Saudi Aramco Inspection Checklist

The document is a checklist for inspecting temperature tie-in welds on pipelines prior to welding. It lists acceptance criteria for 17 items to be inspected, including requirements that at least 450 meters of pipeline be buried downstream, welding surfaces be clean and dry, the welding temperature be within the specified range, and temperature tie-in welds be kept free of movement to prevent cracks. It also provides criteria for aboveground non-restrained and buried pipelines.

Uploaded by

Manoj Kumar
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
2K views4 pages

Saudi Aramco Inspection Checklist

The document is a checklist for inspecting temperature tie-in welds on pipelines prior to welding. It lists acceptance criteria for 17 items to be inspected, including requirements that at least 450 meters of pipeline be buried downstream, welding surfaces be clean and dry, the welding temperature be within the specified range, and temperature tie-in welds be kept free of movement to prevent cracks. It also provides criteria for aboveground non-restrained and buried pipelines.

Uploaded by

Manoj Kumar
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
You are on page 1/ 4

SAUDI ARAMCO ID/PID - 18-MAY-05 - REV 0 (Standards Cutoff - March 2012) Rev 6 31-Mar-12

SAIC NUMBER DATE APPROVED QR NUMBER


SAUDI ARAMCO INSPECTION CHECKLIST
Pipeline Inspection Prior to Welding of Temperature
SAIC-L-2115 30-Apr-13 PIPING-
Tie-In Weld Joint
PROJECT TITLE WBS / BI / JO NUMBER CONTRACTOR / SUBCONTRACTOR
MASTER GAS SYSTEM(MGS) PHASE 1 10-01282 BR.CAT INTERNATIONAL
EQUIPMENT ID NUMBER(S) EQUIPMENT DESCRIPTION EQPT CODE SYSTEM ID. PLANT NO.
N/A N/A N/A K94
LAYOUT DRAWING NUMBER REV. NO. PURCHASE ORDER NUMBER EC / PMCC / MCC NO.
VA-157489- 0 N/A
SCHEDULED INSPECTION DATE & TIME ACTUAL INSPECTION DATE & TIME QUANTITY INSP. MH's SPENT TRAVEL TIME
SAUDI ARAMCO USE ONLY
SAUDI ARAMCO TIP NUMBER SAUDI ARAMCO ACTIVITY NUMBER WORK PERMIT REQUIRED?
SATIP-L-450-04 3.8
SAUDI ARAMCO INSPECTION LEVEL
W
CONTRACTOR INSPECTION LEVEL
H
YES
ITEM
ACCEPTANCE CRITERIA REFERENCE PASS FAIL N/A RE-INSP DATE
No.

A temperature tie-in weld is a weld that connects


one of the following:
1) Two pipeline strings together.
SAES-L-450
Def: 2) An existing pipeline to a pipeline under construction.
Para. 15.1
3) A pipeline to an anchor.
4) Pipeline sections to an intermediate mainline valve
that is being inserted.

A General Requirements

One of the following provisions must be in place prior to welding of


temperature tie-in joint:
1) Anchor is installed on the end of pipeline upstream of the welding
progression, along with friction forces on the tail.
SAES-L-450
A1 2) At least 450 m of buried
Para. 15.1
pipeline downstream of the tie-in weld. 3) 900 m to 1200 m of
pipeline string resting on wooden skids or sand.
4) 1800 m to 2400 m of pipeline string resting on steel supports.

The first string of a buried pipeline is placed in the trench and spot SAES-L-450
A2
backfilled (or tied into an anchor), during the hottest part of the day. Para. 15.5.1

SAES-L-450
A3 Subsequent strings are connected by temperature tie-in welds.
Para. 15.5.1

All welding requirements and preparations conform with SATIP-W-012,


A4 Quality Plan
and inspection conforms with SAIC-W-2006.

Welding shall not be done when surfaces are wet or damp or exposed to SAES-W-012
A5
rain or when the welders are exposed to inclement conditions. Para. 10.2.2

Wind shields or tents are in place if the wind is strong enough to affect
SAES-W-012
A6 arc stability or shielding gas coverage, or when deemed necessary by
Para. 10.2.1
Saudi Aramco Inspection.

Welding surface is clean and free from oil, moisture, rust, scale, sand,
SAES-W-012
A7 paint, metallic coatings or other foreign matter, at least 25 mm from the
Para. 10.3.1
area of interest prior to welding.

Protective sleeves are wrapped snugly around the coated ends of the SAES-H-200
A8
pipes adjacent to the girth weld area. Para 6.2.1

When external clamps are used on pipe > 16" dia., the root bead is 50% SAES-W-012
A9
complete prior to removal of the external clamp. Para. 10.4.2

At least two welders are used for pipelines greater than 16 inch diameter, SAES-W-012
A10
operating simultaneously and in opposite quadrants. Para. 10.7.1

Page 1 of 4
Working clearance for welding is not less than 900 mm all around the SAES-W-012
A11
pipe. Para. 10.8

Page 2 of 4
SAUDI ARAMCO ID/PID - 18-MAY-05 - REV 0 (Standards Cutoff - March 2012) Rev 6 31-Mar-12
SAIC NUMBER DATE APPROVED QR NUMBER
SAUDI ARAMCO INSPECTION CHECKLIST
Pipeline Inspection Prior to Welding of Temperature
SAIC-L-2115 30-Apr-13 PIPING-
Tie-In Weld Joint
PROJECT TITLE WBS / BI / JO NUMBER CONTRACTOR / SUBCONTRACTOR

MASTER GAS SYSTEM(MGS) PHASE 1 10-01282 BR.CAT INTERNATIONAL

ITEM
ACCEPTANCE CRITERIA REFERENCE PASS FAIL N/A RE-INSP DATE
No.

The Construction Engineer has determine the highest practical tie-in


temperature for each tie-in weld.
*NOTE: The tie-in temperature shall be within the range stated in the
SAES-L-450
A12 Project Specifications.
Para. 15.2
**NOTE: Indicate the following:
a. Project specified Tie-In Temperature Range: __________
b. Highest practical Tie-In Temp: __________

The measured tie-in temperature is within the project specified tie-in


temperature range. ( Tie-In Temp=____________)
*NOTES:a) Contact measuring device shall be shielded from direct SAES-L-450
A13
sunlight to prevent an inaccurate reading. Para. 15.3
b) Actual tie-in temperature is the average of two readings, one at the
top and one at the bottom of the pipe.

The actual tie-in temperature and the pipeline stations of the tie-ins are SAES-L-450
A14
recorded in the inspection record books. Para. 15.4

The hot pass is made while the pipe is still fully supported by the SAES-W-012
A15
sideboom tractor or supports. Para. 10.7.3

SAES-L-450
A16 Temperature tie-in welds are kept free of movement to prevent cracks.
Para. 15.5.1

During the night and the cool periods of the day, there should be at least
SAES-L-450
A17 900 m to 1200 m of pipe outside the trench to keep the S-curve in
Para. 15.5.2
sufficient tension to restrain the pipe already in the trench.

B Aboveground Non-restrained Pipelines:

A string is always connected to each side of the anchor stub when the SAES-L-450
B1
work is stopped at the end of the day. Para. 15.8

C Buried Pipelines:

When a sufficient number of strings have been completed, the first string
SAES-L-450
C1 of a buried pipeline shall be placed in the trench and spot backfilled (or
Para. 15.5.1
tied into an anchor) during the hottest part of the day.

SAES-L-450
C2 The subsequent strings shall be connected by temperature tie-in welds.
Para. 15.5.1

Each new string must be kept free of movement to prevent cracks in the SAES-L-450
C3
tie-in weld. Para. 15.5.1

The portion of the pipeline outside the trench shall be supported by side SAES-L-450
C4
booms holding the line in a gentle S-curve. Para. 15.5.2

Spot backfilling (used to anchor to the line) may be completed at any SAES-L-450
C5
temperature but no closer than 1200 m from the free end of the tail. Para. 15.5.4

If spot backfilling closer to the free end is required, it shall be done SAES-L-450
C6
during the hottest part of the day. Para. 15.5.4

Page 3 of 4
SAUDI ARAMCO ID/PID - 18-MAY-05 - REV 0 (Standards Cutoff - March 2012) Rev 6 31-Mar-12
SAIC NUMBER DATE APPROVED QR NUMBER
SAUDI ARAMCO INSPECTION CHECKLIST
Pipeline Inspection Prior to Welding of Temperature
SAIC-L-2115 30-Apr-13 PIPING-
Tie-In Weld Joint
PROJECT TITLE WBS / BI / JO NUMBER CONTRACTOR / SUBCONTRACTOR

MASTER GAS SYSTEM(MGS) PHASE 1 10-01282 BR.CAT INTERNATIONAL

ITEM
ACCEPTANCE CRITERIA REFERENCE PASS FAIL N/A RE-INSP DATE
No.

If the tie-in weld is made with the pipe in the trench (at tie-in temperature)
the string being tied in and the tail must be spot backfilled on the same
SAES-L-450
C7 day of the tie-in.
Para. 15.5.5
* NOTE: The spot backfilling shall not be closer than 24 meters from the
free end.

D Aboveground Restrained Lines:

When a sufficient number of strings have been completed, the starting


SAES-L-450
D1 end of the pipeline is tied-in to a full thrust anchor or to a minimum of 600
Para. 15.6.1
meters of buried pipeline using a temperature tie-in.

The strings which have been tied-in while resting on the skids or on the
SAES-L-450
D2 sand, are placed onto the supports by side booms, holding the line in a
Para. 15.6.2
gentle S-curve between supports and skids.

The pipeline that has been placed onto the supports has the top halves
SAES-L-450
D3 of ring girder supports or support straps, bolted in place on the same day
Para. 15.6.2
it is placed.

There shall always be at least 900 m to 1200 m of pipe attached to the


SAES-L-450
D4 line on skids or on the ground, to restrain it during the night and cool
Para. 15.6.3
periods of the day.

The pipeline strings may also be welded while resting on permanent


SAES-L-450
D5 supports, but only if the supports are designed to resist the friction forces
Para. 15.6.4
of the line developed under full temperature differential.

Two strings on supports may be tied together with a temperature tie-in


weld. This 1800 m to 2400 m double string may then be tied in to the
SAES-L-450
D6 pipeline at normal daily temperatures. However, the pipeline being tied
Para. 15.6.5
into must have an end anchor or be buried in order to obtain the highest
possible effective tie-in temperature.

REFERENCE DOCUMENTS:
1. SAES-L-450, Construction of On-Land and Near Shore Pipelines, (31 Dec 2011)
2. SAES-W-012, Welding Requirements for Pipelines, (04 Oct 2009)
REMARKS:

Contractor / Third-Party Saudi Aramco


Construction Representative* PMT Representative
Work is Complete and Ready for Inspection: T&I Witnessed QC Record Reviewed Work Verified
Name, Initials and Date: Name, Initials and Date:
M ARIF GEOVANNI
QC Inspector PID Representative
Performed Inspection Work / Rework May Proceed T&I Witnessed QC Record Reviewed Work Verified
Name, Initials and Date: Name, Initials and Date:
E HASSAN/ ISMAIL / VIJAY IMRAN ANWAR
QC Supervisor Proponent and Others
Quality Record Approved: T&I Witnessed QC Record Reviewed Work Verified
Name, Organization,
Name, Sign and Date:
Initials and Date:
D.VARADHA RAJAN
*Person Responsible for Completion of Quality Work / Test Y = YES N = NO F = FAILED

Page 4 of 4

You might also like