PROJECT NAME: PROPOSED BMC OFFICE BUILDING –BBSR
Rev : R0
              ELECTRICAL DESIGN REPORT
Project Name: ICOMC & BMC Building Complex
        Architect: Architects Studio,
         Location: BHUBHANESWAR
                                                      Page 1
            PROJECT NAME: PROPOSED BMC OFFICE BUILDING –BBSR
                                                                 Rev : R0
                          ELECTRICAL DESIGN REPORT
                              INDEX - ELECTRICAL
Sl. No.                           CONTENTS                     PAGE NO.
1.0       INTRODUCTION                                          4-6
2.0       DESIGN STANDARD AND ASSUMPTION                        6-8
3.0       HT POWER DISTRIBUTION SYSTEM                         8 - 10
4.0       LT POWER DISTRIBUTION                                  11
5.0       DESIEL GENERATOR SYSTEM                              11 - 15
6.0       EARTHING                                             15 - 16
7.0       LIGHTING                                             16 - 20
8.0       LIGHTNING PROTECTION SYSTEM                             20
9.0       UPS                                                     21
10.0      COMMUNICATION SYSTEM                                 21 - 23
                                                                      Page 2
           PROJECT NAME: PROPOSED BMC OFFICE BUILDING –BBSR
                                                                           Rev : R0
                          ELECTRICAL DESIGN REPORT
                         ELECTRICAL SYSTEM
Scope is only to design warm shell facility, same has been considered. The
following information outlines the salient features of the electrical works.
    Main Grid Power Supply is envisaged at 11KV/33kV.
    11KV/33kV HT Power Distribution by Ring main loops.
    The transformer and DG sizing is made considering the office and utility
     loads.
    33kV/433V outdoor Distribution Transformer, outdoor, oil type, with ON-
     Load Tap Changer (OLTC) with range of +5 to -15% @ 2.5% steps & RTCC
     Panel.
    Stand-by DG Sets are of Indoor with Room acoustic enclosures, 415V, LT, DG
     Sets.
    Change over from EB to DG & Vice versa through Electrical & Mechanical
     wired interlock.
    Downstream Distributions to Main LT Switchboards / Sub-Distribution Boards
     at 415V, 3Phase, 4 Wire System.
    During normal conditions all Transformers shall be charged feeding loads
     independently.
    Internal Power distribution for floors through Raising Mains at 415V, 4 Wire
     System. Further distribution to individual units is not considered in scope of
     work which will be part of the tenant’s.
    Lighting design with Energy efficient management system.
    Power factor correction is considered only for base building equipments.
    Building Management System (BMS) to monitor only base building
     equipment.
                                                                              Page 3
             PROJECT NAME: PROPOSED BMC OFFICE BUILDING –BBSR
                                                                                        Rev : R0
                                  ELECTRICAL DESIGN REPORT
1. DESIGN STANDARDS AND ASSUMPTIONS
        2.1 Design Assumptions
       Light Pollution Density for all the areas including office are considered as
        per latest ECBC norms.
       LED Energy efficient lamps are considered
                                 For 11/33kV supply, OSIDC Electricity Board will provide
                                  Dedicated feeder upto 10MVA Load.
Power            supply
connection    from EB
                                 Since the overall demand is more than Less than 10 MVA
authority
                                  developer should take only one number of 11/33 kV
                                  connection from the EB authority.
HT Metering to the
                                  HT tariff meter : for Office load including the utility loads
developer
LT Metering    to   the
                          Sub LT metering to each tenant at the floor tap off level by RK
Tenant
Overall        Power
                     5 VA / sqft of Tenant Saleable Area + utility loads as per actual
Allotment   to   the
                     (0.87 kVA / 100Sqft)
complete development
Generator back-up         100% backup for complete office and utility loads
                                                                                           Page 4
               PROJECT NAME: PROPOSED BMC OFFICE BUILDING –BBSR
                                                                                    Rev : R0
                              ELECTRICAL DESIGN REPORT
Method of DG source
             change       Automatic
             over
                          Located at Ground floor (Outdoor) – 5 Nos of 2000KVA Oil type
Transformer location
                          Distribution transformer considered.
                          LT DG Sets located Outdoor with acoustic enclosure at Utility
DG yard / room
                          Building.
                          UPS for common area emergency lighting and Base building ELV
Base building UPS
                          equipment is provided.
Tenant UPS                Scope of Tenant works.
Dedicated      DGs for
                        Not envisaged,       power   shall   be   tapped   from   dedicated
                 Multi-
                        centralized DG’s
                 tenant
External lighting         Designed to suit landscape including Building Facade lighting.
                          Mandatory earthing shall be as per IS 3043.
Earthing                  Space provision for the end user’s earthing as per industrial
                          standard with sleeves & tray provision to reach electrical shaft.
Building        lightning
                  protec Grounding & Building Lightning protection system.
                  tion
           2.2 Design Standards
       The design shall be based on the following Standards and Guidelines
       a) Indian Standard Specifications
       b) Andrapradesh Electricity Board Supply Authority Rules and Regulations
       c) National Building Code of India
       d) Other Statutory Regulations.
       2.3 Electrical Design Scope Matrix
       Electrical scope matrix for RK Tower building is as mentioned below.
                HT Source of Supply:
                                                                                      Page 5
          PROJECT NAME: PROPOSED BMC OFFICE BUILDING –BBSR
                                                                             Rev : R0
                           ELECTRICAL DESIGN REPORT
                         From
                         OSIDC
                                              HT cable
                        RMU
                                         HT cable
                    METERING CUBICLE
                  PANEL
                                   HT cable
                           HT PANEL
                                                      HT cable
    33KV /433V 2000KVA OILT TYPE DISTRIBUTION TRANSFORMERS
Equipment Configuration:
  1. TRANSFORMERS oil type distribution Transformers are considered.
      Transformers of the proper ratings and design shall be selected to safety
      the minimum efficiency at 50% and full rating as mentioned in the below
      table. In addition the Transformer shall be selected such that it minimizes
      the total cost of its initial cost in addition to the present value of the cost
      its total lost energy while serving its estimated loads during its respective
      life span.
      Detailed Load calculation:
      Please refer LOAD SHEET
                                                                               Page 6
                   PROJECT NAME: PROPOSED BMC OFFICE BUILDING –BBSR
                                                                               Rev : R0
                                ELECTRICAL DESIGN REPORT
          Load Estimate:
              1.   Load requirement of demand loads with 5 VA / sqft of Saleable area
                   and utility loads as per actual
HT Source:
      1. With the design proposal of 5VA / Sqft + actual load for utility.
         5VA/ Sqft which includes Lighting, Raw power, Ups and AHU Loads.
         Required one HT Source supply for entire Project.
2.0       DIESEL GENERATOR SYSTEM
2.1       LT DG SETS
          Diesel generators shall be provided comprising 100% standby power. PLC
          control system will be provided for automatic start, auto-load sharing,
          synchronizing & Load dependent start & stop operations are performed
          during EB mains failure condition.
              Generator operation would be functioned through PLC / SCADA.
          LT POWER DISTRIBUTION:
         Main LT panel shall be located in Utility building (Ground floor). This shall
          be in a cubicle, compartmentalized, air insulated, indoor type with draw
          out type ACBs & fixed type MCCBs. The bus bars rated above 100A shall be
          of electrolytic grade aluminium. The lower ratings shall be with copper
          cables.
         Bus bars shall be designed for a current density of 0.8Amps/sq.mm for
          Aluminium bus bars and current density of 1.2Amps/sq.mm for Copper bus
                                                                                 Page 7
               PROJECT NAME: PROPOSED BMC OFFICE BUILDING –BBSR
                                                                                  Rev : R0
                             ELECTRICAL DESIGN REPORT
        bars.
       A continuous earth bus of Aluminium bus shall be provided.
     The entire system shall be fuse less.
     Metering shall be with electronic digital type which is capable of displaying
        all electrical parameters and shall have communication capability.
     Over current, short circuit and earth fault protections shall be provided for
        all incoming circuits in the main panel & sub panels.
     The main switch board shall have requisite number of feeders including one
        spare feeder of each rating.
    Separate outgoing feeders shall be provided to cover ACCP, Chillers, fire
        pump, external lighting, rising mains, utility loads and spares.
     All Panels inside the building shall have top entry & outdoor panels shall
        have bottom entry.
     Main panels, Sub panels shall be form 3B construction and both side
        extendable type.
        A. VOLTAGE DROPS
           The maximum voltage drops in various sections of the electrical system
shall be within the limits stated in the table below.
                                 SYSTEM ELEMENT                     MAX. PERMISSIBLE
        Sl.No.
                 Maximum voltage Drop(Vd) allowed from Main
           1                                                               ≤ 12V
                 PCC to Individual Panel
                 % voltage Drop(%) allowed from Main PCC to
           2                                                               ≤ 3%
                 Individual panel
                 Total % cumulative voltage drop (%) is allowed
           3                                                               ≤ 5%
                 from Main PCC panel to upto the Equipment
                                                                                    Page 8
           PROJECT NAME: PROPOSED BMC OFFICE BUILDING –BBSR
                                                                           Rev : R0
                          ELECTRICAL DESIGN REPORT
      RAISING MAINS:
  •   Designed for 5 VA / Sq ft of Tenant Sale area.
  •   Dedicated one shaft provided
  •   Two Raising mains are considered
   Adequate numbers of XLPE Al.Cables are run from Main LT Switchboard to
    Raising Main End feed unit panels located in Ground floor & 11 th Floor
    electrical room – Each 2 Nos. (Tenant Area).
      Tenants will tap the power from these Floor Panel to their individual
      Electrical room.
   Further Distribution from Tap off for Lighting, Power, AHU’s & UPS is not
    part of the Developer scope (It’s Tenant scope).
   Distribution from Main LT Switchboard up to chillers, primary & secondary
    pumps kept at the Ground floor level will be through XLPE Al. cables up to
    the Indoor panel kept near the chillers plant.
   2 Nos. Common area panel are proposed for catering to common area
    lighting of all floors, Basement lighting, Terrace lighting and small power
    loads.
   1nos. Panel is proposed for catering to MLCP.
   1 No. 40kVA Inverter is considered for Emergency lighting. And 2 Nos.
    Emergency lighting panel is proposed for catering to emergency lighting
    loads for all Phases.
   Space Provision for the end user’s Dedicated Equipment earthing as per
    Industrial standard with sleeves & tray provision to reach electrical shaft.
Metering Concept
   LT meters will be provided at the following feeders.
         Main LT Panel Incomers for Grid Power and DG Power.
         Dual (DG and Grid Power) Meters for Chiller feeders in Main LT panel.
         Dual (DG and Grid Power) Meters for Utility and common area load
                                                                             Page 9
          PROJECT NAME: PROPOSED BMC OFFICE BUILDING –BBSR
                                                                           Rev : R0
                          ELECTRICAL DESIGN REPORT
         feeders in Main LT panel.
        Dual (DG and Grid Power) Meters for Raw Power Rising Main feeders in
         Main LT panel.
        Dual (DG and Grid Power) Meters at rising main floor tap offs for
         Tenants.
   The following loads shall be metered by separate energy meters.
        Exterior lighting power consumption.
        UPS Power consumption.
        HVAC Pumps power consumption.
        AHUs / FCUs power consumption.
        Ventilation fans power consumption.
   All utilities like Boilers, compressor, Lifts, Pumps, WTP, STP, Etc (all
     different utility systems available in the Project) shall be metered
     separately.
   All meters shall be with Port Provision (RS 485) for data logging.
SAFETY FEATURES
   For all lighting and small power panels 30mA sensitivity earth leakage circuit
     breakers will be installed for protection against electrocution.
   Live parts of all equipments in panels and Distribution boards shall be
     shrouded.
   HT cable to transformer shall be properly protected using MS pipe or
     suitable size cable tray duly clamped.
   Cables shall be protected with sand cushioning and moulded bricks.
   Cable trays shall be galvanized – weld less and ready to install.-
     prefabricated.
   Copper strips laid for neutral shall be laid in heat shrinkable PVC sleeves.
                                                                             Page 10
           PROJECT NAME: PROPOSED BMC OFFICE BUILDING –BBSR
                                                                         Rev : R0
                           ELECTRICAL DESIGN REPORT
   Route markers shall be provided for HT cables.
   RCCBs – wherever provided shall be suitable for isolation, with distinguished
      trip and off indications.
   RCCBs shall be of Si type with 30 mA
   MCBs used for Lighting and small power shall be Curve C – 10 kA.
   MCBs used for UPS distribution shall be of Curve D – 10 Ka
      ELECTRICAL ROOM
3.0   EARTHING (GROUNDING)
   IS – 3043 – code of Practice Earthing.
   Earthing system with separate neutral & ground wires running all along the
    installation shall be adopted.
   Hot dip galvanized iron will be used for safety earthing.
   Adequate number of earth electrodes meeting statutory requirements
    will be provided.
   The system will be designed to limit the earth impedance as per
    standards, so as to ensure positive operation of the current operated
    safety devices.
   Special soil treatment shall be adopted if the resistivity exceeds 100ohm.
    Meters.
   Chemical earthing shall be considered for rocky areas.
                                                                           Page 11
           PROJECT NAME: PROPOSED BMC OFFICE BUILDING –BBSR
                                                                         Rev : R0
                          ELECTRICAL DESIGN REPORT
   Grounding and earthing for the individual equipments / systems in the
    floor plate shall be by occupant.
   Space Provision for the end user’s Dedicated Equipment earthing as per
    Industrial standard with sleeves & tray provision to reach electrical
    shaft.
   Internal office earthing for UPS / computer / any other special equipments
    is not envisaged.
EQUIPMENT BODY EARTHING                     EQUIPMENT NEUTRAL EARTHING
4.0   LIGHTING
      Interior lighting Control
   Within these buildings, Office areas enclosed by walls, Partitions, etc like
    training rooms, employee lunch, break rooms, meeting & conference rooms,
    and storage spaces shall be provided with Occupancy sensors that turn off
    lights within 30 minutes of Occupant leaving the space. However Interior
    Lighting intended for 24 hrs operations, required for safety, security of
    building occupants are not required to have these controls.
   For continuous improvement of Projects energy performance, it is suggested
    to have separate Lighting DB and Power DB along with separate meters from
    the main board itself.
   Illumination levels for all the below mentioned areas shall be as per NEC.
                                                                           Page 12
           PROJECT NAME: PROPOSED BMC OFFICE BUILDING –BBSR
                                                                              Rev : R0
                          ELECTRICAL DESIGN REPORT
    Street and area lighting for buildings will be supplied and installed to
     provide visual guidance and security lighting. LED with appropriate
     luminaries will be installed on poles.
    Pathway & Landscape lighting for buildings will be supplied and installed to
     provide Architectural features with LED lamps with appropriate luminaries
     will be installed.
    Lighting for common areas and toilets will be with surface / recess mounted
     LED down lighters / Decorative light fixtures.
    Basements and car park areas inside the building would be lit using LED
     luminaries and high efficiency lamps. The light fixtures at strategic
     locations would be provided with emergency power through inverter/UPS
     shall be 45min back-up with auto synchronization with DG. This can
     reduce the battery capacity requirement and also the associated power
     losses.
    The facility is proposed with Emergency source of lighting using UPS
     systems / Inverter for feeding common area lighting i.e, elevator lobbies,
     alternate landings in staircase, basement car park, service area, corridors,
     common toilets etc., loads. Battery backup envisaged is for 45 min. 8-10% of
     common area lighting shall be provided from Emergency UPS. All staircase
     mid landing lights shall be backed up with emergency UPS. Uninterrupted
     power to PLC’s, BMS, and security system shall be fed with this emergency
     UPS. The wiring carried out for emergency lighting is terminated to a
     separate MCB distribution board.
      Lighting has been designed for the whole building with circular LEDs.
      Lighting Lux levels at certain areas are mentioned in DBR as per NBC 2016
      code.
      For Projects energy savings, interior lighting shall be designed with 50% LPD
      reduction (As we reduce the lighting load in the building, HVAC load also
      gets reduced significantly).
Please find below the baseline LPD value & recommended LPD value as               per
Green Building guideline:
                                                                               Page 13
        PROJECT NAME: PROPOSED BMC OFFICE BUILDING –BBSR
                                                                         Rev : R0
                       ELECTRICAL DESIGN REPORT
                                   Max. Allowable Recommended LPD
      Space Name                   LPD (W/ft²)    (W/ft²)
                                                  30% reduction
      Office                       1.10               0.77
      Entrance Lobby / Meeting /   1.30               0.91
      conference
      Reception                    1.20               0.84
      Corridor / lobby             0.50               0.35
      Stairways                    0.60               0.42
      Electrical & Mechanical      1.50               1.05
      Rooms
      Toilet                       0.90               0.63
   Exterior lighting Control
   Exterior Lighting designed for dusk to down operation shall be controlled by
   an astronomical switch or Photo sensor or daylight sensor. Lighting not
   designated for dusk-to-dawn operation shall be controlled by either.
        1. A Combination of Daylight sensor / Photo sensor and time switch or
        2. An Astronomical switch.
   However exterior lighting for covered vehicle entrances or exits from
   buildings or parking structures where required for safety, security, or
   eye adaptation are not required to have these controls.
a. Light Pollution Reduction
   The total upward light ratio of the exterior lighting shall be limited to 5%.
   Lighting levels shall be limited to 0.2 horizontal & vertical foot candles at
   site boundary and 0.01 foot candles at 15ft beyond the site boundary.
b. Lighting Power densities
   Exterior lighting power densities for the project shall not exceed the base
   line values as show in the table.
                                                                             Page 14
              PROJECT NAME: PROPOSED BMC OFFICE BUILDING –BBSR
                                                                            Rev : R0
                            ELECTRICAL DESIGN REPORT
               Exterior Lighting Power Densities
                                 ASHRAE       Recommended     Recommended LPD
       Area                      Baseline     LPD        (30% (50% reduction)
                                              reduction)
       Building Main Entries &   30W/ft of 21 W/ft of door 15W/ft of door width
       exits                     door width width
       Walkways less than        1W/linear  0.7W/linear ft 0.5W/linear ft
       10ft wide                 ft
       Walkways greater than
       10ft wide, landscape,     0.2W /ft²    0.14W /ft²      0.1W /ft²
       facade
       Parking     Lots      &
       driveways                 0.15W /ft²   0.10W /ft²      0.075W /ft²
       Exit Signs
       Exit signs shall not exceed 5W per face. Exit signs with built in back up
       power supplies (Batteries) with service life of 10 years shall be installed.
       External lighting shall be done as per the design given by the landscape
       architects. The power distribution shall be done through armoured cables &
       an outdoor feeder pillar / external lighting DB shall be provided with 24Hrs
       timer for automatic switching on/off the lights during night & day time and
       with provision for Manual on/off, through an Auto/Manual selector switch
       and Push Buttons.
    Lighting scheme will be designed to suit landscape layout as prepared by
     Landscape Architects. Building lighting will be done using LED light fixtures.
     Cabling for all the light fixtures will be executed using multi-core PVC
     armoured cable.
As per National Building Code (NBC) of India, required illumination
       level for various areas are as mentioned below:
                                                                              Page 15
               PROJECT NAME: PROPOSED BMC OFFICE BUILDING –BBSR
                                                                                       Rev : R0
                                ELECTRICAL DESIGN REPORT
           Sl No.         Location                          Recommended lumens in Lux.
                1         Driveway                                     100-150 lux
                2         Parking                                      50-100 lux
                3         Lift landings                                150-200 lux
                4         Common area & lobby                          200-250 lux
                5         Corridors                                     50-100 lux
                6         External Lighting                             15- 20 lux
         Based on above recommendation, following light fixtures are
         proposed for the various area as below:
             S. No.       Location              Recommended         light Remarks
                                                fixtures.
                1         Driveway              LED light
                2         Parking               LED
                3         Lift landings         LED
                4         Reception area        Circular LED
                5         Stairs                LEDCircular CFL
                6         Corridors             LEDCircular
5.0      LIGHTNING PROTECTION SYSTEM
       Lightning Protection System shall be in accordance with IS IEC 62305-3, IEC 62561
        Part 1-7, IEC 61643-12, IEC 61643-22.
       The zone of protection of a lightning conductor defines the space within which
        Air Terminal provides protection against a direct lightning strike with probability
        of protection as per LPL.
       The Building premises will be protected against lightning through
        Conventional type Lightning protection System GI strips Run outside the
        columns shall be used as down conductor and galvanized GI strips
        interconnecting grounding electrodes and the air terminal rods. This design
        will ensure effective grounding of lightning discharges.
                                                                                         Page 16
             PROJECT NAME: PROPOSED BMC OFFICE BUILDING –BBSR
                                                                             Rev : R0
                            ELECTRICAL DESIGN REPORT
       Basic Grounding System and Protection against Lightning and Excess
        Voltages.
6.0     UPS SYSTEM
       Office Space Floors: No space allocation is made for housing UPS system to
        feed desktop & Server loads. This shall be part of end user scope to suit
        their requirements. Further Main panel is made extendable to add on UPS
        feeders by the end user.
       1 No. 10kVA UPS is proposed for catering BMS and Telecom Room
        Equipments in Basement 1.
1. COMMUNICATION SYSTEM
       Design Consideration for Data and Voice communications facilities includes
        (lead-in pipes, cable trays, trunking, conduits, etc.) for the ISP Entry to
        facility.
       Hume pipe / HDPE Pipe is proposed for service provider routing in site plan.
       ISP shall be provided with 2 routes to enter the Telecom Rooms in premises.
       2 Nos. Of Telecom Rooms of size 220Sqft is proposed for ISP cable
        termination in Basement – 1 level.
       No pre-wiring and telephone outlets shall be provided in any area.
       For data communication through ISPs, it is proposed to provide shafts only
        for cabling.
       Dedicated Communication Shafts of Min 1200 x 700 mm are considered for
        each Tower of the project.
       Cable Tray routing provided from the Telecom Room to the IT Shafts at
        Basement 1 level.
       Dedicated ELV Shaft of 1000 x 600mm is provided for all ELV Services, Cable
        tray Routing provided from BMS Room to ELV Shaft at Ground Level.
                                                                               Page 17
           PROJECT NAME: PROPOSED BMC OFFICE BUILDING –BBSR
                                                                        Rev : R0
                         ELECTRICAL DESIGN REPORT
2. CLOSED CIRCUIT TELEVISION SYSTEM
    Objective: To monitor the personal & Vehicle movement at all sensitive
    areas & to keep the record of the events referral and evaluation.
   System will be with IP-Based CCTV Video Cameras & IP-Based Video
    Management Software.
   The IP based Closed Circuit Television System (IP CCTV system) shall be
    provided with on-line display of video images on monitor. Cameras with
    suitable lenses will be provided to view specific areas.
   Colour digital Dome, Box/ Bullet Cameras, PTZ Cameras with Network Video
    Recording (NVR) capability have been considered for installation.
   The CCTV coverage that shall be provided is as below for the following
    areas:
           Entry and exit points to the Campus Facility
           Main Entrance Lobby at Ground and Office Floors
           Lift and Stair Lobby at Office Floors.
           Critical common Areas
           Entry / Exits of parking Areas.
                                                                             Page 18
         PROJECT NAME: PROPOSED BMC OFFICE BUILDING –BBSR
                                                                       Rev : R0
                       ELECTRICAL DESIGN REPORT
         Driveway
         Building Periphery, Cameras mounted to building facing the periphery
         Services Entry / Exit
 CCTV monitoring shall be done from the centralised BMS room.
 All the cameras shall be built on ONVIF supporting platform.
 Power and signal transmission wiring shall be protected from tampering
  (Cameras shall also have the option of POE).
 A Storage device with required Data storage capacities to store data for 30
  days before overwriting.
 All IP based Cameras shall have a minimum of 2 Mp resolution. All Cameras
  shall be with Low Light type to provide better images even during night
  times & Low light.
 Latest compression formats shall be supported for bandwidth optimisation.
 Central Alarm management module shall continuously monitor for operation
  status and event triggered alarms from cameras, VMS server.
 System shall be capable for audit trail report by incident.
                                                                         Page 19