Abuuuu Rabbb
Abuuuu Rabbb
50 % Teras = A ( 50% ) + B + C + D + E + F + G + H
= 42.000 m2
ED_K@K@#1
RAB 2007
PERHITUNGAN VOLUME
6.00 8.50
= 125.000 m2
B
2. Pemasangan Bowplank + Vitzet
L (m) B (m) K = 2 x (( L + 2 ) + ( B + 2 ))
6.00 8.50
= 37.000 m
L
3. Penyediaan Air Kerja - LS
ED_K@K@#1
RAB 2007
NO. SKETSA GAMBAR URAIAN PEKERJAAN DAN PERHITUNGAN VOLUME SAT.
III PEKERJAAN PASANGAN DAN PLESTERAN 1. Pasangan Aanstamping Batu Karang/ Kali
a+b
V = xh xL
h h a (m) b (m) h (m) L (m) 2
ED_K@K@#1
RAB 2007
NO. SKETSA GAMBAR URAIAN PEKERJAAN DAN PERHITUNGAN VOLUME SAT.
Kusen PJ 1 ( 1 Unit ) :
L1 = 1 [ (2.62 x1,02) + (1.42 x 1,6)
= 5.692 m2
Kusen P 1 ( 3 Unit ) :
L2 = 3 [ 0,92 x 2.52 ]
= 6.955 m2
Kusen P 2 ( 1 Unit ) :
L3 = 1 [ 0,82x 2.52 ]
= 2.066 m2
Kusen J 2 ( 3 Unit ):
L4 = 3 [ 0,62x 1,6 ]
= 2.976 m2
Kusen BV 1 ( 1 Unit ) :
L5 = 1 [ 1,18 x 0.42 ]
= 0.566 m2
Kusen BV 2 ( 3 Unit ) :
L6 = 3 [ 0,72 x 0.42 ]
= 0.907 m2
maka, Luas Kusen (Ak) = L1 + L2 + L3 + L4 + L5 + L6
= 19.164 m2
Luas Tanpa Kusen (ATK) = 49.500 - 19.164
= 30.336 m2
ED_K@K@#1
RAB 2007
NO. SKETSA GAMBAR URAIAN PEKERJAAN DAN PERHITUNGAN VOLUME SAT.
Gewel 1
h h(m) b (m) L = (1/2 x b xh)x2
2 6.000
= 12.000
Gewel 2
h(m) b (m) L = (1/2 x b xh)
1 3.000
b = 1.500
Luas Total Pasangan Tembok Biasa 13.500 m2
A = L x h x 2 - AT - AK - ATK + Agwl
L (m) h (m) AT (m2) Agwl (m2) AK (m2) ATK (m2)
= 250.800 m2
49.50 3.000 10.200 13.500 19.164 30.34
A = AG
h4 h3
h1h2
AG
= 12.000
12.000
m2
ED_K@K@#1
RAB 2007
NO. SKETSA GAMBAR URAIAN PEKERJAAN DAN PERHITUNGAN VOLUME SAT.
8. Acian Tembok
262.800
= 262.800 m2
IV PEKERJAAN BETON
1. Cor Beton Sloof (1 pc : 3 psr : 5 Krl)
ED_K@K@#1
RAB 2007
NO. SKETSA GAMBAR URAIAN PEKERJAAN DAN PERHITUNGAN VOLUME SAT.
Pj - 1 = 2 UNI T
0.800 2.000 5
= 8.000 m2
0.700 2.000 1
= 1.400 m2
ED_K@K@#1
RAB 2007
NO. SKETSA GAMBAR URAIAN PEKERJAAN DAN PERHITUNGAN VOLUME SAT.
ED_K@K@#1
RAB 2007
NO. SKETSA GAMBAR URAIAN PEKERJAAN DAN PERHITUNGAN VOLUME SAT.
Kaki Kuda 2
0.08 0.12 4.00 4
= 0.154 m3
ED_K@K@#1
RAB 2007
NO. SKETSA GAMBAR URAIAN PEKERJAAN DAN PERHITUNGAN VOLUME SAT.
Kaki Kuda 2
0.00 0.00 0.00 0
= 0.000
g. Gording (6/12)
ED_K@K@#1
RAB 2007
NO. SKETSA GAMBAR URAIAN PEKERJAAN DAN PERHITUNGAN VOLUME SAT.
54.90 2
= 109.80 m1
B b1 + b2
A = x h
Daerah b1 (m) b2 (m) h (L/cos 30) (m) 2
ED_K@K@#1
RAB 2007
NO. SKETSA GAMBAR URAIAN PEKERJAAN DAN PERHITUNGAN VOLUME SAT.
Bubungan 17.40 1
= 17.400 m1
Jurai 7.00 1
= 7.000 m1
Panjang Total Bubungan Seng Licin BJLS 0.30 24.400 m1
B. Induk 88.00 2
= 176.000 m1
Emperan 40.00 1
= 40.000 m1
ED_K@K@#1
RAB 2007
NO. SKETSA GAMBAR URAIAN PEKERJAAN DAN PERHITUNGAN VOLUME SAT.
0.00 0.00 0
= 0.000 m2
ED_K@K@#1
RAB 2007
NO. SKETSA GAMBAR URAIAN PEKERJAAN DAN PERHITUNGAN VOLUME SAT.
VIII PEKERJAAN INSTALASI LISTRIK DAN AIR 1 Pasangan Titik Lampu = 11 Titik
2 Pasangan Lampu TL 40 Watt = 0 Buah
3 Pasangan lampu pijar 75 watt = 7 Buah
4 Pasangan Lampu Pijar 25 Watt = 4 Buah
5 Pasangan Saklar Tunggal = 7 Buah
6 Pasangan SaklarGanda = 2 Buah
7 Pasangan Stop Kontak = 7 Buah
8 Pasangan Sekring Cast = 1 Buah
9 Pasangan Arde Pembumian = 1 Buah
10 Pasangan Wastafel = 1 Buah
11 Pasangan Bak Air Porselin = 2 Buah
12 Pasangan Closed Jongkok = 2 Buah
13 Pasangan Septic Tank dan Peresapan = 2 Buah
14 Pasangan Instalasi Air Bersih = 1 LS
15 Pasangan Instalasi Air Kotor = 1 LS
16 Pasangan Floor Drain = 2 Buah
17 Pasangan Kran Air = 2 Buah
262.800
= 262.800 m2
2. Cat Plafond
239.840
= 239.840 m2
ED_K@K@#1
RAB 2007
NO. SKETSA GAMBAR URAIAN PEKERJAAN DAN PERHITUNGAN VOLUME SAT.
3. Cat Kayu
ED_K@K@#1
RAB 2007
NO. SKETSA GAMBAR URAIAN PEKERJAAN DAN PERHITUNGAN VOLUME SAT.
4. Cat Seng
As (m2) A = As
250.500
= 250.500 m2
5. Teac oil
8.000
= 16.000 m2
XI PEKERJAAN LAIN - LAIN 1. Pasangan Saluran Keliling Bangunan (Buis Beton U 30 cm)
B
A B K = [ 2 (A + B) - 2 (C + D)] + 3
14.5 8.5
= 49.000 m1
2. Pembersihan Kembali = 1 LS
A
ED_K@K@#1
RAB 2007
REKAPITULASI VOLUME
IV PEKERJAAN BETON
1 Cor Beton Sloof (1pc : 2psr : 3krl) 1.800 m3
2 Cor Beton Kolom Praktis (1pc : 2psr : 3krl) 1.995 m3
3 Cor Beton Kolom Teras (1pc : 2psr : 3krl) 0.000 m3
4 Cor Beton Ringbalk (1pc : 2psr : 3krl) 1.800 m3
6 Cor Beton Neut (1pc : 3psr : 5krl) 0.000 m3
IX PEKERJAAN FINISHING
1 Cat Tembok 376.668 m2
2 Cat Plafond 239.840 m2
3 Cat Kayu 43.440 m2
4 Cat Seng 121.750 m2
5 Teak Oil 25.760 m2
a. Bahan
Kayu 5/7 0.012 M3 x Rp. 1,825,000.00 = Rp. 21,900.00
Paku biasa 0.020 Kg x Rp. 8,500.00 = Rp. 170.00
Kayu papan 3/20 0.007 M3 x Rp. 1,775,000.00 = Rp. 12,425.00
Sub Jumlah (1) = Rp. 34,495.00
b. Tenaga
Pekerja 0.100 Oh x Rp. 26,000.00 = Rp. 2,600.00
Tukang kayu 0.100 Oh x Rp. 42,000.00 = Rp. 4,200.00
Kepala tukang 0.010 Oh x Rp. 45,000.00 = Rp. 450.00
Mandor 0.005 Oh x Rp. 45,000.00 = Rp. 225.00
Sub Jumlah (2) = Rp. 7,475.00
Tenaga
Pekerja 1.250 Oh x Rp. 26,000.00 = Rp. 32,500.00
Mandor 0.062 Oh x Rp. 45,000.00 = Rp. 2,790.00
Tenaga
Pekerja 0.192 Oh x Rp. 26,000.00 = Rp. 4,992.000
Mandor 0.019 Oh x Rp. 45,000.00 = Rp. 855.000
a Bahan
Pasir urug 1.200 M3 x Rp. 75,000.00 = Rp. 90,000.00
Sub Jumlah (1) = Rp. 90,000.00
b Tenaga
Pekerja 0.300 Oh x Rp. 26,000.00 = Rp. 26,000.30
Mandor 0.010 Oh x Rp. 45,000.00 = Rp. 45,000.01
Sub Jumlah (2) = Rp. 71,000.31
Jumlah (1) + (2) = Rp. 161,000.31
a Bahan
Batu Karang 1.200 M3 x Rp. 71,667.00 = Rp. 86,000.40
Pasir urug 0.300 M3 x Rp. 75,000.00 = Rp. 22,500.00
Sub Jumlah (1) = Rp. 108,500.40
b Tenaga
Pekerja 0.780 Oh x Rp. 26,000.00 = Rp. 20,280.00
Tukang batu 0.390 Oh x Rp. 42,000.00 = Rp. 16,380.00
Kepala tukang 0.039 Oh x Rp. 45,000.00 = Rp. 1,755.00
Mandor 0.039 Oh x Rp. 45,000.00 = Rp. 1,755.00
Sub Jumlah (2) = Rp. 40,170.00
Jumlah (1) + (2) = Rp. 148,670.40
ED_K@K@#1
RAB 2007
6). 1 m3 Pasangan Pondasi Batu Karang (1 Pc : 5 Ps)
a Bahan
Batu Karang 1.100 M3 x Rp. 71,667.00 = Rp. 78,833.70
Semen portland 136.000 Kg x Rp. 650.00 = Rp. 88,400.00
Pasir pasang 0.544 M3 x Rp. 95,833.00 = Rp. 52,133.15
Sub Jumlah (1) = Rp. 219,366.85
b Tenaga
Pekerja 1.500 Oh x Rp. 26,000.00 = Rp. 39,000.00
Tukang batu 0.600 Oh x Rp. 42,000.00 = Rp. 25,200.00
Kepala tukang 0.060 Oh x Rp. 45,000.00 = Rp. 2,700.00
Mandor 0.075 Oh x Rp. 45,000.00 = Rp. 3,375.00
Sub Jumlah (2) = Rp. 70,275.00
Jumlah (1) + (2) = Rp. 289,641.85
a Bahan
Bata merah 5 x 11 x 22 cm 70.000 Bh x Rp. 600.00 = Rp. 42,000.00
Semen portland 14.370 Kg x Rp. 650.00 = Rp. 9,340.50
Pasir pasang 0.040 M3 x Rp. 95,833.00 = Rp. 3,833.32
Sub Jumlah (1) = Rp. 55,173.82
b Tenaga
Pekerja 0.320 Oh x Rp. 26,000.00 = Rp. 8,320.00
Tukang batu 0.100 Oh x Rp. 42,000.00 = Rp. 4,200.00
Kepala tukang 0.010 Oh x Rp. 45,000.00 = Rp. 450.00
Mandor 0.015 Oh x Rp. 45,000.00 = Rp. 675.00
Sub Jumlah (2) = Rp. 13,645.00
Jumlah (1) + (2) = Rp. 68,818.82
a Bahan
Bata merah 5 x 11 x 22 cm 70.000 Bh x Rp. 600.00 = Rp. 42,000.00
Semen portland 9.680 Kg x Rp. 650.00 = Rp. 6,292.00
Pasir pasang 0.045 M3 x Rp. 95,833.00 = Rp. 4,312.49
Sub Jumlah (1) = Rp. 52,604.49
b Tenaga
Pekerja 0.320 Oh x Rp. 26,000.00 = Rp. 8,320.000
Tukang batu 0.100 Oh x Rp. 42,000.00 = Rp. 4,200.000
Kepala tukang 0.010 Oh x Rp. 45,000.00 = Rp. 450.000
Mandor 0.015 Oh x Rp. 45,000.00 = Rp. 675.000
Sub Jumlah (2) = Rp. 13,645.000
Jumlah (1) + (2) = Rp. 66,249.49
a Bahan
Semen portland 6.480 Kg x Rp. 650.00 = Rp. 4,212.00
Pasir pasang 0.019 M3 x Rp. 95,833.00 = Rp. 1,820.83
Sub Jumlah (1) = Rp. 6,032.83
b Tenaga
Pekerja 0.200 Oh x Rp. 26,000.00 = Rp. 5,200.000
Tukang batu 0.150 Oh x Rp. 42,000.00 = Rp. 6,300.000
Kepala tukang 0.015 Oh x Rp. 45,000.00 = Rp. 675.000
Mandor 0.010 Oh x Rp. 45,000.00 = Rp. 450.000
Sub Jumlah (2) = Rp. 12,625.000
Jumlah (1) + (2) = Rp. 18,657.827
ED_K@K@#1
RAB 2007
10). 1 m2 Plesteran Tembok Biasa 1 Pc : 5 Ps, tebal 15 mm
a Bahan
Semen portland 4.320 Kg x Rp. 650.00 = Rp. 2,808.00
Pasir pasang 0.022 M3 x Rp. 95,833.00 = Rp. 2,108.33
Sub Jumlah (1) = Rp. 4,916.33
b Tenaga
Pekerja 0.200 Oh x Rp. 26,000.00 = Rp. 5,200.00
Tukang batu 0.150 Oh x Rp. 42,000.00 = Rp. 6,300.00
Kepala tukang 0.015 Oh x Rp. 45,000.00 = Rp. 675.00
Mandor 0.010 Oh x Rp. 45,000.00 = Rp. 450.00
Sub Jumlah (2) = Rp. 12,625.00
Jumlah (1) + (2) = Rp. 17,541.33
a Bahan
Semen portland 5.200 Kg x Rp. 650.00 = Rp. 3,380.00
Pasir pasang 0.020 M3 x Rp. 95,833.00 = Rp. 1,916.66
Sub Jumlah (1) = Rp. 5,296.66
b Tenaga
Pekerja 0.200 Oh x Rp. 26,000.00 = Rp. 5,200.00
Tukang batu 0.150 Oh x Rp. 42,000.00 = Rp. 6,300.00
Kepala tukang 0.015 Oh x Rp. 45,000.00 = Rp. 675.00
Mandor 0.010 Oh x Rp. 45,000.00 = Rp. 450.00
Sub Jumlah (2) = Rp. 12,625.00
Jumlah (1) + (2) = Rp. 17,921.66
a Bahan
Semen merah 0.009 Kg x Rp. 2,050.00 = Rp. 18.45
Kapur padam 0.009 M3 x Rp. 200,000.00 = Rp. 1,800.00
Pasir pasang 0.009 M3 x Rp. 95,833.00 = Rp. 862.50
Sub Jumlah (1) = Rp. 2,680.95
b Tenaga
Pekerja 0.200 Oh x Rp. 26,000.00 = Rp. 5,200.00
Tukang batu 0.150 Oh x Rp. 42,000.00 = Rp. 6,300.00
Kepala tukang 0.015 Oh x Rp. 45,000.00 = Rp. 675.00
Mandor 0.010 Oh x Rp. 45,000.00 = Rp. 450.00
Sub Jumlah (2) = Rp. 12,625.00
Jumlah (1) + (2) = Rp. 15,305.95
13). 1m3 Membuat sloof dan Ring Balk beton bertulang 15/20 (184,56 kg besi + bekesting)
a Bahan
Kayu terentang 0.270 M3 x Rp. 1,775,000.00 = Rp. 479,250.00
Paku biasa 2"-5" 2.000 Kg x Rp. 8,500.00 = Rp. 17,000.00
Minyak bekesting 0.600 lt x Rp. 13,000.00 = Rp. 7,800.00
Besi beton polos (Ø 12) 118.118 Kg x Rp. 5,919.00 = Rp. 699,142.81
Besi beton polos (Ø 6) 66.442 Kg x Rp. 6,695.00 = Rp. 444,826.51
Kawat beton 2.768 Kg x Rp. 11,250.00 = Rp. 31,144.50
Semen portland 323.000 Kg x Rp. 650.00 = Rp. 209,950.00
Pasir beton 0.520 M3 x Rp. 125,333.00 = Rp. 65,173.16
Koral beton 0.780 M3 x Rp. 187,500.00 = Rp. 146,250.00
Sub Jumlah (1) = Rp. 2,100,536.98
ED_K@K@#1
RAB 2007
b Tenaga
Pekerja 5.852 Oh x Rp. 26,000.00 = Rp. 152,152.00
Tukang batu 0.350 Oh x Rp. 42,000.00 = Rp. 14,700.00
Tukang kayu 1.560 Oh x Rp. 42,000.00 = Rp. 65,520.00
Tukang besi 1.292 Oh x Rp. 42,000.00 = Rp. 54,260.64
Kepala tukang 0.331 Oh x Rp. 45,000.00 = Rp. 14,895.00
Mandor 0.170 Oh x Rp. 45,000.00 = Rp. 7,650.00
Sub Jumlah (2) = Rp. 309,177.64
Jumlah (1) + (2) = Rp. 2,409,714.62
14). 1m3 Membuat kolom beton bertulang 15/20 (184,56 kg besi + bekesting)
a Bahan
Kayu terentang 0.400 M3 x Rp. 1,775,000.00 = Rp. 710,000.00
Paku biasa 2"-5" 4.000 Kg x Rp. 8,500.00 = Rp. 34,000.00
Minyak bekesting 2.000 lt x Rp. 13,000.00 = Rp. 26,000.00
Besi beton polos (Ø 12) 118.118 Kg x Rp. 5,919.00 = Rp. 699,142.81
Besi beton polos (Ø 6) 66.442 Kg x Rp. 6,695.00 = Rp. 444,826.51
Kawat beton 2.768 Kg x Rp. 11,250.00 = Rp. 31,144.50
Semen portland 323.000 Kg x Rp. 650.00 = Rp. 209,950.00
Pasir beton 0.520 M3 x Rp. 125,333.00 = Rp. 65,173.16
Koral beton 0.780 M 3
x Rp. 187,500.00 = Rp. 146,250.00
Kayu borneo balok 0.150 M3 x Rp. 1,825,000.00 = Rp. 273,750.00
Tripleks 2.8 mm 3.500 lbr x Rp. 44,500.00 = Rp. 155,750.00
Dolken Ø 8cm/4m 20.000 btg x Rp. 2,000.00 = Rp. 40,000.00
Sub Jumlah (1) = Rp. 2,835,986.98
b Tenaga
Pekerja 6.492 Oh x Rp. 26,000.00 = Rp. 168,792.00
Tukang batu 0.350 Oh x Rp. 42,000.00 = Rp. 14,700.00
Tukang kayu 3.300 Oh x Rp. 42,000.00 = Rp. 138,600.00
Tukang besi 1.292 Oh x Rp. 42,000.00 = Rp. 54,260.64
Kepala tukang 0.570 Oh x Rp. 45,000.00 = Rp. 25,650.00
Mandor 0.250 Oh x Rp. 45,000.00 = Rp. 11,250.00
Sub Jumlah (2) = Rp. 413,252.64
Jumlah (1) + (2) = Rp. 3,249,239.62
a Bahan
Kayu terentang 0.400 M3 x Rp. 1,775,000.00 = Rp. 710,000.00
Paku biasa 2"-5" 4.000 Kg x Rp. 8,500.00 = Rp. 34,000.00
Minyak bekesting 2.000 lt x Rp. 13,000.00 = Rp. 26,000.00
Besi beton polos (Ø 8) 78.253 Kg x Rp. 6,130.00 = Rp. 479,690.89
Besi beton polos (Ø 6) 81.447 Kg x Rp. 6,695.00 = Rp. 545,287.67
Kawat beton 2.396 Kg x Rp. 11,250.00 = Rp. 26,949.38
Semen portland 323.000 Kg x Rp. 650.00 = Rp. 209,950.00
Pasir beton 0.520 M3 x Rp. 125,333.00 = Rp. 65,173.16
Koral beton 0.780 M3 x Rp. 187,500.00 = Rp. 146,250.00
Kayu borneo balok 0.150 M3 x Rp. 1,825,000.00 = Rp. 273,750.00
Tripleks 2.8 mm 3.500 lbr x Rp. 44,500.00 = Rp. 155,750.00
Dolken Ø 8cm/4m 20.000 btg x Rp. 2,000.00 = Rp. 40,000.00
Sub Jumlah (1) = Rp. 2,712,801.09
b Tenaga
Pekerja 6.318 Oh x Rp. 26,000.00 = Rp. 164,268.00
Tukang batu 0.350 Oh x Rp. 42,000.00 = Rp. 14,700.00
Tukang kayu 3.300 Oh x Rp. 42,000.00 = Rp. 138,600.00
Tukang besi 1.118 Oh x Rp. 42,000.00 = Rp. 46,951.80
Kepala tukang 0.570 Oh x Rp. 45,000.00 = Rp. 25,650.00
Mandor 0.250 Oh x Rp. 45,000.00 = Rp. 11,250.00
ED_K@K@#1
RAB 2007
Sub Jumlah (2) = Rp. 401,419.80
Jumlah (1) + (2) = Rp. 3,114,220.89
a Bahan
Kayu terentang 0.250 M3 x Rp. 1,775,000.00 = Rp. 443,750.00
Paku biasa 2"-5" 3.000 Kg x Rp. 8,500.00 = Rp. 25,500.00
Minyak bekesting 1.200 lt x Rp. 13,000.00 = Rp. 15,600.00
Besi beton polos (Ø 8) 200.000 Kg x Rp. 6,130.00 = Rp. 1,226,000.00
Kawat beton 3.000 Kg x Rp. 11,250.00 = Rp. 33,750.00
Semen portland 323.000 Kg x Rp. 650.00 = Rp. 209,950.00
Pasir beton 0.520 M3 x Rp. 125,333.00 = Rp. 65,173.16
Koral beton 0.780 M3 x Rp. 187,500.00 = Rp. 146,250.00
Kayu borneo balok 0.105 M3 x Rp. 1,825,000.00 = Rp. 191,625.00
Tripleks 2.8 mm 2.500 lbr x Rp. 44,500.00 = Rp. 111,250.00
Dolken Ø 8cm/4m 14.000 btg x Rp. 2,000.00 = Rp. 28,000.00
Sub Jumlah (1) = Rp. 2,496,848.16
b Tenaga
Pekerja 5.600 Oh x Rp. 26,000.00 = Rp. 145,600.00
Tukang batu 0.350 Oh x Rp. 42,000.00 = Rp. 14,700.00
Tukang kayu 2.300 Oh x Rp. 42,000.00 = Rp. 96,600.00
Tukang besi 1.400 Oh x Rp. 42,000.00 = Rp. 58,800.00
Kepala tukang 0.405 Oh x Rp. 45,000.00 = Rp. 18,225.00
Mandor 0.202 Oh x Rp. 45,000.00 = Rp. 9,090.00
Sub Jumlah (2) = Rp. 343,015.00
Jumlah (1) + (2) = Rp. 2,839,863.16
ED_K@K@#1
RAB 2007
16). 1m3 Membuat beton tumbuk 1Pc : 3Psr : 5Kr
a Bahan
Semen portland 218.000 Kg x Rp. 650.00 = Rp. 141,700.00
Pasir beton 0.520 M3 x Rp. 125,333.00 = Rp. 65,173.16
Koral beton 0.870 M3 x Rp. 187,500.00 = Rp. 163,125.00
Sub Jumlah (1) 369,998.16
b Tenaga
Pekerja 1.650 Oh x Rp. 26,000.00 = Rp. 42,900.00
Tukang batu 0.250 Oh x Rp. 42,000.00 = Rp. 10,500.00
Kepala tukang 0.025 Oh x Rp. 45,000.00 = Rp. 1,125.00
Mandor 0.080 Oh x Rp. 45,000.00 = Rp. 3,600.00
Sub Jumlah (2) = Rp. 58,125.00
Jumlah (1) + (2) = Rp. 428,123.16
a Bahan
Kayu jati, balok 1.1000 M3 x Rp. 4,625,000.00 = Rp. 5,087,500.00
Sub Jumlah (1) = Rp. 5,087,500.00
b Tenaga
Pekerja 6.000 Oh x Rp. 26,000.00 = Rp. 156,000.00
Tukang kayu 20.000 Oh x Rp. 42,000.00 = Rp. 840,000.00
Kepala tukang 2.000 Oh x Rp. 45,000.00 = Rp. 90,000.00
Mandor 0.300 Oh x Rp. 45,000.00 = Rp. 13,500.00
Sub Jumlah (2) = Rp. 1,099,500.00
Jumlah (1) + (2) = Rp. 6,187,000.00
a Bahan
Kayu jati, papan 0.0400 M3 x Rp. 5,750,000.00 = Rp. 230,000.00
Sub Jumlah (1) = Rp. 230,000.00
b Tenaga
Pekerja 1.000 Oh x Rp. 26,000.00 = Rp. 26,000.00
Tukang kayu 2.500 Oh x Rp. 42,000.00 = Rp. 105,000.00
Kepala tukang 0.250 Oh x Rp. 45,000.00 = Rp. 11,250.00
Mandor 0.050 Oh x Rp. 45,000.00 = Rp. 2,250.00
Sub Jumlah (2) = Rp. 144,500.00
Jumlah (1) + (2) = Rp. 374,500.00
a Bahan
Kayu kamper, papan 0.0196 M3 x Rp. 1,775,000.00 = Rp. 34,790.00
Paku biasa 1/2" - 1" 0.3000 Kg x Rp. 12,500.00 = Rp. 3,750.00
Lem kayu 0.3000 Lt x Rp. 30,000.00 = Rp. 9,000.00
Teakwood 4" x 8" x 4 mm 0.3472 Lbr x Rp. 82,250.00 = Rp. 28,557.20
Sub Jumlah (1) = Rp. 76,097.20
b Tenaga
Pekerja 0.600 Oh x Rp. 26,000.00 = Rp. 15,600.00
Tukang kayu 2.000 Oh x Rp. 42,000.00 = Rp. 84,000.00
Kepala tukang 0.200 Oh x Rp. 45,000.00 = Rp. 9,000.00
Mandor 0.030 Oh x Rp. 45,000.00 = Rp. 1,350.00
Sub Jumlah (2) = Rp. 109,950.00
Jumlah (1) + (2) = Rp. 186,047.20
ED_K@K@#1
RAB 2007
20). 1 m2 Pasang pintu teakwood lapis seng rangkap kayu kamper
a Bahan
Kayu kamper, papan 0.0196 M3 x Rp. 1,775,000.00 = Rp. 34,790.00
Paku biasa 1/2" - 1" 0.3000 Kg x Rp. 12,500.00 = Rp. 3,750.00
Lem kayu 0.3000 Lt x Rp. 30,000.00 = Rp. 9,000.00
Teakwood 4" x 8" x 4 mm 0.3472 Lbr x Rp. 82,250.00 = Rp. 28,557.20
Seng plat BJLS 0.20 mm 1.0000 Lbr x Rp. 13,650.00 = Rp. 13,650.00
Sub Jumlah (1) = Rp. 89,747.20
b Tenaga
Pekerja 0.600 Oh x Rp. 26,000.00 = Rp. 15,600.00
Tukang kayu 2.000 Oh x Rp. 42,000.00 = Rp. 84,000.00
Kepala tukang 0.200 Oh x Rp. 45,000.00 = Rp. 9,000.00
Mandor 0.030 Oh x Rp. 45,000.00 = Rp. 1,350.00
Sub Jumlah (2) = Rp. 109,950.00
Jumlah (1) + (2) = Rp. 199,697.20
a Bahan
Kayu jati, papan 0.0350 M3 x Rp. 5,750,000.00 = Rp. 201,250.00
Sub Jumlah (1a) = Rp. 201,250.00
b Tenaga
Pekerja 0.800 Oh x Rp. 26,000.00 = Rp. 20,800.00
Tukang kayu 2.000 Oh x Rp. 42,000.00 = Rp. 84,000.00
Kepala tukang 0.200 Oh x Rp. 45,000.00 = Rp. 9,000.00
Mandor 0.040 Oh x Rp. 45,000.00 = Rp. 1,800.00
Sub Jumlah (1b) = Rp. 115,600.00
Jumlah (1) = Rp. 316,850.00
a Bahan
Kaca 1.1000 M2 x Rp. 47,500.00 = Rp. 52,250.00
Sub Jumlah (2a) = Rp. 52,250.00
b Tenaga
Pekerja 0.015 Oh x Rp. 26,000.00 = Rp. 390.00
Tukang kayu 0.150 Oh x Rp. 42,000.00 = Rp. 6,300.00
Kepala tukang 0.015 Oh x Rp. 45,000.00 = Rp. 675.00
Mandor 0.00075 Oh x Rp. 45,000.00 = Rp. 33.75
Sub Jumlah (2b) = Rp. 7,398.75
Jumlah (2) = Rp. 59,648.75
Jumlah (1) + (2) = Rp. 376,498.75
a Bahan
Kayu Borneo, balok 1.1000 M3 x Rp. 1,825,000.00 = Rp. 2,007,500.00
Besi strip 15.0000 Kg x Rp. 10,000.00 = Rp. 150,000.00
Paku biasa 2" - 5" 0.8000 Kg x Rp. 8,500.00 = Rp. 6,800.00
Sub Jumlah (1) = Rp. 2,164,300.00
b Tenaga
Pekerja 4.000 Oh x Rp. 26,000.00 = Rp. 104,000.00
Tukang kayu 12.000 Oh x Rp. 42,000.00 = Rp. 504,000.00
Kepala tukang 1.200 Oh x Rp. 45,000.00 = Rp. 54,000.00
Mandor 0.200 Oh x Rp. 45,000.00 = Rp. 9,000.00
Sub Jumlah (2) = Rp. 671,000.00
Jumlah (1) + (2) = Rp. 2,835,300.00
ED_K@K@#1
RAB 2007
23). 1 m1 Listplank ukuran 2 x (2 x 20) cm, kayu kamper
a Bahan
Kayu kamper, papan 0.0086 M3 x Rp. 1,775,000.00 = Rp. 15,265.00
Paku biasa 2" - 5" 0.0600 Kg x Rp. 8,500.00 = Rp. 510.00
Sub Jumlah (1) = Rp. 15,775.00
b Tenaga
Pekerja 0.100 Oh x Rp. 26,000.00 = Rp. 2,600.00
Tukang kayu 0.100 Oh x Rp. 42,000.00 = Rp. 4,200.00
Kepala tukang 0.010 Oh x Rp. 45,000.00 = Rp. 450.00
Mandor 0.050 Oh x Rp. 45,000.00 = Rp. 2,250.00
Sub Jumlah (2) = Rp. 9,500.00
Jumlah (1) + (2) = Rp. 25,275.00
a Bahan
Seng gelombang 3" x 6" bjls 28 0.700 Lbr x Rp. 54,000.00 = Rp. 37,800.00
Paku biasa 1/2" - 1" 0.020 Kg x Rp. 28,250.00 = Rp. 565.00
Sub Jumlah (1) = Rp. 38,365.00
b Tenaga
Pekerja 0.120 Oh x Rp. 26,000.00 = Rp. 3,120.00
Tukang kayu 0.060 Oh x Rp. 42,000.00 = Rp. 2,520.00
Kepala tukang 0.006 Oh x Rp. 45,000.00 = Rp. 270.00
Mandor 0.006 Oh x Rp. 45,000.00 = Rp. 270.00
Sub Jumlah (2) = Rp. 6,180.00
Jumlah (1) + (2) = Rp. 44,545.00
a Bahan
Seng plat 3" x 6" bjls 28 0.300 Lbr x Rp. 28,250.00 = Rp. 8,475.00
Paku biasa 1/2" - 1" 0.040 Kg x Rp. 28,250.00 = Rp. 1,130.00
Sub Jumlah (1) = Rp. 9,605.00
b Tenaga
Pekerja 0.150 Oh x Rp. 26,000.00 = Rp. 3,900.00
Tukang kayu 0.070 Oh x Rp. 42,000.00 = Rp. 2,940.00
Kepala tukang 0.008 Oh x Rp. 45,000.00 = Rp. 360.00
Mandor 0.008 Oh x Rp. 45,000.00 = Rp. 360.00
Sub Jumlah (2) = Rp. 7,560.00
Jumlah (1) + (2) = Rp. 17,165.00
26). 1 m2 Pasang Plafond Tripleks (60 x 120) cm, tebal 4 mm, Rangkap kayu borneo
1). 1m2 Pasang rangka langit - langit (30 x 60) cm, kayu borneo
a Bahan
Kayu borneo, balok 0.0230 M3 x Rp. 1,825,000.00 = Rp. 41,975.00
Paku biasa 2" - 5" 0.1500 Kg x Rp. 8,500.00 = Rp. 1,275.00
Sub Jumlah (1a) = Rp. 43,250.00
b Tenaga
Pekerja 0.150 Oh x Rp. 26,000.00 = Rp. 3,900.00
Tukang kayu 0.070 Oh x Rp. 42,000.00 = Rp. 2,940.00
Kepala tukang 0.008 Oh x Rp. 45,000.00 = Rp. 360.00
Mandor 0.008 Oh x Rp. 45,000.00 = Rp. 360.00
Sub Jumlah (1b) = Rp. 7,560.00
Jumlah (1) = Rp. 50,810.00
ED_K@K@#1
RAB 2007
2). 1m2 Pasang langit - langit tripleks (30 x 60) cm, tebal 3 mm
a Bahan
Tripleks 2.8 mm 0.3600 Lbr x Rp. 44,500.00 = Rp. 16,020.00
Paku 0.0300 Kg x Rp. 12,500.00 = Rp. 375.00
Sub Jumlah (2a) = Rp. 16,395.00
b Tenaga
Pekerja 0.0700 Oh x Rp. 26,000.00 = Rp. 1,820.00
Tukang kayu 0.1000 Oh x Rp. 42,000.00 = Rp. 4,200.00
Kepala tukang 0.0100 Oh x Rp. 45,000.00 = Rp. 450.00
Mandor 0.0035 Oh x Rp. 45,000.00 = Rp. 157.50
Sub Jumlah (2b) = Rp. 6,627.50
Jumlah (2) = Rp. 23,022.50
Jumlah (1) + (2) = Rp. 73,832.50
a Bahan
List Plafond Multipleks 6 mm 1.050 M x Rp. 6,250.00 = Rp. 6,562.50
Sub Jumlah (1) = Rp. 6,562.50
b Tenaga
Pekerja 0.021 Oh x Rp. 26,000.00 = Rp. 546.00
Tukang kayu 0.021 Oh x Rp. 42,000.00 = Rp. 882.00
Kepala tukang 0.002 Oh x Rp. 45,000.00 = Rp. 90.00
Mandor 0.001 Oh x Rp. 45,000.00 = Rp. 45.00
Sub Jumlah (2) = Rp. 1,563.00
Jumlah (1) + (2) = Rp. 8,125.50
a Bahan
Ubin keramik 30x30 cm 11.870 Bh x Rp. 2,835.00 = Rp. 33,651.45
Semen portland 8.360 Kg x Rp. 650.00 = Rp. 5,434.00
Pasir pasang 0.023 M3 x Rp. 95,833.00 = Rp. 2,204.16
Semen warna 0.900 Kg x Rp. 2,050.00 = Rp. 1,845.00
Sub Jumlah (1) = Rp. 43,134.61
b Tenaga
Pekerja 0.2500 Oh x Rp. 26,000.00 = Rp. 6,500.00
Tukang batu 0.1200 Oh x Rp. 42,000.00 = Rp. 5,040.00
Kepala tukang 0.0120 Oh x Rp. 45,000.00 = Rp. 540.00
Mandor 0.0125 Oh x Rp. 45,000.00 = Rp. 562.50
Sub Jumlah (2) = Rp. 12,642.50
Jumlah (1) + (2) = Rp. 55,777.11
a Bahan
Mozaik 30x30 cm 11.870 Bh x Rp. 3,750.00 = Rp. 44,512.50
Semen portland 14.150 Kg x Rp. 650.00 = Rp. 9,197.50
Pasir pasang 0.039 M3 x Rp. 95,833.00 = Rp. 3,737.49
Semen warna 2.000 Kg x Rp. 2,050.00 = Rp. 4,100.00
Sub Jumlah (1) = Rp. 61,547.49
b Tenaga
Pekerja 0.2500 Oh x Rp. 26,000.00 = Rp. 6,500.00
Tukang batu 0.1200 Oh x Rp. 42,000.00 = Rp. 5,040.00
Kepala tukang 0.0120 Oh x Rp. 45,000.00 = Rp. 540.00
Mandor 0.0125 Oh x Rp. 45,000.00 = Rp. 562.50
Sub Jumlah (2) = Rp. 12,642.50
Jumlah (1) + (2) = Rp. 74,189.99
ED_K@K@#1
RAB 2007
30).1 m Pasang plint keramik artistik 10 x 20 cm
a Bahan
Plint keramik artistik 10x20 cm 5.000 Bh x Rp. 1,350.00 = Rp. 6,750.00
Semen portland 1.650 Kg x Rp. 650.00 = Rp. 1,072.50
Pasir pasang 0.0032 M3 x Rp. 95,833.00 = Rp. 306.67
Semen warna 0.100 Kg x Rp. 2,050.00 = Rp. 205.00
Sub Jumlah (1) = Rp. 8,334.17
b Tenaga
Pekerja 0.0900 Oh x Rp. 26,000.00 = Rp. 2,340.00
Tukang batu 0.0900 Oh x Rp. 42,000.00 = Rp. 3,780.00
Kepala tukang 0.0090 Oh x Rp. 45,000.00 = Rp. 405.00
Mandor 0.0045 Oh x Rp. 45,000.00 = Rp. 202.50
Sub Jumlah (2) = Rp. 6,727.50
Jumlah (1) + (2) = Rp. 15,061.67
a Bahan
Porselin 20x20 cm warna 25.000 Bh x Rp. 1,580.00 = Rp. 39,500.00
Semen abu-abu 9.300 Kg x Rp. 650.00 = Rp. 6,045.00
Pasir pasang 0.018 M3 x Rp. 95,833.00 = Rp. 1,724.99
Semen warna 1.500 Kg x Rp. 2,050.00 = Rp. 3,075.00
Sub Jumlah (1) = Rp. 50,344.99
b Tenaga
Pekerja 0.6000 Oh x Rp. 26,000.00 = Rp. 15,600.00
Tukang batu 0.4500 Oh x Rp. 42,000.00 = Rp. 18,900.00
Kepala tukang 0.0450 Oh x Rp. 45,000.00 = Rp. 2,025.00
Mandor 0.0300 Oh x Rp. 45,000.00 = Rp. 1,350.00
Sub Jumlah (2) = Rp. 37,875.00
Jumlah (1) + (2) = Rp. 88,219.99
a Bahan
Wastafel 1.000 Bh x Rp. 162,500.00 = Rp. 162,500.00
Perlengkapan 12% x Rp. 97,500.00 = Rp. 11,700.00
Semen abu-abu 6.000 Kg x Rp. 650.00 = Rp. 3,900.000
Pasir pasang 0.010 M3 x Rp. 95,833.00 = Rp. 958.330
Sub Jumlah (1) = Rp. 179,058.33
b Tenaga
Pekerja 1.2000 Oh x Rp. 26,000.00 = Rp. 31,200.00
Tukang batu 1.4500 Oh x Rp. 42,000.00 = Rp. 60,900.00
Kepala tukang 0.1500 Oh x Rp. 45,000.00 = Rp. 6,750.00
Mandor 0.1000 Oh x Rp. 45,000.00 = Rp. 4,500.00
Sub Jumlah (2) = Rp. 103,350.00
Jumlah (1) + (2) = Rp. 282,408.33
a Bahan
Batu Bata 330.579 bh x Rp. 600.00 = Rp. 198,347.11
Semen Portland 120.000 Kg x Rp. 650.000 = Rp. 78,000.00
Pasir pasang 0.300 M3 x Rp. 95,833.00 = Rp. 28,749.90
Porselen 11 x 11 cm 360.000 Bh x Rp. 950.00 = Rp. 342,000.00
Semen Warna 6.000 Kg x Rp. 2,050.00 = Rp. 12,300.000
Sub Jumlah (1) = Rp. 659,397.007
b Tenaga
Pekerja 6.000 Oh x Rp. 26,000.00 = Rp. 156,000.00
Tukang batu 3.000 Oh x Rp. 42,000.00 = Rp. 126,000.00
Kepala tukang 0.300 Oh x Rp. 45,000.00 = Rp. 13,500.00
Mandor 0.300 Oh x Rp. 45,000.00 = Rp. 13,500.00
Sub Jumlah (2) = Rp. 309,000.00
Jumlah (1) + (2) = Rp. 968,397.007
ED_K@K@#1
RAB 2007
34). Memasang 1 buah kloset jongkok porselen
a Bahan
Kloset Jongkok Porselen 1.000 Bh x Rp. 97,500.00 = Rp. 97,500.00
Semen Portland 6.000 Kg x Rp. 650.000 = Rp. 3,900.00
Pasir pasang 0.010 M3 x Rp. 95,833.00 = Rp. 958.33
Sub Jumlah (1) = Rp. 102,358.330
b Tenaga
Pekerja 1.000 Oh x Rp. 26,000.00 = Rp. 26,000.00
Tukang batu 1.500 Oh x Rp. 42,000.00 = Rp. 63,000.00
Kepala tukang 1.500 Oh x Rp. 45,000.00 = Rp. 67,500.00
Mandor 0.160 Oh x Rp. 45,000.00 = Rp. 7,200.00
Sub Jumlah (2) = Rp. 163,700.00
Jumlah (1) + (2) = Rp. 266,058.330
a Bahan
Floor Drain 1.000 Bh x Rp. 18,750.00 = Rp. 18,750.00
Sub Jumlah (1) = Rp. 18,750.000
b Tenaga
Pekerja 0.010 Oh x Rp. 26,000.00 = Rp. 260.00
Tukang batu 0.100 Oh x Rp. 42,000.00 = Rp. 4,200.00
Kepala tukang 0.010 Oh x Rp. 45,000.00 = Rp. 450.00
Mandor 0.005 Oh x Rp. 45,000.00 = Rp. 225.00
Sub Jumlah (2) = Rp. 5,135.00
Jumlah (1) + (2) = Rp. 23,885.000
a Bahan
Kran Air 1.000 Bh x Rp. 42,500.00 = Rp. 42,500.00
Seal Tape 0.025 Bh x Rp. 6,000.00 150.00
Sub Jumlah (1) = Rp. 42,650.000
b Tenaga
Pekerja 0.0100 Oh x Rp. 26,000.00 = Rp. 260.00
Tukang batu 0.1000 Oh x Rp. 42,000.00 = Rp. 4,200.00
Kepala tukang 0.0100 Oh x Rp. 45,000.00 = Rp. 450.00
Mandor 0.0050 Oh x Rp. 45,000.00 = Rp. 225.00
Sub Jumlah (2) = Rp. 5,135.00
Jumlah (1) + (2) = Rp. 47,785.000
37). 1 m2 Pengecatan tembok baru ( 1 plamir, 1 lapis cat dasar, 2 lapis cat penutup)
a Bahan
Plamir 0.100 Kg x Rp. 25,000.00 = Rp. 2,500.00
Cat dasar 0.100 Kg x Rp. 15,500.00 = Rp. 1,550.00
Cat penutup 2 x 0.26 Kg x Rp. 26,000.00 = Rp. 6,760.00
Sub Jumlah (1) = Rp. 10,810.00
b Tenaga
Pekerja 0.0200 Oh x Rp. 26,000.00 = Rp. 520.00
Tukang cat 0.0630 Oh x Rp. 42,000.00 = Rp. 2,646.00
Kepala tukang 0.0063 Oh x Rp. 45,000.00 = Rp. 283.50
Mandor 0.0025 Oh x Rp. 45,000.00 = Rp. 112.50
Sub Jumlah (2) = Rp. 3,562.00
Jumlah (1) + (2) = Rp. 14,372.00
ED_K@K@#1
RAB 2007
38). 1 m2 Pengecatan bidang kayu baru (1 lapis plamir), 1 lapis cat dasar, 2 lapis cat penutup
a Bahan
Cat meni 0.200 Kg x Rp. 25,000.00 = Rp. 5,000.00
Plamir 0.150 Kg x Rp. 25,000.00 = Rp. 3,750.00
Cat dasar 0.170 Kg x Rp. 15,500.00 = Rp. 2,635.00
Cat penutup 2 x 0.260 Kg x Rp. 25,750.00 = Rp. 6,695.00
Sub Jumlah (1) = Rp. 18,080.00
b Tenaga
Pekerja 0.0700 Oh x Rp. 26,000.00 = Rp. 1,820.00
Tukang cat 0.0090 Oh x Rp. 42,000.00 = Rp. 378.00
Kepala tukang 0.0060 Oh x Rp. 45,000.00 = Rp. 270.00
Mandor 0.0025 Oh x Rp. 45,000.00 = Rp. 112.50
Sub Jumlah (2) = Rp. 2,580.50
Jumlah (1) + (2) = Rp. 20,660.50
39). 1 m2 Pengecatan permukaan baja lapis seng (galbani) secara manual sistem 1 lapis cat muktahir
dengan tebal 200um
a Bahan
Cat 0.300 Kg x Rp. 20,000.00 = Rp. 6,000.00
Sub Jumlah (1) = Rp. 6,000.00
b Tenaga
Pekerja 0.0060 Oh x Rp. 26,000.00 = Rp. 156.00
Tukang cat 0.0600 Oh x Rp. 42,000.00 = Rp. 2,520.00
Kepala tukang 0.0120 Oh x Rp. 45,000.00 = Rp. 540.00
Mandor 0.0060 Oh x Rp. 45,000.00 = Rp. 270.00
Sub Jumlah (2) = Rp. 3,486.00
Jumlah (1) + (2) = Rp. 9,486.00
a Bahan
Teak oil 0.360 Ltr x Rp. 13,000.00 = Rp. 4,680.00
Sub Jumlah (1) = Rp. 4,680.00
b Tenaga
Pekerja 0.0400 Oh x Rp. 26,000.00 = Rp. 1,040.00
Tukang cat 0.0630 Oh x Rp. 42,000.00 = Rp. 2,646.00
Kepala tukang 0.0630 Oh x Rp. 45,000.00 = Rp. 2,835.00
Mandor 0.0025 Oh x Rp. 45,000.00 = Rp. 112.50
Sub Jumlah (2) = Rp. 6,633.50
Jumlah (1) + (2) = Rp. 11,313.50
a Bahan
kunci tanam biasa 1.000 Bh x Rp. 92,500.00 = Rp. 92,500.00
Sub Jumlah (1) = Rp. Rp 92,500.00
b Tenaga
Pekerja 0.0100 Oh x Rp. 26,000.00 = Rp. 260.00
Tukang kayu 0.5000 Oh x Rp. 42,000.00 = Rp. 21,000.00
Kepala tukang 0.0100 Oh x Rp. 45,000.00 = Rp. 450.00
Mandor 0.0050 Oh x Rp. 45,000.00 = Rp. 225.00
Sub Jumlah (2) = Rp. 21,935.00
Jumlah (1) + (2) = Rp. 114,435.00
ED_K@K@#1
RAB 2007
42).1 buah pasang kunci tanam kamar mandi
a Bahan
kunci tanam kamar mandi 1.000 Bh x Rp. 35,000.00 = Rp. 35,000.00
Sub Jumlah (1) = Rp. 35,000.00
b Tenaga
Pekerja 0.0050 Oh x Rp. 26,000.00 = Rp. 130.00
Tukang kayu 0.5000 Oh x Rp. 42,000.00 = Rp. 21,000.00
Kepala tukang 0.0050 Oh x Rp. 45,000.00 = Rp. 225.00
Mandor 0.0025 Oh x Rp. 45,000.00 = Rp. 112.50
Sub Jumlah (2) = Rp. 21,467.50
Jumlah (1) + (2) = Rp. 56,467.50
a Bahan
Grendel Ekspagnolet 1.000 Bh x Rp. 25,000.00 = Rp. 25,000.00
Sub Jumlah (1) = Rp. 25,000.00
b Tenaga
Pekerja 0.0050 Oh x Rp. 26,000.00 = Rp. 130.00
Tukang kayu 0.5000 Oh x Rp. 42,000.00 = Rp. 21,000.00
Kepala tukang 0.0050 Oh x Rp. 45,000.00 = Rp. 225.00
Mandor 0.0025 Oh x Rp. 45,000.00 = Rp. 112.50
Sub Jumlah (2) = Rp. 21,467.50
Jumlah (1) + (2) = Rp. 46,467.50
a Bahan
Engsel 1.0000 Bh x Rp. 11,875.00 = Rp. 11,875.00
Sub Jumlah (1) = Rp. 11,875.00
b Tenaga
Pekerja 0.0150 Oh x Rp. 26,000.00 = Rp. 390.00
Tukang kayu 0.1500 Oh x Rp. 42,000.00 = Rp. 6,300.00
Kepala tukang 0.0150 Oh x Rp. 45,000.00 = Rp. 675.00
Mandor 0.00075 Oh x Rp. 45,000.00 = Rp. 33.75
Sub Jumlah (2) = Rp. 7,398.75
Jumlah (1) + (2) = Rp. 19,273.75
a Bahan
Kait angin 1.000 Bh x Rp. 8,250.00 = Rp. 8,250.00
Sub Jumlah (1) = Rp. 8,250.00
b Tenaga
Pekerja 0.015 Oh x Rp. 26,000.00 = Rp. 390.00
Tukang kayu 0.150 Oh x Rp. 42,000.00 = Rp. 6,300.00
Kepala tukang 0.015 Oh x Rp. 45,000.00 = Rp. 675.00
Mandor 0.00075 Oh x Rp. 45,000.00 = Rp. 33.75
Sub Jumlah (2) = Rp. 7,398.75
Jumlah (1) + (2) = Rp. 15,648.75
ED_K@K@#1
RAB 2007
46). 1 m1 Memasang Pipa Beton, diameter 30 cm - 100 cm
a Bahan
Pipa beton 1.100 Bh x Rp. 30,000.00 = Rp. 33,000.00
Batu bata 454.545 Bh x Rp. 600.00 = Rp. 272,727.27
Sement portland 10.300 Bh x Rp. 650.00 = Rp. 6,695.00
Pasir pasang 0.061 Bh x Rp. 95,833.00 = Rp. 5,845.81
Pasir urug 0.069 Bh x Rp. 75,000.00 = Rp. 5,175.00
Sub Jumlah (1) = Rp. 323,443.09
b Tenaga
Pekerja 0.380 Oh x Rp. 26,000.00 = Rp. 9,880.00
Tukang batu 0.190 Oh x Rp. 42,000.00 = Rp. 7,980.00
Kepala tukang 0.019 Oh x Rp. 45,000.00 = Rp. 855.00
Mandor 0.019 Oh x Rp. 45,000.00 = Rp. 855.00
Sub Jumlah (2) = Rp. 19,570.00
Jumlah (1) + (2) = Rp. 343,013.09
ED_K@K@#1
RAB 2007
DAFTAR HARGA SATUAN UPAH DAN BAHAN 2007
Kualitas / merk
No Jenis Barang / Upah SATUAN HARGA 2007
/ Spesifikasi
A UPAH
1 Pekerja / buruh 8 Jam / Hari Org / Hari 26,000.00
2 Tukang Batu 8 Jam / Hari Org / Hari 42,000.00
3 Tukang Kayu 8 Jam / Hari Org / Hari 42,000.00
4 Tukang Besi 8 Jam / Hari Org / Hari 42,000.00
5 Tukang Cat 8 Jam / Hari Org / Hari 42,000.00
6 Tukang Listrik 8 Jam / Hari Org / Hari 42,000.00
7 Tukang Pipa 8 Jam / Hari Org / Hari 42,000.00
8 Tukang Las 8 Jam / Hari Org / Hari 42,000.00
9 Mandor 8 Jam / Hari Org / Hari 45,000.00
10 Mekanik 8 Jam / Hari Org / Hari 57,500.00
11 Pembantu Mekanik 8 Jam / Hari Org / Hari 35,000.00
12 Operator 8 Jam / Hari Org / Hari 52,500.00
13 Pembantu Operator 8 Jam / Hari Org / Hari 40,000.00
14 Supir 8 Jam / Hari Org / Hari 45,000.00
15 Pembantu Supir 8 Jam / Hari Org / Hari 42,500.00
16 Kepala Tukang 8 Jam / Hari Org / Hari 45,000.00
B BAHAN BANGUNAN
1 Agregat Kasar Bulat 2/3 Ret m3 187,500.00
2 Air bersih 5000 L Tangki liter 65,000.00
3 Amplas Pabrikan Lbr 3,000.00
4 Angker Dok - - 10,000.00
5 Arde Pembumian - - 100,000.00
6 Bak cuci piring Stainless Steel Pabrikan Set 184,500.00
7 Bata Merah Pabrikan Bh 600.00
8 Batako Pabrikan Bh 2,200.00
9 Batu Karang 5 / 7 - m3 71,667.00
10 Batu Karang - m3 71,667.00
11 Baut + Moer Kuda - kuda 0.12 mm Pabrikan Kg 10,000.00
12 Baut + Moer Angker f 12 mm Pabrikan Kg 10,000.00
13 Baut Sudut 0.16 f 16 mm Pabrikan Kg 10,000.00
14 Besi Beton Polos Ø 6 mm - Kg 6,695.00
15 Besi Beton Polos Ø 8 mm - Kg 6,130.00
ED_K@K@#1
RAB 2007
Kualitas / merek
No Jenis Barang / Upah SATUAN HARGA 2007
/ Spesifikasi
15 Besi Beton Polos Ø 12 mm - Kg 5,919.00
16 Beugel U - Bh 15,000.00
17 Box sekring f 4" Pabrikan Bh 15,000.00
18 BRC T (90, 120, 150) 3m lbr 227,500.00
19 Bubungan Multiroof Sakura lbr 27,000.00
20 Bubungan Genteng Beton Pabrikan Bh 7,500.00
21 Cat Kayu Dasar Altex Kg 15,500.00
22 Cat Kayu Mengkilap Altex Kg 25,750.00
24 Cat Tembok merk Bell Mas Bell Mas Kg 26,000.00
Cat meni 25,000.00
Cat seng Kg 20,000.00
25 Dolken Ø 8 mm/4 m - Btg 2,000.00
26 Dumpul Altex Kg 46,500.00
27 Embol Box Pabrikan Bh 625.00
28 Engsel Pintu Merk Everbst Pabrikan Bh 11,875.00
29 Expagnolet/grendel pintu tanam Pabrikan Bh 25,000.00
30 Filer abu batu Pabrikan m3 475,000.00
31 Fitting tempel biasa Pabrikan Bh 2,250.00
32 Floor Drain Stainles Steel Pabrikan Set 18,750.00
33 Grendel pintu Pabrikan Bh 17,500.00
34 Grendel Jendela Pabrikan psg 12,250.00
35 Instalasi Air Bersih - Paket 600,000.00
36 Instalasi Air Kotor - Paket 600,000.00
37 Isolasi Listrik Pabrikan roll 3,000.00
38 Kabel NYY 1.5 mm Pabrikan m1 3,375.00
39 Kaca Bening 3 mm Pabrikan m2 47,500.00
40 Kaca Bening 5 mm Pabrikan m2 61,250.00
41 Kaca Bening 8 mm Pabrikan m2 165,000.00
42 Kaca Es 3 mm Pabrikan m2 40,250.00
43 Kaca Rayband 3 mm 60% m2 55,000.00
44 Kaca Rayband 5 mm 60% m2 68,750.00
45 Kait angin jendela Pabrikan Bh 8,250.00
46 Kait angin pintu Pabrikan Bh 22,500.00
47 Kapur padam - m3 200,000.00
48 Kawat Anyaman 5 cm Pabrikan Kg 10,000.00
49 Kawat Beton Pabrikan Kg 11,250.00
50 Kayu kls I Balok (Bayam) f 2" Bayam m3 4,625,000.00
51 Kayu kls I Usuk (Bayam) f3" Bayam m3 5,500,000.00
52 Kayu kls I Reng (Bayam) f 4" Bayam m3 5,500,000.00
53 Kayu kls I Papan Tipis (Bayam) f6" Bayam m3 5,750,000.00
54 Kayu kls I Papan Tebal (Bayam) Bayam m3 6,000,000.00
55 Kayu kls II Balok f4" - m3 1,825,000.00
56 Kayu kls II Usuk f6" - m3 1,825,000.00
57 Kayu kls II Reng - m3 1,900,000.00
ED_K@K@#1
RAB 2007
Kualitas / merek
No Jenis Barang / Upah SATUAN HARGA 2007
/ Spesifikasi
58 Kayu kls II papan tipis - m3 1,775,000.00
59 Kayu kls II papan tebal - m3 2,350,000.00
Keramik Porselen 11 x 11 cm - Bh 950.00
60 Keramik putih 40 x 40 cm Pabrikan Bh 6,700.00
61 Keramik putih 30 x 30 cm Pabrikan Bh 2,835.00
62 Keramik putih 20 x 20 cm Pabrikan Bh 1,580.00
63 Kertas Pasir Besi Pabrikan lbr 2,750.00
64 Kertas Pasir Kayu Pabrikan lbr 2,250.00
65 Klem Kabel Pabrikan Bh 8,000.00
66 Kloset Jongkok Merk INA f 20 mm Pabrikan Bh 97,500.00
67 Kran air Stainlesstel f 25 mm Pabrikan Unit 42,500.00
68 Kunci Pintu Merk Top Pabrikan Bh 35,000.00
69 Kunci Pintu Merk Valencia 2x putar Pabrikan Bh 92,500.00
70 Kunci Pintu Merk Yuri 2x putar Pabrikan Bh 137,500.00
71 Kunci lemari dinding Pabrikan Bh 5,000.00
72 Kunci Alfa Pabrikan Bh 67,500.00
73 Kwas Pabrikan Bh 4,500.00
74 Lampu TL 40 watt merk Philips Philips Bh 14,000.00
75 Lampu TL 40 watt merk Philips Lengka Philips Bh 64,000.00
76 Lampu TL 20 watt merk Philips Lengka Philips Bh 56,500.00
77 Lampu TL Bundar 20 watt Pabrikan Bh 28,000.00
78 Lampu Pijar 40/60 watt merk Philips Philips Bh 3,900.00
79 Lampu Pijar 25 watt Pabrikan Bh 3,250.00
80 Lem Weber putih Kg 20,000.00
81 Lem Weber kuning Kg 30,000.00
82 List profil kayu Pabrikan m1 17,500.00
83 List Kaca Pabrikan m1 2,000.00
84 List Plafond Multipleks 6 mm Pabrikan m1 6,250.00
85 List Profil Gypsum Pabrikan m1 23,000.00
86 L Joint PVC Ǿ 2 " Pabrikan Bh 9,000.00
87 L Joint PVC Ǿ 3 " Pabrikan Bh 25,000.00
88 L Joint PVC Ǿ 4 " Pabrikan Bh 30,000.00
89 MCB Pabrikan Bh 27,500.00
90 Minyak Cat Super liter 6,750.00
91 Minyak Tanah - liter 2,500.00
92 Nako Lengkap ( 7 ssr ) Pabrikan set 92,750.00
93 Oli - liter 13,000.00
94 Paku halus (2-5 cm) Pabrikan Kg 12,500.00
95 Paku 5s /d 12 cm Pabrikan Kg 8,500.00
96 Paku Beton Halus (2 - 5 cm) Pabrikan Kg 16,250.00
97 Paku Seng Pabrikan Kg 28,250.00
98 Paku Beton 5 s / d 12 cm Pabrikan Kg 14,450.00
99 Paku Tripleks Pabrikan Kg 14,750.00
100 Paku Alumanium Pabrikan Kg 14,550.00
ED_K@K@#1
RAB 2007
Kualitas / merek
No Jenis Barang / Upah SATUAN HARGA 2007
/ Spesifikasi
101 Paku Skrup Halus Pabrikan Kg 3,000.00
102 Paku Skrup Kasar Pabrikan Kg 10,000.00
103 Papan Gypsum Pabrikan lbr 49,000.00
104 Pasir Pasang - m3 95,833.00
105 Pasir Beton - m3 125,333.00
106 Pasir Urugan - m3 75,000.00
107 Paving Stone warna Pabrikan Bh 1,050.00
108 Pegangan Pintu Pabrikan Bh 75,000.00
122 Pipa beton Pabrikan m 30,000.00
123 Pegangan Jendela Pabrikan Bh 10,000.00
124 Pipa GIP MEDIUM B Ø 1/2 " 6m m 66,550.00
125 Pipa GIP MEDIUM B Ø 3/4 " 6m m 81,300.00
126 Pipa GIP MEDIUM B Ø 1" 6m m 116,450.00
127 Pipa GIP MEDIUM B Ø 1 1/2 " 6m m 365,300.00
128 Pipa GIP MEDIUM B Ø 2" 6m m 237,850.00
129 Pipa GIP MEDIUM B Ø 3 " 6m m 369,800.00
130 Pipa GIP MEDIUM B Ø 4 " 6m m 730,250.00
131 Pipa PVC Ǿ 2 " Pabrikan Btg 27,500.00
132 Pipa PVC Ǿ 3 " Pabrikan Btg 42,500.00
133 Pipa PVC Ǿ 4 " Pabrikan Btg 75,000.00
134 Pipa PVC 0.5" untuk listrik Pabrikan m1 4,500.00
135 Pipa Penguras Bak Mandi f 40 mm Pabrikan Unit 17,500.00
136 Plamuur Tembok Pedang Pabrikan Kg 25,000.00
137 Plat Jepit 2 x 50.5 Pabrikan Kg 11,250.00
138 Plat inventarisasi jembatan (Marmer) - Bh 775,000.00
139 Plint Keramik 10 x 30 cm - Bh 1,350.00
140 Politur Pabrikan liter 32,500.00
141 Rangka Nako Pabrikan m2 7,750.00
142 Reducer Ǿ 4"3" Pabrikan Bh 7,500.00
143 Residu/Teer Pabrikan liter 75,000.00
144 Rool cat Pabrikan Bh 13,750.00
145 Saklar Tunggal merk Broco f 20 mm Broco Bh 10,750.00
146 Saklar Ganda merk Broco f 40 mm Broco Bh 14,250.00
147 Saklar Triple merk KJ Pabrikan Bh 13,250.00
148 Seal Tape Pabrikan Bh 6,000.00
149 Sekring cast 3 grup f 15 mm Pabrikan Bh 14,000.00
150 Semen Kupang (portland) - Kg 650.00
151 Semen Tonasa - Kg 706.00
152 Semen Bosowa - Kg 706.00
153 Semen Warna - Kg 2,050.00
154 Seng Gelombang BJLS 0.30 mm Gajahcalisco lbr 54,000.00
155 Seng Bubungan BJLS 0.30 mm Gajahcalisco lbr 33,750.00
156 Seng Plat BJLS 0.30 mm (60 cm) 60 cm lbr 21,500.00
157 Seng Plat BJLS 0.30 mm (90 cm) 90 cm lbr 30,000.00
158 Seng Gelombang BJLS 0.20 mm Gajahcalisco lbr 33,750.00
ED_K@K@#1
RAB 2007
Kualitas / merek
No Jenis Barang / Upah SATUAN HARGA 2007
/ Spesifikasi
160 Seng Bubungan BJLS 0.20 mm Gajahcalisco lbr 28,250.00
161 Seng Plat BJLS 0.20 mm (60 cm) 60 cm lbr 11,675.00
162 Seng Plat BJLS 0.20 mm (90 cm) 90 cm lbr 13,650.00
163 Septictank + Peresapan - Unit 7,500,000.00
164 Sirtu - m3 79,167.00
165 Socket Ǿ 3" Pabrikan Bh 6,750.00
166 Socket Ǿ 4" Pabrikan Bh 8,000.00
167 Stop Kontak merk Broco Broco Bh 12,750.00
168 Tanah Urug - m3 65,000.00
169 Tangki Fibre Glass 2.2 m3 Pabrikan Bh 1,150,000.00
170 Teakwood 3.8 mm Pabrikan lbr 82,250.00
171 Teakwood 2.8 mm Pabrikan lbr 70,000.00
172 Tegel Mozaik - Buah 3,750.00
170 Titik Lampu kontak - - 17,500.00
171 T Joint PVC Ǿ 2 " Pabrikan Bh 5,500.00
172 T Joint PVC Ǿ 3" Pabrikan Bh 8,750.00
173 T Joint PVC Ǿ 4 " Pabrikan Bh 12,500.00
174 Tripleks 9 mm Pabrikan lbr 108,750.00
175 Tripleks 2.8 mm Pabrikan lbr 44,500.00
176 Tripleks 3.8 mm Pabrikan lbr 56,250.00
177 Tripleks 6.0 mm Pabrikan lbr 77,500.00
178 Tripleks lapis aluminium foil Pabrikan lbr 70,000.00
179 Tripleks lapis melamine Pabrikan lbr 70,000.00
180 Wastafel f 75 mm Pabrikan Unit 162,500.00
ED_K@K@#1
RAB 2007
RENCANA ANGGARAN BIAYA
Volume Satuan Bahan Satuan Pekerja Harga Satuan Total Harga Bahan Total Upah Pekerja
No. Jenis Pekerjaan Sat.
(I) ( II ) ( III ) ( II + III ) ( I x II ) ( I x III )
I. PEKERJAAN PERSIAPAN
1 Pembersihan Lahan m2 131.250 Rp - Rp 1,000.00 Rp 1,000.00 Rp - Rp 131,250.00
2 Pemasangan Bowplank + Vitset m 1
56.700 Rp 34,495.00 Rp 7,475.00 Rp 41,970.00 Rp 1,955,866.50 Rp 423,832.50
3 Penyediaan Air Kerja LS 1.000 Rp 300,000.00 Rp - Rp 300,000.00 Rp 300,000.00 Rp -
TOTAL = Rp 2,255,866.50 Rp 555,082.50
II. PEKERJAAN TANAH DAN URUGAN
1 Galian Tanah Pondasi m3 33.580 Rp - Rp 35,290.00 Rp 35,290.00 Rp - Rp 1,185,038.20
2 Urugan Tanah Kembali m3 8.390 Rp - Rp 5,847.00 Rp 5,847.00 Rp - Rp 49,056.33
3 Urugan Pasir di Bawah Pondasi m3 3.400 Rp 90,000.00 Rp 71,000.31 Rp 161,000.31 Rp 306,000.00 Rp 241,401.05
4 Urugan Pasir Peninggi Lantai m3 12.070 Rp 90,000.00 Rp 71,000.31 Rp 161,000.31 Rp 1,086,300.00 Rp 856,973.74
TOTAL = Rp 1,392,300.00 Rp 2,332,469.33
III. PEKERJAAN PASANGAN DAN PLESTERAN
1 Pekerjaan Pasangan batu kosong m3 10.200 Rp 108,500.40 Rp 40,170.00 Rp 148,670.40 Rp 1,106,704.08 Rp 409,734.00
2 Pasangan Pondasi Batu Kali (1 pc : 5 psr) m 3
38.080 Rp 219,366.85 Rp 70,275.00 Rp 289,641.85 Rp 8,353,489.72 Rp 2,676,072.00
3 Pasangan Tembok Trasraam (1 pc : 3 psr) m2 11.686 Rp 55,173.82 Rp 13,645.00 Rp 68,818.82 Rp 644,761.26 Rp 159,455.47
4 Pasangan Tembok Biasa (1 pc : 5 psr) m2 27.591 Rp 52,604.49 Rp 13,645.00 Rp 66,249.49 Rp 1,451,410.35 Rp 376,479.20
5 Plesteran Tembok Trasraam (1 pc : 3 psr) m2 11.686 Rp 6,032.83 Rp 12,625.00 Rp 18,657.83 Rp 70,499.62 Rp 147,535.75
6 Plesteran Tembok Biasa (1 pc : 5 psr) m2 206.500 Rp 4,916.33 Rp 12,625.00 Rp 17,541.33 Rp 1,015,221.32 Rp 2,607,062.50
7 Plesteran Pondasi Tepi Luar (1 pc : 4 psr) m2 0.000 Rp 5,296.66 Rp 12,625.00 Rp 17,921.66 Rp - Rp -
8 Acian Tembok m2 376.668 Rp 2,680.95 Rp 12,625.00 Rp 15,305.95 Rp 1,009,826.94 Rp 4,755,433.50
TOTAL = Rp 13,651,913.29 Rp 11,131,772.42
IV. PEKERJAAN BETON
1 Cor Beton Sloof (1pc : 2psr : 3krl) m3 1.800 Rp 2,100,536.98 Rp 309,177.64 Rp 2,409,714.62 Rp 3,780,966.57 Rp 556,519.75
2 Cor Beton Kolom Praktis (1pc : 2psr : 3krl) m3 1.995 Rp 2,712,801.09 Rp 401,419.80 Rp 3,114,220.89 Rp 5,412,038.17 Rp 800,832.50
3 Cor Beton Kolom Teras (1pc : 2psr : 3krl) m3 0.000 Rp 2,835,986.98 Rp 413,252.64 Rp 3,249,239.62 Rp - Rp -
4 Cor Beton Ringbalk (1pc : 2psr : 3krl) m 3
1.800 Rp 2,100,536.98 Rp 309,177.64 Rp 2,409,714.62 Rp 3,780,966.57 Rp 556,519.75
6 Cor Beton Neut (1pc : 2psr : 3krl) m3 0.000 Rp 369,998.16 Rp 58,125.00 Rp 428,123.16 Rp - Rp -
TOTAL = Rp 12,973,971.31 Rp 1,913,872.01
V. PEKERJAAN KAYU DAN KACA
1 Pasangan Kayu Kusen Klas I m3 1.699 Rp 5,087,500.00 Rp 1,099,500.00 Rp 6,187,000.00 Rp 8,643,662.50 Rp 1,868,050.50
2 Pasangan Daun Pintu Panil Kayu m2 8.000 Rp 230,000.00 Rp 144,500.00 Rp 374,500.00 Rp 1,840,000.00 Rp 1,156,000.00
3 Pas. Daun Pintu Double Teacwood 3 mm m2 0.000 Rp 76,097.20 Rp 109,950.00 Rp 186,047.20 Rp - Rp -
4 Pas. Daun Pintu Double Teacwood lapis Alluminium m 2
1.400 Rp 89,747.20 Rp 109,950.00 Rp 199,697.20 Rp 125,646.08 Rp 153,930.00
5 Pas. Daun Jendela Kaca dan Ventilasi 3 mm m2 23.600 Rp 253,500.00 Rp 122,998.75 Rp 376,498.75 Rp 5,982,600.00 Rp 2,902,770.50
6 Pas. Kaca Polos (Kaca Silang) m2 0.000 Rp 52,250.00 Rp 7,398.75 Rp 59,648.75 Rp - Rp -
ED_K@K@#1
RAB 2007
7 Pas. Kayu Kap dan Gording m3 43.440 Rp 2,164,300.00 Rp 671,000.00 Rp 2,835,300.00 Rp 94,017,192.00 Rp 29,148,240.00
8 Pasangan Lisplank Papan m1
206.600 Rp 15,775.00 Rp 9,500.00 Rp 25,275.00 Rp 3,259,115.00 Rp 1,962,700.00
TOTAL = Rp 113,868,215.58 Rp 37,191,691.00
VI. PEKERJAAN ATAP DAN PLAFOND
1 Pas. Atap Seng BJLS 0.30 mm m2 121.750 Rp 38,365.00 Rp 6,180.00 Rp 44,545.00 Rp 4,670,938.75 Rp 752,415.00
2 Pas. Atap Bubungan Seng Licin 0.30 mm m1 16.000 Rp 9,605.00 Rp 7,560.00 Rp 17,165.00 Rp 153,680.00 Rp 120,960.00
3 Pas. Plafond Tripleks 3 mm & Rangka m2 239.840 Rp 59,645.00 Rp 14,187.50 Rp 73,832.50 Rp 14,305,256.80 Rp 3,402,730.00
4 Pas. List Penutup Plafond (Berprofil) m1 401.500 Rp 6,562.50 Rp 1,563.00 Rp 8,125.50 Rp 2,634,843.75 Rp 627,544.50
TOTAL = Rp 21,764,719.30 Rp 4,903,649.50
ED_K@K@#1
RAB 2007
VII. PEKERJAAN LANTAI
1 Pasangan Tegel Keramik 30/30 m2 59.000 Rp 43,134.61 Rp 12,642.50 Rp 55,777.11 Rp 2,544,941.93 Rp 745,907.50
2 Pasangan tegel mozaik 40/40 m2 5.000 Rp 61,547.49 Rp 12,642.50 Rp 74,189.99 Rp 307,737.44 Rp 63,212.50
3 Pasangan Plint Keramik 10/20 m1
0.000 Rp 8,334.17 Rp 6,727.50 Rp 15,061.67 Rp - Rp -
4 Pasangan Tegel Porselen 20/20 m2 9.000 Rp 50,344.99 Rp 37,875.00 Rp 88,219.99 Rp 453,104.95 Rp 340,875.00
TOTAL = Rp 3,305,784.31 Rp 1,149,995.00
VIII PEKERJAAN INSTALASI LISTRIK DAN AIR
1 Pasangan Titik Lampu Buah 9 Rp - Rp 17,500.00 Rp 17,500.00 Rp - Rp 157,500.00
2 Pasangan Lampu TL 40 Watt Buah 6 Rp 64,000.00 Rp - Rp 64,000.00 Rp 384,000.00 Rp -
3 Pasangan Lampu Pijar 75 Watt Buah 3 Rp 64,000.00 Rp - Rp 3,900.00 Rp 192,000.00 Rp -
4 Pasangan Lampu Pijar 25 Watt Buah 0 Rp 3,250.00 Rp - Rp 3,250.00 Rp - Rp -
5 Pasangan Saklar Tunggal Buah 5 Rp 10,750.00 Rp - Rp 10,750.00 Rp 53,750.00 Rp -
6 Pasangan SaklarGanda Buah 2 Rp 14,250.00 Rp - Rp 14,250.00 Rp 28,500.00 Rp -
7 Pasangan Stop Kontak Buah 6 Rp 12,750.00 Rp - Rp 12,750.00 Rp 76,500.00 Rp -
8 Pasangan Sekring Cast Buah 1 Rp 14,000.00 Rp - Rp 14,000.00 Rp 14,000.00 Rp -
9 Pasangan Arde Pembumian Buah 1 Rp 100,000.00 Rp - Rp 100,000.00 Rp 100,000.00 Rp -
10 Pasangan Wastafel Buah 1 Rp 179,058.33 Rp 103,350.00 Rp 282,408.33 Rp 179,058.33 Rp 103,350.00
11 Pasangan Bak Mandi Batu Bata Buah 1 Rp 659,397.01 Rp 309,000.00 Rp 968,397.01 Rp 659,397.01 Rp 309,000.00
12 Pasangan Closed Jongkok Porselin Buah 1 Rp 102,358.33 Rp 163,700.00 Rp 266,058.33 Rp 102,358.33 Rp 163,700.00
13 Pasangan Septic Tank dan Peresapan Buah 2 Rp 7,500,000.00 Rp - Rp 7,500,000.00 Rp 15,000,000.00 Rp -
14 Pasangan Instalasi Air Bersih LS 1 Rp - Rp 600,000.00 Rp 600,000.00 Rp - Rp 600,000.00
15 Pasangan Instalasi Air Kotor LS 1 Rp - Rp 600,000.00 Rp 600,000.00 Rp - Rp 600,000.00
16 Pasangan Floor Drain Buah 1 Rp 18,750.00 Rp 5,135.00 Rp 23,885.00 Rp 18,750.00 Rp 5,135.00
17 Pasangan Kran Air Buah 1 Rp 42,650.00 Rp 5,135.00 Rp 47,785.00 Rp 42,650.00 Rp 5,135.00
TOTAL = Rp 16,850,963.67 Rp 1,943,820.00
IX. PEKERJAAN FINISHING
1 Cat Tembok m2 376.668 Rp 10,810.00 Rp 3,562.00 Rp 14,372.00 Rp 4,071,781.08 Rp 1,341,691.42
2 Cat Plafond m2 239.840 Rp 18,080.00 Rp 2,580.50 Rp 20,660.50 Rp 4,336,307.20 Rp 618,907.12
3 Cat Kayu m2 43.440 Rp 18,080.00 Rp 2,580.50 Rp 20,660.50 Rp 785,395.20 Rp 112,096.92
4 Cat Seng m2 121.750 Rp 6,000.00 Rp 3,486.00 Rp 9,486.00 Rp 730,500.00 Rp 424,420.50
5 Teak Oil m2 25.760 Rp 4,680.00 Rp 6,633.50 Rp 11,313.50 Rp 120,556.80 Rp 170,878.96
TOTAL = Rp 10,044,540.28 Rp 2,667,994.92
X. PEKRJAAN PENGGANTUNG DAN PENGUNCI
1 Pasangan Kunci Tanam Biasa Buah 5 Rp 92,500.00 Rp 21,935.00 Rp 114,435.00 Rp 462,500.00 Rp 109,675.00
2 Pasangan Kunci KM/ WC Buah 1 Rp 35,000.00 Rp 21,467.50 Rp 56,467.50 Rp 35,000.00 Rp 21,467.50
3 Pasangan Grendel Buah 13 Rp 25,000.00 Rp 21,467.50 Rp 46,467.50 Rp 325,000.00 Rp 279,077.50
4 Pasangan Engsel Buah 34 Rp 11,875.00 Rp 7,398.75 Rp 19,273.75 Rp 403,750.00 Rp 251,557.50
5 Pasangan Kait Angin Buah 13 Rp 8,250.00 Rp 7,398.75 Rp 15,648.75 Rp 107,250.00 Rp 96,183.75
6 Pasangan Anker Doc Buah 32 Rp 10,000.00 Rp - Rp 10,000.00 Rp 320,000.00 Rp -
7 Pasangan Mur, Baut LS 22 Rp 200,000.00 Rp - Rp 200,000.00 Rp 4,400,000.00 Rp -
8 PasanganBeughel U Buah 3 Rp 15,000.00 Rp - Rp 15,000.00 Rp 45,000.00 Rp -
TOTAL = Rp 6,098,500.00 Rp 757,961.25
ED_K@K@#1
RAB 2007
XI. PEKERJAAN LAIN - LAIN
1 Pasangan Saluran Keliling Bangunan ( Buis Beton U 30 cm) m1 196.500 Rp 323,443.09 Rp 19,570.00 Rp 343,013.09 Rp 63,556,566.35 Rp 3,845,505.00
2 Pembersihan kembali LS 1.000 Rp - Rp 250,000.00 Rp 250,000.00 Rp - Rp 250,000.00
TOTAL = Rp 63,556,566.35 Rp 4,095,505.00
ED_K@K@#1
RAB 2007
ANA ANGGARAN BIAYA
Total Harga
Bobot
( I x ( II + II ))
Rp 131,250.00 0.039
Rp 2,379,699.00 0.712
Rp 300,000.00 0.090
Rp 2,810,949.00 0.841
Rp 1,185,038.20 0.355
Rp 49,056.33 0.015
Rp 547,401.05 0.164
Rp 1,943,273.74 0.581
Rp 3,724,769.33 1.114
Rp 1,516,438.08 0.454
Rp 11,029,561.72 3.300
Rp 804,216.73 0.241
Rp 1,827,889.54 0.547
Rp 218,035.37 0.065
Rp 3,622,283.82 1.084
Rp - 0.000
Rp 5,765,260.44 1.725
Rp 24,783,685.71 7.415
Rp 4,337,486.32 1.298
Rp 6,212,870.68 1.859
Rp - 0.000
Rp 4,337,486.32 1.298
Rp - 0.000
Rp 14,887,843.31 4.454
Rp 10,511,713.00 3.145
Rp 2,996,000.00 0.896
Rp - 0.000
Rp 279,576.08 0.084
Rp 8,885,370.50 2.658
Rp - 0.000
ED_K@K@#1
RAB 2007
Rp 123,165,432.00 36.851
Rp 5,221,815.00 1.562
Rp 151,059,906.58 45.197
Rp 5,423,353.75 1.623
Rp 274,640.00 0.082
Rp 17,707,986.80 5.298
Rp 3,262,388.25 0.976
Rp 26,668,368.80 7.979
ED_K@K@#1
RAB 2007
Rp 3,290,849.43 0.985
Rp 370,949.94 0.111
Rp - 0.000
Rp 793,979.95 0.238
Rp 4,455,779.31 1.333
Rp 157,500.00 0.047
Rp 384,000.00 0.115
Rp 11,700.00 0.004
Rp - 0.000
Rp 53,750.00 0.016
Rp 28,500.00 0.009
Rp 76,500.00 0.023
Rp 14,000.00 0.004
Rp 100,000.00 0.030
Rp 282,408.33 0.084
Rp 968,397.01 0.290
Rp 266,058.33 0.080
Rp 15,000,000.00 4.488
Rp 600,000.00 0.180
Rp 600,000.00 0.180
Rp 23,885.00 0.007
Rp 47,785.00 0.014
Rp 18,614,483.67 5.569
Rp 5,413,472.50 1.620
Rp 4,955,214.32 1.483
Rp 897,492.12 0.269
Rp 1,154,920.50 0.346
Rp 291,435.76 0.087
Rp 12,712,535.20 3.804
Rp 572,175.00 0.171
Rp 56,467.50 0.017
Rp 604,077.50 0.181
Rp 655,307.50 0.196
Rp 203,433.75 0.061
Rp 320,000.00 0.096
Rp 4,400,000.00 1.316
Rp 45,000.00 0.013
Rp 6,856,461.25 2.051
ED_K@K@#1
RAB 2007
Rp 67,402,071.35 20.167
Rp 250,000.00 0.075
Rp 67,652,071.35 20.241
ED_K@K@#1
RAB 2007
100.000
Rp 334,226,853.50
ED_K@K@#1
RAB 2007
99.987
0.841
1.114
7.415
4.454
ED_K@K@#1
RAB 2007
45.197
7.979
ED_K@K@#1
RAB 2007
1.333
5.569
3.804
2.051
ED_K@K@#1
RAB 2007
20.241
ED_K@K@#1
RAB 2007
REKAPITULASI RAB
Total Harga
Harga/ m2 Bangunan =
Luas Bangunan
Rp 334,226,853.50
=
#VALUE!
= #VALUE!
ED_K@K@#1
RAB 2007
TIME SCHEDULLE & KURVA S
Bobot MINGGU KE
No. Jenis Pekerjaan
% 1 2 3 4 5 6 7 8 9 10 11 12 13 100
#REF!
I PEKERJAAN PERSIAPAN
1 Pembersihan Lahan 0.039 0.039
2 Pemasangan Bowplank + Vitset 0.712 0.712
3 Penyediaan Air Kerja 0.090 0.022 0.038 0.055
II PEKERJAAN TANAH DAN URUGAN
1 Galian Tanah Pondasi 0.355 0.355
2 Urugan Tanah Kembali 0.015 0.007 0.008
3 Urugan Pasir di Bawah Pondasi 0.164 0.164 90
4 Urugan Pasir Peninggi Lantai 0.581 0.222 0.359
III PEKERJAAN PASANGAN DAN PLESTERAN
1 Pekerjaan Pasangan batu kosong 0.454 0.454
2 Pasangan Pondasi Batu Kali (1 pc : 5 psr) 3.300 1.096 2.204
3 Pasangan Tembok Trasraam (1 pc : 3 psr) 0.241 0.157 0.084
4 Pasangan Tembok Biasa (1 pc : 5 psr) 0.547 3.146 2.154 0.477
5 Plesteran Tembok Trasraam (1 pc : 3 psr) 0.065 0.030 0.496
6 Plesteran Tembok Biasa (1 pc : 5 psr) 1.084 0.277 0.807 80
7 Plesteran Pondasi Tepi Luar (1 pc : 4 psr) 0.000 0.000
8 Acian Tembok 1.725 0.410 1.600 1.329 0.150
IV PEKERJAAN BETON
1 Cor Beton Sloof (1pc : 2psr : 3krl) 1.298 0.401 0.419 0.478
2 Cor Beton Kolom Praktis (1pc : 2psr : 3krl) 1.859 0.559 1.154 0.357
3 Cor Beton Kolom Teras (1pc : 2psr : 3krl) 0.000 0.000
4 Cor Beton Ringbalk (1pc : 2psr : 3krl) 1.298 0.052 1.067 0.870
0.000
70
6 Cor Beton Neut (1pc : 3psr : 5krl) 0.000 0.000
V PEKERJAAN KAYU DAN KACA
1 Pasangan Kayu Kusen Klas I 3.145 1.142 0.252 1.752
2 Pasangan Daun Pintu Panil Kayu 0.896 0.896
3 Pas. Daun Pintu Double Teacwood 3 mm 0.000 0.000
4 Pas. Daun Pintu Double Teacwood 3 mm lapis Seng 0.084 0.084
5 Pas. Daun Jendela Kaca dan Ventilasi 3 mm 2.658 1.857 1.183
6 Pas. Kaca Polos (Kaca Silang) 0.000 0.000
60
7 Pas. Kayu Kap dan Gording 36.851 2.134 2.327 2.271
8 Pasangan Lisplank Papan 1.562 1.060 0.431
50
60
13 Pasangan Septic Tank dan Peresapan 4.488 1.419 1.629 0.748 1.571 0.121
14 Pasangan Instalasi Air Bersih 0.180 0.045 0.071 0.064
15 Pasangan Instalasi Air Kotor 0.180 0.180
16 Pasangan Floor Drain 0.007 0.007
17 Pasangan Kran Air 0.014 0.014
IX PEKERJAAN FINISHING
1 Cat Tembok 1.620 0.557 1.845 0.296
2 Cat Plafond 1.483 1.483 20
3 Cat Kayu 0.269 0.054 0.161 0.054
4 Cat Seng 0.346 0.242 0.104
5 Teak Oil 0.087 0.087
X PEKERJAAN PENGGANTUNG DAN PENGUNCI
1 Pasangan Kunci Tanam Biasa 0.171 0.171
2 Pasangan Kunci KM/ WC 0.017 0.017
3 Pasangan Grendel 0.181 0.181
4 Pasangan Engsel 0.196 0.775 0.039 10
5 Pasangan Kait Angin 0.061 0.061
6 Pasangan Anker Doc 0.096 0.013 0.013 0.341
7 Pasangan Mur, Baut 1.316 0.461 0.856
8 PasanganBeughel U 0.013 0.007 0.007
XI PEKERJAAN LAIN - LAIN
1 Pasangan Saluran Keliling Bangunan (Buis Beton U 30 cm) 20.167 20.167
2 Pembersihan Kembali 0.075 0.075
Parsil 100.000 1.173 5.725 7.429 5.015 7.595 10.347 11.954 10.826 9.156 7.451 5.343 2.414 3.305 0
RENCANA Kumulatif 0.000 1.173 6.898 14.327 19.342 26.937 37.284 49.238 60.064 69.220 76.672 82.015 84.429 87.734
0
ANALISA TENAGA KERJA
I. PEKERJAAN PERSIAPAN
1 m1 Pemasangan Bowplank
Pekerja = 0.100 x 56.700 / 6 = 0.945 orang
Tukang kayu = 0.100 x 56.700 / 6 = 0.945 orang
Kepala tukang = 0.01 x 56.700 / 6 = 0.095 orang
Mandor = 0.0050 x 56.700 / 6 = 0.047 orang
TOTAL :
pekerja = 0.9450 orang
tukang kayu = 0.9450 orang
kepala tukang = 0.0945 orang
mandor = 0.0473 orang
II. PEKERJAAN TANAH DAN URUGAN
1 Galian Tanah pondasi
pekerja = 1.2500 x 33.580 / 6 = 6.996 orang
mandor = 0.0620 x 33.580 / 6 = 0.347 orang
2 Urugan Tanah Kembali
pekerja = 0.1920 x 8.390 / 6 x 2 = 0.537 orang
mandor = 0.0190 x 8.390 / 6 x 2 = 0.053 orang
3 Urugan Pasir Di Bawah Pondasi
pekerja = 0.300 x 3.400 / 6 = 0.170 orang
mandor = 0.010 x 3.400 / 6 = 0.006 orang
4 Urugan Pasir Peninggi Lantai
pekerja = 0.3000 x 12.070 / 6 x 2 = 1.207 orang
mandor = 0.0100 x 12.070 / 6 x 2 = 0.040 orang
TOTAL :
pekerja = 9.855 orang
mandor = 0.493 orang
TOTAL :
pekerja = 92.9199 orang
tukang batu = 58.9228 orang
kepala tukang = 5.8856 orang
mandor = 4.6564 orang
TOTAL :
pekerja = 9.1290 orang
tukang batu = 0.9791 orang
tukang kayu = 6.0998 orang
tukang besi = 4.6148 orang
kepala tukang = 1.1644 orang
mandor = 0.5554 orang
TOTAL :
pekerja = 106.6223 orang
mandor = 8.4368 orang
tukang kayu = 305.2300 orang
kepala tukang = 30.5230 orang
TOTAL :
pekerja = 36.8979 orang
mandor = 1.8995 orang
tukang kayu = 23.5835 orang
kepala tukang = 6.1001 orang
VII. PEKERJAAN LANTAI
1 1 m2 Pasang Lantai Keramik 30 x 30 cm
pekerja = 0.2500 x 59.000 / 6 x 3 = 7.375 orang
tukang batu = 0.1200 x 59.000 / 6 x 3 = 3.540 orang
kepala tukang = 0.0120 x 59.000 / 6 x 3 = 0.354 orang
mandor = 0.0125 x 59.000 / 6 x 3 = 0.369 orang
2 1 m2 Pasang Lantai Mozaik 30 x30 cm
pekerja = 0.2500 x 5.000 / 6 = 0.208 orang
tukang batu = 0.1200 x 5.000 / 6 = 0.100 orang
kepala tukang = 0.0120 x 5.000 / 6 = 0.010 orang
mandor = 0.1250 x 5.000 / 6 = 0.104 orang
3 1 m2 Pasang Keramik porselin 20 x 20 cm
pekerja = 0.0900 x 9.000 / 6 x 2 = 0.270 orang
tukang batu = 0.0900 x 9.000 / 6 x 2 = 0.270 orang
kepala tukang = 0.0090 x 9.000 / 6 x 2 = 0.027 orang
mandor = 0.0045 x 9.000 / 6 x 2 = 0.014 orang
4 1 m2 Pasang Plint Keramik Artistik 10 x 20 cm
pekerja = 0.6000 x 0.000 / 6 x 2 = 0.000 orang
tukang batu = 0.4500 x 0.000 / 6 x 2 = 0.000 orang
kepala tukang = 0.0450 x 0.000 / 6 x 2 = 0.000 orang
mandor = 0.0300 x 0.000 / 6 x 2 = 0.000 orang
TOTAL :
pekerja = 7.8533 orang
mandor = 0.4864 orang
tukang batu = 3.9100 orang
kepala tukang = 0.3910 orang
TOTAL :
pekerja = 2.3683 orang
mandor = 0.1442 orang
tukang batu = 1.5083 orang
kepala tukang = 0.3767 orang
IX PEKERJAAN FINISHING
1 1 m2 Pengecatan Tembok Baru (1 plamir, a lapis cat dasar, 2 lapis cat penutup)
pekerja = 0.0200 x 376.668 / 6 x 3 = 3.767 orang
tukang cat = 0.0630 x 376.668 / 6 x 3 = 11.865 orang
kepala tukang = 0.0063 x 376.668 / 6 x 3 = 1.187 orang
mandor = 0.0020 x 376.668 / 6 x 3 = 0.377 orang
2 1 m2 Pengecatan Plafond ( 1 plamir, 1 lapis cat dasar, 2 lapis cat penutup )
pekerja = 0.0200 x 239.840 / 6 = 0.799 orang
tukang cat = 0.0630 x 239.840 / 6 = 2.518 orang
kepala tukang = 0.0063 x 239.840 / 6 = 0.252 orang
mandor = 0.0025 x 239.840 / 6 = 0.100 orang
3 1m2 Pengecatan Bidang Kayu Baru ( 1 plamir, 1 lapis cat dasar, 2 lapis cat penutup )
pekerja = 0.0700 x 43.440 / 6 x 3 = 1.520 orang
tukang cat = 0.0090 x 43.440 / 6 x 3 = 0.195 orang
kepala tukang = 0.0060 x 43.440 / 6 x 3 = 0.130 orang
mandor = 0.0025 x 43.440 / 6 x 3 = 0.054 orang
4 1 m2 Pengecatan Permukaan Baja Lapis Seng secara manual sistem
1 lapis cat mutakhir dengan tebal 200 mm
pekerja = 0.0060 x 121.750 / 6 x 2 = 0.244 orang
tukang cat = 0.0600 x 121.750 / 6 x 2 = 2.435 orang
kepala tukang = 0.0120 x 121.750 / 6 x 2 = 0.487 orang
mandor = 0.0060 x 121.750 / 6 x 2 = 0.244 orang
5 1 m2 Peleburan Bidang Kayu dengan Teac Oil
pekerja = 0.0400 x 25.760 / 6 = 0.172 orang
tukang cat = 0.0630 x 25.760 / 6 = 0.270 orang
kepala tukang = 0.0630 x 25.760 / 6 = 0.270 orang
mandor = 0.0025 x 25.760 / 6 = 0.011 orang
TOTAL :
pekerja = 6.5018 orang
mandor = 0.7851 orang
tukang cat = 17.2843 orang
kepala tukang = 2.3261 orang
TOTAL :
pekerja = 0.2225 orang
mandor = 0.0208 orang
tukang cat = 3.6083 orang
kepala tukang = 0.2225 orang
TOTAL :
pekerja = 12.4450 orang
mandor = 0.6223 orang
tukang batu = 6.2225 orang
kepala tukang = 0.6223 orang
TABEL KEBUTUHAN TENAGA KERJA
MINGGU KE
NO TENAGA KERJA
1 2 3 4 5 6 7 8 9 10 11 12 13
I PEKERJAAN PERSIAPAN
1 Pemasangan Bowplank dan Vitset
Pekerja 0.945 0.945
Tukang kayu 0.945 0.945
Kepala tukang 0.095 0.095
Mandor 0.047 0.047
TOTAL Pekerja 0.945
Tukang kayu 0.945
Kepala tukang 0.095
Mandor 0.047
II PEKERJAAN TANAH DAN URUGAN
1 Galian Tanah Pondasi
pekerja 6.996 6.996
mandor 0.347 0.347
2 Urugan Tanah di tepi Pondasi
pekerja 0.537 0.537 0.537
mandor 0.053 0.053 0.053
3 Urugan Pasir di bawah Pondasi
pekerja 0.170 0.170
mandor 0.006 0.006
4 Urugan Pasir Peninggi Lantai
pekerja 1.207 1.207 1.207
mandor 0.040 0.040 0.040
TOTAL Pekerja 6.996 0.537 1.207 1.207
Mandor 0.347 0.053 0.053 0.040
III PEKERJAAN PASANGAN DAN PLESTERAN
1 1 m3 Pasangan Aanstamping
pekerja 1.326 1.326
Tukang batu 0.663 0.663
Kepala tukang 0.066 0.066
mandor 0.066 0.066
2 1 m3 Pasangan Pondasi Batu Karang ( 1 pc : 5 psr )
pekerja 19.040 19.040 19.040
Tukang batu 7.616 7.616 7.616
Kepala tukang 0.762 0.762 0.762
mandor 0.952 0.952 0.952
3 1 m3 Pasangan Tembok Trasram ( 1 pc : 3 psr )
pekerja 4.111 4.111 4.111
Tukang batu 1.285 1.285 1.285
Kepala tukang 0.128 0.128 0.128
mandor 0.193 0.193 0.193
4 1 m3 Pasangan Tembok Biasa ( 1 pc : 5 psr )
pekerja 4.415 4.415 4.415 4.415
Tukang batu 1.380 1.380 1.380 1.380
Kepala tukang 0.138 0.138 0.138 0.138
mandor 0.207 0.207 0.207 0.207
5 1 m2 Plesteran Tembok Trasraam ( 1 pc : 3 psr )
pekerja 0.779 0.779 0.779
Tukang batu 0.584 0.584 0.584
Kepala tukang 0.058 0.058 0.058
mandor 0.039 0.039 0.039
6 1 m2 Plesteran Tembok Biasa ( 1 pc : 5 psr )
pekerja 13.767 13.767 13.767
Tukang batu 10.325 10.325 10.325
Kepala tukang 1.033 1.033 1.033
mandor 0.688 0.688 0.688
7 1 m2 Plesteran Pondasi Tepi Luar ( 1 pc : 4 psr )
pekerja 0.000 0.000
Tukang batu 0.000 0.000
Kepala tukang 0.000 0.000
mandor 0.000 0.000
8 1 m2 Acian Tembok
pekerja 50.222 50.222 50.222 50.222 50.222
Tukang batu 37.667 37.667 37.667 37.667 37.667
Kepala tukang 3.767 3.767 3.767 3.767 3.767
mandor 2.511 2.511 2.511 2.511 2.511
TOTAL Pekerja 19.040 19.040 4.415 50.222 50.222 50.222 50.222
Tukang batu 7.616 7.616 1.380 37.667 37.667 37.667 37.667
Kepala tukang 0.762 0.762 0.138 3.767 3.767 3.767 3.767
Mandor 0.952 0.952 0.207 2.511 2.511 2.511 2.511
IV PEKERJAAN BETON
1 1 m3 Pasangan Beton Sloof (1pc : 2psr : 3krl)
pekerja 4.365 4.365 4.365 4.365
tukang batu 0.315 0.315 0.315 0.315
tukang kayu 1.404 1.404 1.404 1.404
tukang besi 1.260 1.260 1.260 1.260
kepala tukang 0.298 0.298 0.298 0.298
mandor 0.153 0.153 0.153 0.153
2 1 m3 Pasangan Beton Kolom Praktis (1pc : 2psr : 3krl)
pekerja 0.399 0.399 0.399 0.399
tukang batu 0.349 0.349 0.349 0.349
tukang kayu 3.292 3.292 3.292 3.292
tukang besi 2.095 2.095 2.095 2.095
kepala tukang 0.569 0.569 0.569 0.569
mandor 0.249 0.249 0.249 0.249
3 1 m3 Pasangan Beton Kolom Teras (1pc : 2psr : 3krl)
pekerja 0.000 0.000
tukang batu 0.000 0.000
tukang kayu 0.000 0.000
tukang besi 0.000 0.000
kepala tukang 0.000 0.000
mandor 0.000 0.000
4 1 m3 Pasangan Beton Ringbalk (1pc : 2psr : 3krl)
pekerja 4.365 4.365 4.365 4.365
tukang batu 0.315 0.315 0.315 0.315
tukang kayu 1.404 1.404 1.404 1.404
tukang besi 1.260 1.260 1.260 1.260
kepala tukang 0.298 0.298 0.298 0.298
mandor 0.153 0.153 0.153 0.153
5 1 m3 Pasangan Beton Meja Dapur (1pc : 2psr : 3krl)
pekerja 0.000 0.000
tukang batu 0.000 0.000
tukang kayu 0.000 0.000
tukang besi 0.000 0.000
kepala tukang 0.000 0.000
mandor 0.000 0.000
6 1 m3 Pasangan Beton Neut (1pc : 2psr : 3krl)
pekerja 0.000 0.000
tukang batu 0.0000 0.0000
kepala tukang 0.00000 0.00000
mandor 0.0000 0.0000
TOTAL pekerja 4.365 4.365 4.365 0.399 4.365 4.365
tukang batu 0.315 0.315 0.349 0.349 0.349 0.315
tukang kayu 1.404 1.404 3.292 3.292 3.292 1.404
tukang besi 1.260 1.260 2.095 2.095 2.095 1.260
kepala tukang 0.298 0.298 0.569 0.569 4.365 0.298
mandor 0.153 0.153 0.249 0.249 0.349 0.153
V PEKERJAAN KAYU DAN KACA
1 1 m3 Pasangan Kayu Kusen Klas I
pekerja 5.097 5.097 5.097 5.097
tukang kayu 16.990 16.990 16.990 16.990
kepala tukang 1.699 1.699 1.699 1.699
mandor 0.255 0.255 0.255 0.255
2 1 m2 Pasangan Daun Pintu Panil Kayu
pekerja 1.333 1.333
tukang kayu 3.333 3.333
kepala tukang 0.333 0.333
mandor 0.067 0.067
3 1 m2 Pasangan Daun Pintu Double Teacwood
pekerja 0.000 0.000
tukang kayu 0.000 0.000
kepala tukang 0.000 0.000
mandor 0.000 0.000
4 1 m2 Pasangan Daun Pintu double Teacwood Lapis seng
pekerja 0.014 0.014
tukang kayu 0.467 0.467
kepala tukang 0.047 0.047
mandor 0.007 0.007
5 1 m2 Pasangan Daun Jendela Kaca dan Ventilasi
pekerja 6.411 6.411 6.411
tukang kayu 16.913 16.913 16.913
kepala tukang 1.691 1.691 1.691
mandor 0.321 0.321 0.321
6 1 m2 Pasang Daun Jendela Kaca Polos ( Silang )
pekerja 0.000 0.000
tukang kayu 0.000 0.000
kepala tukang 0.000 0.000
mandor 0.0000 0.0000
7 1 m3 Pasangan Kayu Kap dan Gording
pekerja 86.880 86.880 86.880 86.880
tukang kayu 260.640 260.640 260.640 260.640
kepala tukang 26.064 26.064 26.064 26.064
mandor 4.344 4.344 4.344 4.344
8 1 m1 Pasangan Papan Lisplank
pekerja 6.887 6.887 6.887
tukang kayu 6.887 6.887 6.887
kepala tukang 0.689 0.689 0.689
mandor 3.443 3.443 3.443
TOTAL pekerja 5.097 5.097 5.097 86.880 86.880 86.880 6.887 6.887 6.411
tukang kayu 16.990 16.990 16.990 260.640 260.640 260.640 6.887 16.913 16.913
kepala tukang 1.699 1.699 1.699 26.064 26.064 26.064 0.689 1.691 1.691
mandor 0.255 0.255 0.255 4.344 4.344 4.344 3.443 3.443 0.321
VI PEKERJAAN ATAP DAN PLAFOND
1 1 m2 Pasangan Atap Seng BJLS 0.30 mm
pekerja 7.305 7.305 7.305 7.305
tukang kayu 0.365 0.365 0.365 0.365
kepala tukang 3.653 3.653 3.653 3.653
mandor 0.365 0.365 0.365 0.365
2 1 m2 Pasang Atap Nok Seng
pekerja 0.400 0.400
tukang kayu 0.021 0.021
kepala tukang 0.187 0.187
mandor 0.021 0.021
3 1 m2 Pasangan Plafond Tripleks dan Rangka
pekerja 26.382 26.382 26.382 26.382
tukang kayu 1.379 1.379 1.379 1.379
kepala tukang 20.386 20.386 20.386 20.386
mandor 2.159 2.159 2.159 2.159
4 1 m1 List Plafond Profil
pekerja 2.811 2.811 2.811
tukang kayu 0.134 0.134 0.134
kepala tukang 2.811 2.811 2.811
mandor 0.268 0.268 0.268
TOTAL pekerja 7.305 26.382 26.382 26.382
tukang kayu 0.365 1.379 1.379 1.379
kepala tukang 3.653 20.386 20.386 20.386
mandor 0.365 2.159 2.159 2.159
VII PEKERJAAN LANTAI
1 1 m2 Pasangan Tegel Keramik 30 x 30 cm
pekerja 7.375 7.375 7.375 7.375
tukang batu 3.540 3.540 3.540 3.540
kepala tukang 0.354 0.354 0.354 0.354
mandor 0.369 0.369 0.369 0.369
2 1 m2 Pasangan Tegel Mozaik30 x 30 cm
pekerja 0.208 0.208
tukang batu 0.100 0.100
kepala tukang 0.010 0.010
mandor 0.104 0.104
3 1 m2 Pasangan Tegel Plint 10 x 20 cm
pekerja 0.000 0.000 0.000
tukang batu 0.000 0.000 0.000
kepala tukang 0.000 0.000 0.000
mandor 0.000 0.000 0.000
4 1 m2 Pasangan Tegel Porselin 20 x 20 cm
pekerja 0.270 0.270 0.270
tukang batu 0.270 0.270 0.270
kepala tukang 0.027 0.027 0.027
mandor 0.014 0.014 0.014
TOTAL pekerja 7.375 7.375 7.375 0.270 0.000
tukang batu 3.540 3.540 3.540 0.270 0.000
kepala tukang 0.354 0.354 0.354 0.027 0.000
mandor 0.369 0.369 0.369 0.014 0.000
VIII PEKERJAAN INSTALASI LISTRIK DAN AIR
1 Memasang 1 buah Wastavel
pekerja 0.200 0.200
tukang batu 0.242 0.242
kepala tukang 0.025 0.025
mandor 0.017 0.017
2 Memasang 1 buah bak mandi batu bata volume 0.30 m3
pekerja 2.000 2.000 2.000
tukang batu 1.000 1.000 1.000
kepala tukang 0.100 0.100 0.100
mandor 0.100 0.100 0.100
3 Memasang 1 buah kloset jongkok porselin
pekerja 0.167 0.167
tukang batu 0.250 0.250
kepala tukang 0.250 0.250
mandor 0.027 0.027
4 Memasang 1 buah floor drain
pekerja 0.002 0.002
tukang batu 0.017 0.017
kepala tukang 0.002 0.002
mandor 0.001 0.001
5 Memasang 1 buah kran diameter 3/4" atau 1/2"
pekerja 0.002 0.002
tukang batu 0.017 0.017
kepala tukang 0.002 0.002
mandor 0.001 0.001
TOTAL pekerja 0.002 2.000 2.000
tukang batu 0.017 1.000 1.000
kepala tukang 0.002 0.250 0.100
mandor 0.001 0.100 0.100
IX PEKERJAAN FINISHING
1 1m2 pengecatan tembok baru
pekerja 3.767 3.767 3.767 3.767
tukang cat 11.865 11.865 11.865 11.865
kepala tukang 1.187 1.187 1.187 1.187
mandor 0.377 0.377 0.377 0.377
2 1m2 pengecatan plafon
pekerja 0.799 0.799
tukang cat 2.518 2.518
kepala tukang 0.252 0.252
mandor 0.100 0.100
3 1m2 pengecatan bidang kayu baru
pekerja 1.520 1.520 1.520 1.520
tukang cat 0.195 0.195 0.195 0.195
kepala tukang 0.130 0.130 0.130 0.130
mandor 0.054 0.054 0.054 0.054
4 1m2 pengecatan permukaan baja lapis seng
pekerja 0.244 0.244 0.244
tukang cat 2.435 2.435 2.435
kepala tukang 0.487 0.487 0.487
mandor 0.244 0.244 0.244
5 1m2 pelaburaqn bidang kayu dengan taek oil
pekerja 0.172 0.172
tukang cat 0.270 0.270
kepala tukang 0.270 0.270
mandor 0.011 0.011
TOTAL pekerja 1.520 3.767 3.767 3.767 1.520 0.799
tukang cat 0.195 11.865 11.865 11.865 2.435 2.518
kepala tukang 0.130 1.187 1.187 1.187 0.487 0.487
mandor 0.054 0.377 0.377 0.377 0.244 0.244
X PEKERJAAN PENGGANTUNG DAN PENGUNCI
1 1 buah pasang kunci tanam biasa
pekerja 0.008 0.008
tukang kayu 0.417 0.417
kepala tukang 0.008 0.008
mandor 0.004 0.004
2 1 buah pasang kunci tanam KM
pekerja 0.001 0.001
tukang kayu 0.083 0.083
kepala tukang 0.001 0.001
mandor 0.000 0.000
3 1 buah pasang grendel
pekerja 0.011 0.011
tukang kayu 1.083 1.083
kepala tukang 0.011 0.011
mandor 0.005 0.005
4 1 buah pasang engsel
pekerja 0.170 0.170 0.170
tukang kayu 1.700 1.700 1.700
kepala tukang 0.170 0.170 0.170
mandor 0.009 0.009 0.009
5 1 buah kait angin
pekerja 0.033 0.033
tukang kayu 0.325 0.325
kepala tukang 0.033 0.033
mandor 0.002 0.002
TOTAL pekerja 0.170 0.170
tukang cat 1.700 1.700
kepala tukang 0.170 0.170
mandor 0.009 0.009
XI PEKERJAAN LAIN - LAIN
1 1 m pasangan buis beton U 30
pekerja 12.445 12.445
tukang batu 6.223 6.223
kepala tukang 0.622 0.622
mandor 0.622 0.622
TOTAL pekerja 12.445
tukang batu 6.223
kepala tukang 0.622
mandor 0.622
MINGGU KE
NO TENAGA KERJA JUMLAH
1 2 3 4 5 6 7 8 9 10 11 12 13
1 PEKERJA 6.996 19.040 19.040 5.097 50.222 86.880 86.880 86.880 26.382 26.382 26.382 0.799 12.445 453.427
2 TUKANG BATU 7.616 7.616 1.380 37.667 37.667 37.667 37.667 3.540 3.540 3.540 0.270 6.223 184.391
3 TUKANG BESI 1.260 1.260 2.095 2.095 2.095 1.260 10.064
4 TUKANG KAYU 0.945 1.404 1.699 16.990 16.990 260.640 260.640 260.640 6.887 16.913 16.913 860.661
5 TUKANG CAT 0.195 11.865 11.865 11.865 2.435 2.518 40.744
6 KEPALA TUKANG 0.095 0.762 1.699 1.699 3.767 26.064 26.064 26.064 20.386 20.386 20.386 0.487 0.622 148.481
7 MANDOR 0.347 0.952 0.952 0.255 2.511 4.344 4.344 4.344 3.443 3.443 2.159 0.244 0.622 27.960
KEBUTUHAN MATERIAL
IV PEKERJAAN BETON
1 Cor Beton Sloof 15/20 (1pc : 2psr : 3krl) 1.800
Kayu terentang
Paku biasa 2"-5"
Minyak bekesting
Besi beton polos (Ø 12)
Besi beton polos (Ø 6)
Kawat beton
Semen portland
Pasir beton
Koral beton
2 Cor Beton Kolom Praktis 15/15 (1pc : 2psr : 3krl) 1.995
Kayu terentang
Paku biasa 2"-5"
Minyak bekesting
Besi beton polos (Ø 8)
Besi beton polos (Ø 6)
Kawat beton
Semen portland
Pasir beton
Koral beton
Kayu borneo balok
Tripleks 2,8 mm
Dolken Ø 8cm/4m
3 Cor Beton Kolom Teras 15/20 (1pc : 2psr : 3krl) 0.000
Kayu terentang
Paku biasa 2"-5"
Minyak bekesting
Besi beton polos (Ø 12)
Besi beton polos (Ø 6)
Kawat beton
Semen portland
Pasir beton
Koral beton
Kayu borneo balok
Tripleks 2,8 mm
Dolken Ø 8cm/4m
4 Cor Beton Ringbalk 15/20 (1pc : 2psr : 3krl) 1.800
Kayu terentang
Paku biasa 2"-5"
Minyak bekesting
Besi beton polos (Ø 12)
Besi beton polos (Ø 6)
Kawat beton
Semen portland
Pasir beton
Koral beton
6 Cor Beton Neut (1pc : 3psr : 5krl) 0.000
Semen portland
Pasir beton
Koral beton
Kaca
6 Pas. Kaca Polos (Kaca Silang) 0.000
Kaca
7 Pas. Kayu Kap dan Gording 43.440
a.) Kayu 8/12 1.058
Kayu Borneo, balok
Besi strip
Paku biasa 2" - 5"
b.) Kayu 6/12 2.803
Kayu Borneo, balok
Besi strip
Paku biasa 2" - 5"
c.) Kayu 4/12 0.063
Kayu Borneo
Besi strip
Paku biasa 2" - 5"
8 Pasangan Lisplank Papan 206.600
Kayu kamper, papan
Paku biasa 2" - 5"
IX PEKERJAAN FINISHING
1 Cat Tembok 376.668
Plamir
Cat dasar
Cat penutup 2 x
2 Cat Plafond 239.840
Cat meni
Plamir
Cat dasar
Cat penutup 2 x
3 Cat Kayu 43.440
Cat meni
Plamir
Cat dasar
Cat penutup 2 x
4 Cat Seng 121.750
Cat
5 Teak Oil 25.760
Teak oil
m1
0.012 0.680 m3
0.020 1.134 Kg
0.007 0.397 m3
1.000 LS
m3
1.200 4.080 m3
m3
1.200 14.484 m3
m3
1.200 12.240 m3
0.300 3.060 m3
m3
1.100 41.888 m3
136.000 5178.880 Kg
0.544 20.716 m3
m2
70.000 818.020 bh
14.370 167.928 Kg
0.040 0.467 m3
m2
70.000 1931.370 bh
9.680 267.081 Kg
0.045 1.242 m3
m2
6.480 75.725 Kg
0.019 0.222 m3
m2
4.320 892.080 Kg
0.022 4.543 m3
m2
5.200 0.000 Kg
0.020 0.000 m3
m2
0.009 3.390 Kg
0.009 3.390 m3
0.009 3.390 m3
m3
0.270 0.486 m3
2.000 3.600 Kg
0.600 1.080 ltr
118.118 212.613 Kg
66.442 119.595 Kg
2.768 4.983 Kg
323.000 581.400 Kg
0.520 0.936 m3
0.780 1.404 m3
m3
0.400 0.798 m3
4.000 7.980 Kg
2.000 3.990 ltr
78.253 156.115 Kg
81.447 162.487 Kg
2.396 4.779 Kg
323.000 644.385 Kg
0.520 1.037 m3
0.780 1.556 m3
0.150 0.299 m3
3.500 6.983 lbr
20.000 39.900 btng
m3
0.400 0.000 m3
4.000 0.000 Kg
2.000 0.000 ltr
118.118 0.000 Kg
66.442 0.000 Kg
2.768 0.000 Kg
323.000 0.000 Kg
0.520 0.000 m3
0.780 0.000 m3
0.150 0.000 m3
3.500 0.000 lbr
20.000 0.000 btng
m3
0.400 0.720 m3
2.000 3.600 Kg
0.600 1.080 ltr
118.118 212.613 Kg
66.442 119.595 Kg
2.768 4.983 Kg
323.000 581.400 Kg
0.520 0.936 m3
0.780 1.404 m3
m3
218.000 0.000 Kg
0.520 0.000 m3
0.870 0.000 m3
m2
1.100 1.869 m3
m2
0.040 0.320 m3
m2
0.020 0.000 m3
0.300 0.000 Kg
0.300 0.000 ltr
0.347 0.000 lbr
m2
0.020 0.027 m3
0.300 0.420 Kg
0.300 0.420 ltr
0.347 0.486 lbr
1.000 1.400 lbr
m2
0.035 0.826 m3
1.100 25.960 m2
m2
1.100 0.000 m2
m3
m3
1.100 1.164 m3
15.000 15.869 Kg
0.800 0.846 Kg
m3
1.100 3.083 m3
15.000 42.044 Kg
0.800 2.242 Kg
m3
1.100 0.070 m3
15.000 0.950 Kg
0.800 0.051 Kg
0.009 1.777 m3
0.060 12.396 Kg
m2
0.700 85.225 lbr
0.020 2.435 Kg
m2
0.300 4.800 lbr
0.040 0.640 Kg
m2
0.023 5.516 m3
0.150 35.976 Kg
m2
11.870 700.330 bh
8.360 493.240 Kg
0.023 1.357 m3
0.900 53.100 Kg
m2
11.870 59.350 bh
14.150 70.750 Kg
0.039 0.195 m3
2.000 10.000 Kg
m2
25.000 225.000 bh
9.300 83.700 Kg
0.018 0.162 m3
1.500 13.500 Kg
m2
5.000 0.000 bh
1.650 0.000 Kg
0.003 0.000 m3
0.100 0.000 Kg
1 9.000 Titik
1 6.000 Buah
1 3.000 Buah
1 0.000 Buah
1 5.000 Buah
1 2.000 Buah
1 6.000 Buah
1 1.000 Buah
1 1.000 Buah
Buah
1.000 1.000 Buah
0.120 0.120
6.000 6.000 Kg
0.010 0.010 m3
Buah
330.579 330.579 Buah
120.000 120.000 Kg
0.300 0.300 m3
360.000 360.000 Buah
6.000 6.000 Kg
Buah
1.000 1.000 Buah
6.000 6.000 Kg
0.010 0.010 m3
1.000 2.000 unit
1.000 1.000 LS
1.000 1.000 LS
Buah
1.000 1.000 Buah
Buah
1.000 1.000 Buah
0.025 0.025 Buah
m2
0.100 37.667 Kg
0.100 37.667 Kg
0.260 97.934 Kg
m2
0.200 47.968 Kg
0.150 35.976 Kg
0.170 40.773 Kg
0.260 62.358 Kg
m2
0.200 8.688 Kg
0.150 6.516 Kg
0.170 7.385 Kg
0.260 11.294 Kg
m2
0.300 36.525 Kg
m2
0.360 9.274 Kg
Buah
1.000 5.000 Buah
Buah
1.000 1.000 Buah
Buah
1.000 13.000 Buah
Buah
1.000 34.000 Buah
Buah
1.000 13.000 Buah
1.000 32.000 Buah
1.000 22.000 LS
1.000 3.000 Buah
m1
1.100 216.150 Buah
454.545 89318.182 Buah
10.300 2023.950 Kg
0.061 11.987 m3
0.069 13.559 m3
KONTROL TENAGA KERJA
Rp 63,030,000.00
PERCENTASE =
Rp 334,226,853.50