Tender Inviting Authority: Engineer-in-Chief ,Rural Works
Name of Work: Constn of H.L. bridge over river Salandi at 4th KM on Daising-Kudiamal road in the District of Bhadrak under Biju Setu Yojana
Tender Online-10/2018-19( Bridges )
Name of the
Bidder/
Bidding Firm /
Company :
                                                                                   PRICE SCHEDULE
  (This BOQ template must not be modified/replaced by the bidder and the same should be uploaded after filling the relevent columns, else the bidder is liable to be rejected for this tender.
                                                             Bidders are allowed to enter the Bidder Name and Values only )
  NUMBER #                             TEXT #                           NUMBER #   TEXT #         NUMBER                 NUMBER #                                 TEXT #
     Sl.                         Item Description                       Quantity    Units      Estimated Rate TOTAL AMOUNT                 TOTAL AMOUNT
     No.                                                                                                      (excluding GST)              In Words
                                                                                                     in               in
                                                                                                  Rs.       P      Rs.     P
       1                                  2                                4          5                 6                   53                                      55
     1.00        Earth work in cutting in all kind of soil within 50m
                 initial leads &1.5m initial lifts includingrough
                 dressing and breakingclods to max 5cm to 7cm
                 and laying in layers not exceeding 0.3m in depth        980.280    Cum            154.00                #VALUE!                                 #VALUE!
                 etc complete as per specification &direction of the
                 Engineer-in-Charge .
     2.00        Providing & constructing temporary island
                 14.50mtr Diametre for construction of well
                 foundation for 6.50mtr Dia well including all cost,
                 carriage etc complete as per specification &             3.000      No           35086.30               #VALUE!                                 #VALUE!
                 Direction of Engineer-in charge
3.00   Providing & constructing one span service road to
       reach island location from one pier location to
       another pier location including all labours ,          91.890    Rmt   2667.90   #VALUE!   #VALUE!
       materials & T&P etc complete as per direction of
       Engineer- in –charge
4.00   Earth work in excavation of foundation in all kinds
       of soil including moorum & stoney earth & gravel
       mixed with boulders with all leads & lifts including
       dressing the sides & leveling the bed of the
       foundation to the required width & required depth
       including shoring shuttering, propping bullah,
       pilling, dewatering from foundation supplying &
       working of pumps including hire & running
       charges of pumps & all machineries required for        339.920   Cum   184.80    #VALUE!   #VALUE!
       the work & providing coffer dam if required &
       stacking the excavated materials away from the
       working areas as directed by the Engineer-in
       -Charge complete as per specification & direction
       of the Engineer-in-charge, below bed level.
5.00   Labour of sinking single cicular well caisson/
       cribwell of specified external diameter in all kinds
       of soil to lines levels & plumb by scooping out
       from inside the well & below the steining by
       grabbing (if required) etc, including cost of
       dredging , jack hammers or using any other
       modern devices including cost of necesary tools
       & plants supply & work of pumps, dredgers &
       compressors, derrick, winches, cranes etc. bailing
       out of water & dredging removing all materials &
       obstacles from inside the wells inclusive of hire &
       running charges of all such machinery including
       materials & labour charges for providing
       kentledge
5.01   loading if necessary & sinking to the required
       depth by loading with proper designed &
       preapproved weight & taking precautions
       adequately against tilting & shifting & dispiosal of
       the dredged materials away from the wells as per
       the direction of Engineer-in charge with all leads
       & lifts including islanding, providing foot bridges if
       necessary & including hire & running charges of
       all machenaries cost of all labour with all leads
       lifts complete in all repects including all incidental
       charges like temporary sand filling, top pluging of
       well etc. for safety of the structure during
       execution as directed by the Enginer-in charge.
       (Payment will only be made for sinking of the well
       & other items required for the well sinking
       operation is only incidental & no payment will be
       made for such items)
5.02   i) Upto 10m. Depth
5.03   A) For 7.5m dia abutment wells
                                                                20.000   Rmt   22122.45   #VALUE!   #VALUE!
5.04   B) For 6.5m dia. pier wells
                                                                30.000   Rmt   18080.88   #VALUE!   #VALUE!
5.05   11th successive metre Depth
5.06   A) For 7.65m dia abutment wells
                                                                2.000    Rmt   22398.75   #VALUE!   #VALUE!
5.07   B) For 6.65m dia. pier wells
                                                                3.000    Rmt   18305.22   #VALUE!   #VALUE!
5.08   12th successive metre Depth
5.09   A) For 7.65m dia abutment wells
                                                                2.000    Rmt   22675.05   #VALUE!   #VALUE!
5.10   B) For 6.65m dia. pier wells
                                         3.000   Rmt   18529.56   #VALUE!   #VALUE!
5.11   13th successive metre Depth
5.12   A) For 7.65m dia abutment wells
                                         2.000   Rmt   22951.34   #VALUE!   #VALUE!
5.13   B) For 6.65m dia. pier wells
                                         3.000   Rmt   18753.90   #VALUE!   #VALUE!
5.14   14th successive metre Depth
5.15   A) For 7.65m dia abutment wells
                                         2.000   Rmt   23227.64   #VALUE!   #VALUE!
5.16   B) For 6.65m dia. pier wells
                                         3.000   Rmt   18978.24   #VALUE!   #VALUE!
5.17   15th successive metre Depth
5.18   A) For 7.65m dia abutment wells
                                         2.000   Rmt   23503.93   #VALUE!   #VALUE!
5.19   B) For 6.65m dia. pier wells
                                         3.000   Rmt   19202.58   #VALUE!   #VALUE!
5.20   16th successive metre Depth
5.21   A) For 7.65m dia abutment wells
                                         2.000   Rmt   23780.23   #VALUE!   #VALUE!
5.22   B) For 6.65m dia. pier wells
                                         3.000   Rmt   19426.93   #VALUE!   #VALUE!
5.23   17th successive metre Depth
5.24   A) For 7.65m dia abutment wells
                                         2.000   Rmt   24056.52   #VALUE!   #VALUE!
5.25   B) For 6.65m dia. pier wells
                                         3.000   Rmt   19651.27   #VALUE!   #VALUE!
5.26   18th successive metre Depth
5.27   A) For 7.65m dia abutment wells
                                         2.000   Rmt   24332.82   #VALUE!   #VALUE!
5.28   B) For 6.65m dia. pier wells
                                         3.000   Rmt   19875.61   #VALUE!   #VALUE!
5.29   19th successive metre Depth
5.30   A) For 7.65m dia abutment wells
                                         2.000   Rmt   24609.11   #VALUE!   #VALUE!
5.31   B) For 6.65m dia. pier wells
                                         3.000   Rmt   20099.95   #VALUE!   #VALUE!
5.32   20th successive metre Depth
5.33   A) For 7.65m dia abutment wells
                                         2.000   Rmt   24885.41   #VALUE!   #VALUE!
5.34   B) For 6.65m dia. pier wells
                                         3.000   Rmt   20324.29   #VALUE!   #VALUE!
5.35   21st successive metre Depth
5.36   A) For 7.65m dia abutment wells
                                         2.000   Rmt   25161.71   #VALUE!   #VALUE!
5.37   B) For 6.65m dia. pier wells
                                         3.000   Rmt   20548.63   #VALUE!   #VALUE!
5.38   22nd successive metre Depth
5.39   A) For 7.65m dia abutment wells
                                         2.000   Rmt   25438.00   #VALUE!   #VALUE!
5.40   B) For 6.65m dia. pier wells
                                         3.000   Rmt   20772.97   #VALUE!   #VALUE!
5.41   23rd successive metre Depth
5.42   A) For 7.65m dia abutment wells
                                         2.000   Rmt   25714.30   #VALUE!   #VALUE!
5.43   B) For 6.65m dia. pier wells
                                         3.000   Rmt   20997.31   #VALUE!   #VALUE!
5.44   24th successive metre Depth
5.45   A) For 7.65m dia abutment wells
                                         2.000   Rmt   25990.56   #VALUE!   #VALUE!
5.46   B) For 6.65m dia. pier wells
                                         3.000   Rmt   21221.66   #VALUE!   #VALUE!
5.47   25th successive metre Depth
5.48   A) For 7.65m dia abutment wells
                                         2.000   Rmt   26266.86   #VALUE!   #VALUE!
5.49   B) For 6.65m dia. pier wells
                                         3.000   Rmt   21446.00   #VALUE!   #VALUE!
5.50   26th successive metre Depth
5.51   A) For 7.65m dia abutment wells
                                         2.000   Rmt   26543.15   #VALUE!   #VALUE!
5.52   B) For 6.65m dia. pier wells
                                         3.000   Rmt   21670.34   #VALUE!   #VALUE!
5.53   27th successive metre Depth
5.54   A) For 7.65m dia abutment wells
                                         2.000   Rmt   26819.45   #VALUE!   #VALUE!
5.55   B) For 6.65m dia. pier wells
                                                               3.000    Rmt   21894.68   #VALUE!   #VALUE!
5.56   28th successive metre Depth
5.57   A) For 7.65m dia abutment wells
                                                               0.976    Rmt   27095.74   #VALUE!   #VALUE!
5.58   B) For 6.65m dia. pier wells
                                                               3.000    Rmt   22119.02   #VALUE!   #VALUE!
5.59   29th successive metre Depth
5.60   A) For 6.65m dia. pier wells
                                                               0.209    Rmt   22343.36   #VALUE!   #VALUE!
6.00   Cement concrete (1:3:6) in foundation & plinth
       with 4cm. crusher broken granite metal of
       approved quality from approved quarry including
       hoisting lowering & laying in layers not exceeding
       150mm. thick with proper packing & ramming
       each layer of concrete by means of vibrator
       ,providing groove & beads where necessary
       including curing, dewatering, shoring, shuttering if
       necessary at the time of laying concrete with cost,
       conveyance royality & taxes of all material
       required for the work including supplying &
       working pumps, T&P articles finishing the
       exposed surface smooth as per specific ation &
       direction of the Engineer-in Charge
6.01   (i) In foundation
                                                              222.280   Cum   4416.80    #VALUE!   #VALUE!
6.02   (ii) Up to Bed
                                                              332.180   Cum   4517.70    #VALUE!   #VALUE!
7.00   Cement concrete (1:2.5:5) in foundation & plinth
       with 12mm size crusher broken hard granite
       broken metal of approved quality from approved
       quarry including hoisting lowering & laying in
       layers not exceeding 150mm. thick with proper
       packing & ramming each layer of concrete by
       means of vibrator providing groove & beads
       where necessary including curing, dewatering,
       shoring, shuttering if necessary at the time of
       laying concrete with cost, conveyance royality &
       taxes of all material required for the work
       including supplying & working pumps, T&P
       articles finishing the exposed surface smooth as
       per specification & direction of the Engineer-in
       Charge
7.01   (i) In foundation
                                                          128.810   Cum   4473.00   #VALUE!   #VALUE!
7.02   (ii) upto bed
                                                          39.880    Cum   4576.14   #VALUE!   #VALUE!
8.00   RCC of design mix of M-250grade having
       specified characteristics compressive strength/
       target mean strength of 250kg./cm2 in design mix
       with minimum quantity of cement as specified in
       IRC Code of 150 mm. cubes at 28 days curing
       after mixing & tests conducted in accordance with
       relevant clauses of IS 456/IS 516/IRC
       216/1987/IRC-78/1983 using crusher broken hard
       granite course aggregate of 20mm. down
       graded.sizes & proportion as specified in clause-
       302.6.2 of IRC 21/1987 & IS-10262 & subject to
       mix design in conformity with the grading &
       proportion of different materials for concrete as
       specified in the relevant codes of approved
       quality, obtained from approved quarry & using
       minimum quantity of cement confirming to codal
       provision including hoisting, lowering & laying
       concrete in layers not exceeding 15cm thick
       compacting with vibrators watering & curing for
       28 days including water tight steel centering ,
       shuttering
8.01   & form works finishing the exposed surface
       smooth providing beads & grooves wherever
       necessary including cost, conveyance royalties
       and all other taxes of all materials with all leads &
       lifts, cost of all labour T&P & machineries etc.
       required for the work including dewatering if
       necessary, complete in all respects as per
       direction of the Engineer-in-Charge but excluding
       cost, conveyance of tor steel & binding wire &
       labour charges for straightening, cutting, bending,
       binding welding & tying the grills lapping spacing
       etc. where ever necessary & hoisting & placing in
       position ( to be paid separately as required for
       RCC works)
8.02   (i) Well curb
                                                               123.300   Cum   8665.80   #VALUE!   #VALUE!
8.03   (ii) Well steining
                                                             2536.000   Cum   7702.30    #VALUE!   #VALUE!
8.04   (iii) Well caps
                                                             254.900    Cum   7558.60    #VALUE!   #VALUE!
8.05   (iv) Abutment & pier shafts
                                                             175.610    Cum   6554.91    #VALUE!   #VALUE!
8.06   (v ) Column, Tie beam,Wing wall & Canti lever
                                                              12.000    Cum   11573.21   #VALUE!   #VALUE!
8.07   (vi) Railing & post
                                                             217.960    Rmt   1620.90    #VALUE!   #VALUE!
9.00   RCC of design mix of M-300grade having
       specified characteristics compressive strength/
       target mean strength of 300kg./cm2 in design mix
       with minimum quantity of cement as specified in
       IRC Code of 150 mm. cubes at 28 days curing
       after mixing & tests conducted in accordance with
       relevant clauses of IS 456/IS 516/IRC
       216/1987/IRC-78/1983 using crusher broken hard
       granite course aggregate of 20mm. down graded
       sizes & proportion as specified in clause-302.6.2
       of IRC 21/1987 & IS-10262 & subject to mix
       design in conformity with the grading & proportion
       of different materials for concrete as specified in
       the relevant codes of approved quality, obtained
       from approved quarry & using minimum quantity
       of cement confirming to codal provision including
       hoisting, lowering & laying concrete in layers not
       exceeding 15cm thick compacting with vibrators
       watering & curing for 28 days including water tight
        steel centering , shuttering
9.01   & form works finishing the exposed surface
       smooth providing beads & grooves wherever
       necessary including cost, conveyance royalties
       and all other taxes of all materials with all leads &
       lifts, cost of all labour T&P & machineries etc.
       required for the work including dewatering if
       necessary, complete in all respects as per
       direction of the Engineer-in-Charge but excluding
       cost, conveyance of tor steel & binding wire &
       labour charges for straightening, cutting, bending,
       binding welding & tying the grills lapping spacing
       etc. where ever necessary & hoisting & placing in
       position ( to be paid separately as required for
       RCC works)
9.02   Wearing coat
                                                               73.180    Cum   5972.80    #VALUE!   #VALUE!
9.03   Road kerb
                                                               17.890    Cum   9184.50    #VALUE!   #VALUE!
9.04   Abutment & Pier caps
                                                               18.840    Cum   7578.67    #VALUE!   #VALUE!
9.05   Dirt walls
                                                               11.690    Cum   8542.20    #VALUE!   #VALUE!
9.06   Super structure
                                                               511.760   Cum   17936.47   #VALUE!   #VALUE!
9.07   Approach slab
                                                               18.170    Cum   5972.82    #VALUE!   #VALUE!
10.00   Cement concrete with M-150+10% extra cement
        on nominal mix to be used for bottom plugging
        having maximum compressive strength of 150
        kg./cm2 with minimum quantity of cement as
        specified in IRC code in work tests on 150 mm.
        cubes at 28 days curing using cement as per CL
        710-7 of IRC-78/1983 after mixing & tests
        conduct in accordance with IS 456 & IS-516 with
        crusher broken hard granite coarse aggregate of
        40 mm. size down graded in conformity with
        clause-302.6.2 of IRC-21/1987 of approved
        quality (test in laboratory) from approved quarry &
        concrete laid in continuous operation using tremie
        pipes or skip boxes upto required depth including
        lowering, hoisting & laying in layers of 150 mm.
        thick with cost, conveyance royalty & other taxes
        of all materials, labour hire charges of all T&P &
        machineries required for the work complete in all
        respect. (in case of grouted concrete the grout
        mix shall not be leaner than 1:2) (Recuperation
        test may have to be done if directed by Engineer-
        in-Charge).
10.01   (i) Bottom plugging
                                                              400.000   Cum   4540.80   #VALUE!   #VALUE!
11.00   Cement concrete of M-150 having maximum
        compressive strength of 150 kg./cm2 ( test to be
        conducted) on 150 mm. cubes tested at 28 days
        including curing (tests conducted in accordance
        with IS-456 & IS-516) & conforming to clause-302
        of IRC 21/1987 using clean crusher broken hard
        granite coarse aggregate of 40 mm. size down
        grade of approved quality to be protested in the
        laboratory) obtained from approved quarry the
        proportion mix, grading conforming to relevant
        ISI/IRC codes pre-approved including arranging
        of reinforcement as per approved drawing
        including hoisting, lowering concrete in layers not
        exceeding 150 mm. thick each compacting with
        vibrator watering & curing for 28 days centering
        shuttering & finishing the exposed surface
        smooth providing grooves & beads where
        necessary including cost, conveyance royality &
        taxes of all labour machineries etc. required for
        the work complete in all respects including
        dismantling the centering & shuttering as per
        specification & direction of Engineer-in-Charge.
11.01   (i) Top plugging
                                                              91.900   Cum   4173.84   #VALUE!   #VALUE!
12.00   Supply of HYSD bars confirming to grade S-415
        cutting bending, binding, lapping, splicing,
        welding etc. (conforming to ISI specification) &
        jointing if necessary by lapping & tying the grills &
        placing in position as required for RCC works as
        per the approved design, hoisting, lowering &
        laying position including cost & conveyance of tor
        steel & binding wires of 18 to 20 gauge(as to be
        approved by the Deptt.) etc. complete (weight of
        binding wire shall not be considered for payment        3108.000   Qtl   6314.16   #VALUE!   #VALUE!
        at all which will be borne by the contractor
        (standard CO-efficient of different sizes of the
        steel shall be considered & welding & lapping
        should confirm to relevant clause of IRC-21/1987)
13.00   Supplying & fitting fixing in position steel cutting
        edge as per approved design & drawing weighing
        not less than 80kg. per meter including steel
        cladding using M.S.Angles/ rods, plates bolts &
        nuts, rivets complete wherever necessary
        including bending to size & shape drilling holes
        riveting welding bolting etc. complete in all
        respects confirming to relevant IRC codes & ISI
        specification including cost conveyance & all
        taxes of all materials, labour & T&P & all
        machineries etc. required for the work with all          86.740    Qtl   8072.15   #VALUE!   #VALUE!
        leads & lifts complete in position in all respects
        (cutting edge to be placed at the level of the
        bottom of well cap indicated in Drg. or 150 mm.
        above L.W.L. as specified in the Drg. or as per
        written order of the Engineer-in-Charge.
14.00   Supplying & filling good clean river sand inside
        the well/approach road including watering to
        complete saturation & ramming complete with all
        leads & lifts including cost. Conveyance royality &
        taxes of all materials & cost of all labour & T&P
                                                                  3212.960    Cum    766.63    #VALUE!   #VALUE!
        required for the work complete ( measurement
        will be taken for compacted section as per
        direction of Engineer-in-Charge.)
15.00   Supplying, fitting, fixing in position Neoprene
        bearing of approved design & specification at the
        designed level including fixing with resin of
        required grade & strength/ holding down bolts of
        standard specification including cost conveyance
        taxes of all materials with cost of all labour T&P &
        other machineries required for the work complete         307200.000   CCm     1.01     #VALUE!   #VALUE!
        in respects as per direction of the Engineer-in-
        Charge. The bearing should confirm to the latest
        MOST specification & IRC codes & should be
        tested before use( test certificate to be furnished)
16.00   Providing fitting & fixing strip seal expansion joints
         at the edges of the slab with suitable anchoring
        arrangements by 12mm. M.S. Bars as per MOST
        design & drawing including fitting, fixing & welding
        with 6 mm. plates & filling joints of wearing coat
        with bitumen joint filler 12 mm. thick & joint
        sealing compound at top including painting of
        exposed surface of M.S. covered plates with                37.500     Rmt   10609.85   #VALUE!   #VALUE!
        anticorrosive bitumanstic paint etc. with cost,
        conveyance taxes of all materials labour & T&P
        etc. complete in all respects as per specification
        & direction of the Engineer-in-Charge.
17.00   Providing C.I. grating to holes in deck slabs size
        upto 15 cm dia for drainage of water including
        cost of materials & T&P required for the work as           56.000     Nos    43.89     #VALUE!   #VALUE!
        directed by the Engineer-in-Charge.
18.00   Rough stone dry packing in aprons and
        revetments of desgned thickness on slope using
        30cm and above size hard broken granite stones
        of approved quality free from weathering skin and
        from approved quarry including filling the
        interestices with small stones spalls etc. with
        cost, conveyance and royalty and with all leads
        and lifts and taxes of all materials and labour T&P    777.410   Cum   1599.02   #VALUE!   #VALUE!
        etc. complete in all respects (the weight of each
        stone shall not be less than 50kg to 70kg) as per
        specification and direction of Engineer-in-charge.
19.00   Providing 600mm thick filter media in the rear of
        abutment and wing walls with 5cm size and down
        graded hand broken granite metal of approved
        quality from approved quarry as per specification
        and direction of the Engineer-in-charge including      46.065    Cum   1829.74   #VALUE!   #VALUE!
        cost, conveyance royalty and taxes of all
        materials T&P articles required for the work etc.
        complete.
20.00   Back filling behind abutment, wing wall & return
        wall with granular material including all cost,
        carriage, royality & labour as per specification &     423.680   Cum   2494.46   #VALUE!   #VALUE!
        direction of the Engineer-in-Charge.
21.00   Providing granular sub-base using gravel having
        CBR value not less than 20 & PI value not more
        than 6 mix with required proportion of sand of
        approved quality including cost, conveyance,
        royalty & taxes including cost of T&P articles
        required for the work etc. complete & labour for
        spreading moorum in layers not exceeding 23cm.
        thickness watering & compacting to the required
        density at OMC with power road roller including        854.060   Cum   1106.00   #VALUE!   #VALUE!
        cost & carriage of water, all T&P articles with hire
        & running charges of machineries such as PRR
        etc. required for the work complete in all respect
        as per specification & direction of the Engineer-in-
        charge
22.00   Supplying and fixing of RCC Guard post of 150
        mm dia and IM long in RCC (1:2:4) using 20mm
        down graded size h.g chips including all labours,      24.000     Nos   105.68   #VALUE!   #VALUE!
        materials ,carriage ,royality & taxes of etc.
        complete.
23.00   Earth work in all kinds of soil from approved
        borrow areas including all leads & lifts & carriage
        with manual means on properly prepared &
        scientifically   approved     surface     including
        spreading leveling earth in 22.50 cm. layers to
                                                              11197.350   Cum   237.38   #VALUE!   #VALUE!
        make ready for compaction with PRR to bring it
        upto OMC condition as per specification &
        direction of Engineer-in-Charge.
24.00   Earth work in all kinds of soil from approved
        borrow areas including all leads & lifts & carriage
        with mechanical means on properly prepared &
        scientifically   approved     surface     including
        spreading leveling earth in 22.50 cm. layers to
                                                              1244.150    Cum   127.56   #VALUE!   #VALUE!
        make ready for compaction with PRR to bring it
        upto OMC condition as per specification &
        direction of Engineer-in-Charge.
25.00   Clearing grass & removal of rubbish on both sides
        of the road to facilitate widening berms, disposal
        of stuff including all labours, T&P articles as per   3250.000    Sqm    1.70    #VALUE!   #VALUE!
        specification & direction of Engineer-in-Charge.
26.00   Fine dressing & turfing to the slopes of the dam
        with compacted dud grass with all leads & lifts as
        per specification & direction of Engineer-in-         1000.000    Sqm   17.82    #VALUE!   #VALUE!
        Charge.
27.00   Providing 75mm. compacting thickness metalling
        with following size of metal including        cost,
        conveyance, royalty & taxes including cost of T&P
        articles required for the work etc. complete &
        labour for spreading & laying metal of all sizes in
        layers to proper camber & grade including hand
        packing & compacting with PRR conveying
        moorum from stacks,filling the interstics
        spreading the same over the metalled surface in
        required quantities watering,including carriage of
        water consolidating with PRR including hire &
        running charges of PRR & all other machineries
        cost & conveyance of water T&P articles
        excluding the cost of metal & moorum required
        for the work etc. complete as per specification &
        direction of the Engineer-in-Charge
27.01   IRC Grade-II
                                                                196.310    Cum   2289.00   #VALUE!   #VALUE!
27.02   IRC Grade-III
                                                                154.130    Cum   2357.25   #VALUE!   #VALUE!
28.00   Providing & applying primer coat with bituminous
        emulsion on prepared surface of granular sub-
        base including clearing of road surface & sparying
        primerat the rate of 0.6Kg/sqm using mechanical         2055.000   Sqm    19.14    #VALUE!   #VALUE!
        means as per Clause 502 of MOSRT&H
        Specifications for Road & Bridge works ( 4th
        revision )
29.00   Providing bituminous Tack Coat of bituminous
        materials @ 3.00kg/ 10 Sqm including primer
        coat including cleaning the existing mettaled with
        all cost,carriage, royality of all materials , hire &
        running charges of mechinaries, T & P etc
                                                                2055.000   Sqm    10.14    #VALUE!   #VALUE!
        complete as directed by the Engineer in charge
        and as per MORTH Technical Specification
        Clause No. 503 and 501.
30.00   Providing, laying and rolling of open-graded
        premix carpet of 20 mm thickness composed of
        13.2 mm to 5.6 mm aggregates using S-60/70
        penetration grade bitumen to required line, grade
        and level to serve as wearing course on a
        previously prepared base, including mixing in a
        suitable plant, laying and rolling with a three
        wheel 80-100 kN static roller capacity, finished to
        required level and grades to be followed by seal      2055.000   Sqm   136.94   #VALUE!   #VALUE!
        coat as per Technical Specification Clause 508 of
        MoRD including cost, lead, lift royality and taxes
        of all materials, hire & running charges of
        mechinaries , T &P etc complete and as per
        direction of the Engineer -in- charge.
31.00   Providing & applying premix seal coat using 0.06
        cum of 6mm. Size chips & down graded as per
        sieve analysis & good river sand & 6.8 kg. of
        bitumen for 10sqm including hire & running            2055.000   Sqm   54.60    #VALUE!   #VALUE!
        charges of mechinaries , labour, T&P required for
        the work as per specification & direction of
        Engineer-in-Charge.
32.00   Construction of un-reinforced, plain cement
        concrete pavement, thickness as per design, over
        a prepared sub base, with 43 grade cement or
        any other type as per Clause 1501.2.2 M30
        (Grade), coarse and fine aggregates conforming
        to IS:383, maximum size of coarse aggregate not
        exceeding 25 mm, mixed in a concrete mixer of
        not less than 0.2 cum capacity & appropiate
        weigh batcher using approved mix design, laid in
        approved fixed side formwork (Steel channel,
        laying & fixing of 125 micron thick polythene film,
        wedges, steel plates including levelling the
        formwork as per drawing), spreading the concrete
        with shovels, racks, compacted using needle,
        screed and plate vibrators & finished in continious   106.880   Cum   6252.10   #VALUE!   #VALUE!
        operation including provision of contraction &
        expansion,      construction    joints,    applying
        debonding      strips,  primer,    sealant,    near
        approaches to bridge / culvert and construction
        joints, admixtures as approved, curing of concrete
        slabs for 14 days, water finishing to lines and
        grade     as    per    drawing    and     Technical
        Specificatiopn Clause 1501 & as per the direction
        of the Engineer-in-charge.
33.00   Cement washing 2 coats including cost of all
        materials and labours etc complete as per             760.470   Sqm    21.60    #VALUE!   #VALUE!
        derection of Engineer-in-charge.
34.00   Painting two coats over a coat of primer with
        approved synthetic enamel paint in all shades on
        new plastered/concrete surfaces as per drawing        329.440   Sqm    31.50    #VALUE!   #VALUE!
        and technical specification under section 1700 of
        MORD.
     35.00         Providing weep holes in the abutment & wing
                   walls 8.00cm. X 23.00cm. size including metal
                   spall backing 30cm X 30cm. size in rear complete
                   as per the approved design & drawing including
                   providing centering & shuttering with cost,
                                                                        262.400       Rmt   105.68    #VALUE!          #VALUE!
                   conveyance, royality & taxes of all materials T&P
                   articles etc. complete in all respects as per
                   specification & direction of the Engineer-in-
                   Charge.
     36.00         Laying & fixing in position RCC span pipes of
                   following size (NP3) with collars or enclosing the
                   joints with cement concrete(1:2:4) including cost
                   of hume pipes, all labour T&P etc. & conveying
                   the hume pipes from the approved stacking yard
                   at road side with all leads & lifts etc. complete,
                   including cost, carriage & all taxes of concrete
                   pipes as per direction of Engineer-in-Charge.
     36.01         (i) 600mm dia
                                                                         7.500        Rmt   2278.38   #VALUE!          #VALUE!
     36.02         (ii) 1000mm dia
                                                                         7.500        Rmt   5167.08   #VALUE!          #VALUE!
Total in Figures                                                                                           #VALUE!               #VALUE!
Quoted Rate in Figures
                                                                                  Select
                                                                                                                0.00             #VALUE!
Quoted Rate in Words                                                                                   #VALUE!
Please Enable Macros to View BoQ information