NAVAYUGA ENGINEERING COMPANY LIMITED
PROJECT TITILE       DESIGN AND CONSTRUCTION OF SHIPYARD FACILITIES AND ALLIED WORKS AT SBC(V)
  DOCUMENT TITLE ASSEMBLY AND WELDING AREA
  PROJECT NO.          DOCUMENT NO.                  REVISION NO.     DATE       REMARKS
  ST - 1278            SBV - DSN - *******                 0        12/09/2019
   1. ************** 000000000000000 *************
                                                  ASSEMBLY & WELDING (RCC AND STEEL Q
                                                          +1.3M LVL - PILE CAP SCHEDULES
                            NO'S
                       PILE   OF   PILE
                                                  LENGTH [L]                WIDTH [W/B]
S.No:    DESCRIPTION   CAP  MEMB   DIA
                       TYPE   ER
                             no's Ø (mm)    L1       L2     L(mm)     B1       B2    B(mm)
 1.     PC - 1          B     1    1200    2410     1150     3560    1555     1960    3515
 2.     PC - 2          C     1    1200    2410     2235     4645    1680     1835    3515
 3.     PC - 3          C     5    1200    2235     2235     4470    1680     1835    3515
 4.     PC - 4          B     1    1200    2235     1400     3635    1680     1835    3515
 5.     PC - 5          C     2    1200    2535     1770     4305    1550     1050    2600
 6.     PC - 6          C     2    1200    2535     1770     4305    1050     2555    3605
 7.     PC - 7          D     16   1200    2485     2485     4970    1500     1500    3000
 8.     PC - 8          A     2    1200    1320     1320     2640    1000     1000    2000
 9.     PC - 9          B     2    1200    1080     2555     3635    1000     1000    2000
 10.    PC - 10         C     8    1200    1185     3285     4470    1000     1550    2550
 11.    PC - 10 - A     A     1    1200    1550     1000     2550    1235     1185    2420
 12.    PC - 10 - B     A     1    1200    1550     1000     2550    1000     1185    2185
 13.    PC - 11         C     2    1200    1185     2505     3690    1000     1550    2550
 14.    PC - 12         C     2    1200    1185     2520     3705    1000     1550    2550
 15.    PC - 13         B     2    1200    1185     1960     3145    1000     1550    2550
 16.    PC - 14         A     1    1200    1555     1050     2605    1000     1000    2000
 17.    PC - 15         D     2    1200    2560     3035     5595    1400     1050    2450
 18.    PC - 16         F     2    1200    3035     3985     7020    1400     1050    2450
 19.    PC - 17         F     4    1200    3985     3935     7920    1400     1050    2450
 20.    PC - 18         F     4    1200    3935     3485     7420    1400     1050    2450
 21.    PC - 19         F     4    1200    3485     3735     7220    1400     1050    2450
 22.    PC - 20         F     4    1200    3735     3985     7720    1400     1050    2450
 23.    PC - 21         F     2    1200    3985     2995     6980    1400     1050    2450
 24.    PC - 22         D     2    1200    3090     2580     5670    1400     1050    2450
 25.    PC - 23         E     1    1200    3489     2581     6070    1500     1500    3000
 26.    PC - 24         C     2    1200    2920     1490     4410    1220     1400    2620
 27.    PC - 25         D     4    1200    2140     2920     5060    1000     2600    3600
 28.    PC - 26-A       B     4    1200    1485     1485     2970    1400     1400    2800
 29.    PC - 26         B     16   1200    1485     1485     2970    1400     1400    2800
 30.    PC - 27         E     4    1200    4330     1400     5730    1000     1000    2000
 31.    PC - 28         E     4    1200    1745     3985     5730    1000     1000    2000
 32.    PC - 29         E     4    1200    3985     2600     6585    2135     2130    4265
 33.    PC - 30         C     4    1200    2130     2130     4260    2600     1000    3600
 34.    PC - 31         C     4    1200    2130     2130     4260    2120     1485    3605
 35.    PC - 32         B     16   1200    2600     1000     3600    1485     1485    2970
 36.    PC - 33         B     4    1200    2600     1000     3600    1985     1485    3470
 37.    PC - 34         B     2    1200    1700     1700     3400    985       985    1970
                                                                   +1.3M LVL - PILE CAP SCHEDULES
                                  NO'S
                             PILE   OF   PILE
                                                           LENGTH [L]                WIDTH [W/B]
S.No:      DESCRIPTION       CAP  MEMB   DIA
                             TYPE   ER
                                   no's Ø (mm)       L1       L2     L(mm)     B1       B2    B(mm)
 38.      PC - 35              A       24    1200   985      985      1970    985       985    1970
 39.      PC - 36              C      122    1200   1000     2900     3900    985       985    1970
 40.      PC - 37              G       2     1200   1970     3985     5955    2000     2000    4000
 41.      PC - 38              G       2     1200   2000     3000     5000    2000     2000    4000
 42.      PC - 39              G       54    1200   2985     2985     5970    2000     2000    4000
 43.      PC - 40              G       2     1200   2150     2050     4200    2000     2000    4000
 44.      PC - 41              G       2     1200   3000     2320     5320    2000     2000    4000
 45.      PC - 42              D       2     1200   3740     1000     4740    1000     1745    2745
 46.      PC - 44              B       2     1200   2185     1000     3185    1000     1485    2485
 47.      PC - 45              C       2     1200   2085     2185     4270    1000     1485    2485
 48.      PC - 46              B       1     1200   2085     1000     3085    1000     1485    2485
 49.      PC - 47              D       2     1200   3710     1900     5610    1000     1485    2485
 50.      PC - 48              D       30    1200   2900     2500     5400    985       985    1970
 51.      PC - 52-A            E       16    1200   2985     2985     5970    1400     1400    2800
 52.      PC - 52              E       36    1200   2985     2985     5970    1400     1400    2800
 53.      PC - 53              C       20    1200   1695     2500     4195    2985     1000    3985
 54.      PC - 55              C       10    1200   3285     1000     4285    1000     1485    2485
 55.      PC - 56              C       2     1200   2235     2035     4270    1400     1400    2800
 56.      PC - 57              C       2     1200   2235     1485     3720    1400     1400    2800
 57.      PC - 58              D       1     1200   3715     1000     4715    3285     1185    4470
 58.      PC - 60              C       1     1200   2920     1000     3920    1185     2440    3625
 59.      PC - 61              B       1     1200   1185     2440     3625    1370     1000    2370
 60.      PC - 62              C       2     1200   2985     1515     4500    1400     1400    2800
 61.      PC - 64              C       1     1200   2795     1000     3795    1485     1000    2485
 62.      PC - 66              G      110    1200   4545     805      5350    1015     1015    2030
 63.      PC - 66A             G       2     1200   4515     805      5320    2000      750    2750
 64.      Overall Hook's       -      2372    -      -        -         -      -         -         -
                                      397    1200    -        -         -      -         -         -
        CAST IN SITU (remaining RCC
 65.                                   22    1200    -        -         -      -         -         -
                  @ PILE)
                                      174    1200    -        -         -      -         -         -
LDING (RCC AND STEEL QUANTITIES)
LE CAP SCHEDULES
                                                    RCC      TOTAL RCC   STEEL TOTAL STEEL
                   DEPTH / THICK [D/T]   AREA
                                                    QTY.        QTY.      QTY.    QTY.
                   T1     T2    T(mm)    ( Sq.M )   (Cu.M)     (Cu.M)     ( kg )   ( MT )
                   150   150     300      1.07       3.25       3.26     384.13    0.39
                   150   150     300      1.39       4.35       4.35     528.02    0.53
                   150   150     300      1.34       4.17      20.87     509.30    2.55
                   150   150     300      1.09       3.33       3.34     388.35    0.39
                   150   150     300      1.29       2.82       5.65     384.72    0.77
                   150   150     300      1.29       4.22       8.44     486.90    0.98
                   150   150     300      1.49       3.91      62.57     997.33    15.96
                   150   150     300      0.79       1.24       2.49     123.63    0.25
                   150   150     300      1.09       1.84       3.69     211.75    0.43
                   150   150     300      1.34       2.98      23.84     360.45    2.89
                   150   150     300      0.74       1.46       1.46     148.38    0.15
                   150   150     300      0.74       1.28       1.29     137.15    0.14
                   150   150     300      1.11       2.40       4.81     299.37    0.60
                   150   150     300      1.11       2.41       4.83     300.04    0.61
                   150   150     300      0.94       2.00       4.00     245.55    0.50
                   150   150     300      0.78       1.17       1.17     129.86    0.13
                   150   150     300      1.68       3.65       7.30     887.27    1.78
                   150   200     350      2.46       5.41      10.83     1449.23   2.90
                   150   200     350      2.77       6.16      24.64     1625.42   6.51
                   150   200     350      2.60       5.74      22.98     1524.12   6.10
                   150   200     350      2.53       5.58      22.32     1486.67   5.95
                   150   200     350      2.70       5.99      23.97     1582.85   6.34
                   150   200     350      2.44       5.38      10.77     1442.77   2.89
                   150   200     350      1.98       4.30       8.60     903.13    1.81
                   150   150     300      1.82       4.85       4.86     1003.67   1.01
                   150   150     300      1.30       3.07       6.14     356.87    0.72
                   150   150     300      1.52       5.01      20.05     1140.17   4.57
                   150   150     300      0.87       2.09       8.38     249.59    1.00
                   150   150     300      0.89       2.16      34.49     241.84    3.87
                   150   150     300      1.72       2.84      11.37     673.59    2.70
                   150   150     300      1.72       2.97      11.88     841.06    3.37
                   150   150     300      1.95       7.99      31.97     2014.35   8.06
                   150   150     300      1.28       4.17      16.67     474.02    1.90
                   150   150     300      1.28       4.17      16.69     474.24    1.90
                   150   150     300      1.06       2.80      44.83     311.03    4.98
                   150   150     300      1.06       3.33      13.33     359.06    1.44
                   150   150     300      1.02       1.67       3.35     200.02    0.41
LE CAP SCHEDULES
                                                    RCC      TOTAL RCC   STEEL TOTAL STEEL
                   DEPTH / THICK [D/T]   AREA
                                                    QTY.        QTY.      QTY.    QTY.
                   T1     T2    T(mm)    ( Sq.M )   (Cu.M)     (Cu.M)     ( kg )    ( MT )
                   150   150     300      0.59       0.82      19.80      98.71      2.37
                   150   150     300      1.15       1.92      234.40    248.45     30.32
                   150   225     375      2.23       8.31      16.62     2515.07     5.04
                   150   225     375      1.88       6.91      13.82     2128.10     4.26
                   150   225     375      2.24       8.33      449.79    2520.28   136.10
                   150   225     375      1.58       5.73      11.47     1810.75     3.63
                   150   225     375      2.00       7.38      14.76     2255.04     4.52
                   150   150     300      1.40       3.50       7.01     828.43      1.66
                   150   150     300      0.96       1.96       3.93     238.83      0.48
                   150   150     300      1.28       2.75       5.50     343.41      0.69
                   150   150     300      0.93       1.89       1.90     234.99      0.24
                   150   150     300      1.68       3.72       7.44     892.71      1.79
                   150   150     300      1.58       2.76      82.91     588.81     17.67
                   150   150     300      1.79       4.41      70.51     918.37     14.70
                   150   150     300      1.79       4.68      168.32    1188.41    42.79
                   150   150     300      1.21       4.50      89.94     510.41     10.21
                   150   150     300      1.29       2.76      27.59     344.08      3.45
                   150   150     300      1.28       3.25       6.50     357.12      0.72
                   150   150     300      1.09       2.72       5.45     321.06      0.65
                   150   150     300      1.41       5.98       5.99     1282.25     1.29
                   150   150     300      1.18       3.92       3.93     424.56      0.43
                   150   150     300      1.09       2.24       2.24     246.34      0.25
                   150   150     300      1.33       3.38       6.76     380.72      0.77
                   150   150     300      1.14       2.40       2.41     306.80      0.31
                   150   225     375      2.01       3.47      381.49    1181.38   129.96
                   150   225     375      2.00       4.88       9.77     1565.85     3.14
                    -      -       -        -         -          -        3.25       7.71
                                                    RCC =    2161.7 Cu.m STEEL =   522.63 T
                   150   150     300                 0.34      134.70
                   150   200     350                 0.40       8.71
                   150   225     375                 0.42      73.80
                                                    RCC =    2379 Cu.m   STEEL =    523 T
                        ASSEMBLY & WELDING (RCC AND STEEL QUANTITIES)
                                       +1.3M LVL - PLANK'S (SCHEDULES & QTY.)
                                 NO'S
                                   OF LENGTH WIDTH                         RCC     TOTAL
                      PLANK                               THICK   AREA
S.No:   DESCRIPTION              MEMB     [L]      [W/B]                   QTY.   RCC QTY.
                       TYPE        ER
                                  no's  L(mm)     B(mm)   T(mm) ( Sq.M ) (Cu.M)     (Cu.M)
 1.     PL-1          TYPE - B    255    3000    1200     150     3.60    0.54      137.70
 2.     PL-2          TYPE - A     3     3300    2000     150     6.60    0.99       2.97
 3.     PL-2A         TYPE - B     2     3000    855      150     2.57    0.38       0.77
 4.     PL-3          TYPE - C    312    3300    1420     150     4.69    0.70      219.31
 5.     PL-3A         TYPE - C     2     3300    1750     150     5.78    0.87       1.74
 6.     PL-4          TYPE - A    16     2600    1200     150     3.12    0.47       7.49
 7.     PL-4A         TYPE - A     2     2600    1620     150     4.21    0.63       1.27
 8.     PL-5          TYPE - A     8     2115    1200     150     2.54    0.38       3.05
 9.     PL-6          TYPE - C     3     3300    2550     150     8.42    1.26       3.79
 10.    PL-7          TYPE - A    14     2105    1200     150     2.53    0.38       5.31
 11.    PL-8          TYPE - A    56     1900    2415     150     4.59    0.69      38.55
 12. OVERALL HOOK'S               673     -        -       -       -       -          -
                                                                         RCC =    422.0 Cu.m
DING (RCC AND STEEL QUANTITIES)
VL - PLANK'S (SCHEDULES & QTY.)
                                            TOTAL
                                  STEEL
                                            STEEL
                                   QTY.
                                             QTY.
                                   ( kg )   ( MT )
                                   49.52    12.63
                                   47.16     0.15
                                   33.47     0.07
                                   86.07    26.86
                                  104.68     0.21
                                   22.34     0.36
                                   29.88     0.06
                                   18.25     0.15
                                  157.02     0.48
                                   18.20     0.26
                                   32.68     1.83
                                   8.31       5.6
                                  STEEL =   43.06 T
                          ASSEMBLY & WELDING (RCC AND STEEL QUANTITIES)
                                       +4.0M LVL - PLANK'S (SCHEDULES & QTY.)
                                 NO'S
                                   OF LENGTH WIDTH                       RCC
                      PLANK                             THICK    AREA
S.No:   DESCRIPTION              MEMB    [L]    [W/B]                    QTY.
                       TYPE        ER
                                  no's L(mm)   B(mm)    T(mm) ( Sq.M ) (Cu.M)
 1.     SPL-1         TYPE - D    13    1950    1000     150    1.95    0.29
 2.     SPL - 2       TYPE - D     1    1950    1480     150    2.89    0.43
 3.     SPL - 3       TYPE - D     6    1885    1000     150    1.89    0.28
 4.     SPL - 3A      TYPE - D     6    1065    1000     150    1.07    0.16
 5.     SPL - 3B      TYPE - D     1    1885     835     150    1.57    0.24
 6.     SPL - 3C      TYPE - D     1    1065     830     150    0.88    0.13
 7.     SPL - 3D      TYPE - D     1    1945     780     150    1.52    0.23
 8.     SPL - 4       TYPE - D     2    1825    1280     150    2.34    0.35
 9.     SPL - 6       TYPE - D     5    3390    1400     150    4.75    0.71
 10.    SPL - 7       TYPE - D     1    3390     800     150    2.71    0.41
 11.    SPL - 8       TYPE - D     1    1985    1360     150    2.70    0.40
 12.    SPL - 9       TYPE - E     8    2250    1100     150    2.48    0.37
 13.    SPL - 10      TYPE - D     1    1250    1075     150    1.34    0.20
 14.    SPL - 11      TYPE - D     9    1700    1100     150    1.87    0.28
 15.    SPL - 13      TYPE - D     1    3190     800     150    2.55    0.38
 16.    SPL - 14      TYPE - D     1    1990    1400     150    2.79    0.42
 17.    SPL - 14 A    TYPE - F     1    2810    1990     150    5.59    0.84
 18.    SPL - 14 B    TYPE - F     1    2610    1255     150    3.28    0.49
 19.    SPL - 15      TYPE - D    21    1900    1250     150    2.38    0.36
 20.    SPL - 16      TYPE - D     7    1900    1260     150    2.39    0.36
 21.    SPL - 17      TYPE - E     3    2300    1250     150    2.88    0.43
 22.    SPL - 18      TYPE - E     1    2300    1260     150    2.90    0.43
 23.    SPL - 19      TYPE - D     9    1300    1100     150    1.43    0.21
 24.    SPL - 20      TYPE - D     9    1150    1100     150    1.27    0.19
 25.    SPL - 21      TYPE - D     8    3125    1400     150    4.38    0.66
 26.    SPL - 22      TYPE - D    36    2175    1400     150    3.05    0.46
 27.    SPL - 23      TYPE - D     9    3000    1400     150    4.20    0.63
 28.    SPL - 24      TYPE - D    280   1990    1400     150    2.79    0.42
 29.    SPL - 25      TYPE - D    280   1900    1250     150    2.38    0.36
 30.    SPL - 26      TYPE - D    40    1250    1210     150    1.51    0.23
 31.    SPL - 27      TYPE - D    81    1300    1100     150    1.43    0.21
 32.    SPL - 28      TYPE - D    18    1200    1100     150    1.32    0.20
 33.    SPL - 29      TYPE - D    23    1985    1400     150    2.78    0.42
 34.    SPL - 29 A    TYPE - D     2    1985    1700     150    3.37    0.51
 35.    SPL - 29 B    TYPE - D     1    1985    1100     150    2.18    0.33
 36.    SPL - 30      TYPE - D    21    1905    1400     150    2.67    0.40
 37.    SPL - 31      TYPE - D    42    1985    1400     150    2.78    0.42
                                       +4.0M LVL - PLANK'S (SCHEDULES & QTY.)
                                 NO'S
                                   OF LENGTH WIDTH                       RCC
                      PLANK                             THICK    AREA
S.No:   DESCRIPTION              MEMB    [L]    [W/B]                    QTY.
                       TYPE        ER
                                  no's L(mm)   B(mm)    T(mm) ( Sq.M ) (Cu.M)
 38.    SPL - 32      TYPE - G     2    3300    1980     150    6.53    0.98
 39.    SPL - 33      TYPE - G     1    3300    1905     150    6.29    0.94
 40.    SPL - 34      TYPE - D    20    1900    1300     150    2.47    0.37
 41.    SPL - 35      TYPE - D     5    1900     980     150    1.86    0.28
 42.    SPL - 36      TYPE - D     4    1300    1415     150    1.84    0.28
 43.    SPL - 37      TYPE - D     4    1300    1075     150    1.40    0.21
 44.    SPL - 38      TYPE - D     1    1415     975     150    1.38    0.21
 45.    SPL - 39      TYPE - D     1    1075     975     150    1.05    0.16
 46.    APL - 1       TYPE - D    10    3300    1400     150    4.62    0.69
 47.    APL - 2       TYPE - D     2    3300     800     150    2.64    0.40
 48.    APL - 3       TYPE - D    56    1975    1400     150    2.77    0.41
 49.    APL - 4       TYPE - D     8    1975     800     150    1.58    0.24
 50.    APL - 5       TYPE - D    20    2525    1400     150    3.54    0.53
 51.    APL - 6       TYPE - D     4    2525     800     150    2.02    0.30
 52.    APL - 7       TYPE - D    10    2675    1400     150    3.75    0.56
 53.    APL - 8       TYPE - D     2    2675     800     150    2.14    0.32
 54.    APL - 9       TYPE - D    76    2325    1400     150    3.26    0.49
 55.    APL - 10      TYPE - D     8    2325     800     150    1.86    0.28
 56.    APL - 11      TYPE - D    38    2675    1400     150    3.75    0.56
 57.    APL - 12      TYPE - D     5    3105     800     150    2.48    0.37
 58.    APL - 13      TYPE - D    11    1905    1400     150    2.67    0.40
 59.    APL - 13 A    TYPE - D     3    1860    1400     150    2.60    0.39
 60.    APL - 13B     TYPE - D     1    2705    1400     150    3.79    0.57
 61.    APL - 14      TYPE - D     1    2705    1200     150    3.25    0.49
 62.    APL - 15      TYPE - D     2    2475     800     150    1.98    0.30
 63.    APL - 16      TYPE - D    30    1985    1400     150    2.78    0.42
 64.    APL - 17      TYPE - D     2    2470    1200     150    2.96    0.44
 65.    APL - 18      TYPE - D     2    2700     800     150    2.16    0.32
 66.    APL - 19      TYPE - D    28    2700    1400     150    3.78    0.57
 67.    APL - 20      TYPE - D     2    2475     800     150    1.98    0.30
 68.    APL - 21      TYPE - D    20    2475    1400     150    3.47    0.52
 69.    APL - 22      TYPE - D     2    2475    1200     150    2.97    0.45
 70.    APL - 23      TYPE - D     1    2705     800     150    2.16    0.32
 71.    APL - 24      TYPE - D    10    1900    1400     150    2.66    0.40
 72.    APL - 25      TYPE - D     1    1905    1200     150    2.29    0.34
 73.    APL - 26      TYPE - D     2    2475    1600     150    3.96    0.59
 74.    APL - 27      TYPE - D     1    1900    1600     150    3.04    0.46
 75.    APL - 28      TYPE - E     4    4950    2415     150    11.95   1.79
 76.    APL - 29      TYPE - D     2    4950    2000     150    9.90    1.49
                                       +4.0M LVL - PLANK'S (SCHEDULES & QTY.)
                                 NO'S
                                   OF LENGTH WIDTH                       RCC
                      PLANK                             THICK    AREA
S.No:   DESCRIPTION              MEMB    [L]    [W/B]                    QTY.
                       TYPE        ER
                                  no's L(mm)   B(mm)    T(mm) ( Sq.M ) (Cu.M)
 77.    NPL-1         TYPE - H     1    2400     895     250    2.15    0.54
 78.    NPL-2         TYPE - H     1    2400    2400     250    5.76    1.44
 79.    NPL-3         TYPE - H     1    2500    2400     250    6.00    1.50
 80.    NPL-4         TYPE - D     3    2650    1400     150    3.71    0.56
 81.    NPL-5         TYPE - H     5    1400     900     250    1.26    0.32
 82.    NPL-6         TYPE - H     8    2400    1400     250    3.36    0.84
 83.    NPL-7         TYPE - D     1    2400    1475     250    3.54    0.89
 84.    NPL-8         TYPE - H    19    2500    1400     250    3.50    0.88
 85.    NPL-9         TYPE - D    10    1300    1100     150    1.43    0.21
 86.    NPL-10        TYPE - D     2    1435    1300     150    1.87    0.28
 87.    NPL-11        TYPE - D    10    1125    1100     150    1.24    0.19
 88.    NPL-12        TYPE - D     2    1435    1100     150    1.58    0.24
 89.    NPL-13        TYPE - D    58    2175    1400     150    3.05    0.46
 90.    NPL-14        TYPE - D     4    2175    1475     150    3.21    0.48
 91.    NPL-15        TYPE - D     2    1770    1475     150    2.61    0.39
 92.    NPL-16        TYPE - D    26    1770    1400     150    2.48    0.37
 93.    NPL-17        TYPE - D     3    3390    1400     150    4.75    0.71
 94.    NPL-18        TYPE - D     2    2000    1400     150    2.80    0.42
 95.    NPL-19        TYPE - D    10    1700    1100     150    1.87    0.28
 96.    NPL-20        TYPE - D     2    1700    1430     150    2.43    0.36
 97.    NPL-21        TYPE - H    20    1975    1400     250    2.77    0.69
 98.    NPL-22        TYPE - H     2    4400     895     250    3.94    0.98
 99.    NPL-23        TYPE - H     4    4400    1975     250    8.69    2.17
100.    NPL-24        TYPE - H     2    4400    2500     250    11.00   2.75
101.    NPL-25        TYPE - D     8    2995    1400     150    4.19    0.63
102.    NPL-26        TYPE - F     1    2995    2600     150    7.79    1.17
103.    NPL-27        TYPE - F     4    2600    2175     150    5.66    0.85
104.    NPL-28        TYPE - D     2    2175    1770     150    3.85    0.58
105.    NPL-29        TYPE - H     2    2750    1975     250    5.43    1.36
106.    NPL - 30      TYPE - D     4    2200    1250     150    2.75    0.41
107.    NPL - 30-1    TYPE - D    12    2050    1250     150    2.56    0.38
108.    NPL - 30-2    TYPE - E     4    2460    1250     150    3.08    0.46
109.    NPL - 30A     TYPE - H    10    2752    2500     250    6.88    1.72
110.    NPL - 30B     TYPE - D    10    1200    1100     150    1.32    0.20
111.    NPL - 31      TYPE - D     2    1435    1200     150    1.72    0.26
112.    NPL - 32      TYPE - D    200   1900    1250     150    2.38    0.36
113.    NPL - 33      TYPE - D    54    1300    1150     150    1.50    0.22
114.    NPL - 34      TYPE - D    42    1985    1400     150    2.78    0.42
115.    NPL - 35      TYPE - D    21    1850    1400     150    2.59    0.39
                                       +4.0M LVL - PLANK'S (SCHEDULES & QTY.)
                                 NO'S
                                   OF LENGTH WIDTH                       RCC
                      PLANK                             THICK    AREA
S.No:   DESCRIPTION              MEMB    [L]    [W/B]                    QTY.
                       TYPE        ER
                                  no's L(mm)   B(mm)    T(mm) ( Sq.M ) (Cu.M)
116.    NPL - 36      TYPE - F     1    3050    2850     150    8.69     1.30
117.    NPL - 37      TYPE - F     4    2185    2850     150    6.23     0.93
118.    NPL - 38      TYPE - F     1    3585    2850     150    10.22    1.53
119.    NPL - 39      TYPE - D    26    1400    1250     150    1.75     0.26
120.    NPL - 40      TYPE - H     3    2950    1985     250    5.86     1.46
121.    NPL - 41      TYPE - H     1    2950    2485     250    7.33     1.83
122.    NPL - 42      TYPE - H    28    4500     900     250    4.05     1.01
123.    NPL - 43      TYPE - H    116   4500     950     250    4.28     1.07
124.    NPL - 44      TYPE - H    58    4500    1285     250    5.78     1.45
125.    NPL - 45      TYPE - H     2    1985     900     250    1.79     0.45
126.    NPL - 46      TYPE - H     8    1985     950     250    1.89     0.47
127.    NPL - 47      TYPE - H     4    1985    1285     250    2.55     0.64
128.    NPL - 48      TYPE - G     2    3300    1985     150    6.55     0.98
129.    NPL - 49      TYPE - G     1    3300    1905     150    6.29     0.94
130.    NPL - 50      TYPE - D     8    1900    1300     150    2.47     0.37
131.    NPL - 51      TYPE - D     2    1900     980     150    1.86     0.28
132.    NPL - 52      TYPE - D     4    1415    1300     150    1.84     0.28
133.    NPL - 53      TYPE - D     1    1415     980     150    1.39     0.21
134.    NPL - 54      TYPE - D     4    1300    1075     150    1.40     0.21
135.    NPL - 55      TYPE - D     1    1300    1075     150    1.40     0.21
136.    NPL - 56      TYPE - D     4    1300    2115     150    2.75     0.41
137.    NPL - 57      TYPE - D     1    2115     980     150    2.07     0.31
138. OVERALL HOOK'S              2207     -       -       -       -       -
                                                                        RCC =
WELDING (RCC AND STEEL QUANTITIES)
.0M LVL - PLANK'S (SCHEDULES & QTY.)
                                       TOTAL RCC   STEEL TOTAL STEEL
                                          QTY.      QTY.    QTY.
                                         (Cu.M)    ( kg )   ( MT )
                                          3.81     12.10     0.16
                                          0.44     18.00     0.02
                                          1.70     11.87     0.08
                                          0.96     6.43      0.04
                                          0.24     11.05     0.02
                                          0.14     6.01      0.01
                                          0.23     9.23      0.01
                                          0.71     14.69     0.03
                                          3.56     30.50     0.16
                                          0.41     16.72     0.02
                                          0.41     17.59     0.02
                                          2.97     18.41     0.15
                                          0.21     9.10      0.01
                                          2.53     12.56     0.12
                                          0.39     15.60     0.02
                                          0.42     17.66     0.02
                                          0.84     59.18     0.06
                                          0.50     34.53     0.04
                                          7.49     14.88     0.32
                                          2.52     14.93     0.11
                                          1.30     21.59     0.07
                                          0.44     21.65     0.03
                                          1.94     9.39      0.09
                                          1.71     8.73      0.08
                                          5.25     28.24     0.23
                                         16.45     19.62     0.71
                                          5.67     26.50     0.24
                                         117.02    17.66     4.95
                                         99.75     14.88     4.17
                                          9.08     9.46      0.38
                                         17.38     9.39      0.77
                                          3.57     8.95      0.17
                                          9.59     17.64     0.41
                                          1.02     21.01     0.05
                                          0.33     14.27     0.02
                                          8.41     17.34     0.37
                                         17.51     17.64     0.75
.0M LVL - PLANK'S (SCHEDULES & QTY.)
                                       TOTAL RCC   STEEL TOTAL STEEL
                                          QTY.      QTY.    QTY.
                                         (Cu.M)    ( kg )   ( MT )
                                          1.97     93.15     0.19
                                          0.95     89.58     0.09
                                          7.41     15.12     0.31
                                          1.40     11.82     0.06
                                          1.11     11.55     0.05
                                          0.84     9.01      0.04
                                          0.21     8.84      0.01
                                          0.16     7.02      0.01
                                          6.93     28.89     0.29
                                          0.80     15.81     0.04
                                         23.23     17.60     0.99
                                          1.90     9.64      0.08
                                         10.61     22.19     0.45
                                          1.22     12.14     0.05
                                          5.62     24.02     0.25
                                          0.65     13.16     0.03
                                         37.11     21.45     1.64
                                          2.24     11.77     0.1
                                         21.35     24.02     0.92
                                          1.87     15.45     0.08
                                          4.41     17.34     0.2
                                          1.18     17.17     0.06
                                          0.57     24.13     0.03
                                          0.49     20.50     0.03
                                          0.60     12.05     0.03
                                         12.51     17.64     0.53
                                          0.89     18.67     0.04
                                          0.65     13.21     0.03
                                         15.88     24.11     0.68
                                          0.60     12.05     0.03
                                         10.40     22.01     0.45
                                          0.90     18.69     0.04
                                          0.33     13.22     0.02
                                          3.99     17.32     0.18
                                          0.35     14.73     0.02
                                          1.19     25.32     0.06
                                          0.46     19.93     0.02
                                          7.18     89.50     0.36
                                          2.97     60.74     0.13
.0M LVL - PLANK'S (SCHEDULES & QTY.)
                                       TOTAL RCC   STEEL TOTAL STEEL
                                          QTY.      QTY.    QTY.
                                         (Cu.M)    ( kg )   ( MT )
                                          0.54     153.80    0.16
                                          1.44     480.17    0.49
                                          1.50     490.54    0.5
                                          1.67     23.93     0.08
                                          1.58     112.60    0.57
                                          6.72     189.66    1.52
                                          0.89     204.25    0.21
                                         16.63     196.94    3.75
                                          2.15      9.39     0.1
                                          0.56     11.62     0.03
                                          1.86      8.62     0.09
                                          0.48     10.55     0.03
                                         26.50     19.62     1.14
                                          1.93     20.22     0.09
                                          0.79     16.03     0.04
                                          9.67     15.56     0.41
                                          2.14     30.50     0.1
                                          0.84     17.69     0.04
                                          2.81     12.56     0.13
                                          0.73     15.52     0.04
                                         13.83     155.84    3.12
                                          1.97     235.02    0.48
                                          8.69     581.68    2.33
                                          5.50     757.49    1.52
                                          5.04     26.48     0.22
                                          1.17     83.74     0.09
                                          3.40     59.76     0.24
                                          1.16     23.70     0.05
                                          2.72     417.07    0.84
                                          1.65     16.99     0.07
                                          4.62     15.54     0.19
                                          1.85     23.37     0.1
                                         17.20     544.88    5.45
                                          1.98     10.05     0.11
                                          0.52     11.08     0.03
                                         71.25     16.60     3.32
                                         12.11     10.74     0.58
                                         17.51     17.64     0.75
                                          8.16     17.14     0.36
.0M LVL - PLANK'S (SCHEDULES & QTY.)
                                       TOTAL RCC   STEEL TOTAL STEEL
                                          QTY.      QTY.    QTY.
                                         (Cu.M)     ( kg )   ( MT )
                                          1.31      94.57     0.1
                                          3.74      67.64    0.28
                                          1.54     108.79    0.11
                                          6.83      12.36    0.33
                                          4.40     437.46    1.32
                                          1.84     570.04    0.58
                                         28.35     238.68    6.69
                                         123.98    270.03    31.33
                                         83.85     375.71    21.8
                                          0.90     136.88    0.28
                                          3.78     154.84    1.24
                                          2.56     216.70    0.87
                                          1.97      93.19    0.19
                                          0.95      89.58    0.09
                                          2.97      18.56    0.15
                                          0.56      13.54    0.03
                                          1.11      13.92    0.06
                                          0.21      10.15    0.02
                                          0.84      10.99    0.05
                                          0.21      10.99    0.02
                                          1.65      19.65    0.08
                                          0.32      15.12    0.02
                                           -        8.31     18.34
                                       1076 Cu.m   STEEL =   137 T
                       CAST IN SITU BEAMS REINFORCEMENT SCHEDULE AND QUANTITIES
                          NO'S OF           OVERALL                                TOTAL RCC    STEEL
                                                             AREA       RCC QTY.
                          MEMBER                                                      QTY.       QTY.
S.NO      DESCRIPTION
                                    L (mm) B (mm) D (mm)
                            no's                             ( Sq.M )    (Cu.M)      (Cu.M)      ( kg )
 1.    SPB - 1              19       5100      600    1200    0.484       2.47       46.88      461.67
 2.    SPB - 2              133      5100      600    1200    0.518       2.64       351.03     483.90
 3.    SPB - 3               5       5100      600    1200    0.484       2.47       12.34      713.19
 4.    SPB - 3A              1       5100      600    1200    0.518       2.64        2.64      715.66
 5.    SPB-4A, NPB-3A        2       5350      600    1200    0.484       2.59        5.18      740.24
 6.    SPB-4, NPB-3          4       5350      600    1200    0.518       2.77       11.08      742.81
 7.    NPB - 1               1       5200      600    1200    0.484       2.52        2.52      471.24
 8.    NPB - 1              90       5200      600    1200    0.518       2.69       242.19     493.84
 9.    NPB - 2               4       5200      600    1200    0.518       2.69       10.77      493.84
10. NPB - 2A                 3       6300      600    1200    0.518       3.26        9.79      582.07
11. SMB - 1                 37      10115     1300    1750    1.834      18.55       686.30     4393.83
12. SMB - 1                  5      10115     1300    1750    1.758      17.78       88.89      4431.26
13. SMB - 2                  1       3140     1600    1750    2.148       6.74        6.75      1774.79
14. SMB - 2                  2       4750     1600    1750    2.148      10.20       20.41      2395.69
15. SMB - 2                 17       4700     1600    1750    2.148      10.09       171.59     2381.62
16. SMB - 3-A                1       3140     1300    1750    1.724       5.41        5.42      1537.80
17. SMB - 3-B                1       3140     1300    1750    1.758       5.52        5.52      1552.85
18. SMB - 3-C                2       4700     1300    1750    1.724       8.10       16.21      2080.39
19. SMB - 3-D                1       4750     1300    1750    1.758       8.35        8.35      2112.66
20. SMB - 3-E                1       4300     1300    1750    1.724       7.41        7.42      1938.64
21. SMB - 4, NMB-4           4       5900     1200    1750    1.594       9.40       37.62      2532.48
22. SMB - 5,NMB-6            2       5765     1200    1750    1.560       8.99       17.99      2346.61
23. RB - 1 & RB-6            2      209650    4000    1750    5.200     1090.18     2180.36    278762.72
24. RB-3 & RB-4              2      52950     4000    1750    5.200      275.34      550.68    25123.25
25. RB-2 & RB-5              2       8900     4000    1750    5.200      46.28       92.56      4062.32
26. RB-2A & RB-5A            2      201500    3050    2500    6.253     1259.88     2519.76    116613.28
27. RB - 7                   1      88645     1600    1750    2.148      190.37      190.37    41347.55
28. RB - 7                   1      17250     1600    1750    2.148      37.04       37.05      8376.95
29. RB - 8,9,10              3      88600     1600    1750    2.148      190.27      570.81    41335.59
30. RB - 8,9,10              3      15500     1600    1750    2.148      33.29       99.86      7618.88
31. RB - 11,12               2      122190    1600    1750    2.148      262.40      524.81    56898.87
32. RB - 13 & RB-14          2      41256     1600    1750    2.148      88.60       177.20    25091.72
33. RB - 15 & RB-16          2      32366     1600    1750    2.148      69.51       139.02    19226.55
34. RB - 18                  1      48700     1600    1750    2.148      104.58      104.59    31441.94
35. RB - 19 TO RB - 26       8      78065     1600    1750    2.148      167.64     1341.16    47681.63
36. RB - 27,28,29,30         4      36290     1600    1750    2.148      77.93       311.74    17292.53
37. RB-31 & RB-32            2      236575    4000    1750    5.200     1230.19     2460.38    94023.51
38. RB-33                   42       5850     1600    1750    2.148      12.56       527.65     4043.67
39. RB-33                   52       1255     1600    1750    2.148       2.70       140.15     1942.87
                    CAST IN SITU BEAMS REINFORCEMENT SCHEDULE AND QUANTITIES
                         NO'S OF           OVERALL                                TOTAL RCC     STEEL
                                                            AREA       RCC QTY.
                         MEMBER                                                      QTY.        QTY.
S.NO   DESCRIPTION
                                   L (mm) B (mm) D (mm)
                          no's                              ( Sq.M )    (Cu.M)      (Cu.M)       ( kg )
40. RB-33                  44       1990     1600    1750    2.148       4.27       188.04      1589.92
41. RB-33                   1      22905     1600    1750    2.148      49.19       49.19      11892.47
42. RB-33                   1      24260     1600    1750    2.148      52.10       52.10      15267.08
43. RB-34                  20       5850     1900    1750    2.504      14.65       292.94      4075.34
44. RB-34                   5       1995     1900    1750    2.504       4.99       24.98       1602.13
45. NMB - 1                37       7085     1200    1750    1.834      12.99       480.71      3296.62
46. NMB - 1                 2       7485     1200    1750    1.834      13.73       27.46       3453.84
47. NMB - 1                 6       7485     1200    1750    1.628      12.18       73.10       3761.36
48. NMB - 2                 1       4800     1600    1750    2.148      10.31       10.31       2411.26
49. NMB - 2A               18       4700     2055    1750    2.705      12.71       228.87      2398.85
50. NMB - 3A               18       4700     1750    1750    2.309      10.85       195.33      2376.46
51. NMB-5                   1       5900     1200    1750    1.594       9.40        9.41       2540.89
52. B-5B & B-6A             2      202255    1200    1750    1.560      315.52      631.04     63337.67
53. B-5A & B-6B             2      203690    1200    1750    1.560      317.76      635.52     64313.72
54. B-1 or 1A & B-4/4a      2      228395    1600    1750    2.080      475.06      950.13     113206.08
55. B-2 & B-3               2      52950     1600    1750    2.080      110.14      220.28     27072.11
56. B-5 & B-6               2       8900     1600    1750    2.080      18.51       37.03       4746.12
57. B-7,B-8 & B-9           3      34525     1600    1750    2.080      71.81       215.44     18214.71
58. B-10,B-11 & B-12        3      25450     1600    1750    2.080      52.94       158.81     13048.00
59. B-13                   31       7500     1500    1750    2.018      15.13       469.07      2870.42
60. B-14                    1      252550    1900    1750    2.470      623.80      623.80     59014.88
                                                                         RCC =    19309 Cu.m
                                                                                                STEEL =
NFORCEMENT SCHEDULE AND QUANTITIES
                                     TOTAL STEEL
                                        QTY.
                                        ( MT )
                                         8.77
                                        64.36
                                         3.57
                                         0.72
                                         1.48
                                         2.97
                                         0.47
                                        44.45
                                         1.98
                                         1.75
                                       162.57
                                        22.16
                                         1.77
                                         4.79
                                        40.49
                                         1.54
                                         1.55
                                         4.16
                                         2.11
                                         1.94
                                        10.13
                                         4.69
                                       557.53
                                        50.25
                                         8.12
                                       233.23
                                        41.35
                                         8.38
                                       124.01
                                        22.86
                                        113.80
                                        50.18
                                        38.45
                                        31.44
                                       381.45
                                        69.17
                                       188.05
                                       169.83
                                       101.03
NFORCEMENT SCHEDULE AND QUANTITIES
                                     TOTAL STEEL
                                        QTY.
                                        ( MT )
                                        69.96
                                        11.89
                                        15.27
                                        81.51
                                        8.01
                                       121.97
                                        6.91
                                        22.57
                                        2.41
                                        43.18
                                        42.78
                                        2.54
                                       126.68
                                       128.63
                                       226.41
                                        54.14
                                        9.49
                                        54.64
                                        39.14
                                        88.98
                                        59.01
                                       3794 T
                                       1910 T
NAVAYUGA ENGINEERING COMPANY LIMITED
                          DESIGN AND CONSTRUCTION OF SHIPYARD FACILITIES AND ALLIED WORKS
  PROJECT TITILE
                                            AT SBC(V), VISAKHAPATNAM
  DOCUMENT TITLE                                   ASSEMBLY AND WELDING AREA
  PROJECT NO.                    DOCUMENT NO.                     REVISION NO.           DATE       REMARKS
  ST - 1278                     SBV - DSN - *******                       0            12/09/2019
 7.1. +1.3M LVL - PRECAST PILECAP DESIGN - TYPE - A
7.1.1. UNIT WEIGHTS
        Plain Cement Concrete (PCC)                               =              24.00 kN/m3
        Reinforced Cement Concrete (RCC)                          =              25.00 kN/m3
        Grade of Concrete                                   fck   =           M50
        Grade of Steel                                       fy   =           Fe500
        Modulus of elasticity of concrete                  EC     =        35,356.00 N/mm2
        Modulus of elasticity of steel                     ES     =       200,000.00 N/mm2
7.1.2. PRECAST PILECAP SECTION
     NOTE : -The purpose of the precast pilecap is to support the precast planks(PL) and
        create a platform for cast in situ slab concreting 400mm. These pile caps
        sacrificial in nature and no serviceability check are required.
                         FIG:- 1 - PRE CAST PILE CAP CROSS SECTION DETAILS
     PRECAST PILE CAP DIMENSIONAL DATA :
        Pile diameter                                       Ø     =            1200.00 mm
     LENGTH OF PILE CAP
        Distance from center of Pile to end of p            L1    =            1320.00 mm
        Distance from center of Pile to end of p            L2    =            1320.00 mm
        Corbel width                                        L3    =               0.00 mm
        Corbel width                                        L4    =               0.00 mm
NAVAYUGA ENGINEERING COMPANY LIMITED
                        DESIGN AND CONSTRUCTION OF SHIPYARD FACILITIES AND ALLIED WORKS
  PROJECT TITILE
                                          AT SBC(V), VISAKHAPATNAM
  DOCUMENT TITLE                                 ASSEMBLY AND WELDING AREA
  PROJECT NO.                     DOCUMENT NO.             REVISION NO.      DATE       REMARKS
  ST - 1278                   SBV - DSN - *******               0          12/09/2019
 7.1. +1.3M LVL - PRECAST PILECAP DESIGN - TYPE - A
        Top length of Pile Cap (Excluding Corb        L5   =        2640.00 mm
        Total length of pilecap                        L   =        2640.00 mm
NAVAYUGA ENGINEERING COMPANY LIMITED
                           DESIGN AND CONSTRUCTION OF SHIPYARD FACILITIES AND ALLIED WORKS
  PROJECT TITILE
                                             AT SBC(V), VISAKHAPATNAM
  DOCUMENT TITLE                                    ASSEMBLY AND WELDING AREA
  PROJECT NO.                        DOCUMENT NO.                REVISION NO.           DATE       REMARKS
  ST - 1278                        SBV - DSN - *******                 0            12/09/2019
 7.1. +1.3M LVL - PRECAST PILECAP DESIGN - TYPE - A
     WIDTH OF PILE CAP
        Distance from center of Pile to end of p           B1    =         1000.00 mm
        Distance from center of Pile to end of p           B2    =         1000.00 mm
        Corbel width                                       B3    =          150.00 mm
        Corbel width                                       B4    =          150.00 mm
        Top Pilecap width (Excluding Corbel)               B5    =         1700.00 mm
        Total width of pilecap                              B    =         2000.00 mm
     DEPTH OF PILE CAP
        Depth of corbel                                    T1    =          150.00 mm
        Depth of corbel                                    T2    =          150.00 mm
        Total depth of pile cap                             T    =          300.00 mm
        Clear cover to the outer reinforcement              C    =           30.00 mm
        Area of Pile Cap                                    A    =            0.80 m2
7.1.3. DESIGN LOADS CALCULATION
     DAEAD LOADS (DL)
     1. Self weight of Pile Cap                                  =           36.63 kN
     2. Load from Cast in situ slab on Pile Cap
        Thickness of slab                                   D    =          400.00 mm
        Weight of cast in situ slab                              =           44.88 kN
     3. Load from Plank [self weight of plank + Cast in situ slab]
     Precast planks are placed over the length of at corbel location. The load will considered length of pilecap.
        Length of plank is acting on pile cap                l   =         2640.00 mm
              Width of plank                                w    =         3000.00 mm
              Thickness of precast plank                     t   =          150.00 mm
              Self Weight of Plank                        WPL    =           29.70 kN
        Cast in situ slab weight
              Cast in situ slab load on the plank                =           79.20 kN
        Total load from Plank to corbel                          =          108.90 kN
     Total Dead Load (DL)                                WDL     =          191.00 kN
     CONSTRUCTIONAL LIVE LOAD ON PILE CAP (LL)
     4. Assumed Construction live load                     LL    =            5.00 kN/m2
        Live load acting over a Length of pilec           LPC    =         2640.00 mm
        Live load acting over a width of pilecap          BPC    =         1700.00 mm
NAVAYUGA ENGINEERING COMPANY LIMITED
                        DESIGN AND CONSTRUCTION OF SHIPYARD FACILITIES AND ALLIED WORKS
  PROJECT TITILE
                                          AT SBC(V), VISAKHAPATNAM
  DOCUMENT TITLE                                  ASSEMBLY AND WELDING AREA
  PROJECT NO.                   DOCUMENT NO.                 REVISION NO.      DATE       REMARKS
  ST - 1278                    SBV - DSN - *******                0          12/09/2019
 7.1. +1.3M LVL - PRECAST PILECAP DESIGN - TYPE - A
        Live load acting over a Length of Plank        LPL   =        2640.00 mm
        Live load acting over a width of Plank        WPL    =        3000.00 mm
NAVAYUGA ENGINEERING COMPANY LIMITED
                          DESIGN AND CONSTRUCTION OF SHIPYARD FACILITIES AND ALLIED WORKS
  PROJECT TITILE
                                            AT SBC(V), VISAKHAPATNAM
  DOCUMENT TITLE                                      ASSEMBLY AND WELDING AREA
  PROJECT NO.                       DOCUMENT NO.                    REVISION NO.             DATE       REMARKS
  ST - 1278                       SBV - DSN - *******                    0                 12/09/2019
 7.1. +1.3M LVL - PRECAST PILECAP DESIGN - TYPE - A
        Load on Pilecap                                             =           22.44 kN
        Load from Plank                                             =           39.60 kN
        Total Live Load                                     WLL     =           63.00 kN
     TOTAL LOADS ON PILE CAP
        1. Self weight of pile cap                                  =           36.63 kN
        2. Cast In situ slab on pilecap                             =           44.88 kN
        3. Self Weight of plank + cast in situ slab                 =          108.90 kN
        4. Construction live load                                   =           63.00 kN
     Total load on pile cap                                  WU     =          254.00 kN
     Total factored load acting on the Pile cap                     =          381.00 kN
     Intensity of pressure                                          =           84.89 kN/m2
7.1.4. REINFORCEMENT DETAILS
        Minimum percentage of steel required                        =               0.20 %
        Maximum % of reinforcement                                  =               1.89 %
                                            LENGTH DIRECTION              WIDTH DIRECTION
                                            L1               L2                B1              B2
        Cantilever Length                 0.72 m          0.72 m             0.40 m          0.40 m
        Bending Moment                 22.00 kNm        22.00 kNm        6.79 kNm          6.79 kNm
        Effective Depth                  264.0 mm       264.0 mm         252.0 mm            252 mm
                              Mu / bd2     0.32             0.32              0.11            0.11
        % Steel Required                  0.07 %          0.07 %          0.02 %             0.02 %
        Assumed main bar                            12 mm                            12 mm
                                       REQUIRED         PROVIDED        REQUIRED PROVIDED
        Percentage of steel               0.20 %        0.21 %            0.20 %             0.22 %
        Area of steel     Ast. (mm )
                                   2
                                          528.00        565.49               504.00          565.49
        Spacing of barSp.(mm c/c)         214.20        200.00               224.40          200.00
                 Provide #12 @200mm c/c Both Direction at TOP & BOTTOM.
7.1.5. DESIGN OF LIFTING HOOK
     Steel hook is designed to take 1/4 of the total weight of precast section.
     And the precast section is to be lifted by 4 hooks
        Lifting weight of precast section                           =           37.00 kN
        Impact during handling                                      =               1.25                ASSUMED
NAVAYUGA ENGINEERING COMPANY LIMITED
                         DESIGN AND CONSTRUCTION OF SHIPYARD FACILITIES AND ALLIED WORKS
  PROJECT TITILE
                                           AT SBC(V), VISAKHAPATNAM
  DOCUMENT TITLE                                 ASSEMBLY AND WELDING AREA
  PROJECT NO.                      DOCUMENT NO.           REVISION NO.         DATE    REMARKS
  ST - 1278                     SBV - DSN - *******            0          12/09/2019
 7.1. +1.3M LVL - PRECAST PILECAP DESIGN - TYPE - A
        Total force in each hook                          =         11.56 kN
        Permissible stress in the steel                   =        275.00 N/mm2        IS 456:2000
NAVAYUGA ENGINEERING COMPANY LIMITED
                           DESIGN AND CONSTRUCTION OF SHIPYARD FACILITIES AND ALLIED WORKS
  PROJECT TITILE
                                             AT SBC(V), VISAKHAPATNAM
  DOCUMENT TITLE                                   ASSEMBLY AND WELDING AREA
  PROJECT NO.                    DOCUMENT NO.                    REVISION NO.             DATE        REMARKS
  ST - 1278                      SBV - DSN - *******                    0              12/09/2019
 7.1. +1.3M LVL - PRECAST PILECAP DESIGN - TYPE - A
        Area of hook required                                    =            42.05 mm2
        Diameter of hook required                                =                 8 mm
        Assume diameter for hook                                 =                16 mm
        Area of steel for Hook                                   =           200.96 mm2
                                     Provided 4no's #16 mm dia
     DEVELOPMENT LENGTH FOR LIFTING HOOK
        Bond strength                                     Ꞇbd    =              1.90 N/mm2          IS 456:2000
        Stress in the bar                                        =            57.54 N/mm   2          Cl. 26.2.1.1
        Development length                                       =           121.13 mm
        Total length                                             =           400.00 mm
7.1.6. DESIGN OF CORBEL
        Load transfer through corbel is a temporary phase until in-situ concrete attains its full strength.
        For corbel design, reaction from deck slab and construction live load is considered.
        Length of corbel                                         =          1000.00 mm
        Depth of corbel                                          =           150.00 mm
        Width of corbel                                          =           150.00 mm
        Distance of the concentrated load from the face of t     =            75.00 mm
        Effective length of corbel                               =              1.09 m
        Overall depth                                       d    =           150.00 mm
                                                            s    =           150.00 mm
        Clear cover                                         c    =            25.00 mm
        Dia of main reinforcement                          ø1    =            12.00 mm
        Dia of Secondary reinforcement                     ø2    =            12.00 mm
        Effective depth                                     d'   =           107.00 mm
        Poisson's ratio                                     µ    =              1.40
                                                          S/d'   =              1.40
                                            S/d' > 0.5 HENCE DESIGN AS CORBEL
     LOADS ON CORBEL
        Slab Load                                                =            26.40 kN
        Plank Load                                               =              9.90 kN
        Construction Load                                        =              1.67 kN
        Total Load                                               =            37.97 kN
        Factored Load                                            =            57.00 kN
        Bending Moment                                           =              4.28 kNm
NAVAYUGA ENGINEERING COMPANY LIMITED
                       DESIGN AND CONSTRUCTION OF SHIPYARD FACILITIES AND ALLIED WORKS
  PROJECT TITILE
                                         AT SBC(V), VISAKHAPATNAM
  DOCUMENT TITLE                               ASSEMBLY AND WELDING AREA
  PROJECT NO.                  DOCUMENT NO.                 REVISION NO.     DATE       REMARKS
  ST - 1278                   SBV - DSN - *******                0         12/09/2019
 7.1. +1.3M LVL - PRECAST PILECAP DESIGN - TYPE - A
        Nominal shear strength of concrete          Vu/bd   =         0.49 N/mm2
                                                            =         7.50 N/mm2
NAVAYUGA ENGINEERING COMPANY LIMITED
                          DESIGN AND CONSTRUCTION OF SHIPYARD FACILITIES AND ALLIED WORKS
  PROJECT TITILE
                                            AT SBC(V), VISAKHAPATNAM
  DOCUMENT TITLE                                    ASSEMBLY AND WELDING AREA
  PROJECT NO.                    DOCUMENT NO.                       REVISION NO.            DATE       REMARKS
  ST - 1278                      SBV - DSN - *******                      0               12/09/2019
 7.1. +1.3M LVL - PRECAST PILECAP DESIGN - TYPE - A
                                                      Vu/bd < 0.15 fck is SAFE.
        Grade Of Concrete                                           =         M50
        Grade of Steel                                        Fy    =         Fe500
        Clear Cover                                                 =            25.00 mm
        Factored Vertical load                                Vu    =            57.00 kN
        Shear Friction Reinforcement, Avf = Vu / (0.85 x Fy x μ ) =              95.80 mm2
                                                 Hu = 0.2 x Vu      =            11.40 kN
        Direct Tension Reinforcement, At = Hu / (0.85 x Fy)         =            26.82 mm2
        Flexural Tensile Reinforcement, Af = [(Vu x cd) + Hu(h-d')] / (0.85 x Fy x d)
                                                              Af    =           134.12 mm2
        Total tensile reinforcement is taken as the largest of the following
                                                         Af + At    =           160.94 mm2
                                                  0.67 Avt + At     =            91.01 mm2
                                      (0.04 x fck / Fy ) x b x d'   =            64.20 mm2
                                                              As    =           160.94 mm2
        Diameter of bar                                             =                 12 mm
        No of bars Provided                                  no.    =                 2
        Area of reinforcement provided                       Ast    =           226.19 mm2
        Horizontal Reinforcement
        Diameter for horizontal reinforcement                       =                 12 mm
        No of legs                                                  =                 2
        Area of reinforcement stirrups
                                                   Ah = 0.5 Af      =            67.06 mm2
                                                    Ah = Avf/3      =            31.93 mm2
                                                             Ah     =            67.06 mm2
                                  Assume 2 legged, #12 mm dia.
NAVAYUGA ENGINEERING COMPANY LIMITED
                          DESIGN AND CONSTRUCTION OF SHIPYARD FACILITIES AND ALLIED WORKS
  PROJECT TITILE
                                            AT SBC(V), VISAKHAPATNAM
  DOCUMENT TITLE                                   ASSEMBLY AND WELDING AREA
  PROJECT NO.                    DOCUMENT NO.                     REVISION NO.           DATE       REMARKS
  ST - 1278                     SBV - DSN - *******                       0            12/09/2019
 7.2. +1.3M LVL - PRECAST PILECAP DESIGN - TYPE - B
7.2.1. UNIT WEIGHTS
        Plain Cement Concrete (PCC)                               =              24.00 kN/m3
        Reinforced Cement Concrete (RCC)                          =              25.00 kN/m3
        Grade of Concrete                                   fck   =           M50
        Grade of Steel                                       fy   =           Fe500
        Modulus of elasticity of concrete                  EC     =        35,356.00 N/mm2
        Modulus of elasticity of steel                     ES     =       200,000.00 N/mm2
7.2.2. PRECAST PILECAP SECTION
     NOTE : -The purpose of the precast pilecap is to support the precast planks(PL) and
        create a platform for cast in situ slab concreting 400mm. These pile caps
        sacrificial in nature and no serviceability check are required.
                         FIG:- 1 - PRE CAST PILE CAP CROSS SECTION DETAILS
     PRECAST PILE CAP DIMENSIONAL DATA :
        Pile diameter                                       Ø     =            1200.00 mm
     LENGTH OF PILE CAP
        Distance from center of Pile to end of p            L1    =            2235.00 mm
        Distance from center of Pile to end of p            L2    =            1400.00 mm
        Corbel width                                        L3    =               0.00 mm
        Corbel width                                        L4    =               0.00 mm
NAVAYUGA ENGINEERING COMPANY LIMITED
                        DESIGN AND CONSTRUCTION OF SHIPYARD FACILITIES AND ALLIED WORKS
  PROJECT TITILE
                                          AT SBC(V), VISAKHAPATNAM
  DOCUMENT TITLE                                 ASSEMBLY AND WELDING AREA
  PROJECT NO.                     DOCUMENT NO.             REVISION NO.      DATE       REMARKS
  ST - 1278                   SBV - DSN - *******               0          12/09/2019
 7.2. +1.3M LVL - PRECAST PILECAP DESIGN - TYPE - B
        Top length of Pile Cap (Excluding Corb        L5   =        3635.00 mm
        Total length of pilecap                        L   =        3635.00 mm
NAVAYUGA ENGINEERING COMPANY LIMITED
                           DESIGN AND CONSTRUCTION OF SHIPYARD FACILITIES AND ALLIED WORKS
  PROJECT TITILE
                                             AT SBC(V), VISAKHAPATNAM
  DOCUMENT TITLE                                    ASSEMBLY AND WELDING AREA
  PROJECT NO.                        DOCUMENT NO.                REVISION NO.           DATE       REMARKS
  ST - 1278                        SBV - DSN - *******                 0            12/09/2019
 7.2. +1.3M LVL - PRECAST PILECAP DESIGN - TYPE - B
     WIDTH OF PILE CAP
        Distance from center of Pile to end of p           B1    =         1680.00 mm
        Distance from center of Pile to end of p           B2    =         1835.00 mm
        Corbel width                                       B3    =          150.00 mm
        Corbel width                                       B4    =          150.00 mm
        Top Pilecap width (Excluding Corbel)               B5    =         3215.00 mm
        Total width of pilecap                              B    =         3515.00 mm
     DEPTH OF PILE CAP
        Depth of corbel                                    T1    =          150.00 mm
        Depth of corbel                                    T2    =          150.00 mm
        Total depth of pile cap                             T    =          300.00 mm
        Clear cover to the outer reinforcement              C    =           30.00 mm
        Area of Pile Cap                                    A    =            1.10 m2
7.2.3. DESIGN LOADS CALCULATION
     DAEAD LOADS (DL)
     1. Self weight of Pile Cap                                  =           91.74 kN
     2. Load from Cast in situ slab on Pile Cap
        Thickness of slab                                   D    =          400.00 mm
        Weight of cast in situ slab                              =          116.87 kN
     3. Load from Plank [self weight of plank + Cast in situ slab]
     Precast planks are placed over the length of at corbel location. The load will considered length of pilecap.
        Length of plank is acting on pile cap                l   =         3635.00 mm
              Width of plank                                w    =         3000.00 mm
              Thickness of precast plank                     t   =          150.00 mm
              Self Weight of Plank                        WPL    =           40.90 kN
        Cast in situ slab weight
              Cast in situ slab load on the plank                =          109.05 kN
        Total load from Plank to corbel                          =          149.95 kN
     Total Dead Load (DL)                                WDL     =          359.00 kN
     CONSTRUCTIONAL LIVE LOAD ON PILE CAP (LL)
     4. Assumed Construction live load                     LL    =            5.00 kN/m2
        Live load acting over a Length of pilec           LPC    =         3635.00 mm
        Live load acting over a width of pilecap          BPC    =         3215.00 mm
NAVAYUGA ENGINEERING COMPANY LIMITED
                        DESIGN AND CONSTRUCTION OF SHIPYARD FACILITIES AND ALLIED WORKS
  PROJECT TITILE
                                          AT SBC(V), VISAKHAPATNAM
  DOCUMENT TITLE                                  ASSEMBLY AND WELDING AREA
  PROJECT NO.                   DOCUMENT NO.                 REVISION NO.      DATE       REMARKS
  ST - 1278                    SBV - DSN - *******                0          12/09/2019
 7.2. +1.3M LVL - PRECAST PILECAP DESIGN - TYPE - B
        Live load acting over a Length of Plank        LPL   =        3635.00 mm
        Live load acting over a width of Plank        WPL    =        3000.00 mm
NAVAYUGA ENGINEERING COMPANY LIMITED
                          DESIGN AND CONSTRUCTION OF SHIPYARD FACILITIES AND ALLIED WORKS
  PROJECT TITILE
                                            AT SBC(V), VISAKHAPATNAM
  DOCUMENT TITLE                                      ASSEMBLY AND WELDING AREA
  PROJECT NO.                       DOCUMENT NO.                    REVISION NO.             DATE       REMARKS
  ST - 1278                       SBV - DSN - *******                    0                 12/09/2019
 7.2. +1.3M LVL - PRECAST PILECAP DESIGN - TYPE - B
        Load on Pilecap                                             =           58.43 kN
        Load from Plank                                             =           54.53 kN
        Total Live Load                                     WLL     =          113.00 kN
     TOTAL LOADS ON PILE CAP
        1. Self weight of pile cap                                  =           91.74 kN
        2. Cast In situ slab on pilecap                             =          116.87 kN
        3. Self Weight of plank + cast in situ slab                 =          149.95 kN
        4. Construction live load                                   =          113.00 kN
     Total load on pile cap                                  WU     =          472.00 kN
     Total factored load acting on the Pile cap                     =          708.00 kN
     Intensity of pressure                                          =           60.58 kN/m2
7.2.4. REINFORCEMENT DETAILS
        Minimum percentage of steel required                        =               0.20 %
        Maximum % of reinforcement                                  =               1.89 %
                                            LENGTH DIRECTION              WIDTH DIRECTION
                                            L1               L2                B1              B2
        Cantilever Length                 1.64 m          0.80 m             1.08 m          1.24 m
        Bending Moment                 80.98 kNm        19.39 kNm       35.33 kNm          46.20 kNm
        Effective Depth                  264.0 mm       264.0 mm         252.0 mm            252 mm
                              Mu / bd2     1.16             0.28              0.56            0.73
        % Steel Required                  0.27 %          0.06 %          0.13 %             0.17 %
        Assumed main bar                            12 mm                            12 mm
                                       REQUIRED         PROVIDED        REQUIRED PROVIDED
        Percentage of steel               0.27 %        0.34 %            0.20 %             0.26 %
        Area of steel     Ast. (mm )
                                   2
                                          725.40        904.78               504.00          646.27
        Spacing of barSp.(mm c/c)         155.91        125.00               224.40          175.00
                 Provide #12 @125mm c/c Both Direction at TOP & BOTTOM.
7.2.5. DESIGN OF LIFTING HOOK
     Steel hook is designed to take 1/4 of the total weight of precast section.
     And the precast section is to be lifted by 4 hooks
        Lifting weight of precast section                           =           92.00 kN
        Impact during handling                                      =               1.25                ASSUMED
NAVAYUGA ENGINEERING COMPANY LIMITED
                         DESIGN AND CONSTRUCTION OF SHIPYARD FACILITIES AND ALLIED WORKS
  PROJECT TITILE
                                           AT SBC(V), VISAKHAPATNAM
  DOCUMENT TITLE                                 ASSEMBLY AND WELDING AREA
  PROJECT NO.                      DOCUMENT NO.           REVISION NO.         DATE    REMARKS
  ST - 1278                     SBV - DSN - *******            0          12/09/2019
 7.2. +1.3M LVL - PRECAST PILECAP DESIGN - TYPE - B
        Total force in each hook                          =         28.75 kN
        Permissible stress in the steel                   =        275.00 N/mm2        IS 456:2000
NAVAYUGA ENGINEERING COMPANY LIMITED
                           DESIGN AND CONSTRUCTION OF SHIPYARD FACILITIES AND ALLIED WORKS
  PROJECT TITILE
                                             AT SBC(V), VISAKHAPATNAM
  DOCUMENT TITLE                                   ASSEMBLY AND WELDING AREA
  PROJECT NO.                    DOCUMENT NO.                    REVISION NO.             DATE        REMARKS
  ST - 1278                      SBV - DSN - *******                    0              12/09/2019
 7.2. +1.3M LVL - PRECAST PILECAP DESIGN - TYPE - B
        Area of hook required                                    =           104.55 mm2
        Diameter of hook required                                =                12 mm
        Assume diameter for hook                                 =                16 mm
        Area of steel for Hook                                   =           200.96 mm2
                                     Provided 4no's #16 mm dia
     DEVELOPMENT LENGTH FOR LIFTING HOOK
        Bond strength                                     Ꞇbd    =              1.90 N/mm2          IS 456:2000
        Stress in the bar                                        =           143.06 N/mm   2          Cl. 26.2.1.1
        Development length                                       =           301.19 mm
        Total length                                             =           400.00 mm
7.2.6. DESIGN OF CORBEL
        Load transfer through corbel is a temporary phase until in-situ concrete attains its full strength.
        For corbel design, reaction from deck slab and construction live load is considered.
        Length of corbel                                         =          1000.00 mm
        Depth of corbel                                          =           150.00 mm
        Width of corbel                                          =           150.00 mm
        Distance of the concentrated load from the face of t     =            75.00 mm
        Effective length of corbel                               =              1.09 m
        Overall depth                                       d    =           150.00 mm
                                                            s    =           150.00 mm
        Clear cover                                         c    =            25.00 mm
        Dia of main reinforcement                          ø1    =            12.00 mm
        Dia of Secondary reinforcement                     ø2    =            12.00 mm
        Effective depth                                     d'   =           107.00 mm
        Poisson's ratio                                     µ    =              1.40
                                                          S/d'   =              1.40
                                            S/d' > 0.5 HENCE DESIGN AS CORBEL
     LOADS ON CORBEL
        Slab Load                                                =            36.35 kN
        Plank Load                                               =            13.63 kN
        Construction Load                                        =              1.67 kN
        Total Load                                               =            51.65 kN
        Factored Load                                            =            78.00 kN
        Bending Moment                                           =              5.85 kNm
NAVAYUGA ENGINEERING COMPANY LIMITED
                       DESIGN AND CONSTRUCTION OF SHIPYARD FACILITIES AND ALLIED WORKS
  PROJECT TITILE
                                         AT SBC(V), VISAKHAPATNAM
  DOCUMENT TITLE                               ASSEMBLY AND WELDING AREA
  PROJECT NO.                  DOCUMENT NO.                 REVISION NO.     DATE       REMARKS
  ST - 1278                   SBV - DSN - *******                0         12/09/2019
 7.2. +1.3M LVL - PRECAST PILECAP DESIGN - TYPE - B
        Nominal shear strength of concrete          Vu/bd   =         0.67 N/mm2
                                                            =         7.50 N/mm2
NAVAYUGA ENGINEERING COMPANY LIMITED
                          DESIGN AND CONSTRUCTION OF SHIPYARD FACILITIES AND ALLIED WORKS
  PROJECT TITILE
                                            AT SBC(V), VISAKHAPATNAM
  DOCUMENT TITLE                                    ASSEMBLY AND WELDING AREA
  PROJECT NO.                    DOCUMENT NO.                       REVISION NO.            DATE       REMARKS
  ST - 1278                      SBV - DSN - *******                      0               12/09/2019
 7.2. +1.3M LVL - PRECAST PILECAP DESIGN - TYPE - B
                                                      Vu/bd < 0.15 fck is SAFE.
        Grade Of Concrete                                           =         M50
        Grade of Steel                                        Fy    =         Fe500
        Clear Cover                                                 =            25.00 mm
        Factored Vertical load                                Vu    =            78.00 kN
        Shear Friction Reinforcement, Avf = Vu / (0.85 x Fy x μ ) =             131.09 mm2
                                                 Hu = 0.2 x Vu      =            15.60 kN
        Direct Tension Reinforcement, At = Hu / (0.85 x Fy)         =            36.71 mm2
        Flexural Tensile Reinforcement, Af = [(Vu x cd) + Hu(h-d')] / (0.85 x Fy x d)
                                                              Af    =           183.53 mm2
        Total tensile reinforcement is taken as the largest of the following
                                                         Af + At    =           220.24 mm2
                                                  0.67 Avt + At     =           124.54 mm2
                                      (0.04 x fck / Fy ) x b x d'   =            64.20 mm2
                                                              As    =           220.24 mm2
        Diameter of bar                                             =                 12 mm
        No of bars Provided                                  no.    =                 2
        Area of reinforcement provided                       Ast    =           226.19 mm2
        Horizontal Reinforcement
        Diameter for horizontal reinforcement                       =                 12 mm
        No of legs                                                  =                 2
        Area of reinforcement stirrups
                                                   Ah = 0.5 Af      =            91.76 mm2
                                                    Ah = Avf/3      =            43.70 mm2
                                                             Ah     =            91.76 mm2
                                  Assume 2 legged, #12 mm dia.
NAVAYUGA ENGINEERING COMPANY LIMITED
                          DESIGN AND CONSTRUCTION OF SHIPYARD FACILITIES AND ALLIED WORKS
  PROJECT TITILE
                                            AT SBC(V), VISAKHAPATNAM
  DOCUMENT TITLE                                   ASSEMBLY AND WELDING AREA
  PROJECT NO.                    DOCUMENT NO.                     REVISION NO.           DATE       REMARKS
  ST - 1278                     SBV - DSN - *******                       0            12/09/2019
 7.3. +1.3M LVL - PRECAST PILECAP DESIGN - TYPE - C
7.3.1. UNIT WEIGHTS
        Plain Cement Concrete (PCC)                               =              24.00 kN/m3
        Reinforced Cement Concrete (RCC)                          =              25.00 kN/m3
        Grade of Concrete                                   fck   =           M50
        Grade of Steel                                       fy   =           Fe500
        Modulus of elasticity of concrete                  EC     =        35,356.00 N/mm2
        Modulus of elasticity of steel                     ES     =       200,000.00 N/mm2
7.3.2. PRECAST PILECAP SECTION
     NOTE : -The purpose of the precast pilecap is to support the precast planks(PL) and
        create a platform for cast in situ slab concreting 400mm. These pile caps
        sacrificial in nature and no serviceability check are required.
                         FIG:- 1 - PRE CAST PILE CAP CROSS SECTION DETAILS
     PRECAST PILE CAP DIMENSIONAL DATA :
        Pile diameter                                       Ø     =            1200.00 mm
     LENGTH OF PILE CAP
        Distance from center of Pile to end of p            L1    =            2410.00 mm
        Distance from center of Pile to end of p            L2    =            2235.00 mm
        Corbel width                                        L3    =               0.00 mm
        Corbel width                                        L4    =               0.00 mm
NAVAYUGA ENGINEERING COMPANY LIMITED
                        DESIGN AND CONSTRUCTION OF SHIPYARD FACILITIES AND ALLIED WORKS
  PROJECT TITILE
                                          AT SBC(V), VISAKHAPATNAM
  DOCUMENT TITLE                                 ASSEMBLY AND WELDING AREA
  PROJECT NO.                     DOCUMENT NO.             REVISION NO.      DATE       REMARKS
  ST - 1278                   SBV - DSN - *******               0          12/09/2019
 7.3. +1.3M LVL - PRECAST PILECAP DESIGN - TYPE - C
        Top length of Pile Cap (Excluding Corb        L5   =        4645.00 mm
        Total length of pilecap                        L   =        4645.00 mm
NAVAYUGA ENGINEERING COMPANY LIMITED
                           DESIGN AND CONSTRUCTION OF SHIPYARD FACILITIES AND ALLIED WORKS
  PROJECT TITILE
                                             AT SBC(V), VISAKHAPATNAM
  DOCUMENT TITLE                                    ASSEMBLY AND WELDING AREA
  PROJECT NO.                        DOCUMENT NO.                REVISION NO.           DATE       REMARKS
  ST - 1278                        SBV - DSN - *******                 0            12/09/2019
 7.3. +1.3M LVL - PRECAST PILECAP DESIGN - TYPE - C
     WIDTH OF PILE CAP
        Distance from center of Pile to end of p           B1    =         1680.00 mm
        Distance from center of Pile to end of p           B2    =         1835.00 mm
        Corbel width                                       B3    =          150.00 mm
        Corbel width                                       B4    =          150.00 mm
        Top Pilecap width (Excluding Corbel)               B5    =         3215.00 mm
        Total width of pilecap                              B    =         3515.00 mm
     DEPTH OF PILE CAP
        Depth of corbel                                    T1    =          150.00 mm
        Depth of corbel                                    T2    =          150.00 mm
        Total depth of pile cap                             T    =          300.00 mm
        Clear cover to the outer reinforcement              C    =           30.00 mm
        Area of Pile Cap                                    A    =            1.40 m2
7.3.3. DESIGN LOADS CALCULATION
     DAEAD LOADS (DL)
     1. Self weight of Pile Cap                                  =          117.23 kN
     2. Load from Cast in situ slab on Pile Cap
        Thickness of slab                                   D    =          400.00 mm
        Weight of cast in situ slab                              =          149.34 kN
     3. Load from Plank [self weight of plank + Cast in situ slab]
     Precast planks are placed over the length of at corbel location. The load will considered length of pilecap.
        Length of plank is acting on pile cap                l   =         4645.00 mm
              Width of plank                                w    =         3000.00 mm
              Thickness of precast plank                     t   =          150.00 mm
              Self Weight of Plank                        WPL    =           52.26 kN
        Cast in situ slab weight
              Cast in situ slab load on the plank                =          139.35 kN
        Total load from Plank to corbel                          =          191.61 kN
     Total Dead Load (DL)                                WDL     =          459.00 kN
     CONSTRUCTIONAL LIVE LOAD ON PILE CAP (LL)
     4. Assumed Construction live load                     LL    =            5.00 kN/m2
        Live load acting over a Length of pilec           LPC    =         4645.00 mm
        Live load acting over a width of pilecap          BPC    =         3215.00 mm
NAVAYUGA ENGINEERING COMPANY LIMITED
                        DESIGN AND CONSTRUCTION OF SHIPYARD FACILITIES AND ALLIED WORKS
  PROJECT TITILE
                                          AT SBC(V), VISAKHAPATNAM
  DOCUMENT TITLE                                  ASSEMBLY AND WELDING AREA
  PROJECT NO.                   DOCUMENT NO.                 REVISION NO.      DATE       REMARKS
  ST - 1278                    SBV - DSN - *******                0          12/09/2019
 7.3. +1.3M LVL - PRECAST PILECAP DESIGN - TYPE - C
        Live load acting over a Length of Plank        LPL   =        4645.00 mm
        Live load acting over a width of Plank        WPL    =        3000.00 mm
NAVAYUGA ENGINEERING COMPANY LIMITED
                          DESIGN AND CONSTRUCTION OF SHIPYARD FACILITIES AND ALLIED WORKS
  PROJECT TITILE
                                            AT SBC(V), VISAKHAPATNAM
  DOCUMENT TITLE                                      ASSEMBLY AND WELDING AREA
  PROJECT NO.                       DOCUMENT NO.                    REVISION NO.             DATE       REMARKS
  ST - 1278                       SBV - DSN - *******                    0                 12/09/2019
 7.3. +1.3M LVL - PRECAST PILECAP DESIGN - TYPE - C
        Load on Pilecap                                             =           74.67 kN
        Load from Plank                                             =           69.68 kN
        Total Live Load                                     WLL     =          145.00 kN
     TOTAL LOADS ON PILE CAP
        1. Self weight of pile cap                                  =          117.23 kN
        2. Cast In situ slab on pilecap                             =          149.34 kN
        3. Self Weight of plank + cast in situ slab                 =          191.61 kN
        4. Construction live load                                   =          145.00 kN
     Total load on pile cap                                  WU     =          604.00 kN
     Total factored load acting on the Pile cap                     =          906.00 kN
     Intensity of pressure                                          =           60.67 kN/m2
7.3.4. REINFORCEMENT DETAILS
        Minimum percentage of steel required                        =               0.20 %
        Maximum % of reinforcement                                  =               1.89 %
                                            LENGTH DIRECTION              WIDTH DIRECTION
                                            L1               L2                B1              B2
        Cantilever Length                 1.81 m          1.64 m             1.08 m          1.24 m
        Bending Moment                 99.38 kNm        81.09 kNm       35.38 kNm          46.27 kNm
        Effective Depth                  264.0 mm       264.0 mm         252.0 mm            252 mm
                              Mu / bd2     1.43             1.16              0.56            0.73
        % Steel Required                  0.34 %          0.28 %          0.13 %             0.17 %
        Assumed main bar                            12 mm                            12 mm
                                       REQUIRED         PROVIDED        REQUIRED PROVIDED
        Percentage of steel               0.34 %        0.39 %            0.20 %             0.26 %
        Area of steel     Ast. (mm )
                                   2
                                          896.21        1028.16              504.00          646.27
        Spacing of barSp.(mm c/c)         126.19         110.00              224.40          175.00
                 Provide #12 @110mm c/c Both Direction at TOP & BOTTOM.
7.3.5. DESIGN OF LIFTING HOOK
     Steel hook is designed to take 1/4 of the total weight of precast section.
     And the precast section is to be lifted by 4 hooks
        Lifting weight of precast section                           =          118.00 kN
        Impact during handling                                      =               1.25                ASSUMED
NAVAYUGA ENGINEERING COMPANY LIMITED
                         DESIGN AND CONSTRUCTION OF SHIPYARD FACILITIES AND ALLIED WORKS
  PROJECT TITILE
                                           AT SBC(V), VISAKHAPATNAM
  DOCUMENT TITLE                                 ASSEMBLY AND WELDING AREA
  PROJECT NO.                      DOCUMENT NO.           REVISION NO.         DATE    REMARKS
  ST - 1278                     SBV - DSN - *******            0          12/09/2019
 7.3. +1.3M LVL - PRECAST PILECAP DESIGN - TYPE - C
        Total force in each hook                          =         36.88 kN
        Permissible stress in the steel                   =        275.00 N/mm2        IS 456:2000
NAVAYUGA ENGINEERING COMPANY LIMITED
                           DESIGN AND CONSTRUCTION OF SHIPYARD FACILITIES AND ALLIED WORKS
  PROJECT TITILE
                                             AT SBC(V), VISAKHAPATNAM
  DOCUMENT TITLE                                   ASSEMBLY AND WELDING AREA
  PROJECT NO.                    DOCUMENT NO.                    REVISION NO.             DATE        REMARKS
  ST - 1278                      SBV - DSN - *******                    0              12/09/2019
 7.3. +1.3M LVL - PRECAST PILECAP DESIGN - TYPE - C
        Area of hook required                                    =           134.09 mm2
        Diameter of hook required                                =                14 mm
        Assume diameter for hook                                 =                16 mm
        Area of steel for Hook                                   =           200.96 mm2
                                     Provided 4no's #16 mm dia
     DEVELOPMENT LENGTH FOR LIFTING HOOK
        Bond strength                                     Ꞇbd    =              1.90 N/mm2          IS 456:2000
        Stress in the bar                                        =           183.49 N/mm   2          Cl. 26.2.1.1
        Development length                                       =           386.30 mm
        Total length                                             =           400.00 mm
7.3.6. DESIGN OF CORBEL
        Load transfer through corbel is a temporary phase until in-situ concrete attains its full strength.
        For corbel design, reaction from deck slab and construction live load is considered.
        Length of corbel                                         =          1000.00 mm
        Depth of corbel                                          =           150.00 mm
        Width of corbel                                          =           150.00 mm
        Distance of the concentrated load from the face of t     =            75.00 mm
        Effective length of corbel                               =              1.09 m
        Overall depth                                       d    =           150.00 mm
                                                            s    =           150.00 mm
        Clear cover                                         c    =            25.00 mm
        Dia of main reinforcement                          ø1    =            12.00 mm
        Dia of Secondary reinforcement                     ø2    =            12.00 mm
        Effective depth                                     d'   =           107.00 mm
        Poisson's ratio                                     µ    =              1.40
                                                          S/d'   =              1.40
                                            S/d' > 0.5 HENCE DESIGN AS CORBEL
     LOADS ON CORBEL
        Slab Load                                                =            46.45 kN
        Plank Load                                               =            17.42 kN
        Construction Load                                        =              1.67 kN
        Total Load                                               =            65.54 kN
        Factored Load                                            =            99.00 kN
        Bending Moment                                           =              7.43 kNm
NAVAYUGA ENGINEERING COMPANY LIMITED
                       DESIGN AND CONSTRUCTION OF SHIPYARD FACILITIES AND ALLIED WORKS
  PROJECT TITILE
                                         AT SBC(V), VISAKHAPATNAM
  DOCUMENT TITLE                               ASSEMBLY AND WELDING AREA
  PROJECT NO.                  DOCUMENT NO.                 REVISION NO.     DATE       REMARKS
  ST - 1278                   SBV - DSN - *******                0         12/09/2019
 7.3. +1.3M LVL - PRECAST PILECAP DESIGN - TYPE - C
        Nominal shear strength of concrete          Vu/bd   =         0.85 N/mm2
                                                            =         7.50 N/mm2
NAVAYUGA ENGINEERING COMPANY LIMITED
                          DESIGN AND CONSTRUCTION OF SHIPYARD FACILITIES AND ALLIED WORKS
  PROJECT TITILE
                                            AT SBC(V), VISAKHAPATNAM
  DOCUMENT TITLE                                    ASSEMBLY AND WELDING AREA
  PROJECT NO.                    DOCUMENT NO.                       REVISION NO.            DATE       REMARKS
  ST - 1278                      SBV - DSN - *******                      0               12/09/2019
 7.3. +1.3M LVL - PRECAST PILECAP DESIGN - TYPE - C
                                                      Vu/bd < 0.15 fck is SAFE.
        Grade Of Concrete                                           =         M50
        Grade of Steel                                        Fy    =         Fe500
        Clear Cover                                                 =            25.00 mm
        Factored Vertical load                                Vu    =            99.00 kN
        Shear Friction Reinforcement, Avf = Vu / (0.85 x Fy x μ ) =             166.39 mm2
                                                 Hu = 0.2 x Vu      =            19.80 kN
        Direct Tension Reinforcement, At = Hu / (0.85 x Fy)         =            46.59 mm2
        Flexural Tensile Reinforcement, Af = [(Vu x cd) + Hu(h-d')] / (0.85 x Fy x d)
                                                              Af    =           232.94 mm2
        Total tensile reinforcement is taken as the largest of the following
                                                         Af + At    =           279.53 mm2
                                                  0.67 Avt + At     =           158.07 mm2
                                      (0.04 x fck / Fy ) x b x d'   =            64.20 mm2
                                                              As    =           279.53 mm2
        Diameter of bar                                             =                 12 mm
        No of bars Provided                                  no.    =                 2
        Area of reinforcement provided                       Ast    =           226.19 mm2
        Horizontal Reinforcement
        Diameter for horizontal reinforcement                       =                 12 mm
        No of legs                                                  =                 2
        Area of reinforcement stirrups
                                                   Ah = 0.5 Af      =           116.47 mm2
                                                    Ah = Avf/3      =            55.46 mm2
                                                             Ah     =           116.47 mm2
                                  Assume 2 legged, #12 mm dia.
NAVAYUGA ENGINEERING COMPANY LIMITED
                          DESIGN AND CONSTRUCTION OF SHIPYARD FACILITIES AND ALLIED WORKS
  PROJECT TITILE
                                            AT SBC(V), VISAKHAPATNAM
  DOCUMENT TITLE                                   ASSEMBLY AND WELDING AREA
  PROJECT NO.                    DOCUMENT NO.                     REVISION NO.           DATE       REMARKS
  ST - 1278                     SBV - DSN - *******                       0            12/09/2019
 7.4. +1.3M LVL - PRECAST PILECAP DESIGN - TYPE - D
7.4.1. UNIT WEIGHTS
        Plain Cement Concrete (PCC)                               =              24.00 kN/m3
        Reinforced Cement Concrete (RCC)                          =              25.00 kN/m3
        Grade of Concrete                                   fck   =           M50
        Grade of Steel                                       fy   =           Fe500
        Modulus of elasticity of concrete                  EC     =        35,356.00 N/mm2
        Modulus of elasticity of steel                     ES     =       200,000.00 N/mm2
7.4.2. PRECAST PILECAP SECTION
     NOTE : -The purpose of the precast pilecap is to support the precast planks(PL) and
        create a platform for cast in situ slab concreting 400mm. These pile caps
        sacrificial in nature and no serviceability check are required.
                         FIG:- 1 - PRE CAST PILE CAP CROSS SECTION DETAILS
     PRECAST PILE CAP DIMENSIONAL DATA :
        Pile diameter                                       Ø     =            1200.00 mm
     LENGTH OF PILE CAP
        Distance from center of Pile to end of p            L1    =            3090.00 mm
        Distance from center of Pile to end of p            L2    =            2580.00 mm
        Corbel width                                        L3    =               0.00 mm
        Corbel width                                        L4    =               0.00 mm
NAVAYUGA ENGINEERING COMPANY LIMITED
                        DESIGN AND CONSTRUCTION OF SHIPYARD FACILITIES AND ALLIED WORKS
  PROJECT TITILE
                                          AT SBC(V), VISAKHAPATNAM
  DOCUMENT TITLE                                 ASSEMBLY AND WELDING AREA
  PROJECT NO.                     DOCUMENT NO.             REVISION NO.      DATE       REMARKS
  ST - 1278                   SBV - DSN - *******               0          12/09/2019
 7.4. +1.3M LVL - PRECAST PILECAP DESIGN - TYPE - D
        Top length of Pile Cap (Excluding Corb        L5   =        5670.00 mm
        Total length of pilecap                        L   =        5670.00 mm
NAVAYUGA ENGINEERING COMPANY LIMITED
                           DESIGN AND CONSTRUCTION OF SHIPYARD FACILITIES AND ALLIED WORKS
  PROJECT TITILE
                                             AT SBC(V), VISAKHAPATNAM
  DOCUMENT TITLE                                    ASSEMBLY AND WELDING AREA
  PROJECT NO.                        DOCUMENT NO.                REVISION NO.           DATE       REMARKS
  ST - 1278                        SBV - DSN - *******                 0            12/09/2019
 7.4. +1.3M LVL - PRECAST PILECAP DESIGN - TYPE - D
     WIDTH OF PILE CAP
        Distance from center of Pile to end of p           B1    =         1400.00 mm
        Distance from center of Pile to end of p           B2    =         1050.00 mm
        Corbel width                                       B3    =          150.00 mm
        Corbel width                                       B4    =            0.00 mm
        Top Pilecap width (Excluding Corbel)               B5    =         2300.00 mm
        Total width of pilecap                              B    =         2450.00 mm
     DEPTH OF PILE CAP
        Depth of corbel                                    T1    =          150.00 mm
        Depth of corbel                                    T2    =          150.00 mm
        Total depth of pile cap                             T    =          300.00 mm
        Clear cover to the outer reinforcement              C    =           30.00 mm
        Area of Pile Cap                                    A    =            1.71 m2
7.4.3. DESIGN LOADS CALCULATION
     DAEAD LOADS (DL)
     1. Self weight of Pile Cap                                  =          101.00 kN
     2. Load from Cast in situ slab on Pile Cap
        Thickness of slab                                   D    =          400.00 mm
        Weight of cast in situ slab                              =          130.41 kN
     3. Load from Plank [self weight of plank + Cast in situ slab]
     Precast planks are placed over the length of at corbel location. The load will considered length of pilecap.
        Length of plank is acting on pile cap                l   =         5670.00 mm
              Width of plank                                w    =         3000.00 mm
              Thickness of precast plank                     t   =          150.00 mm
              Self Weight of Plank                        WPL    =           63.79 kN
        Cast in situ slab weight
              Cast in situ slab load on the plank                =          170.10 kN
        Total load from Plank to corbel                          =          233.89 kN
     Total Dead Load (DL)                                WDL     =          466.00 kN
     CONSTRUCTIONAL LIVE LOAD ON PILE CAP (LL)
     4. Assumed Construction live load                     LL    =            5.00 kN/m2
        Live load acting over a Length of pilec           LPC    =         5670.00 mm
        Live load acting over a width of pilecap          BPC    =         2300.00 mm
NAVAYUGA ENGINEERING COMPANY LIMITED
                        DESIGN AND CONSTRUCTION OF SHIPYARD FACILITIES AND ALLIED WORKS
  PROJECT TITILE
                                          AT SBC(V), VISAKHAPATNAM
  DOCUMENT TITLE                                  ASSEMBLY AND WELDING AREA
  PROJECT NO.                   DOCUMENT NO.                 REVISION NO.      DATE       REMARKS
  ST - 1278                    SBV - DSN - *******                0          12/09/2019
 7.4. +1.3M LVL - PRECAST PILECAP DESIGN - TYPE - D
        Live load acting over a Length of Plank        LPL   =        5670.00 mm
        Live load acting over a width of Plank        WPL    =        3000.00 mm
NAVAYUGA ENGINEERING COMPANY LIMITED
                          DESIGN AND CONSTRUCTION OF SHIPYARD FACILITIES AND ALLIED WORKS
  PROJECT TITILE
                                            AT SBC(V), VISAKHAPATNAM
  DOCUMENT TITLE                                      ASSEMBLY AND WELDING AREA
  PROJECT NO.                       DOCUMENT NO.                   REVISION NO.             DATE       REMARKS
  ST - 1278                       SBV - DSN - *******                   0                 12/09/2019
 7.4. +1.3M LVL - PRECAST PILECAP DESIGN - TYPE - D
        Load on Pilecap                                            =           65.21 kN
        Load from Plank                                            =           85.05 kN
        Total Live Load                                     WLL    =          151.00 kN
     TOTAL LOADS ON PILE CAP
        1. Self weight of pile cap                                 =          101.00 kN
        2. Cast In situ slab on pilecap                            =          130.41 kN
        3. Self Weight of plank + cast in situ slab                =          233.89 kN
        4. Construction live load                                  =          151.00 kN
     Total load on pile cap                                  WU    =          617.00 kN
     Total factored load acting on the Pile cap                    =          926.00 kN
     Intensity of pressure                                         =           71.01 kN/m2
7.4.4. REINFORCEMENT DETAILS
        Minimum percentage of steel required                       =               0.20 %
        Maximum % of reinforcement                                 =               1.89 %
                                            LENGTH DIRECTION             WIDTH DIRECTION
                                            L1               L2               B1              B2
        Cantilever Length                 2.49 m          1.98 m            0.80 m          0.45 m
        Bending Moment                 220.12 kNm       139.19 kNm     22.72 kNm          7.19 kNm
        Effective Depth                  262.0 mm       262.0 mm        246.0 mm            246 mm
                              Mu / bd2     3.21             2.03             0.38            0.12
        % Steel Required                  0.80 %          0.49 %         0.09 %             0.03 %
        Assumed main bar                            16 mm                           16 mm
                                       REQUIRED         PROVIDED       REQUIRED PROVIDED
        Percentage of steel               0.80 %         0.85 %          0.20 %             0.54 %
        Area of steel     Ast. (mm )
                                   2
                                         2100.85        2234.02             492.00          1340.41
        Spacing of barSp.(mm c/c)         95.71           90.00             408.66          150.00
                  Provide #16 @90mm c/c Both Direction at TOP & BOTTOM.
7.4.5. DESIGN OF LIFTING HOOK
     Steel hook is designed to take 1/4 of the total weight of precast section.
     And the precast section is to be lifted by 4 hooks
        Lifting weight of precast section                          =          101.00 kN
        Impact during handling                                     =               1.25                ASSUMED
NAVAYUGA ENGINEERING COMPANY LIMITED
                         DESIGN AND CONSTRUCTION OF SHIPYARD FACILITIES AND ALLIED WORKS
  PROJECT TITILE
                                           AT SBC(V), VISAKHAPATNAM
  DOCUMENT TITLE                                 ASSEMBLY AND WELDING AREA
  PROJECT NO.                      DOCUMENT NO.           REVISION NO.         DATE    REMARKS
  ST - 1278                     SBV - DSN - *******            0          12/09/2019
 7.4. +1.3M LVL - PRECAST PILECAP DESIGN - TYPE - D
        Total force in each hook                          =         31.56 kN
        Permissible stress in the steel                   =        275.00 N/mm2        IS 456:2000
NAVAYUGA ENGINEERING COMPANY LIMITED
                           DESIGN AND CONSTRUCTION OF SHIPYARD FACILITIES AND ALLIED WORKS
  PROJECT TITILE
                                             AT SBC(V), VISAKHAPATNAM
  DOCUMENT TITLE                                   ASSEMBLY AND WELDING AREA
  PROJECT NO.                    DOCUMENT NO.                    REVISION NO.             DATE        REMARKS
  ST - 1278                      SBV - DSN - *******                    0              12/09/2019
 7.4. +1.3M LVL - PRECAST PILECAP DESIGN - TYPE - D
        Area of hook required                                    =           114.77 mm2
        Diameter of hook required                                =                14 mm
        Assume diameter for hook                                 =                16 mm
        Area of steel for Hook                                   =           200.96 mm2
                                     Provided 4no's #16 mm dia
     DEVELOPMENT LENGTH FOR LIFTING HOOK
        Bond strength                                     Ꞇbd    =              1.90 N/mm2          IS 456:2000
        Stress in the bar                                        =           157.06 N/mm   2          Cl. 26.2.1.1
        Development length                                       =           330.65 mm
        Total length                                             =           400.00 mm
7.4.6. DESIGN OF CORBEL
        Load transfer through corbel is a temporary phase until in-situ concrete attains its full strength.
        For corbel design, reaction from deck slab and construction live load is considered.
        Length of corbel                                         =          1000.00 mm
        Depth of corbel                                          =           150.00 mm
        Width of corbel                                          =              0.00 mm
        Distance of the concentrated load from the face of t     =              0.00 mm
        Effective length of corbel                               =              1.00 m
        Overall depth                                       d    =           150.00 mm
                                                            s    =           150.00 mm
        Clear cover                                         c    =            25.00 mm
        Dia of main reinforcement                          ø1    =            16.00 mm
        Dia of Secondary reinforcement                     ø2    =            16.00 mm
        Effective depth                                     d'   =           101.00 mm
        Poisson's ratio                                     µ    =              1.40
                                                          S/d'   =              1.49
                                            S/d' > 0.5 HENCE DESIGN AS CORBEL
     LOADS ON CORBEL
        Slab Load                                                =            56.70 kN
        Plank Load                                               =            21.26 kN
        Construction Load                                        =              1.67 kN
        Total Load                                               =            79.63 kN
        Factored Load                                            =           120.00 kN
        Bending Moment                                           =              0.00 kNm
NAVAYUGA ENGINEERING COMPANY LIMITED
                       DESIGN AND CONSTRUCTION OF SHIPYARD FACILITIES AND ALLIED WORKS
  PROJECT TITILE
                                         AT SBC(V), VISAKHAPATNAM
  DOCUMENT TITLE                               ASSEMBLY AND WELDING AREA
  PROJECT NO.                  DOCUMENT NO.                 REVISION NO.     DATE       REMARKS
  ST - 1278                   SBV - DSN - *******                0         12/09/2019
 7.4. +1.3M LVL - PRECAST PILECAP DESIGN - TYPE - D
        Nominal shear strength of concrete          Vu/bd   =         1.19 N/mm2
                                                            =         7.50 N/mm2
NAVAYUGA ENGINEERING COMPANY LIMITED
                          DESIGN AND CONSTRUCTION OF SHIPYARD FACILITIES AND ALLIED WORKS
  PROJECT TITILE
                                            AT SBC(V), VISAKHAPATNAM
  DOCUMENT TITLE                                    ASSEMBLY AND WELDING AREA
  PROJECT NO.                    DOCUMENT NO.                       REVISION NO.            DATE       REMARKS
  ST - 1278                      SBV - DSN - *******                      0               12/09/2019
 7.4. +1.3M LVL - PRECAST PILECAP DESIGN - TYPE - D
                                                      Vu/bd < 0.15 fck is SAFE.
        Grade Of Concrete                                           =         M50
        Grade of Steel                                        Fy    =         Fe500
        Clear Cover                                                 =            25.00 mm
        Factored Vertical load                                Vu    =           120.00 kN
        Shear Friction Reinforcement, Avf = Vu / (0.85 x Fy x μ ) =             201.68 mm2
                                                 Hu = 0.2 x Vu      =            24.00 kN
        Direct Tension Reinforcement, At = Hu / (0.85 x Fy)         =            56.47 mm2
        Flexural Tensile Reinforcement, Af = [(Vu x cd) + Hu(h-d')] / (0.85 x Fy x d)
                                                              Af    =             0.00 mm2
        Total tensile reinforcement is taken as the largest of the following
                                                         Af + At    =            56.47 mm2
                                                  0.67 Avt + At     =           191.60 mm2
                                      (0.04 x fck / Fy ) x b x d'   =             0.00 mm2
                                                              As    =           191.60 mm2
        Diameter of bar                                             =                 16 mm
        No of bars Provided                                  no.    =                 2
        Area of reinforcement provided                       Ast    =           402.12 mm2
        Horizontal Reinforcement
        Diameter for horizontal reinforcement                       =                 16 mm
        No of legs                                                  =                 2
        Area of reinforcement stirrups
                                                   Ah = 0.5 Af      =             0.00 mm2
                                                    Ah = Avf/3      =            67.23 mm2
                                                             Ah     =            67.23 mm2
                                  Assume 2 legged, #16 mm dia.
NAVAYUGA ENGINEERING COMPANY LIMITED
                          DESIGN AND CONSTRUCTION OF SHIPYARD FACILITIES AND ALLIED WORKS
  PROJECT TITILE
                                            AT SBC(V), VISAKHAPATNAM
  DOCUMENT TITLE                                   ASSEMBLY AND WELDING AREA
  PROJECT NO.                    DOCUMENT NO.                     REVISION NO.           DATE       REMARKS
  ST - 1278                     SBV - DSN - *******                       0            12/09/2019
 7.5. +1.3M LVL - PRECAST PILECAP DESIGN - TYPE - E
7.5.1. UNIT WEIGHTS
        Plain Cement Concrete (PCC)                               =              24.00 kN/m3
        Reinforced Cement Concrete (RCC)                          =              25.00 kN/m3
        Grade of Concrete                                   fck   =           M50
        Grade of Steel                                       fy   =           Fe500
        Modulus of elasticity of concrete                  EC     =        35,356.00 N/mm2
        Modulus of elasticity of steel                     ES     =       200,000.00 N/mm2
7.5.2. PRECAST PILECAP SECTION
     NOTE : -The purpose of the precast pilecap is to support the precast planks(PL) and
        create a platform for cast in situ slab concreting 400mm. These pile caps
        sacrificial in nature and no serviceability check are required.
                         FIG:- 1 - PRE CAST PILE CAP CROSS SECTION DETAILS
     PRECAST PILE CAP DIMENSIONAL DATA :
        Pile diameter                                       Ø     =            1200.00 mm
     LENGTH OF PILE CAP
        Distance from center of Pile to end of p            L1    =            3985.00 mm
        Distance from center of Pile to end of p            L2    =            2600.00 mm
        Corbel width                                        L3    =               0.00 mm
        Corbel width                                        L4    =             150.00 mm
NAVAYUGA ENGINEERING COMPANY LIMITED
                        DESIGN AND CONSTRUCTION OF SHIPYARD FACILITIES AND ALLIED WORKS
  PROJECT TITILE
                                          AT SBC(V), VISAKHAPATNAM
  DOCUMENT TITLE                                 ASSEMBLY AND WELDING AREA
  PROJECT NO.                     DOCUMENT NO.             REVISION NO.      DATE       REMARKS
  ST - 1278                   SBV - DSN - *******               0          12/09/2019
 7.5. +1.3M LVL - PRECAST PILECAP DESIGN - TYPE - E
        Top length of Pile Cap (Excluding Corb        L5   =        6435.00 mm
        Total length of pilecap                        L   =        6585.00 mm
NAVAYUGA ENGINEERING COMPANY LIMITED
                           DESIGN AND CONSTRUCTION OF SHIPYARD FACILITIES AND ALLIED WORKS
  PROJECT TITILE
                                             AT SBC(V), VISAKHAPATNAM
  DOCUMENT TITLE                                    ASSEMBLY AND WELDING AREA
  PROJECT NO.                        DOCUMENT NO.                REVISION NO.           DATE       REMARKS
  ST - 1278                        SBV - DSN - *******                 0            12/09/2019
 7.5. +1.3M LVL - PRECAST PILECAP DESIGN - TYPE - E
     WIDTH OF PILE CAP
        Distance from center of Pile to end of p           B1    =         2135.00 mm
        Distance from center of Pile to end of p           B2    =         2130.00 mm
        Corbel width                                       B3    =            0.00 mm
        Corbel width                                       B4    =            0.00 mm
        Top Pilecap width (Excluding Corbel)               B5    =         4265.00 mm
        Total width of pilecap                              B    =         4265.00 mm
     DEPTH OF PILE CAP
        Depth of corbel                                    T1    =          150.00 mm
        Depth of corbel                                    T2    =          150.00 mm
        Total depth of pile cap                             T    =          300.00 mm
        Clear cover to the outer reinforcement              C    =           30.00 mm
        Area of Pile Cap                                    A    =            1.96 m2
7.5.3. DESIGN LOADS CALCULATION
     DAEAD LOADS (DL)
     1. Self weight of Pile Cap                                  =          208.24 kN
     2. Load from Cast in situ slab on Pile Cap
        Thickness of slab                                   D    =          400.00 mm
        Weight of cast in situ slab                              =          274.46 kN
     3. Load from Plank [self weight of plank + Cast in situ slab]
     Precast planks are placed over the length of at corbel location. The load will considered length of pilecap.
        Length of plank is acting on pile cap                l   =         6585.00 mm
              Width of plank                                w    =         3000.00 mm
              Thickness of precast plank                     t   =          150.00 mm
              Self Weight of Plank                        WPL    =           74.09 kN
        Cast in situ slab weight
              Cast in situ slab load on the plank                =          197.55 kN
        Total load from Plank to corbel                          =          271.64 kN
     Total Dead Load (DL)                                WDL     =          755.00 kN
     CONSTRUCTIONAL LIVE LOAD ON PILE CAP (LL)
     4. Assumed Construction live load                     LL    =            5.00 kN/m2
        Live load acting over a Length of pilec           LPC    =         6435.00 mm
        Live load acting over a width of pilecap          BPC    =         4265.00 mm
NAVAYUGA ENGINEERING COMPANY LIMITED
                        DESIGN AND CONSTRUCTION OF SHIPYARD FACILITIES AND ALLIED WORKS
  PROJECT TITILE
                                          AT SBC(V), VISAKHAPATNAM
  DOCUMENT TITLE                                  ASSEMBLY AND WELDING AREA
  PROJECT NO.                   DOCUMENT NO.                 REVISION NO.      DATE       REMARKS
  ST - 1278                    SBV - DSN - *******                0          12/09/2019
 7.5. +1.3M LVL - PRECAST PILECAP DESIGN - TYPE - E
        Live load acting over a Length of Plank        LPL   =        6585.00 mm
        Live load acting over a width of Plank        WPL    =        3000.00 mm
NAVAYUGA ENGINEERING COMPANY LIMITED
                          DESIGN AND CONSTRUCTION OF SHIPYARD FACILITIES AND ALLIED WORKS
  PROJECT TITILE
                                            AT SBC(V), VISAKHAPATNAM
  DOCUMENT TITLE                                      ASSEMBLY AND WELDING AREA
  PROJECT NO.                       DOCUMENT NO.                   REVISION NO.             DATE       REMARKS
  ST - 1278                       SBV - DSN - *******                   0                 12/09/2019
 7.5. +1.3M LVL - PRECAST PILECAP DESIGN - TYPE - E
        Load on Pilecap                                            =          137.23 kN
        Load from Plank                                            =           98.78 kN
        Total Live Load                                     WLL    =          237.00 kN
     TOTAL LOADS ON PILE CAP
        1. Self weight of pile cap                                 =          208.24 kN
        2. Cast In situ slab on pilecap                            =          274.46 kN
        3. Self Weight of plank + cast in situ slab                =          271.64 kN
        4. Construction live load                                  =          237.00 kN
     Total load on pile cap                                  WU    =          992.00 kN
     Total factored load acting on the Pile cap                    =         1488.00 kN
     Intensity of pressure                                         =           54.22 kN/m2
7.5.4. REINFORCEMENT DETAILS
        Minimum percentage of steel required                       =               0.20 %
        Maximum % of reinforcement                                 =               1.89 %
                                            LENGTH DIRECTION             WIDTH DIRECTION
                                            L1               L2               B1              B2
        Cantilever Length                 3.39 m          2.00 m            1.54 m          1.53 m
        Bending Moment                 310.62 kNm       108.43 kNm     63.87 kNm          63.46 kNm
        Effective Depth                  260.0 mm       260.0 mm        244.0 mm            244 mm
                              Mu / bd2     4.59             1.60             1.07            1.07
        % Steel Required                  1.20 %          0.38 %         0.25 %             0.25 %
        Assumed main bar                            20 mm                           12 mm
                                       REQUIRED         PROVIDED       REQUIRED PROVIDED
        Percentage of steel               1.20 %         1.34 %          0.25 %             0.31 %
        Area of steel     Ast. (mm )
                                   2
                                         3122.83        3490.66             617.73          753.98
        Spacing of barSp.(mm c/c)         100.60          90.00             183.09          150.00
                  Provide #20 @90mm c/c Both Direction at TOP & BOTTOM.
7.5.5. DESIGN OF LIFTING HOOK
     Steel hook is designed to take 1/4 of the total weight of precast section.
     And the precast section is to be lifted by 4 hooks
        Lifting weight of precast section                          =          209.00 kN
        Impact during handling                                     =               1.25                ASSUMED
NAVAYUGA ENGINEERING COMPANY LIMITED
                         DESIGN AND CONSTRUCTION OF SHIPYARD FACILITIES AND ALLIED WORKS
  PROJECT TITILE
                                           AT SBC(V), VISAKHAPATNAM
  DOCUMENT TITLE                                 ASSEMBLY AND WELDING AREA
  PROJECT NO.                      DOCUMENT NO.           REVISION NO.         DATE    REMARKS
  ST - 1278                     SBV - DSN - *******            0          12/09/2019
 7.5. +1.3M LVL - PRECAST PILECAP DESIGN - TYPE - E
        Total force in each hook                          =         65.31 kN
        Permissible stress in the steel                   =        275.00 N/mm2        IS 456:2000
NAVAYUGA ENGINEERING COMPANY LIMITED
                           DESIGN AND CONSTRUCTION OF SHIPYARD FACILITIES AND ALLIED WORKS
  PROJECT TITILE
                                             AT SBC(V), VISAKHAPATNAM
  DOCUMENT TITLE                                   ASSEMBLY AND WELDING AREA
  PROJECT NO.                    DOCUMENT NO.                    REVISION NO.             DATE        REMARKS
  ST - 1278                      SBV - DSN - *******                    0              12/09/2019
 7.5. +1.3M LVL - PRECAST PILECAP DESIGN - TYPE - E
        Area of hook required                                    =           237.50 mm2
        Diameter of hook required                                =                18 mm
        Assume diameter for hook                                 =                16 mm
        Area of steel for Hook                                   =           200.96 mm2
                                     Provided 4no's #16 mm dia
     DEVELOPMENT LENGTH FOR LIFTING HOOK
        Bond strength                                     Ꞇbd    =              1.90 N/mm2          IS 456:2000
        Stress in the bar                                        =           325.00 N/mm   2          Cl. 26.2.1.1
        Development length                                       =           684.22 mm
        Total length                                             =           400.00 mm
7.5.6. DESIGN OF CORBEL
        Load transfer through corbel is a temporary phase until in-situ concrete attains its full strength.
        For corbel design, reaction from deck slab and construction live load is considered.
        Length of corbel                                         =          1000.00 mm
        Depth of corbel                                          =           150.00 mm
        Width of corbel                                          =           150.00 mm
        Distance of the concentrated load from the face of t     =            75.00 mm
        Effective length of corbel                               =              1.09 m
        Overall depth                                       d    =           150.00 mm
                                                            s    =           150.00 mm
        Clear cover                                         c    =            25.00 mm
        Dia of main reinforcement                          ø1    =            20.00 mm
        Dia of Secondary reinforcement                     ø2    =            20.00 mm
        Effective depth                                     d'   =            95.00 mm
        Poisson's ratio                                     µ    =              1.40
                                                          S/d'   =              1.58
                                            S/d' > 0.5 HENCE DESIGN AS CORBEL
     LOADS ON CORBEL
        Slab Load                                                =            65.85 kN
        Plank Load                                               =            24.70 kN
        Construction Load                                        =              1.67 kN
        Total Load                                               =            92.21 kN
        Factored Load                                            =           139.00 kN
        Bending Moment                                           =            10.43 kNm
NAVAYUGA ENGINEERING COMPANY LIMITED
                       DESIGN AND CONSTRUCTION OF SHIPYARD FACILITIES AND ALLIED WORKS
  PROJECT TITILE
                                         AT SBC(V), VISAKHAPATNAM
  DOCUMENT TITLE                               ASSEMBLY AND WELDING AREA
  PROJECT NO.                  DOCUMENT NO.                 REVISION NO.     DATE       REMARKS
  ST - 1278                   SBV - DSN - *******                0         12/09/2019
 7.5. +1.3M LVL - PRECAST PILECAP DESIGN - TYPE - E
        Nominal shear strength of concrete          Vu/bd   =         1.34 N/mm2
                                                            =         7.50 N/mm2
NAVAYUGA ENGINEERING COMPANY LIMITED
                          DESIGN AND CONSTRUCTION OF SHIPYARD FACILITIES AND ALLIED WORKS
  PROJECT TITILE
                                            AT SBC(V), VISAKHAPATNAM
  DOCUMENT TITLE                                    ASSEMBLY AND WELDING AREA
  PROJECT NO.                    DOCUMENT NO.                       REVISION NO.            DATE       REMARKS
  ST - 1278                      SBV - DSN - *******                      0               12/09/2019
 7.5. +1.3M LVL - PRECAST PILECAP DESIGN - TYPE - E
                                                      Vu/bd < 0.15 fck is SAFE.
        Grade Of Concrete                                           =         M50
        Grade of Steel                                        Fy    =         Fe500
        Clear Cover                                                 =            25.00 mm
        Factored Vertical load                                Vu    =           139.00 kN
        Shear Friction Reinforcement, Avf = Vu / (0.85 x Fy x μ ) =             233.61 mm2
                                                 Hu = 0.2 x Vu      =            27.80 kN
        Direct Tension Reinforcement, At = Hu / (0.85 x Fy)         =            65.41 mm2
        Flexural Tensile Reinforcement, Af = [(Vu x cd) + Hu(h-d')] / (0.85 x Fy x d)
                                                              Af    =           327.06 mm2
        Total tensile reinforcement is taken as the largest of the following
                                                         Af + At    =           392.47 mm2
                                                  0.67 Avt + At     =           221.93 mm2
                                      (0.04 x fck / Fy ) x b x d'   =            57.00 mm2
                                                              As    =           392.47 mm2
        Diameter of bar                                             =                 20 mm
        No of bars Provided                                  no.    =                 2
        Area of reinforcement provided                       Ast    =           628.32 mm2
        Horizontal Reinforcement
        Diameter for horizontal reinforcement                       =                 20 mm
        No of legs                                                  =                 2
        Area of reinforcement stirrups
                                                   Ah = 0.5 Af      =           163.53 mm2
                                                    Ah = Avf/3      =            77.87 mm2
                                                             Ah     =           163.53 mm2
                                  Assume 2 legged, #20 mm dia.
NAVAYUGA ENGINEERING COMPANY LIMITED
                          DESIGN AND CONSTRUCTION OF SHIPYARD FACILITIES AND ALLIED WORKS
  PROJECT TITILE
                                            AT SBC(V), VISAKHAPATNAM
  DOCUMENT TITLE                                   ASSEMBLY AND WELDING AREA
  PROJECT NO.                    DOCUMENT NO.                     REVISION NO.           DATE       REMARKS
  ST - 1278                     SBV - DSN - *******                       0            12/09/2019
 7.6. +1.3M LVL - PRECAST PILECAP DESIGN - TYPE - F
7.6.1. UNIT WEIGHTS
        Plain Cement Concrete (PCC)                               =              24.00 kN/m3
        Reinforced Cement Concrete (RCC)                          =              25.00 kN/m3
        Grade of Concrete                                   fck   =           M50
        Grade of Steel                                       fy   =           Fe500
        Modulus of elasticity of concrete                  EC     =        35,356.00 N/mm2
        Modulus of elasticity of steel                     ES     =       200,000.00 N/mm2
7.6.2. PRECAST PILECAP SECTION
     NOTE : -The purpose of the precast pilecap is to support the precast planks(PL) and
        create a platform for cast in situ slab concreting 400mm. These pile caps
        sacrificial in nature and no serviceability check are required.
                         FIG:- 1 - PRE CAST PILE CAP CROSS SECTION DETAILS
     PRECAST PILE CAP DIMENSIONAL DATA :
        Pile diameter                                       Ø     =            1200.00 mm
     LENGTH OF PILE CAP
        Distance from center of Pile to end of p            L1    =            3985.00 mm
        Distance from center of Pile to end of p            L2    =            3935.00 mm
        Corbel width                                        L3    =               0.00 mm
        Corbel width                                        L4    =               0.00 mm
NAVAYUGA ENGINEERING COMPANY LIMITED
                        DESIGN AND CONSTRUCTION OF SHIPYARD FACILITIES AND ALLIED WORKS
  PROJECT TITILE
                                          AT SBC(V), VISAKHAPATNAM
  DOCUMENT TITLE                                 ASSEMBLY AND WELDING AREA
  PROJECT NO.                     DOCUMENT NO.             REVISION NO.      DATE       REMARKS
  ST - 1278                   SBV - DSN - *******               0          12/09/2019
 7.6. +1.3M LVL - PRECAST PILECAP DESIGN - TYPE - F
        Top length of Pile Cap (Excluding Corb        L5   =        7920.00 mm
        Total length of pilecap                        L   =        7920.00 mm
NAVAYUGA ENGINEERING COMPANY LIMITED
                           DESIGN AND CONSTRUCTION OF SHIPYARD FACILITIES AND ALLIED WORKS
  PROJECT TITILE
                                             AT SBC(V), VISAKHAPATNAM
  DOCUMENT TITLE                                    ASSEMBLY AND WELDING AREA
  PROJECT NO.                        DOCUMENT NO.                REVISION NO.           DATE       REMARKS
  ST - 1278                        SBV - DSN - *******                 0            12/09/2019
 7.6. +1.3M LVL - PRECAST PILECAP DESIGN - TYPE - F
     WIDTH OF PILE CAP
        Distance from center of Pile to end of p           B1    =         1400.00 mm
        Distance from center of Pile to end of p           B2    =         1050.00 mm
        Corbel width                                       B3    =          150.00 mm
        Corbel width                                       B4    =            0.00 mm
        Top Pilecap width (Excluding Corbel)               B5    =         2300.00 mm
        Total width of pilecap                              B    =         2450.00 mm
     DEPTH OF PILE CAP
        Depth of corbel                                    T1    =          150.00 mm
        Depth of corbel                                    T2    =          200.00 mm
        Total depth of pile cap                             T    =          350.00 mm
        Clear cover to the outer reinforcement              C    =           30.00 mm
        Area of Pile Cap                                    A    =            2.78 m2
7.6.3. DESIGN LOADS CALCULATION
     DAEAD LOADS (DL)
     1. Self weight of Pile Cap                                  =          165.33 kN
     2. Load from Cast in situ slab on Pile Cap
        Thickness of slab                                   D    =          400.00 mm
        Weight of cast in situ slab                              =          182.16 kN
     3. Load from Plank [self weight of plank + Cast in situ slab]
     Precast planks are placed over the length of at corbel location. The load will considered length of pilecap.
        Length of plank is acting on pile cap                l   =         7920.00 mm
              Width of plank                                w    =         3000.00 mm
              Thickness of precast plank                     t   =          150.00 mm
              Self Weight of Plank                        WPL    =           89.10 kN
        Cast in situ slab weight
              Cast in situ slab load on the plank                =          237.60 kN
        Total load from Plank to corbel                          =          326.70 kN
     Total Dead Load (DL)                                WDL     =          675.00 kN
     CONSTRUCTIONAL LIVE LOAD ON PILE CAP (LL)
     4. Assumed Construction live load                     LL    =            5.00 kN/m2
        Live load acting over a Length of pilec           LPC    =         7920.00 mm
        Live load acting over a width of pilecap          BPC    =         2300.00 mm
NAVAYUGA ENGINEERING COMPANY LIMITED
                        DESIGN AND CONSTRUCTION OF SHIPYARD FACILITIES AND ALLIED WORKS
  PROJECT TITILE
                                          AT SBC(V), VISAKHAPATNAM
  DOCUMENT TITLE                                  ASSEMBLY AND WELDING AREA
  PROJECT NO.                   DOCUMENT NO.                 REVISION NO.      DATE       REMARKS
  ST - 1278                    SBV - DSN - *******                0          12/09/2019
 7.6. +1.3M LVL - PRECAST PILECAP DESIGN - TYPE - F
        Live load acting over a Length of Plank        LPL   =        7920.00 mm
        Live load acting over a width of Plank        WPL    =        3000.00 mm
NAVAYUGA ENGINEERING COMPANY LIMITED
                          DESIGN AND CONSTRUCTION OF SHIPYARD FACILITIES AND ALLIED WORKS
  PROJECT TITILE
                                            AT SBC(V), VISAKHAPATNAM
  DOCUMENT TITLE                                      ASSEMBLY AND WELDING AREA
  PROJECT NO.                       DOCUMENT NO.                   REVISION NO.             DATE       REMARKS
  ST - 1278                       SBV - DSN - *******                   0                 12/09/2019
 7.6. +1.3M LVL - PRECAST PILECAP DESIGN - TYPE - F
        Load on Pilecap                                            =           91.08 kN
        Load from Plank                                            =          118.80 kN
        Total Live Load                                     WLL    =          210.00 kN
     TOTAL LOADS ON PILE CAP
        1. Self weight of pile cap                                 =          165.33 kN
        2. Cast In situ slab on pilecap                            =          182.16 kN
        3. Self Weight of plank + cast in situ slab                =          326.70 kN
        4. Construction live load                                  =          210.00 kN
     Total load on pile cap                                  WU    =          885.00 kN
     Total factored load acting on the Pile cap                    =         1328.00 kN
     Intensity of pressure                                         =           72.90 kN/m2
7.6.4. REINFORCEMENT DETAILS
        Minimum percentage of steel required                       =               0.20 %
        Maximum % of reinforcement                                 =               1.89 %
                                            LENGTH DIRECTION             WIDTH DIRECTION
                                            L1               L2               B1              B2
        Cantilever Length                 3.39 m          3.34 m            0.80 m          0.45 m
        Bending Moment                 417.67 kNm       405.42 kNm     23.33 kNm          7.38 kNm
        Effective Depth                  310.0 mm       310.0 mm        294.0 mm            294 mm
                              Mu / bd2     4.35             4.22             0.27            0.09
        % Steel Required                  1.13 %          1.09 %         0.06 %             0.02 %
        Assumed main bar                            20 mm                           12 mm
                                       REQUIRED         PROVIDED       REQUIRED PROVIDED
        Percentage of steel               1.13 %         1.35 %          0.20 %             0.26 %
        Area of steel     Ast. (mm )
                                   2
                                         3492.25        4188.79             588.00          753.98
        Spacing of barSp.(mm c/c)         89.96           75.00             192.34          150.00
                  Provide #20 @75mm c/c Both Direction at TOP & BOTTOM.
7.6.5. DESIGN OF LIFTING HOOK
     Steel hook is designed to take 1/4 of the total weight of precast section.
     And the precast section is to be lifted by 4 hooks
        Lifting weight of precast section                          =          166.00 kN
        Impact during handling                                     =               1.25                ASSUMED
NAVAYUGA ENGINEERING COMPANY LIMITED
                         DESIGN AND CONSTRUCTION OF SHIPYARD FACILITIES AND ALLIED WORKS
  PROJECT TITILE
                                           AT SBC(V), VISAKHAPATNAM
  DOCUMENT TITLE                                 ASSEMBLY AND WELDING AREA
  PROJECT NO.                      DOCUMENT NO.           REVISION NO.         DATE    REMARKS
  ST - 1278                     SBV - DSN - *******            0          12/09/2019
 7.6. +1.3M LVL - PRECAST PILECAP DESIGN - TYPE - F
        Total force in each hook                          =         51.88 kN
        Permissible stress in the steel                   =        275.00 N/mm2        IS 456:2000
NAVAYUGA ENGINEERING COMPANY LIMITED
                           DESIGN AND CONSTRUCTION OF SHIPYARD FACILITIES AND ALLIED WORKS
  PROJECT TITILE
                                             AT SBC(V), VISAKHAPATNAM
  DOCUMENT TITLE                                   ASSEMBLY AND WELDING AREA
  PROJECT NO.                    DOCUMENT NO.                    REVISION NO.             DATE        REMARKS
  ST - 1278                      SBV - DSN - *******                    0              12/09/2019
 7.6. +1.3M LVL - PRECAST PILECAP DESIGN - TYPE - F
        Area of hook required                                    =           188.64 mm2
        Diameter of hook required                                =                16 mm
        Assume diameter for hook                                 =                16 mm
        Area of steel for Hook                                   =           200.96 mm2
                                     Provided 4no's #16 mm dia
     DEVELOPMENT LENGTH FOR LIFTING HOOK
        Bond strength                                     Ꞇbd    =              1.90 N/mm2          IS 456:2000
        Stress in the bar                                        =           258.14 N/mm   2          Cl. 26.2.1.1
        Development length                                       =           543.44 mm
        Total length                                             =           400.00 mm
7.6.6. DESIGN OF CORBEL
        Load transfer through corbel is a temporary phase until in-situ concrete attains its full strength.
        For corbel design, reaction from deck slab and construction live load is considered.
        Length of corbel                                         =          1000.00 mm
        Depth of corbel                                          =           200.00 mm
        Width of corbel                                          =              0.00 mm
        Distance of the concentrated load from the face of t     =              0.00 mm
        Effective length of corbel                               =              1.00 m
        Overall depth                                       d    =           200.00 mm
                                                            s    =           150.00 mm
        Clear cover                                         c    =            25.00 mm
        Dia of main reinforcement                          ø1    =            20.00 mm
        Dia of Secondary reinforcement                     ø2    =            20.00 mm
        Effective depth                                     d'   =           145.00 mm
        Poisson's ratio                                     µ    =              1.40
                                                          S/d'   =              1.03
                                            S/d' > 0.5 HENCE DESIGN AS CORBEL
     LOADS ON CORBEL
        Slab Load                                                =            79.20 kN
        Plank Load                                               =            29.70 kN
        Construction Load                                        =              1.67 kN
        Total Load                                               =           110.57 kN
        Factored Load                                            =           166.00 kN
        Bending Moment                                           =              0.00 kNm
NAVAYUGA ENGINEERING COMPANY LIMITED
                       DESIGN AND CONSTRUCTION OF SHIPYARD FACILITIES AND ALLIED WORKS
  PROJECT TITILE
                                         AT SBC(V), VISAKHAPATNAM
  DOCUMENT TITLE                               ASSEMBLY AND WELDING AREA
  PROJECT NO.                  DOCUMENT NO.                 REVISION NO.     DATE       REMARKS
  ST - 1278                   SBV - DSN - *******                0         12/09/2019
 7.6. +1.3M LVL - PRECAST PILECAP DESIGN - TYPE - F
        Nominal shear strength of concrete          Vu/bd   =         1.14 N/mm2
                                                            =         7.50 N/mm2
NAVAYUGA ENGINEERING COMPANY LIMITED
                          DESIGN AND CONSTRUCTION OF SHIPYARD FACILITIES AND ALLIED WORKS
  PROJECT TITILE
                                            AT SBC(V), VISAKHAPATNAM
  DOCUMENT TITLE                                    ASSEMBLY AND WELDING AREA
  PROJECT NO.                    DOCUMENT NO.                       REVISION NO.            DATE       REMARKS
  ST - 1278                      SBV - DSN - *******                      0               12/09/2019
 7.6. +1.3M LVL - PRECAST PILECAP DESIGN - TYPE - F
                                                      Vu/bd < 0.15 fck is SAFE.
        Grade Of Concrete                                           =         M50
        Grade of Steel                                        Fy    =         Fe500
        Clear Cover                                                 =            25.00 mm
        Factored Vertical load                                Vu    =           166.00 kN
        Shear Friction Reinforcement, Avf = Vu / (0.85 x Fy x μ ) =             278.99 mm2
                                                 Hu = 0.2 x Vu      =            33.20 kN
        Direct Tension Reinforcement, At = Hu / (0.85 x Fy)         =            78.12 mm2
        Flexural Tensile Reinforcement, Af = [(Vu x cd) + Hu(h-d')] / (0.85 x Fy x d)
                                                              Af    =             0.02 mm2
        Total tensile reinforcement is taken as the largest of the following
                                                         Af + At    =            78.14 mm2
                                                  0.67 Avt + At     =           265.04 mm2
                                      (0.04 x fck / Fy ) x b x d'   =             0.00 mm2
                                                              As    =           265.04 mm2
        Diameter of bar                                             =                 20 mm
        No of bars Provided                                  no.    =                 2
        Area of reinforcement provided                       Ast    =           628.32 mm2
        Horizontal Reinforcement
        Diameter for horizontal reinforcement                       =                 20 mm
        No of legs                                                  =                 2
        Area of reinforcement stirrups
                                                   Ah = 0.5 Af      =             0.01 mm2
                                                    Ah = Avf/3      =            93.00 mm2
                                                             Ah     =            93.00 mm2
                                  Assume 2 legged, #20 mm dia.
NAVAYUGA ENGINEERING COMPANY LIMITED
                          DESIGN AND CONSTRUCTION OF SHIPYARD FACILITIES AND ALLIED WORKS
  PROJECT TITILE
                                            AT SBC(V), VISAKHAPATNAM
  DOCUMENT TITLE                                   ASSEMBLY AND WELDING AREA
  PROJECT NO.                    DOCUMENT NO.                     REVISION NO.           DATE       REMARKS
  ST - 1278                     SBV - DSN - *******                       0            12/09/2019
 7.7. +1.3M LVL - PRECAST PILECAP DESIGN - TYPE - G
7.7.1. UNIT WEIGHTS
        Plain Cement Concrete (PCC)                               =              24.00 kN/m3
        Reinforced Cement Concrete (RCC)                          =              25.00 kN/m3
        Grade of Concrete                                   fck   =           M50
        Grade of Steel                                       fy   =           Fe500
        Modulus of elasticity of concrete                  EC     =        35,356.00 N/mm2
        Modulus of elasticity of steel                     ES     =       200,000.00 N/mm2
7.7.2. PRECAST PILECAP SECTION
     NOTE : -The purpose of the precast pilecap is to support the precast planks(PL) and
        create a platform for cast in situ slab concreting 400mm. These pile caps
        sacrificial in nature and no serviceability check are required.
                         FIG:- 1 - PRE CAST PILE CAP CROSS SECTION DETAILS
     PRECAST PILE CAP DIMENSIONAL DATA :
        Pile diameter                                       Ø     =            1200.00 mm
     LENGTH OF PILE CAP
        Distance from center of Pile to end of p            L1    =            4545.00 mm
        Distance from center of Pile to end of p            L2    =             805.00 mm
        Corbel width                                        L3    =               0.00 mm
        Corbel width                                        L4    =               0.00 mm
NAVAYUGA ENGINEERING COMPANY LIMITED
                        DESIGN AND CONSTRUCTION OF SHIPYARD FACILITIES AND ALLIED WORKS
  PROJECT TITILE
                                          AT SBC(V), VISAKHAPATNAM
  DOCUMENT TITLE                                 ASSEMBLY AND WELDING AREA
  PROJECT NO.                     DOCUMENT NO.             REVISION NO.      DATE       REMARKS
  ST - 1278                   SBV - DSN - *******               0          12/09/2019
 7.7. +1.3M LVL - PRECAST PILECAP DESIGN - TYPE - G
        Top length of Pile Cap (Excluding Corb        L5   =        5350.00 mm
        Total length of pilecap                        L   =        5350.00 mm
NAVAYUGA ENGINEERING COMPANY LIMITED
                           DESIGN AND CONSTRUCTION OF SHIPYARD FACILITIES AND ALLIED WORKS
  PROJECT TITILE
                                             AT SBC(V), VISAKHAPATNAM
  DOCUMENT TITLE                                    ASSEMBLY AND WELDING AREA
  PROJECT NO.                        DOCUMENT NO.                REVISION NO.           DATE       REMARKS
  ST - 1278                        SBV - DSN - *******                 0            12/09/2019
 7.7. +1.3M LVL - PRECAST PILECAP DESIGN - TYPE - G
     WIDTH OF PILE CAP
        Distance from center of Pile to end of p           B1    =         1020.00 mm
        Distance from center of Pile to end of p           B2    =         1020.00 mm
        Corbel width                                       B3    =          150.00 mm
        Corbel width                                       B4    =            0.00 mm
        Top Pilecap width (Excluding Corbel)               B5    =         1890.00 mm
        Total width of pilecap                              B    =         2040.00 mm
     DEPTH OF PILE CAP
        Depth of corbel                                    T1    =          150.00 mm
        Depth of corbel                                    T2    =          225.00 mm
        Total depth of pile cap                             T    =          375.00 mm
        Clear cover to the outer reinforcement              C    =           30.00 mm
        Area of Pile Cap                                    A    =            2.01 m2
7.7.3. DESIGN LOADS CALCULATION
     DAEAD LOADS (DL)
     1. Self weight of Pile Cap                                  =           99.31 kN
     2. Load from Cast in situ slab on Pile Cap
        Thickness of slab                                   D    =          800.00 mm
        Weight of cast in situ slab                              =          202.23 kN
     3. Load from Plank [self weight of plank + Cast in situ slab]
     Precast planks are placed over the length of at corbel location. The load will considered length of pilecap.
        Length of plank is acting on pile cap                l   =         5350.00 mm
              Width of plank                                w    =         1100.00 mm
              Thickness of precast plank                     t   =          150.00 mm
              Self Weight of Plank                        WPL    =           22.07 kN
        Cast in situ slab weight
              Cast in situ slab load on the plank                =          117.70 kN
        Total load from Plank to corbel                          =          139.77 kN
     Total Dead Load (DL)                                WDL     =          442.00 kN
     CONSTRUCTIONAL LIVE LOAD ON PILE CAP (LL)
     4. Assumed Construction live load                     LL    =            5.00 kN/m2
        Live load acting over a Length of pilec           LPC    =         5350.00 mm
        Live load acting over a width of pilecap          BPC    =         1890.00 mm
NAVAYUGA ENGINEERING COMPANY LIMITED
                        DESIGN AND CONSTRUCTION OF SHIPYARD FACILITIES AND ALLIED WORKS
  PROJECT TITILE
                                          AT SBC(V), VISAKHAPATNAM
  DOCUMENT TITLE                                  ASSEMBLY AND WELDING AREA
  PROJECT NO.                   DOCUMENT NO.                 REVISION NO.      DATE       REMARKS
  ST - 1278                    SBV - DSN - *******                0          12/09/2019
 7.7. +1.3M LVL - PRECAST PILECAP DESIGN - TYPE - G
        Live load acting over a Length of Plank        LPL   =        5350.00 mm
        Live load acting over a width of Plank        WPL    =        1100.00 mm
NAVAYUGA ENGINEERING COMPANY LIMITED
                          DESIGN AND CONSTRUCTION OF SHIPYARD FACILITIES AND ALLIED WORKS
  PROJECT TITILE
                                            AT SBC(V), VISAKHAPATNAM
  DOCUMENT TITLE                                      ASSEMBLY AND WELDING AREA
  PROJECT NO.                       DOCUMENT NO.                   REVISION NO.             DATE       REMARKS
  ST - 1278                       SBV - DSN - *******                   0                 12/09/2019
 7.7. +1.3M LVL - PRECAST PILECAP DESIGN - TYPE - G
        Load on Pilecap                                            =           50.56 kN
        Load from Plank                                            =           29.43 kN
        Total Live Load                                     WLL    =           80.00 kN
     TOTAL LOADS ON PILE CAP
        1. Self weight of pile cap                                 =           99.31 kN
        2. Cast In situ slab on pilecap                            =          202.23 kN
        3. Self Weight of plank + cast in situ slab                =          139.77 kN
        4. Construction live load                                  =           80.00 kN
     Total load on pile cap                                  WU    =          522.00 kN
     Total factored load acting on the Pile cap                    =          783.00 kN
     Intensity of pressure                                         =           77.44 kN/m2
7.7.4. REINFORCEMENT DETAILS
        Minimum percentage of steel required                       =               0.20 %
        Maximum % of reinforcement                                 =               1.89 %
                                            LENGTH DIRECTION             WIDTH DIRECTION
                                            L1               L2               B1              B2
        Cantilever Length                 3.95 m          0.21 m            0.42 m          0.42 m
        Bending Moment                 602.57 kNm       1.63 kNm        6.83 kNm          6.83 kNm
        Effective Depth                  332.5 mm       332.5 mm        314.0 mm            314 mm
                              Mu / bd2     5.45             0.01             0.07            0.07
        % Steel Required                  1.47 %          0.00 %         0.02 %             0.02 %
        Assumed main bar                            25 mm                           12 mm
                                       REQUIRED         PROVIDED       REQUIRED PROVIDED
        Percentage of steel               1.47 %        1.64 %           0.20 %             0.24 %
        Area of steel     Ast. (mm )
                                   2
                                         4886.23        5454.15             628.00          753.98
        Spacing of barSp.(mm c/c)         100.46          90.00             180.09          150.00
                  Provide #25 @90mm c/c Both Direction at TOP & BOTTOM.
7.7.5. DESIGN OF LIFTING HOOK
     Steel hook is designed to take 1/4 of the total weight of precast section.
     And the precast section is to be lifted by 4 hooks
        Lifting weight of precast section                          =          100.00 kN
        Impact during handling                                     =               1.25                ASSUMED
NAVAYUGA ENGINEERING COMPANY LIMITED
                         DESIGN AND CONSTRUCTION OF SHIPYARD FACILITIES AND ALLIED WORKS
  PROJECT TITILE
                                           AT SBC(V), VISAKHAPATNAM
  DOCUMENT TITLE                                 ASSEMBLY AND WELDING AREA
  PROJECT NO.                      DOCUMENT NO.           REVISION NO.         DATE    REMARKS
  ST - 1278                     SBV - DSN - *******            0          12/09/2019
 7.7. +1.3M LVL - PRECAST PILECAP DESIGN - TYPE - G
        Total force in each hook                          =         31.25 kN
        Permissible stress in the steel                   =        275.00 N/mm2        IS 456:2000
NAVAYUGA ENGINEERING COMPANY LIMITED
                           DESIGN AND CONSTRUCTION OF SHIPYARD FACILITIES AND ALLIED WORKS
  PROJECT TITILE
                                             AT SBC(V), VISAKHAPATNAM
  DOCUMENT TITLE                                   ASSEMBLY AND WELDING AREA
  PROJECT NO.                    DOCUMENT NO.                    REVISION NO.             DATE        REMARKS
  ST - 1278                      SBV - DSN - *******                    0              12/09/2019
 7.7. +1.3M LVL - PRECAST PILECAP DESIGN - TYPE - G
        Area of hook required                                    =           113.64 mm2
        Diameter of hook required                                =                14 mm
        Assume diameter for hook                                 =                16 mm
        Area of steel for Hook                                   =           200.96 mm2
                                     Provided 4no's #16 mm dia
     DEVELOPMENT LENGTH FOR LIFTING HOOK
        Bond strength                                     Ꞇbd    =              1.90 N/mm2          IS 456:2000
        Stress in the bar                                        =           155.50 N/mm   2          Cl. 26.2.1.1
        Development length                                       =           327.38 mm
        Total length                                             =           400.00 mm
7.7.6. DESIGN OF CORBEL
        Load transfer through corbel is a temporary phase until in-situ concrete attains its full strength.
        For corbel design, reaction from deck slab and construction live load is considered.
        Length of corbel                                         =          1000.00 mm
        Depth of corbel                                          =           225.00 mm
        Width of corbel                                          =              0.00 mm
        Distance of the concentrated load from the face of t     =              0.00 mm
        Effective length of corbel                               =              1.00 m
        Overall depth                                       d    =           225.00 mm
                                                            s    =           150.00 mm
        Clear cover                                         c    =            25.00 mm
        Dia of main reinforcement                          ø1    =            25.00 mm
        Dia of Secondary reinforcement                     ø2    =            25.00 mm
        Effective depth                                     d'   =           162.50 mm
        Poisson's ratio                                     µ    =              1.40
                                                          S/d'   =              0.92
                                            S/d' > 0.5 HENCE DESIGN AS CORBEL
     LOADS ON CORBEL
        Slab Load                                                =           107.00 kN
        Plank Load                                               =            20.06 kN
        Construction Load                                        =              4.55 kN
        Total Load                                               =           131.61 kN
        Factored Load                                            =           198.00 kN
        Bending Moment                                           =              0.00 kNm
NAVAYUGA ENGINEERING COMPANY LIMITED
                       DESIGN AND CONSTRUCTION OF SHIPYARD FACILITIES AND ALLIED WORKS
  PROJECT TITILE
                                         AT SBC(V), VISAKHAPATNAM
  DOCUMENT TITLE                               ASSEMBLY AND WELDING AREA
  PROJECT NO.                  DOCUMENT NO.                 REVISION NO.     DATE       REMARKS
  ST - 1278                   SBV - DSN - *******                0         12/09/2019
 7.7. +1.3M LVL - PRECAST PILECAP DESIGN - TYPE - G
        Nominal shear strength of concrete          Vu/bd   =         1.22 N/mm2
                                                            =         7.50 N/mm2
NAVAYUGA ENGINEERING COMPANY LIMITED
                          DESIGN AND CONSTRUCTION OF SHIPYARD FACILITIES AND ALLIED WORKS
  PROJECT TITILE
                                            AT SBC(V), VISAKHAPATNAM
  DOCUMENT TITLE                                    ASSEMBLY AND WELDING AREA
  PROJECT NO.                    DOCUMENT NO.                       REVISION NO.            DATE       REMARKS
  ST - 1278                      SBV - DSN - *******                      0               12/09/2019
 7.7. +1.3M LVL - PRECAST PILECAP DESIGN - TYPE - G
                                                      Vu/bd < 0.15 fck is SAFE.
        Grade Of Concrete                                           =         M50
        Grade of Steel                                        Fy    =         Fe500
        Clear Cover                                                 =            25.00 mm
        Factored Vertical load                                Vu    =           198.00 kN
        Shear Friction Reinforcement, Avf = Vu / (0.85 x Fy x μ ) =             332.77 mm2
                                                 Hu = 0.2 x Vu      =            39.60 kN
        Direct Tension Reinforcement, At = Hu / (0.85 x Fy)         =            93.18 mm2
        Flexural Tensile Reinforcement, Af = [(Vu x cd) + Hu(h-d')] / (0.85 x Fy x d)
                                                              Af    =             0.03 mm2
        Total tensile reinforcement is taken as the largest of the following
                                                         Af + At    =            93.21 mm2
                                                  0.67 Avt + At     =           316.13 mm2
                                      (0.04 x fck / Fy ) x b x d'   =             0.00 mm2
                                                              As    =           316.13 mm2
        Diameter of bar                                             =                 25 mm
        No of bars Provided                                  no.    =                 2
        Area of reinforcement provided                       Ast    =           981.75 mm2
        Horizontal Reinforcement
        Diameter for horizontal reinforcement                       =                 25 mm
        No of legs                                                  =                 2
        Area of reinforcement stirrups
                                                   Ah = 0.5 Af      =             0.02 mm2
                                                    Ah = Avf/3      =           110.92 mm2
                                                             Ah     =           110.92 mm2
                                  Assume 2 legged, #25 mm dia.
NAVAYUGA ENGINEERING COMPANY LIMITED
                         DESIGN AND CONSTRUCTION OF SHIPYARD FACILITIES AND ALLIED WORKS AT
  PROJECT TITILE
                                              SBC(V), VISAKHAPATNAM
  DOCUMENT TITLE                                    ASSEMBLY AND WELDING AREA
  PROJECT NO.                     DOCUMENT NO.                    REVISION NO.             DATE     REMARKS
  ST - 1278                      SBV - DSN - *******                     0             12/09/2019
 8.1. DESIGN FOR PRECAST PLANKS +1.3M LVL - TYPE - A
8.1.1. UNIT WEIGHT
        Plain Cement Concrete (PCC)                               =             24.00 kN/m3
        Reinforced Cement Concrete (RCC)                          =             25.00 kN/m3
        Grade of Concrete                                         =              M50
        Grade of Steel                                            =            Fe500
        Modulus of elasticity of concrete                   Ec    =          35356.00 N/mm2
        Modulus of elasticity of steel                      Es    =       200000.00 N/mm2
8.1.2. PRECAST PLANK DIMENSION
     NOTE:- These precast planks are formwork for placing cast in situ concrete above they
              do not participate or have any composite action. as these are sacrificial planks.
              No serviceability checks are needed. Based on its length, planks are designed
        Length of span                                            =           2600.00 mm
        Width of span                                             =           1200.00 mm
        Thickness / Depth of plank                          T     =            150.00 mm
        Area                                                A     =      3120000.00 mm2
        Clear cover to the outer reinforcement              C     =             30.00 mm
        Main reinforcement                                 dia    =               12 mm
        Distribution reinforcement                                =               10 mm
8.1.3. DESIGN LOAD CALCULATION
     DEAD LOADS (DL)
     1. Self weight of plank                                      =              3.75 kN/m2
     2. Load on Plank
        Cast in situ slab will be consider on the plank.
        Cast in situ slab thickness                          t    =            400.00 mm
        Weight of cast in situ slab                               =             10.00 kN/m2
     LIVE LOAD (LL)
     3. Construction live load                                    =              5.00 kN/m2         Assumed
     Total Factor load on the precast plank                Wu     =             29.00 kN/m2
     Bending Moment Calculations
        Design span of the plank                                  =           2600.00 mm
        Maximum Bending moment                             Mu     =             25.00 kNm
        Shear Force                                         P     =             37.70 kN
NAVAYUGA ENGINEERING COMPANY LIMITED
                         DESIGN AND CONSTRUCTION OF SHIPYARD FACILITIES AND ALLIED WORKS AT
  PROJECT TITILE
                                              SBC(V), VISAKHAPATNAM
  DOCUMENT TITLE                                     ASSEMBLY AND WELDING AREA
  PROJECT NO.                     DOCUMENT NO.                      REVISION NO.         DATE      REMARKS
  ST - 1278                       SBV - DSN - *******                    0            12/09/2019
 8.1. DESIGN FOR PRECAST PLANKS +1.3M LVL - TYPE - A
8.1.4. REINFORCEMENT DETAILS
        Assumed Main bar                                    dia     =              12 mm
        Effective depth of the section                         d    =        114.00 mm
        Minimum area of steel                            Ast.Min.   =        180.00 mm2
                                                     Mu/bd2         =          1.93
                                                        Required               Provided
        Percentage of steel                               0.47 %               0.50 %
        Area of steel                         Ast       530.76 mm2           565.49 mm2
        Spacing of bar                        Sp        213.09 mm c/c        200.00 mm c/c
                                     Provide 12mm dia @200mm c/c
        Assumed Secondary reinforcement                    dia      =              10 mm
                                                        Required               Provided
        Percentage of steel                               0.12 %               0.28 %
        Area of steel                         Ast       136.80 mm2           314.16 mm2
        Spacing of bar                        Sp        574.12 mm c/c        250.00 mm c/c
                                     Provide 10mm dia @250mm c/c
8.1.5. CHECKS
     SHEAR DESIGN CHECK
        Effective Depth                                        d    =         114.0 mm
        Ultimate Maximum Shear at a distance                  Vu    =         38.00 kN
        Normal Shear stress                                   Ꞇv    =          0.33 N/mm2          IS 456:2000
        Factor                                                 k    =          1.30                Cl.40.2.1.1
        Shear stress in Concrete                              Ꞇc    =         0.590 N/mm2           Table-19
        k*Ꞇc                                                Ꞇc '    =          0.77 N/mm2
                                                         Ꞇc max.    =          5.00 N/mm2           Table-20
                           Ꞇv < Ꞇc' < Ꞇc.max, Hence SHEAR IS SAFE.
8.1.6. DESIGN OF LIFTING HOOK
        Steel hook is designed to take 1/4 of the total weight of precast section
        Precast section is to be lifted by 4 hooks
        Lifting weight of precast section                           =         11.70 kN
        Impact during handling                                      =          1.25
        Total force in the hook                                     =          3.66 kN
        Permissible stress in the steel                             =        275.00 N/mm2
NAVAYUGA ENGINEERING COMPANY LIMITED
                      DESIGN AND CONSTRUCTION OF SHIPYARD FACILITIES AND ALLIED WORKS AT
  PROJECT TITILE
                                           SBC(V), VISAKHAPATNAM
  DOCUMENT TITLE                                 ASSEMBLY AND WELDING AREA
  PROJECT NO.                   DOCUMENT NO.                  REVISION NO.        DATE       REMARKS
  ST - 1278                     SBV - DSN - *******                0            12/09/2019
 8.1. DESIGN FOR PRECAST PLANKS +1.3M LVL - TYPE - A
        Area of hook required                         Ast.h   =         13.30 mm2
        Diameter of hook required                        ø    =          5.00
NAVAYUGA ENGINEERING COMPANY LIMITED
                        DESIGN AND CONSTRUCTION OF SHIPYARD FACILITIES AND ALLIED WORKS AT
  PROJECT TITILE
                                             SBC(V), VISAKHAPATNAM
  DOCUMENT TITLE                                 ASSEMBLY AND WELDING AREA
  PROJECT NO.                   DOCUMENT NO.                  REVISION NO.         DATE      REMARKS
  ST - 1278                     SBV - DSN - *******                0            12/09/2019
 8.1. DESIGN FOR PRECAST PLANKS +1.3M LVL - TYPE - A
        Assume dia of hook                               d    =         16.00 mm
        Area of hook provided                         Ast.h   =        200.96 mm2
                                   Provide 16mm dia for Hooks.
     Development length for lifting Hook                                                     IS 456:2000
        Bond strength                                  Ʈbd    =              1.9 N/mm2       Cl. 26.2.1.1
        Stress in the bar                                     =         18.19 N/mm2
        Development length                                    =         38.30 mm
        Total length                                          =          400 mm
NAVAYUGA ENGINEERING COMPANY LIMITED
                         DESIGN AND CONSTRUCTION OF SHIPYARD FACILITIES AND ALLIED WORKS AT
  PROJECT TITILE
                                              SBC(V), VISAKHAPATNAM
  DOCUMENT TITLE                                    ASSEMBLY AND WELDING AREA
  PROJECT NO.                     DOCUMENT NO.                    REVISION NO.             DATE     REMARKS
  ST - 1278                      SBV - DSN - *******                     0             12/09/2019
 8.2. DESIGN FOR PRECAST PLANKS +1.3M LVL - TYPE - B
8.2.1. UNIT WEIGHT
        Plain Cement Concrete (PCC)                               =             24.00 kN/m3
        Reinforced Cement Concrete (RCC)                          =             25.00 kN/m3
        Grade of Concrete                                         =              M50
        Grade of Steel                                            =            Fe500
        Modulus of elasticity of concrete                   Ec    =          35356.00 N/mm2
        Modulus of elasticity of steel                      Es    =       200000.00 N/mm2
8.2.2. PRECAST PLANK DIMENSION
     NOTE:- These precast planks are formwork for placing cast in situ concrete above they
              do not participate or have any composite action. as these are sacrificial planks.
              No serviceability checks are needed. Based on its length, planks are designed
        Length of span                                            =           3000.00 mm
        Width of span                                             =           1200.00 mm
        Thickness / Depth of plank                          T     =            150.00 mm
        Area                                                A     =      3600000.00 mm2
        Clear cover to the outer reinforcement              C     =             30.00 mm
        Main reinforcement                                 dia    =               12 mm
        Distribution reinforcement                                =               10 mm
8.2.3. DESIGN LOAD CALCULATION
     DEAD LOADS (DL)
     1. Self weight of plank                                      =              3.75 kN/m2
     2. Load on Plank
        Cast in situ slab will be consider on the plank.
        Cast in situ slab thickness                          t    =            400.00 mm
        Weight of cast in situ slab                               =             10.00 kN/m2
     LIVE LOAD (LL)
     3. Construction live load                                    =              5.00 kN/m2         Assumed
     Total Factor load on the precast plank                Wu     =             28.13 kN/m2
     Bending Moment Calculations
        Design span of the plank                                  =           3000.00 mm
        Maximum Bending moment                             Mu     =             32.00 kNm
        Shear Force                                         P     =             42.19 kN
NAVAYUGA ENGINEERING COMPANY LIMITED
                         DESIGN AND CONSTRUCTION OF SHIPYARD FACILITIES AND ALLIED WORKS AT
  PROJECT TITILE
                                              SBC(V), VISAKHAPATNAM
  DOCUMENT TITLE                                     ASSEMBLY AND WELDING AREA
  PROJECT NO.                     DOCUMENT NO.                      REVISION NO.          DATE      REMARKS
  ST - 1278                       SBV - DSN - *******                    0             12/09/2019
 8.2. DESIGN FOR PRECAST PLANKS +1.3M LVL - TYPE - B
8.2.4. REINFORCEMENT DETAILS
        Assumed Main bar                                    dia     =              12 mm
        Effective depth of the section                         d    =         114.00 mm
        Minimum area of steel                            Ast.Min.   =         180.00 mm2
                                                     Mu/bd2         =           2.47
                                                        Required                Provided
        Percentage of steel                               0.60 %                1.25 %
        Area of steel                         Ast       689.31 mm2           1413.72 mm2
        Spacing of bar                        Sp        164.07 mm c/c          80.00 mm c/c
                                     Provide 12mm dia @80mm c/c
        Assumed Secondary reinforcement                    dia      =              10 mm
                                                        Required                Provided
        Percentage of steel                               0.12 %                0.28 %
        Area of steel                         Ast       136.80 mm2            314.16 mm2
        Spacing of bar                        Sp        574.12 mm c/c         250.00 mm c/c
                                     Provide 10mm dia @250mm c/c
8.2.5. CHECKS
     SHEAR DESIGN CHECK
        Effective Depth                                        d    =          114.0 mm
        Ultimate Maximum Shear at a distance                  Vu    =          43.00 kN
        Normal Shear stress                                   Ꞇv    =           0.38 N/mm2          IS 456:2000
        Factor                                                 k    =           1.30                Cl.40.2.1.1
        Shear stress in Concrete                              Ꞇc    =          0.780 N/mm2           Table-19
        k*Ꞇc                                                Ꞇc '    =           1.01 N/mm2
                                                         Ꞇc max.    =           5.00 N/mm2           Table-20
                           Ꞇv < Ꞇc' < Ꞇc.max, Hence SHEAR IS SAFE.
8.2.6. DESIGN OF LIFTING HOOK
        Steel hook is designed to take 1/4 of the total weight of precast section
        Precast section is to be lifted by 4 hooks
        Lifting weight of precast section                           =          13.50 kN
        Impact during handling                                      =           1.25
        Total force in the hook                                     =           4.22 kN
        Permissible stress in the steel                             =         275.00 N/mm2
NAVAYUGA ENGINEERING COMPANY LIMITED
                      DESIGN AND CONSTRUCTION OF SHIPYARD FACILITIES AND ALLIED WORKS AT
  PROJECT TITILE
                                           SBC(V), VISAKHAPATNAM
  DOCUMENT TITLE                                 ASSEMBLY AND WELDING AREA
  PROJECT NO.                   DOCUMENT NO.                  REVISION NO.        DATE       REMARKS
  ST - 1278                     SBV - DSN - *******                0            12/09/2019
 8.2. DESIGN FOR PRECAST PLANKS +1.3M LVL - TYPE - B
        Area of hook required                         Ast.h   =         15.34 mm2
        Diameter of hook required                        ø    =          5.00
NAVAYUGA ENGINEERING COMPANY LIMITED
                        DESIGN AND CONSTRUCTION OF SHIPYARD FACILITIES AND ALLIED WORKS AT
  PROJECT TITILE
                                             SBC(V), VISAKHAPATNAM
  DOCUMENT TITLE                                 ASSEMBLY AND WELDING AREA
  PROJECT NO.                   DOCUMENT NO.                  REVISION NO.         DATE      REMARKS
  ST - 1278                     SBV - DSN - *******                0            12/09/2019
 8.2. DESIGN FOR PRECAST PLANKS +1.3M LVL - TYPE - B
        Assume dia of hook                               d    =         16.00 mm
        Area of hook provided                         Ast.h   =        200.96 mm2
                                   Provide 16mm dia for Hooks.
     Development length for lifting Hook                                                     IS 456:2000
        Bond strength                                  Ʈbd    =              1.9 N/mm2       Cl. 26.2.1.1
        Stress in the bar                                     =         20.99 N/mm2
        Development length                                    =         44.20 mm
        Total length                                          =          400 mm
NAVAYUGA ENGINEERING COMPANY LIMITED
                         DESIGN AND CONSTRUCTION OF SHIPYARD FACILITIES AND ALLIED WORKS AT
  PROJECT TITILE
                                              SBC(V), VISAKHAPATNAM
  DOCUMENT TITLE                                    ASSEMBLY AND WELDING AREA
  PROJECT NO.                     DOCUMENT NO.                    REVISION NO.             DATE     REMARKS
  ST - 1278                      SBV - DSN - *******                     0             12/09/2019
 8.3. DESIGN FOR PRECAST PLANKS +1.3M LVL - TYPE - C
8.3.1. UNIT WEIGHT
        Plain Cement Concrete (PCC)                               =             24.00 kN/m3
        Reinforced Cement Concrete (RCC)                          =             25.00 kN/m3
        Grade of Concrete                                         =              M50
        Grade of Steel                                            =            Fe500
        Modulus of elasticity of concrete                   Ec    =          35356.00 N/mm2
        Modulus of elasticity of steel                      Es    =       200000.00 N/mm2
8.3.2. PRECAST PLANK DIMENSION
     NOTE:- These precast planks are formwork for placing cast in situ concrete above they
              do not participate or have any composite action. as these are sacrificial planks.
              No serviceability checks are needed. Based on its length, planks are designed
        Length of span                                            =           3300.00 mm
        Width of span                                             =           1420.00 mm
        Thickness / Depth of plank                          T     =            150.00 mm
        Area                                                A     =      4686000.00 mm2
        Clear cover to the outer reinforcement              C     =             30.00 mm
        Main reinforcement                                 dia    =               16 mm
        Distribution reinforcement                                =               10 mm
8.3.3. DESIGN LOAD CALCULATION
     DEAD LOADS (DL)
     1. Self weight of plank                                      =              3.75 kN/m2
     2. Load on Plank
        Cast in situ slab will be consider on the plank.
        Cast in situ slab thickness                          t    =            400.00 mm
        Weight of cast in situ slab                               =             10.00 kN/m2
     LIVE LOAD (LL)
     3. Construction live load                                    =              5.00 kN/m2         Assumed
     Total Factor load on the precast plank                Wu     =             29.00 kN/m2
     Bending Moment Calculations
        Design span of the plank                                  =           3300.00 mm
        Maximum Bending moment                             Mu     =             40.00 kNm
        Shear Force                                         P     =             47.85 kN
NAVAYUGA ENGINEERING COMPANY LIMITED
                         DESIGN AND CONSTRUCTION OF SHIPYARD FACILITIES AND ALLIED WORKS AT
  PROJECT TITILE
                                              SBC(V), VISAKHAPATNAM
  DOCUMENT TITLE                                     ASSEMBLY AND WELDING AREA
  PROJECT NO.                     DOCUMENT NO.                      REVISION NO.          DATE      REMARKS
  ST - 1278                       SBV - DSN - *******                    0             12/09/2019
 8.3. DESIGN FOR PRECAST PLANKS +1.3M LVL - TYPE - C
8.3.4. REINFORCEMENT DETAILS
        Assumed Main bar                                    dia     =              16 mm
        Effective depth of the section                         d    =         112.00 mm
        Minimum area of steel                            Ast.Min.   =         180.00 mm2
                                                     Mu/bd2         =           3.19
                                                        Required                Provided
        Percentage of steel                               0.80 %                1.80 %
        Area of steel                         Ast       892.93 mm2           2010.62 mm2
        Spacing of bar                        Sp        225.17 mm c/c         100.00 mm c/c
                                     Provide 16mm dia @100mm c/c
        Assumed Secondary reinforcement                    dia      =              10 mm
                                                        Required                Provided
        Percentage of steel                               0.12 %                0.29 %
        Area of steel                         Ast       134.40 mm2            314.16 mm2
        Spacing of bar                        Sp        584.37 mm c/c         250.00 mm c/c
                                     Provide 10mm dia @250mm c/c
8.3.5. CHECKS
     SHEAR DESIGN CHECK
        Effective Depth                                        d    =          112.0 mm
        Ultimate Maximum Shear at a distance                  Vu    =          48.00 kN
        Normal Shear stress                                   Ꞇv    =           0.43 N/mm2          IS 456:2000
        Factor                                                 k    =           1.30                Cl.40.2.1.1
        Shear stress in Concrete                              Ꞇc    =          0.850 N/mm2           Table-19
        k*Ꞇc                                                Ꞇc '    =           1.11 N/mm2
                                                         Ꞇc max.    =           5.00 N/mm2           Table-20
                           Ꞇv < Ꞇc' < Ꞇc.max, Hence SHEAR IS SAFE.
8.3.6. DESIGN OF LIFTING HOOK
        Steel hook is designed to take 1/4 of the total weight of precast section
        Precast section is to be lifted by 4 hooks
        Lifting weight of precast section                           =          17.57 kN
        Impact during handling                                      =           1.25
        Total force in the hook                                     =           5.49 kN
        Permissible stress in the steel                             =         275.00 N/mm2
NAVAYUGA ENGINEERING COMPANY LIMITED
                      DESIGN AND CONSTRUCTION OF SHIPYARD FACILITIES AND ALLIED WORKS AT
  PROJECT TITILE
                                           SBC(V), VISAKHAPATNAM
  DOCUMENT TITLE                                 ASSEMBLY AND WELDING AREA
  PROJECT NO.                   DOCUMENT NO.                  REVISION NO.        DATE       REMARKS
  ST - 1278                     SBV - DSN - *******                0            12/09/2019
 8.3. DESIGN FOR PRECAST PLANKS +1.3M LVL - TYPE - C
        Area of hook required                         Ast.h   =         19.97 mm2
        Diameter of hook required                        ø    =          6.00
NAVAYUGA ENGINEERING COMPANY LIMITED
                        DESIGN AND CONSTRUCTION OF SHIPYARD FACILITIES AND ALLIED WORKS AT
  PROJECT TITILE
                                             SBC(V), VISAKHAPATNAM
  DOCUMENT TITLE                                 ASSEMBLY AND WELDING AREA
  PROJECT NO.                   DOCUMENT NO.                  REVISION NO.         DATE      REMARKS
  ST - 1278                     SBV - DSN - *******                0            12/09/2019
 8.3. DESIGN FOR PRECAST PLANKS +1.3M LVL - TYPE - C
        Assume dia of hook                               d    =         16.00 mm
        Area of hook provided                         Ast.h   =        200.96 mm2
                                   Provide 16mm dia for Hooks.
     Development length for lifting Hook                                                     IS 456:2000
        Bond strength                                  Ʈbd    =              1.9 N/mm2       Cl. 26.2.1.1
        Stress in the bar                                     =         27.33 N/mm2
        Development length                                    =         57.53 mm
        Total length                                          =          400 mm