Hindusthan Gears,.
Chennai - 98
Venu:      Hindusthan Gears
Profit via Reprasentative :-Mr.Anbu.S
Hindusthan Reprasentative :-Mr.Sathya
   S.No    Points Discussed                                                  Date       Remarks
           To Review the sub contract and Inhouse Rejection and
    1                                                                      09.07.2019
           calculate in % wise
           To Assign the Roles and responsibility for Receiving
    2      (Mr.Balaji),Final Inspection(Mr.Thandavamurthy) and             09.07.2019
           Inprocess Inspection (Mr.Sathish).
           To review the MSA for Instruments (To sub group the
    3      Insturmtns in range wise and select one instrument do the       09.07.2019
           MSA) Like Stability
    4      Next Meeting to plan the Control Plan correction and updation   09.07.2019