Civil Engineering Department Material II - CIVIL 0010 Proposal For Coursework Assignment (Assignment-1)

This document is a proposal submitted by Sultan Ahmed Alnamani for a civil engineering course assignment on testing the compressive strength of concrete with glass cement replacement. The proposal outlines a plan to cast concrete cubes with glass replacement, test the cubes, and analyze the results to compare normal concrete and glass concrete compressive strength. A timeline is provided showing the 5 week project will include research, sample collection, mixing, 7 and 14 day compressive strength testing, analysis, and report writing. Tools for mixing, curing, weighing, and compressive testing are also listed.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
63 views4 pages

Civil Engineering Department Material II - CIVIL 0010 Proposal For Coursework Assignment (Assignment-1)

This document is a proposal submitted by Sultan Ahmed Alnamani for a civil engineering course assignment on testing the compressive strength of concrete with glass cement replacement. The proposal outlines a plan to cast concrete cubes with glass replacement, test the cubes, and analyze the results to compare normal concrete and glass concrete compressive strength. A timeline is provided showing the 5 week project will include research, sample collection, mixing, 7 and 14 day compressive strength testing, analysis, and report writing. Tools for mixing, curing, weighing, and compressive testing are also listed.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 4

Civil Engineering Department

Material II – CIVIL 0010

Proposal for

Coursework Assignment (Assignment-1)

Submitted By

Sultan Ahmed Alnamani

14F12665

Session C

FALL 2017

1
CW input:

This study is conducted to show that the camper between normal concrete and concert
with glass as cement replacement on the compressive strength by:

 Casting cubes of concert with glass as cement replacement.


 Testing cubes and performer lab experiment.

CW output:

The following point will be used to complete the project:

 Research of relative topics in journal articles, relative books…etc.


 Analyses and discuss the results and data.
 Discussing and capering between normal concrete and concert with glass as cement
replacement on the compressive strength
 Writing the report.

Tools:

The tools and apparatus, which will be used in this project :

 Cubes, will be used to put the concrete in its.


 Concrete mixer to mix the concrete.
 Weigh machine to weigh the concrete samples before testing.
 Curing tank to curing concrete samples.
 TO know the slump of concrete the slump cones will be used.
 Compressive testing machine to know the Compressive strength of the concrete samples.
 Microsoft office (word) to doing the report and write the data.

2
Project Plan / Timeline:

In five weeks the project will be done, the starting date is on 22 / 10 / 2017 and the finishing date
is on 28 / 11 / 2017 as shown on table 1.

Table (1) : project Plan

Activity Week

Research and collecting data Week 5

Doing proposal Week 5

Collecting samples Week 6

Mixing concrete Week 6

Testing compressive strength (normal) 7 days Week 7

Testing compressive strength (with glass) 7 days Week 7

Testing compressive strength (normal) 14 days Week 8

Testing compressive strength (with glass) 14 days Week 8

Analyzing and discussing Week 9

Writing report Week 9

Reviewing the report Week 10

Submission Week 11

3
PROPOSAL FOR PROJECT REPORT

Marking Sheet

Student ID: 14f13230 Student Name: Haitham Salem Darwesh

Bad / Marks Max.


S.No Task Average Good Excellent
poor Scored Marks

1 CW inputs 3

2 CW outputs 4

3 Tools 1

4 Time Plan 2

Total Marks /10

Penalty

Final Marks