checked for the defects, if any defect is found,
alteration is done and rechecking is done for altered part.
TYPES OF DEFECTS
                                                                                             53 | P a g e
      2.   Open stitch
      3.   Skip stitch
      4.   Operation missing
      5.   Puckering
      6.   Exposed raw edges
      7.   Seam open
MAINTENANCE
The maintenance department is headed by Mr. Aminul and has got mechanics personnel under
him to look after the maintenance work. The responsibility of this department is to ensure higher
machines uptime. The objective of maintenance is to minimize the total cost of unavailability and
resources.
  Whenever the machine is not available or not working properly, we do bear costs like-
      Loss of earnings due to stoppage of equipment
           Labour of overhead expenses
           Materials in spares and consumables
           Cost of storage of spares and facilities.
           Cost of poor quality products
           Late shipments
           Wastage of productive time
           Productivity loss due to decreased morale of the work force.
                                                                                     54 | P a g e
                              Crescent Fashion & Design Ltd.(Level-1)
                                              Beximco Industrial Park
                                              Sarabo Kashimpur Gazipur.
Yearly Maintenance plan
                                    Yearly Maintenance Plan For -2018
Sl No             Item Description                    Work        Work Period        Work Person      Dept. Head Check
  1     Personal Protective Equipment Check       Check & Fill Up   Daily           Line Mechanic           Daily
                                                  Mechanical,Oil,
 2       Daily Sewing M/C Maintenance Log                           Daily           Line Mechanic           Daily
                                                      Dust
                                                   Needle Issue,
 3             Needle Pasting Check                                     Daily        Needle Man             Daily
                                                  Collect & Pasting
 4        DB Board & Electrical Loose Wire             Check           Monthly        Mechanic        Monthly(Date-5/6)
                                                  Fan,SDB Board,
 5        Weekly Electrical Item Check List                            Weekly        Electrician           Weekly
                                                     Iron etc.
                                                    temp/Load
 6             Cable Load Check List                                    Daily        Electrician            Daily
                                                       Check
 7                 ECC Check List                 Earthing Check      Half Month     Electrician         Half Month
 8       Weekly Light Measurement Report             Lux Check         Weekly        Electrician          Weekly
                                                   Wall Plastrer,
 9      Weekly Building Inspection Check List     Dam Proof Wall       Weekly      Maint. Incharge         Weekly
                                                        Etc.
                                                  Fire Alam, Exit
 10     Daily Electrical Device Maintenance          Light, P.A         Daily        Electrician            Daily
                                                      System
 11               Daily AC Check List              Check & Solve        Daily         Electrician           Daily
 12        Daily Fire Equipment Check List         Check & Solve        Daily         Electrician           Daily
                                                  Machine Break                    Line Mechanic &
 13                 TPM Report                                          Daily                               Daily
                                                       Down                               IE
Maintenance Head
                                                                                                         55 | P a g e
WAREHOUSE
Objective - The objective of warehouse is to store the finished and packed goods according to
buyer and to dispatch it after receiving shipment chalan and packing list according to delivery
scheduled.
Area 2000 Sq ft
Manpower status 11
             Manual entry in
                                               Entry in Datatex
                register