Safety is the paramount responsibility of each and every Railway employee. Individual
executive and technical departments look after and are accountable for safety within their
own departments. The Safety department assists the management in monitoring the
implementation of safety measures on the Railways and in developing strategies to improve
the safety record. The department keeps a vigil over the safe transportation of men and
material to detect lacunae in working, conducts inspections to determine if the rules and
procedures governing the running of trains are being followed, and maintains liaison with
all departments concerned with train operations. The safety department also gets inquiries
conducted into accidents and monitors the follow up action that results from such inquiries.
Regular reviews of the rules and systems of working are conducted with a view to
improving safety and efficiency.
Safety Inspection and for that matter all inspections are to be conducted meaningfully and
diligently not only to detect the shortcomings and failures at the individual levels but more
importantly at the system and procedure level. Continuous introduction of new technologies
in all fields connected with train running viz. Track, Loco, Signalling, OHE etc. calls for up
gradation of knowledge and procedures. Inspecting officials can play very important role in
this regard.
The exhaustive check lists of various safety inspections and short-cuts prepared by Safety
Department are contained in this Safety Diary. I am sure will go a long way in ensuring
that quality of inspections of Officers and Supervisors of all Departments connected to
running of trains is of very high order.
Wishing you and your family a Happy, Peaceful & Prosperous New Year- 2014.
1
INDEX
3. Operating
4. Commercial
5. Electrical
6. Mechanical (OP)
7. Engineering
2
CHAPTER - I
DUTY LISTS OF SAFETY OFFICERS AND SAFETY COUNSELLORS
3
ii. The quality and compliance of inspection items (concerning safety) by the staff and
officers as pending of the concerned branch shall also be scrutinized besides those
of Safety Branch.
iii. It shall be examined that Safety critical checks are conducted by inspecting officials.
iv. Safety test checks shall be invariably done.
v. Surprise inspections especially between zero hours and 4.00 hrs. at night to
observe the performance of staff in actual working condition in the field shall be
done.
vi. Maintenance depot and other activity centres shall also be covered under night
inspections.
vii. Safety Audits by Multi disciplinary team shall be done for making in depth
assessment of Safety system with the main purpose of checking only safety critical
items and to identify generic short comings. The Safety Audit shall be done in the
worst section first.
viii. During the inspection of any unit it shall be examined that the equipment failure
are being properly investigated, and then classified as avoidable/unavoidable and
corrective action taken.
ix. The Safety super checks should be reasonably distributed geographically as well as
over a period of time so that concern for Safety is all pervasive in entire division all
the time effectively.
x. Inspections Reports should have 3 parts as following:
i) Part I : A brief on compliance of outstanding inspection notes
concerning safety.
ii) Part II- Generic Short comings/system failure noticed.
iii) Part III Fresh inspection notes.
xi. A computerized data base should be prepared at the Divisional Headquarters to
assess the efficacy of field inspections and monitoring the same.
xii. The unique serial No. to each Safety checks/inspection item may be given at the
Divisional level and continuous monitoring during periodic Safety meetings held by
DRM shall be done. No item howsoever old should miss the follow up unless
decided for dropping/closing by DRM.
xiii. The reports should be put up to DRM on a separate file. Part III should be sent to
respective PHOD and CSO.
4
vi. Identifying at least 10 staff per month who have confusion/ignorance about the
safe working methods and remove their doubt in such a way that they adopt safe
working methods.
vii. Identifying such staff who are having bad habits viz. drinking while on duty or off
duty, sleeping on duty, leaving work place, long absenteeism, careless working,
etc. and counsel them about the demerits of such habits and instill enthusiasm into
them for safety. Also keeping a special watch on them over a period of time.
viii. Detailed inspection of station and cabin to identify short comings and counselling
staff to improve.
ix. Inspection of 2 Traffic level crossing gates for identifying shortcomings and
counselling of gateman for proper working.
x. 2 surprise night inspection of station to identify staff who sleep while on duty or are
not alert and counselling.
xi. 2 surprise night foot plate inspection by goods train to monitor exchange of all right
signal by station staff proper use of Walkie-talkie etc. and those found not properly
alert should be given counselling.
xii. Inspection of all running rooms and lobbies once in every 3 months for identifying
shortcomings and follow up action.
xiii. 4 Brake van inspections and counselling of those guards/staff who are not
maintaining break vans properly.
xiv. Counselling of at least 10 shunting staff in one yard every month proper and safe
working.
xv. He must detect cases of any uneven/overloading in wagons or improper loading in
SLRs etc.
xvi. He must inspect at least 2 pantry cars in a month for ensuring measures being
taken to prevent fire.
xvii. He must inspect /visit control office whenever in divisional HQ to check the
following items: -
a. Paper line clear working, if any with proper precautions
b. Frequent changes in the planning are not done by sectional controls as
this creates misunderstanding at the stations.
c Any cases of invalid BPC, if being allowed.
d Restrictions for any rolling stock being adhered to. For example,
movement of 4 wheeler oil tank wagon on oops, movement of flat
wheel rolling stock etc.
xviii. Conducting one safety seminar per month.
xix. Report as many system inadequacies as possible.
xx. Attending accident site and accident enquiries.
xxi. Safety Counsellors must make out a register indicating his observations date-wise,
staff counselled name wise, while lighting action required for further follow up.
This register should be put up to the concerned branch officer of operating through
Sr.DSO so that the corrective action required is relentlessly pursued.
xxii. Any other work as directed by Sr.DSO/ADSO
1.4 DUTY LIST OF SAFETY COUNSELLOR / MECHANICAL
i. He must know at least 10 different types of case histories of accidents, which
occurred due to unsafe practices by Mechanical staff. He should similarly also know
at least 10 case histories wherein accidents were saved by the Mechanical
5
staff. Such case histories should be then cited to convince the staff tobe
counselled.
ii. He must be up-to-date in his knowledge of Mechanical safety instructions and must
have readily available copies of such instructions.
iii. Identifying 10 Mechanical staff per month who need maximum counselling and give
proper guidance till satisfactory level is achieved.
iv. Identifying at least 10 staff per month who have confusion/ignorance about the
safe working methods and remove their doubt in such a way that they adopt safe
working pattern.
v. Identifying such staff who are habitual of bad habits viz. drinking while on duty or
off duty, sleeping on duty, leaving work place, long absenteeism, careless working,
etc. and counselling them about the demerits of such habits and instill enthusiasm
into them for safety. Also keeping special watch on them over a period of time.
vi) Super check of rakes intensively examined within the division. 4 goods loads and 4
Mail/Express rakes to be checked per month at different locations.
vii. Checking of BPCs of goods trains originating on division with actual brake power
available on train. 8 goods trains to be checked per month at different locations
and foot plating.
viii. Examination of Close Circuit Rakes after termination and before originating at the
maintenance depots. 4 rakes per month.
ix. Check of Brake Power of through, passing trains. 8 goods trains and 4 Mail
/Expresses to be checked per month at different locations.
x. Checks of SLR equipment such as Fire Extinguishers, PCP sets, Electric Kit Box, First
Aid Box, Vacuum/Pressure Gauges etc. 8 Checks to be conducted per month at
different locations for originating through trains on the division. 4 Brake van
inspections and counselling of staff concerned who are not maintaining properly.
xi. All ARME/ART rolling stock to be checked once in 3 months.
xii. Super check on sick line out train 2 checks per month for wagons and coaches.
xiii. Night Inspection of working place, 2 nights per month.
xiv. To make out a list of important T&P items which are either not available or not in
working order in yards, sick lines, platforms and washing lines.
xv. Counselling of gate man to make them conversant with method of detecting. Hot
Axles, Bearing spring broken or any other hanging part 4 gate man to be
counselled per month on the any one section.
xvi. Check availability of Safety items in coaching/goods depot.
xvii. Analysis of 100 day's sick marking in coaching depot.
xviii. Compliance of Inspection report by various Officers.
xix. During inspections lists should be prepared indicating the following:-
a) Shortcomings noticed.
b) Items of ignorance
c) Safety precautions ignored.
d) Short cut methods used.
6
xx. Conducting/attending one safety seminar per month.
xxi. Report as many system inadequacies as possible.
xxii. Attending accident sites and accident inquiries.
Xxiii He must inspect at least 2 pantry cars in a month for ensuring measures being
taken to prevent fire.
xxiv. Safety Counsellors must make out a register indicating his observations date-wise,
staff counselled name wise, duly acknowledge and while highlighting action
required for further follow up. This register should be put up to the concerned
branch officer of Mech. Deptt. (Sr.DME/DME/ADME) through Sr.DSO/DSO
so that the corrective action required is relentlessly pursued.
xxv. Any other work as directed by Sr.DSO/DSO/ADSO
1.5 DUTY LIST OF SAFETY COUNSELLOR MECHANICAL (LOCO)
i. He must know at least 10 different types of case histories of accidents, which
occurred due to unsafe practices by Loco staff. He should similarly also know at
least 10 cases in histories wherein accidents were saved by the Loco staff. Such
case histories should be then cited to convince the staff to be counselled.
ii. He must be up to date in his knowledge of Loco safety instructions and must have
readily available copies of such instructions.
iii. During any inspection Safety Counsellors must critically take note of shortcomings,
items of ignorance, short cut method in use, safety precautions being ignored. Pay
special attention to staff that is indulging in this.
iv. Compile category ‘C’ (Red Card) staff for the entire division and personalized
attention and counseling in such a way that they improve to A &B category.
v. Identifying at least 10 staff per month who have confusion/ignorance about the
safe working methods and remove their doubt in such a way that they adopt safe
working methods.
vi. Identifying such staff who are having of bad habits viz. drinking while on duty or off
duty, sleeping on duty, leaving work place, long absenteeism, careless working, etc.
and counselling them about the demerits of such habits and instil enthusiasm into
them for safety. Also keeping a special watch on them over a period of time.
vii. Foot plating and counselling of drivers having poor enginemanship. 1 driver of
each LI to be covered every 3 months.
viii. Foot plating and counselling of 4 drivers having good engineman ship per month
regarding use of Dynamic Brake.
ix. 2 surprise night foot plate inspection per month by goods train to monitor
exchange of all right signal by concerned staff, proper use of Walkie-talkie etc
and those found not properly alert should be given counselling.
x. 1 Ambush checks per month regarding the following: -
a) Exchanging of all right signal with the station staff.
b) Whistling at unmanned L-Xing gates.
c) Observance of Temporary Engineering Speed Restrictions.
xi. Inspection of all Driver Running Rooms and Driver Lobbies once in every 3 months.
xii. He must inspect /visit control office whenever in divisional HQ to check the
following items: -
i) Any cases of invalid BPC if being allowed.
ii) Restrictions for any rolling stock being adhered to. For example
movement of 4 wheeler oil tank wagon on loops, movement of flat
wheel rolling stock etc
7
iii) In divisions where Automatic block system of working is in force he
should examine and counsel the loco pilots and assistant loco pilots
in the rules applicable.
iv) During inspections lists should be prepared indicating the following.
a) Shortcomings noticed.
b) Items of ignorance
c) Safety precautions ignored.
d) Short cut methods used.
e) Compliance of inspection report by various officers.
f) Analysis of repeated Loco failure.
g) Check availability of safety items in shed/Loco etc.
xiii. Report as many system inadequacies as possible.
xiv. 1 Seminar per month at different driver Hdqrts. station and counselling
Driver/Asstt. Driver / Shunters about various circulars in force.
xv. Attending accident sites and accident inquiries.
xvi. Safety Counsellors must make out a register indicating his observations
date-wise, staff counselled name wise, and while highlighting action required for
further follow up. This register should be put up to the concerned branch officer of
Mechanical through Sr.DSO so that the corrective action required is relentlessly
pursued.
xvii. Any other work as directed by Sr.DSO/DSO/ADSO
v. Identifying at least 10 staff per month who have confusion/ignorance about the
safe working methods and remove their doubt in such a way that they adopt safe
working pattern.
vi. Identifying such staff who are having bad habits viz. drinking while on duty or off
duty, sleeping on duty, leaving work place, long absenteeism, careless working,
etc. and counsel them about the demerits of such habits and instill enthusiasm
into them for safety. Also keeping a special watch on them over a period of
time.
vii. Covering 75 Kms./month by push trolley covering 4-5 different sections.
viii. During the push trolley inspection the following items should be checked :-
a) Work sites and safety precautions
b) Engg. Gangs and safety equipments available.
c) Points and crossings.
d) L-Xing gates.
e) LWR/CWR
8
f) IMR/OBS rails
g) Bridge and bridge approaches.
h) Sharp curves
i) Push trolley competency available with staff.
j) Gap survey in SWR.
ix. Footplate Inspection of the same sections each month before and after the push
trolley inspections.
x. Inspection of 2 Engg. level crossing gates for identifying shortcomings and
counselling of gateman for proper working.
xi. Night inspection of Engg. L-Xing gates, one gate in each I/C PWI's jurisdiction
every month in rotation.
xii. Conducting one ambush check at Unmanned Level Crossing Gate covering each
I/C PWI's in rotation.
xiii. 2 surprise night foot plate inspection by goods train to monitor exchange of all
right signal by station staff, proper use of Walkie-talkie location of SR boards,
bad locations etc. and those found not proper should be given counselling.
xiv. Inspection of all running rooms and lobbies once in every 3 months for
identifying shortcomings and follow up action.
xv. Inspection of P.Way materials on all ARTs once in 3 months.
xvi. Inspection of all track machines once in 3 months.
xvii. During inspections lists should be prepared indicating the following:-
a. Shortcomings noticed.
b. Items of ignorance
c. Safety precautions ignored.
d. Short cut methods used.
e. Compliance of previous inspection notes of Officers and supervisors.
xviii. Conducting one safety seminar per month.
xix. Report as many system inadequacies as possible.
xx. Attending accident site and accident enquiries.
xxi. Safety Counsellors must make out a register indicating his observations date-
wise, staff counselled name wise, while highlighting action required for further
follow up. This register should be put up to Sr. DEN (HQ). through Sr.DSO so
that the corrective action required is relentlessly pursued.
xxii. Any other work as directed by Sr.DSO/DSO/ADSO
1.7 DUTY LIST OF SAFETY COUNSELLORSIGNAL
i. He must know at least 10 different types of case histories of accidents, which
occurred due to unsafe practices by S&T staff. He should similarly also know at
least 10 cases in histories wherein accidents were saved by the S&T staff. Such
case histories should be then cited to convince the staff to be counselled.
ii. He must be up to date in his knowledge of S&T safety instructions and must have
readily available copies of such instructions.
iii. Identifying 10 S&T staff per month that need maximum counselling and give
proper guidance till satisfactory level is achieved.
iv. Compile category ‘C’ and ‘D’ staff for the entire division and give personalised
attention and counselling in such a way that they improve to A &B category.
v. Identifying at least 10 staff per month who have confusion/ignorance about the
safe working methods and remove their doubt in such a way that they adopt safe
working pattern.
9
vi. Identifying such staff who are having bad habits viz. drinking while on duty or off
duty, sleeping on duty, leaving work place, long absenteeism, careless working,
etc. and counsel them about the demerits of such habits and instil enthusiasm
into them for safety. Also keeping special watch on them over a period of time.
vii. Foot plate Inspection of sections to see items concerning signals i.e. visibility
focusing etc. complete.
viii. Inspection of Stations for the following items: - 8 Stations per month.
a) Detailed inspection of station and cabin to identify shortcomings and
Counselling staff to improve.
b) Testing of Signals, Points, Lever frames, SM's slide control frame and
block instruments.
c) Double locking of relay rooms, cabin basements and checking of
records.
d) Points and Crossings including Point Motors. Joint Inspection register
of points & Xing.
e) Locking and seating arrangements of all S&T gears.
f) Work sites and safety precautions.
g) Disconnection and reconnection memos.
h) Testing of PCP sets and telephones in cabins etc.
i) Repeaters. Voltage checking of signals.
j) Motor/Push trolley competency available with staff.
k) Memos for RRBU operations.
It should be spread out to cover entire division.
ix. Inspection of Level Xing gates both Engg. and, interlocked traffic gates:-
6 per Month.
x. 2 surprise night inspection of station to identify staffs that sleeps while on duty or
are not alert and counselling them.
xi. 2 surprise night foot plate inspection by goods train to monitor exchange of all
right signal by station staff proper use of Walkie-talkie etc. and those found not
properly alert should be given counselling.
xii. Checking of Competency Certificate for ESMs and MSMs
xiii. Inspection of S&T materials of all ARMEs & ARTs once in three months.
xiv. Night Inspection of MSM/ESM Hd. Qrts. having shift duty. (2 nights per month.)
xv. Report as many system inadequacies as possible.
xvi. During inspections lists should be prepared indicating the following:-
a. Shortcomings noticed.
b. Items of ignorance
c. Safety precautions ignored.
d. Short cut methods used.
e. Compliance of previous inspection notes of Officers and supervisors.
xvii. Conducting one safety seminar per month.
xviii. Attending accident site and accident enquiries.
xix. Safety Counsellors must make out a register indicating his observations in detail
date-wise, staff counselled name wise, and action required for further follow up.
This register should be put up to the concerned branch officer through Sr.DSO so
that the corrective action required is relentlessly pursued. They will keep two
registers one each for odd and even calendar months.
xx. Assist to Sr.DSO /DSO for conducting Safety Audit.
xxi. Any other work as directed by Sr.DSO /DSO/ADSO.
10
1.8 DUTY LIST OF SAFETY COUNSELLOR ELECTRICAL
i. He must know at least 10 different types of case histories of accidents, which
occurred due to unsafe practices by Loco staff. He should similarly also know at
least 10 cases in histories wherein accidents were saved by the Loco staff. Such
case histories should be then cited to convince the staff to be counselled.
ii. He must be up to date in his knowledge of Electric Loco safety instructions and
must have readily available copies of such instructions.
iii. During any inspection Safety Counsellors must critically take note of
shortcomings, items of ignorance, short cut method in use, safety precautions
being ignored. Pay special attention to staff that is indulging in this.
iv. Compile category ‘C’ (Red Card) staff for the entire division and give personalised
attention and counselling in such a way that they improve to A &B category.
v. Identifying at least 10 staff per month who have confusion/ignorance about the
safe working methods and remove their doubt in such a way that they adopt safe
working methods.
vi. Identifying such staff who are having of bad habits viz. drinking while on duty or
off duty, sleeping on duty, leaving work place, long absenteeism, careless
working, etc. and counselling them about the demerits of such habits and instil
enthusiasm into them for safety. Also keeping a special watch on them over a
period of time.
vii. Foot plating and counselling of drivers having poor engineman ship. 1 driver of
each LI to be covered every 3 months.
viii. Foot plating and counselling of 4 drivers having good engineman ship per month
regarding use of Dynamic Brake.
ix. 2 surprise night foot plate inspection per month by goods train to monitor
exchange of all right signal by concerned staff, proper use of Walkie-talkie etc
and those found not properly alert should be given counselling.
x. 1 Ambush checks per month regarding the following: -
a Exchanging of all right signal with the station staff.
b Whistling at unmanned L-Xing gates.
c Observance of Temporary Engineering Speed Restrictions.
xi. Inspection of all Driver Running Rooms and Driver Lobbies once in every 3
months.
xii. He must inspect /visit control office whenever in divisional HQ to check the
following items: -
a) Any cases of invalid BPC if being allowed.
b) Restrictions for any rolling stock being adhered to. For example
movement of 4 wheeler oil tank wagon on loops, movement of flat
wheel rolling stock etc
xiii. In divisions where Automatic block system of working is in force he should
examine and counsel the loco pilots and assistant loco pilots in the rules
applicable.
xviii. Inspect 2 passenger rakes per month for ensuring anti fire measures by checking
leakages in current, fire extinguishing equipment etc. completely.
xv. During inspections lists should be prepared indicating the following.
a. Shortcomings noticed.
b. Items of ignorance
c. Safety precautions ignored.
d. Short cut methods used.
11
e. Compliance of inspection report by various officers.
f. Analysis of repeated Loco failure.
g. Check availability of safety items in shed/Loco etc.
xvi. Report as many system inadequacies as possible.
xvii. 1 Seminar per month at different driver Hdqrts. station and counselling
Driver/Asstt. Driver / Shunters about various circulars in force.
xviii. Attending accident sites and accident inquiries.
xix. Safety Counsellors must make out a register indicating his observations date-
wise, staff counselled name wise, and while highlighting action required for
further follow up. This register should be put up to the concerned branch officer
of Electrical through Sr.DSO so that the corrective action required is relentlessly
pursued.
xx. Any other work as directed by Sr.DSO/DSO/ADSO.
12
CHAPTER – I
1.1 INSPECTION OF ACCIDENT RELIEF TRAINS
13
vi. Condition of all brakes.
vii. Condition of coal and adequacy.
14
CHAPTER - II
OPERATING
15
- Cross check signal failure register with T / 369 (3B). Also timings of preparation of
T / 369 (3B) from TSR to ensure sufficient time for the points man, p/porter for
following provision of GR.
- Cross check shunting order T / 806 with attaching /detaching register.
- Cross check private number with adjacent block station, cabins and gates.
- Cross check caution order book and caution order register.
- Detention to trains outside signal.
- Cross check crank handle register with signal failure register.
- Cross check number of emergency counters with the register.
- Whether Axle Counter failure register maintained and how clearance of line
ascertained in case of Axle Counter failures.
- Total failure of communications and No. of trains started without line clear cross
check T / B 602 / T / C 602 with TSR.
- Accident register, follow up action against accident prone staff and suggested
remedies / measures if any.
- SM’s night inspection and safety meetings, effective or not.
- Scrutinize station inspection book and follow up action
thereto.
- Watch cases of loose/rough shunting. Explain to staff about dangers involved
therein.
- Adequate communications and lighting facilities in yard.
- Possibilities of reducing detention to stock and shunting engine hours.
2.3 RULE BOOKS REGISTER AND CHARTS
- Whether Rule book / Manuals and SWR’s have latest amendment slips?
- Cross check assurance register for SWR’s with attendance register.
- Are Safety Bulletins and Safety Circulars maintained properly and assurance of staff
taken? Cross check with assurance register kept for this purpose.
- Cross check rostered duty chart with actual attendance. Whether mutual
arrangements being resorted to?
- Cross check Bio-data register with competency / medical certificates. Whether staff
is due for.
- Competency (Block Automatic territory)
- Periodical medical examination.
- Safety Camp / Ghat Rules etc.
- Line admission book for reception of goods trains.
- Validity of fog signals and knowledge of staff in their use. Assurance of fog
signalmen in the fog signal register.
- Cross check disconnection/reconnection register with counter foil of S & T (T / 351)
- Whether joint inspection of points and crossing carried out by SI, PWI & TI/SS.
- Monthly summary of signal failures in register being signed by SI. PWI & TI/SS.
- Sanctioned strength, staff on roll register. Indicate surplus staff, if any, and
suggest possible redeployment.
- Whether wagon exchange register and wagon card index is maintained properly?
- Average detention of wagons. Old dated and unconnected wagons register.
- Replacement/detention to sick stock register.
- Cross running of empty stock.
- Whether large number of empties have been shown rejected as unloadable in
wagon loading register.
- Originating trains load register.
- Adequate availability of stationary, forms and stores.
16
2.4 CABINS
- Essential equipments of cabins and their condition.
- Whether points are set against the blocked line?
- Whether cabin man ensures clearance of line and puts back dispatch signal to “ON”
before releasing slot for home signal?
- Ensuring clearance of fouling mark in case of stopping trains.
- Whether lever collars on the relevant levers of blocked/obstructed line are being
used?
- While shunting over emergency cross over, whether the facing point of emergency
cross over is cotter bolted/pad locked in addition to locking them from cabin?
- Test knowledge of cabin/leverman in G&SR/SWR and other instructions pertaining
to his duties.
- Cross check private numbers exchanged between the cabin/leverman and ASM as
well as with other cabin and adjacent stations.
- Whether signals for conflicting movements may be taken off? - Cross check
slide/slotting arrangements with conflicting movements.
- Cleanliness of cabin, lever handles etc.
2.5 GUARDS EQUIPMENTS
- Guards essential equipments of at least two stopping trains, viz. rule books with
latest amendment slips, HS lamp, tail lamp/board, current working time table, a
red flag / a green flag.
- First aid box, fire extinguishers and Emergency train lighting box and Portable
Telephone set of passenger trains. Test knowledge of guard about use of
Emergency Train Lighting box and Portable Telephone.
- Currency of fog signals.
- Complete bio-data available or not.
- Additional equipments i.e. one spare red flag, 2 vacuum hose pipe washers, no. of
pad locks as prescribed, one vacuum/pressure indicator gauge.
- Accident relief bands for mail/ Exp. guards only.
2.6 INSPECTION OF LOCO PILOTS AND GUARDS LOBBIES
- Whether crew are called under rest?
- Whether breath analyzer machines are in working order?
- Speed restriction boards available or not.
- Caution in force, got noted by the staff.
- Safety literatures viz. posters pamphlets, bulletins/circulars displayed kept in the
lobbies.
- Unusual occurrence register maintained or not. Whether the irregularities recorded
by Loco Pilots are conveyed to CTNL office.
17
- Whether running rooms are used by outsiders/unauthorized persons?
- Stand by lighting arrangements.
I) AT STATIONS.
- Incognito check of alertness and vigilance of staff whether sleeping or alert on duty
in proper uniform.
- Exchange of all right signals by Loco pilot and guard with station staff.
- Whether SM himself exchanges signals or deputes points man for the same on his
behalf.
- Whether proper staff, as per roster, is on duty or staff are unauthorizedly
exchanging duty with their colleagues?
- Show red signal to guard of through passing train for checking his alertness.
- Any other short comings.
18
- Condition of gate leaves, leaf catchers, lifting barriers with bell, speed breakers,
road signs, clearance of channels between stock rail and check rail etc.
- Checking of gate parameters with the standard list issued by the division.
2.10 DETAILED LEVEL CROSSING GATES INSPECTION
- Availability of essential equipments. List of safety equipments to be physically
verified. Whether the same has been displayed prominently.
- Check the bio-data of gateman working at the gate.
- Check the knowledge of gate working rules and use of fog signals and LED based
H S Lamp.
- Whether the gate kept in its prescribed normal position.
- Whether gateman looks for hot axle, hanging part, spring breakage and other
unsafe conditions on the passing trains ?
- Test knowledge particularly where he should stand when any train passes and
action to be taken when anything unsafe noted.
- Guards response if danger signal is shown to him.
- Action to be taken in case of defective gate signals/barriers.
- Test about practical application of placing detonators and showing danger signal.
- Action to be taken in case a train noticed running in 2 or more parts.(Train Parting)
- Are leaves of gate, catches OK?
- Duty roster and vacancy position.
- If lifting barriers work properly and check ringing of bell.
- Road surface and depth of channel between stock and check rail.
- Channels between stock and check rail are clean.
- Condition of road signs/speed breakers whether of standard design.
- Visibility of gate from the road and track.
- Hand signal and gate lamps are clean and bushes trimmed and lit at night.
- Is interlocking justified ?
- Complaint books particularly detention to road traffic.
2.11 AMBUSH CHECKS AT AUTOMATIC SECTIONS, IBS AND LEVEL
CROSSING GATES.
I) AT LEVEL CROSSING GATES.
- Loco pilot and guard look for gateman danger signal.
- Guard’s response if danger signal is shown to him.
- Whether Loco pilot stops 1” during day 2” during night if gate signal is “ON”
- Whether Loco pilot continuously whistles at ‘WL’ board upto the unmanned level
crossing gate ?
20
(Ref : GM’s DO No. T 257/0 (policy) dated 4-2-97).
- Safety Inspections both during day as well as night as per advance weekly
programme.
At Divisional level -- (i) By all Officers (Monitoring by Controlling officers)
(ii) By Branch officers (Monitoring by ADRM/DRM)
At HQ level -- By all Officers of JA grade & above
(monitored by PHOD/ nominated HOD)
(Ref GM’s DO No. T 257/0 WKLY, INSP, SCH, dated 17/21-12-93)
- Inspection of Safety and Passenger Amenity items at important stations:--
“One ‘A’ type station be inspected every week by a team of JAG/SS officers of Civil,
Electrical, Mechanical, S &T and Traffic departments on each Division. Similarly one
‘B’ type station be Inspected every week by a team of SS/JS officers of Civil,
Electrical, Mechanical, S & T and Traffic Departments on each Division -- emphasis
on Safety and Passenger Amenity items and Issues”
(Ref. : CRB’s DO letter No. 99/Safety-1/18/3 dated 22-3-99).
21
2.16 Schedule of Safety Inspections by Operating Officers and Transportation
Inspectors
Sr Type/Nature of Sr. DOM/ Sr. Area AOM(M) AOM(G) TIs
No inspections DOM DOM(G)/ Manager/
DOM(G) Area Officer
1 Detailed Inspection - 2 2 All stations
(Half yearly) major major 2 2 2 twice in their
stations stations jurisdiction
2 Safety Inspection- All stations in
(Every month) 2 4 4 2 6 their
jurisdiction
3 Surprise Inspection-
(Minimum every month 1 4 4 2 4 6
4 Level Xing
Inspection 1 1 1 1 2 3
during day time(Every
month)
5 Surprise road Inspection
(Every month) 1 1 1 1 1 1
6 Footplate inspection 2 2 2 4 4
(Every month) 1 (One each (One each (One (Two each (1 = Coaching
by by each by by & 3 = Goods
Coaching & Coaching & Coaching Coaching & train)
Goods Goods & Goods Goods
train) train) train) train)
7 Night-Inspection
i Level Xing 1 1 1 1 2 3
ii Station 1 1 1 1 2 3
iii Footplate 1 1 1 1 2 3
(Every month) (1 goods (2 goods train)
train)
8 Joint Footplate 2 All sections All sections All All sections Covering
Inspection in one year to be to be sections to be entire
covered covered to be covered jurisdiction
within one within one covered within one once in six
year year within year months
one year including Up/
Dn day/night .
9 Brake-van Inspection
(Every month) 1 2 2 1 3 5
10 Surprise speed checks
. (Every month) 1 2 2 1 3 5
11 Joint Running Rooms 1 major 1 major 1 major 1 All Traffic Each running
Regular Inspection running Traffic running running running room under
room as running room as rooms rooms once their
identified room as identified (along- a year jurisdiction
by DRM- identified by DRM- with AEN along with once in a
once a year by DRM- once a year & AEE). AEN and month along
(along with once a year (along with AEE with
Sr. DEN (along with local concerned
and Sr. DEE Sr. DEN officers). Supervisors
and Sr. DEE
12 Ambush Checks in 1 2 2 1 2 2
Automatic signalling One during One during One during One during
territories (Every day and day and day and day and one
month) one during one during one during during night.
night. night night
13 Loco Shed Inspections 1 every 3 -- 1 every 1 every -- --
months month. month
14 Depot 1 every 3 -- 1 every 1 every -- --
Inspection months month. month.
15 Accident Relief Medical 1 every six -- 1 every six 1 every -- --
Equip-ment (ARMEs) months. months. 6months
16 Accident Relief Trains- 1 every six -- 1 every six 1 every -- --
(ARTs) months months 6months
22
CHAPTER III
COMMERCIAL
23
CHAPTER IV
ELECTRICAL
24
i) Availability of man power
ii) On Roll
iii) Actually Present
iv) Unauthorized absent
II DEPLOYMENT OF STAFF
i) Availability of Technical Circulars in the shed.
ii) Knowledge/ Skill of staff. (few staff to be interviewed)
iii) Knowledge of staff of their assigned job.
iv) Safety Consciousness among staff.
v) Review of training of staff in Depots.
25
e) Transformer oil spilled over in HT compartment
f) Oil in compressor tray
26
c) Battery box cover fixing hooks, nuts / fly nuts
d) Battery fuse
V WORKING CONDITIONS
a) Condition of pit.
b) Illumination level
c) Availability of pre-cooling points.
d) Availability of Charging points.
27
v) Availability of proper tools.
vi) Review of training.
v) M&P
a) Earthing arrangement.
b) Condition of cable terminal lugs.
c) Capacity of cables.
d) Display of work instructions.
e) Knowledge/ Skill of staff. (Few staff to be
interviewed)
vi) Air Conditioning plants
a) Earthing arrangement.
b) Condition of cable terminal lugs.
c) Capacity of cables.
d) Capacity of HRC fuses on power panels.
e) Display of work instructions.
f) Knowledge/ Skill of staff. (Few staff to be
interviewed).
vii) LIFTS
a) Earthing arrangement.
b) Condition of cable terminal lugs.
c) Capacity of cables.
d) Capacity of HRC fuses on power panels.
28
e) Condition of wire rope.
f) Working of limit switch and other safety items.
g) Display of work/ Safety instructions.
h) Knowledge/ Skill of staff. (Few staff to be
interviewed).
viii) Transformer
i) Oil and Winding temperature – Present and maximum
ii) Oil Level in conservator tank
iii) Abnormal humming
iv) Oil leakage
v) CB & Control Panel
vi) Relays and their functioning
29
c) Functioning of Emergency lights in Coaches.
V WORKING CONDITIONS
a) Condition of Pits (for Shed).
b) Condition of Stabling lines (for stabling yards).
c) Illumination level.
VI AVAILABILTY OF MATERIALS
a) Availability of materials in the depots as per the list.
b) Condition of the materials/ assemblies lying in the depots.
c) Non- availability of safety and vital items (for shed)
d) Upkeep of material storage.
II DEPLOYMENT OF STAFF
i) Availability of Technical Circulars in the shed.
ii) Knowledge/ Skill of staff. (few staff to be interviewed)
iii) Knowledge of staff of their assigned job.
iv) Safety Consciousness among staff.
v) Review of training of staff in shed and terminals/ Stabling lines
30
c) Battery lugs
d) Distilled water topping
e) Other maintenance of batteries.
f) Proper functioning of battery charger.
g) Working of COS (Charge over switch)
v) VISUAL INSPECTION
a) Tyre heating / Crack
b) Proper application and release of brakes.
c). Axle box temperature.
d) Sleeve bearing temperature.
e) Noise level of different auxiliaries.
f) Transformer oil spilled over in HT compartment
g) Oil in compressor tray
31
CHAPTER V
MECHANICAL (OP)
5.2 RECORDS
i) Staff overdue courses viz. refresher courses in traffic and Diesel loco: air
brake simulator and safety camp etc.
ii) Long absentees cases.
iii) Status of unauthorized occupation of Railway accommodation.
iv) Staff grievances and follow-up.
v) Supply of store items i.e. uniform, torch cells, dusters soap etc.
vi) Genl 164
vii) Review of excess in the categories of staff.
34
rules
x) Knowledge in loco examination while making over /taking over charge, 2
Continuity test between Loco Pilot and guard of vacuum/air pressure
xii) Personality and uniform. 1
NOTE: Bio data of the crew is to be checked regarding next due for vision test/glasses,
refresher courses, competency certificate to work in Automatic signaling territory and rule
books.
5.11 GATES
i) Alertness of gatemen and their presence with hand signals.
ii) Illumination of side lamps of manned L-xing gates.
5.12 RIDING
i) Uneven riding on any portion of track. Any unusual occurrence during the
trip.
5.13 AMBUSH CHECK
i) Blowing of horn by the crew on W/L board while approaching unmanned
and manned L-xings.
ii) Observance of speed limits by the Loco Pilot if some engg. Restriction is
imposed.
iii) Condition of L-xings as regards road across the track and caution boards for
road users.
iv) Proper equipment on the gate.
v) Safety chains, use of fog signals and NVT of the gateman.
vi) Proper exchange of private number by the gateman with SM if telephone is
provided.
vii) Displaying of hand signal by the gateman to an approaching train.
viii) Timely closing and opening of gates.
35
ix) Arrange fuelling and lub oil in case of exigencies.
5.17 SECURITY
i) Door latches/Catches.
5.18 SSE(DSL)/CWS OFFICES
i) Transfer of Material from shed to shed Register of Tools and Plants and
dead stock Register.
ii) Clothing and Uniform Register.
iii) Periodical verification of stores
iv) Detention of rolling stock specially for want of materials.
5.19 (C & W)
The following documents / register should be checked.
1. Kacha seal wagon checking register.
2. D D message Register.
3. RP (UP) Act register.
4. Malkhana Register.
5. IRA Register.
6. Arms ammunition register.
7. Duty roster.
8. Muster roll.
9. Key register in case of inspection of workshop.
10. Staff grievances register.
11. Roznamcha.
12. Adequacy of pit examination time
13. Availability of berthing slots.
14. Pit lights for night examination.
15. Condition of M&P items such as Air brake Test Rings, Compressor,
EOT Cranes, Generator, Lifting Jacks
16. Over due coaches if any.
17. Repair schedule of coaches ‘A’, ‘B’ & ‘C’.
18. Availability of Safety items
19. Coach Failure Analysis
36
ix) Overdue POH stock
x) Water and lighting arrangements of ART
xi) Inspection of ART by Sr. Subordinates and branch officers.
CHAPTER – VI
ENGINEERING
6.1.2 Rails
i. No Battering / chipping of rails ends
ii. No wear on fishing surface
iii. No hogging of rail ends
iv. Gap should not be jammed and not more than 12mm
v. Minimum 75 Minutes block required to do one AT weld.
6.2 Fish Plate
i. No plastic Deformation
ii. Fish plate should be fishing fit
iii. No wear on the fishing surface
iv. No cracks
6.6 Ballast
i. Ballast should be clean under sleepers as well as to the shoulders.
ii. No blowing/pumping joint
iii. Drainage to be good.
39
ii. Battered rail end must be put right.
iii. Rail ends should be free of burrs.
iv. Rail ends be kept free from dirt, dust, sand and other materials.
6.10 Creep in Joints
i. Regular assessment and adjustment of creep.
ii. One rail length on either side to be box anchored.
iii. Creep in excess of 150 mm shall not be permitted(para 242(6) IRPWM)
6.11 Condition of end post in Glued joints.
i. Top of end post to be flush with the rail top.
ii. Gap, if any, due to wearing out of end post to be filled up with
insulated material like epoxy to avoid ingress of dirt, dust, sand, etc.,
6.12 Others.
i. Ballast in vicinity of glued joints should be clean
ii. No relative movement between rails and fish plates.
iii. Twist – on straight and curved track other than on transition – 2 mm
per meter except at isolated locations this may go upto 3.5 mm per
meter. and on transitions of curves local defect should not exceed 1
mm per meter except that at isolated locations this may go up to 2.1
mm per meter. Para 607 (2) (iii)
6.13 Inspection of SEJs.
6.13.1 Condition of Sleepers.
i. Should be good and proper size i.e. 300 mm x 150 mm.
6.13.2 Spacing of sleepers.
i. The gap between the sleepers should be 700 mm centre to centre as
per drawing No.T-1412 for B.G. Track
ii. Sleepers should be square.
6.13.3 Packing of sleepers.
i. Sound packing. No tilting of joint sleepers.
6.13.4 Condition of Tongue.
i. No battering/hogging of tongue rails.
ii. Look for cracks in the neck of stock rails.
6.13.5 Condition of fittings.
i. All the fittings and spikes on SEJs should be complete and light.
6.13.6 Ballast.
i. Ballast to be clean under sleepers as well as in shoulders.
ii. No blowing/pumping
iii. Drainage to be good.
40
vi. Reference mark should be clearly punched on top of the rail post.
6.13.8 Measurements.
i. Measurement of gap to be done on tongue rail and stock rail side from
the reference line and recorded on the LWR register. Total gap as per
limit prescribed in Annexure XIIIB of LWR manual.
ii. All abnormal movements to be recorded on LWR register and corrective
action taken.
6.15 Curves.
i. Calculation of SE, Versines, Permissible speed etc. as per IRPWM.]
ii. Permanent speed restrictions if any.
iii. Curve markers as per P 409 of IRPWM.
iv. Painting of curve at stations, versines, SE.
v. provision of vertical curves (P 419 of IRPWM)
vi. Recording of versines, S.E. in the register.
vii. Extra clearance for curves for Electrified sections.
viii. Checking of actual cant, cant deficiency, cant gradients w.r.t.
permissible limits.
ix. Details of transition length and speed potential for curves.
6.15.1 Versine variation – Service limit for station to station Versine variation for 3
speed groups viz. 120kmph and above, below 120 kmph and upto 80 kmph and
below 80 kmph and upto 50 kmph is as follows:-
41
above more.
Below 120 Kmph 15 mm or 25% of the average Versine on circular curve whichever is
and upto 80 Kmph more.
Below 80 Kmph 40 mm or 25% of the average Versine on circular curve whichever is
and upto 50 Kmph more.
In case exceedence of the above limit is observed during inspection local adjustments
may be restored to in cases where the variation of versines between adjacent
stations is only at few isolated locations, at the earliest possible. If, more than 20%
of the stations are having versine variation above the limit prescribed, complete
realignment of the curve should be planned within a month.PARA 421 IRPWM
42
xii. Combination joint if any, should be at least one rail away from SRJ and
back of Xing. The combination joint should be gap less and all the bolts
should be complete.
xiii. Physical condition of tongue rail, stock rail and crossing should be
sound.
xiv. All the fittings are as per standard, particularly, the spherical washers.
In track circuited areas, proper insulated/GFN liners etc.
600 100
550 90
500 80
450 75
400 65
350 55
300 50
250 40
200 30
150 25
6.18 Bridges.
i. Steps to be provided for inspection.
ii. Guard rail clearances: Ends to be buried in ballast with wooden block.
iii. Clearing of water way.
iv. PDL Marks : As per RDSO guidelines No.RBF/MOL AT 20-9-89
Circulated under No.EW/641.BRN.1 GOA(C)/IV of 7-11-89.
v. Spacing of sleepers in approaches of major and important bridges (60
cm. upto 100 cm on either side).
44
vi. Warning Board on approaches of important bridges for photography
and tress passing prohibited.
vii. Flood gauge to be painted.
viii. Inspection of bridge. Bridge register
ix. Painting/O&G, date of painting on girder bridges.
x. Trolley refuges.
xi. Foundation plaque Painting on piers and
xii. Name Board abutments
xiii. H.F.L. Marking)
xiv. Gauge on every sleeper to be recorded.
xv. Provision of hook bolts: arrow marking
xvi. Locking of the openings: for inspection purpose.
xvii. Expansion gap arrangements : clean.
1 2 3 4 5 6 7 8
45
6.19.2 Action to be taken after detection of defects: Following action to be taken
in respect of defective rail:
ii) In case of DFWR the protection of weld has been done with the same method
described as above but care should be taken that DFWR shall be replaced with in
three months of detection.
PARA 8.14 of Manual for Ultrasonic Testing of Rails and Welds.
46
CHAPTER VII
47
(m) Spare relays are kept sealed in Relay Room.
(n) Data Loggers / modem or its reset is shifted outside, wherever feasible.
(o) Panel, lever frame, SM frame, Block testing / overhauling is done.
(p) In Relay Room loop or extra wire are not kept.
7.4 Panel
(a) Panel testing is as per schedule of 3 years.
(b) Record of panel testing is kept at site, check the LT/ST on which testing done and
signed by testing official.
(c) Date of testing is painted on panel
(d) Cable from relay room to panel is in protected Pipe
(e) RRBU lock is not free
(f) Physical checking & cleaning of Panel, Panel Buttons, Lamps etc.
(g) Testing of all Panel counters, SM’s Key and emergency crossover operation.
(h) Functional testing for all circuits as per selection table and conflicting movements.
7.5 Counters
(a) Check all the counters are in working conditions and increment by one only.
(b) RRBU cancellations are done after receipt of memo from SM and all memos kept
serially numbered in guard file.
(c) EBPU operation during TC failure – corresponds with SFR record.
(d) ERRB cancellations are not too many and analysis of it.
(e) Proper procedure of Axle Counter / MUX resetting is followed.
7.6 Points
(a) Point motors are opened for regular maintenance and not kept sealed throughout
48
the year except monsoon.
(b) Epoxy coating of motor and detector assembly in flood prone area is done. & Visual
checks of Points insulation.
(c) Ground connection are fitted as per standard drawing.
(d) Wear and Tear on machine slides, looseness on pins in ground connection.
(e) Motor current under obstruction and normal
(f) Friction clutch strips under obstruction.
(g) WJR timing for ‘N” and “R”
(h) Wards on point motor corresponds with the KLR
(i) Cleanliness of carbon brush and availability of chamois leather.
(j) Tightening of all nuts, check nuts & bolts, lock nuts holding the detector slides &
lock slides with lugs.
(k) The setting of switch for having required amount of spring action.
Correspondence test with respect to panel.
Obstruction test - of points with 5 mm test piece to ensure point cannot be locked,
detection contacts should not assume the position indicating point closure& friction
clutch should slip.
(l) Joint check with SE/SSE (P-Way), of points & crossing for leveling, squaring,
creeping, packing, clearance of ballast and other P-Way fittings, etc. and
measurement of LH, RH switch opening, as per SEM Para 12.40. SE & SSE to carry
out every alternate inspection.
(m) Checking of NX Switch and its wards, connections and its effectiveness during power
operation points.
(n) Lubrication of all gears, bearings, slides, rollersand Pins.
(o) Cleanliness and smoothness of commutators.
(p) The contacts are free from pitting.
(q) Tightness of nuts, bolts holding the detector
(r) slides and lock slides with lugs kept tight
7.9 Signal
(a) Lamp voltages are not less than 11.2V.
(b) MECR functions is checked regularly as per schedule.
(c) Cases of repeated lamp fusing of a signal or particular Make
(d) Cleaning of inner & ouer lenses, housing, signal units and protective wire mesh.
Tightness of all adjusting nuts.
(e) Visual check of insulation of wires ables gasket.
(f) Focusing of signals units and all its aspects.
(g) Effectiveness of screen earthing.
(h) Condition of signal post.
(i) Check infringement of Signal & all its fitting with respect to schedule of
dimensions (infringement to be removed, if found).
(j) Automatic cutting in of the next restrictive aspect When the lamp of one aspect
burns out.
7.10 COLOUR LIGHT SIGNAL
(i) Cleanliness of lenses, housing
(ii) Lamps are replaced as per extent instruction
(iii) Lamps are working at 90% of rated voltage
(v) Holders are having proper tension and fitting
50
Focusing of siganls
7.11 RELAYS
a Checking & cleaning of dust on relays.
(b) Effectiveness of anti-tilting arrangement on self-type relays.
(c) In case of panel using Solid State flasher, its indication on panel is in working
condition.
(d) Accuracy of time delay circuit.
(e) Overhauling is not more than 10-12 years old for track relays and 15 years for self-
type line relays.
(f) Seals of relays are intact, effective and not tempered.
(g) Visual inspection of relays. The relay to be checked for defects in respect of –
movement of armature and contact carriage, wiping of contacts, arcing of contacts,
pitting or charring of contacts, dust accumulation on contacts, electro-plating,
corrosion / rusting of components, crack or breakage in components, presence of
fungus and ants inside the relay casing, charring of cover near contacts in the case
of plug-in-type relays, corrosion of label, absence of tempering of seal, any other
abnormal condition.
(h) Checking the effectiveness of locking of KLCR
7.12 Power equipment, batteries and fuses-
(a) Battery conditions and year of installation, plan for replacement.
(b) Battery maintenance SG and voltage.
(c) Load capacity.
(d) Redundant fuses are removed.
(e) Programme switch contacts are made parallel.
(f) Parallel fuses in relays and other circuits with indication arrangement.
(g) Charger failure and alarm for TC batteries and other
(h) Visual checks of power supply equipment, their front panel, fuses and charging
of batteries.
(i) Tightness of battery & load connections.
(j) Testing of Diesel Generator and Auto Push Button start.
7.13 FUSES
(a) Checking that all fuses provided are of ND type / ‘D’ type / ‘G’ types as per
requirement.
(b) Visual inspection of fuse blown off indications & Replacing with proper fuses if
blown off.
7.14 EARTHING
(a) All earth connections of block earth, Axle Counter, MUX and other equipment earth
are intact.
(b) Earth wire lead is not corroded and is well protected.
(c) Nut connecting earth wires to electrode are not corroded.
(d) Any other earth or system earth of electrical is not less than 20 meters away from
the equipment earth.
(e) Separate earth exists for each block.
(f) Measuring the value of earth resistance of the earthing provided for signaling circuit,
improving earth resistance if found > 10 ohms by taking step including as indicated
in SEM Para 19.92.
(g) Keeping records of the earth resistance Measurement and painting its value on
earth enclosures / nearest wall.
7.15 BPAC and Axle Counters
(a) Co-operative reset is effective and for point zone it is from site.
51
(b) Resetting of axle counter – analysis, repeated resets and cause thereof.
(c) Channels voltages are in limit.
(d) Resetting of MUX and analysis of it.
(e) Quad cable is terminated on M6 terminals – plan for removing 8-way
(f) Availability of spares, card, field units and measuring instruments.
(g) Checking system of spares, put for one work in service.
(h) Storage of spare cards.
(i) Axle counter/MUX are provided with better earth through resistance improvement
compound.
(j) Working of trolley protection circuit.
(k) Outdoor Equipment –
Checking & tightening of all connections & screw couplers on the oscillator /
receiver amplifier unit. Observing packing conditions of supporting sleepers and
ensuring fittings do not vibrate under train and getting packed if required.
(l) Evaluator
Checking & tightening screw couplers. Verifying the counting with actual axles
of a train. Ensuring Reset switch is sealed & resetting entries tallies with counter.
(m) Note - Interference with power supply, connection of evaluator, oscillator /
receiver amplifier and transmitter and receiver coils are likely to cause random
counting in the Evaluator and should be done only after ensuring that no train is
occupying or approaching the controlled section.
7.16 Cable Testing
(a) Cable Testing as per maintenance schedule.
(b) System of monitoring cable testing as per schedule
(c) Availability of left over spares in existing cables.
(d) Age and insulation value left.
(e) Need for replacement of defective cable and quantity.
(f) Tail cables of all electrical gear are tested as per schedule.
7.17 Signal Failures
(a) Repeated failure of a gear.
(b) Repeated and cause
(c) Broad analysis and input needed for improvement.
7.18 BLOCKS:
7.18.1 General for all types of block instruments
(a) Locking & sealing.
(b) Proper working of SM’s lock up key.
(c) The telephone and telephone chord should be proper & in working order.
(d) Tones of bells are distinct when two or more instruments are provided.
(e) Instrument is in level.
(f) Instrument is not due for overhauling.
(g) Proper condition of electrical and mechanical locks.
(h) Checking & tightening of all terminal screws, lock nuts and locking screws, and split
pins opened.
7.18.2 I - Token Block Instrument - Single Line Neal’s
(a) Token receiver can receive only the token of the correct configuration.
(b) Effectiveness of ‘No Token’ lock and handle does not turn to TGT when token
indicator shows Red.
(c) No burr on tokens and free movement of token indicator.
(d) Token are not damaged / deformed.
(e) All wiring and the polarity of instruments.
(f) Locking of pawl and notches in the rack are correctly shaped and square ended.
52
(g) Carrying census of working tokens and keeping records in register of Block
Instrument & Signal History Book
7.18.3 II – Block Instrument - Double Line
(a) Checking that LSS cannot be taken OFF without line clear and is automatically
replaced to ON when train enters the Block section.
(b) Checking that the commutator handle is locked first before the “Train On Line”
indication appears on the indicator when the handle is turned from “Line Clear”
to “ Train On Line” position.
7.18.4 III - Token less Block Instrument – Single Line (Push Button type)
(a) The condition of Block Instruments and are free from mechanical damage,
corrosion, etc.
(b) Push Buttons, Indicators, relays, bell & buzzer all should be in working order.
(c) Checking that shunting key is released in Line Closed or TGT position.
(d) LSS cannot be taken OFF without line clear and is automatically replaced to ON
when train enters the Block section.
(e) The Last Stop Signal at the sending station cannot be taken ‘OFF’ until the receiving
station instrument is set to “Train Coming From” condition and the sending station
instrument is set to “Train Going To” condition.
(f) The Line Clear can be granted only when reception signals and the Last Stop
Signal are proved at ‘ON’.
(g) The opposing Last Stop Signals of the block section Cannot be taken ‘OFF’ at one
and the same time.
7.18.5 IV- Tokenless Block Instrument - Single Line (Handle type)
(a) Full deflection of Needle indicator.
(b) LSS cannot be taken OFF without line clear and is automatically replaced to ON
when train enters the Block section.
(c) Working of all counters. Shunting key is released in Line Closed or TGT position.
7.19 LEVEL CROSSINGS
(a) The proper working of telephone.
(b) Checking that Checking of audiovisual & approach warning.
(c) Checking and cleaning of traffic lights, warning bell, boom light and operating panel.
(d) Parallel operation and opening of gate.
(e) The integrity of interlocking & locking of gate boom.
(f) Proper functioning and interlocking of Emergency Key Chain.
(g) Availability of gate working instructions in vernacular language & gate working
diagram.
(h) Visual checking, oiling, greasing & graphing of gate mechanism, all moving parts and
gate locks.
(b) The founts of signal lamps are in good condition. Check for damaged flame guard,
leaky founts and broken burners and non-standard wick. To avoid poor visibility
(c) The focusing of signals.
(d) Where signals are slotted, any of the controlling agencies shall be independently
capable of returning the signal to ‘ON’.
(e) When a Warner arm is placed below a Stop arm, the slot lever shall be installed so
that the Warner cannot be taken ‘OFF’ unless the Stop Signal above is ‘OFF’. When
the Stop Signal is returned to ‘ON’ the Warner shall return to ‘ON’.
7.21 SIGNAL MACHINE
(a) The machine is in good condition, free from dirt, rust and dust, peeling off
electroplating.
(b) All the contacts for cleanliness, freedom from pitting, proper adjustment, the
cleanliness and smoothness of the commutators.
(c) Positive test - Take off signal, observe latching without clutch slipping.
(d) Negative test – Near 45 degrees & near 90 degrees before hold off device engages,
cut off feed –signal should return to ‘ON’.
(e) The position of the arm is correctly repeated on the arm indicator, if provided.
Lowering is not more than 50 degrees or raising is not more than 90 degrees.
7.37 SWR/SWRD
(a) SWR matches with SP.
(b) SP matches with the last work commissioned.
(c) Counselling of station staff is done for the late update of SWR.
7.38 Loco Pilots lobby-
(a) Signal defects are attended and the remarks are put in
(b) Repeated cases of defects reported.
7.39 Documents
(a) Completion documents are available at site.
(b) Modification, if any done, it as per approved circuit and approved diagrams for that
are available.
(c) All documents as per list are available.
57
CHAPTER VIII
SHORT CUTS TO BE GUARDED AGAINST
The department-wise short cuts / irregularities are listed below:- These are to be guarded
against.
1. OPERATING
i) Station Staff
- Non-exchange of signals by Guards with the Crew of Passing trains.
- Non-exchange of Signals by SMs/ASMs with train crew of passing trains.
- Non-exchanging/faulty exchange of Private numbers by SMs/ASMs with Switchman
and improper exchange of Private numbers with Gate Keepers of Level Crossing
Gates by Switchman. Private numbers are not exchanged in proper sequence and
time with concern station and cabins and L.C. Gates.
- Derailing switch points indicator not being lit up during night.
- Over aged detonators not being replaced.
- Non-securing of vehicles stabled at stations.
- Improper maintenance of private number sheets.
- Improper maintenance of Signal failure registers.
- Improper maintenance of weather warning register.
- Non-suspension of lock and block instrument after failure of advance starter on first
occasion.
- SMs/ASMs not personally ensuring clamping of facing points before piloting in of
coaching trains.
- Not clamping of Trailing end of motor points in case of non signalled movements.
- Handing over Pilot in & Out Memo before ensuring correct setting of route with clamp
and pad locking.
- Not supervising clamping of points by the SM on duty in case of piloting In & Out of
coaching trains.
- Non-observance of LV Boards of through passing trains by station staff.
- Use of non-standard LV boards by Guards.
- Station staff not counselled of contents of safety circulars but their signature obtained
on the acknowledgement sheet.
- Non-disposal of used P. N. Books by SMs/ASMs as per instructions.
- Motor Trolleys are being allowed by sectional controllers /ASMs following goods trains
and even after 18.00 hrs following goods trains.
- Non acceptance of disconnection memo by sectional controllers/SM/ASMs from ESM.
- Allowing of train into block section on improper line clear form.
- Inspections by Supervisors are not result oriented. Nothing unusual / deficiency noted
repeatedly.
- Non-maintenance of P.N. Books in Safe custody.
- Safety equipments not kept handy.
- Allowing goods train without C&W examinations (BPC).
- By passing of TXR points, and not offering of rakes for C&W examination.
- Non-observance of proper procedure for issuing of disconnection/Reconnection
memo. Allowing S&T staff to attend a failure without issuing Failure memo.
- Handing over Relay Room Key to S&T staff before signing of Relay Room Key
Register and without taking private number from Signal Control (SI control).
- Allowing S&T staff to interfere with Relay on the plea of saving the failure and
detention.
58
- Allowing S&T staff to repair / renew signals and point gears – violation of SR 3.51.04
- Receiving RE-connection Memo without testing the S&T gears – Violation of SR
3.51.04.
- Trains are being Piloted ‘IN/OUT’ without making corresponding entries in the Signal
failure register.
- SWRs/Gate Working Rules not corrected / updated.
- Staff overdue PME & Refresher Course.
- Leaving duty without being proper relieved – Violation of GR 2.08
- SMs do not check SM Diary, Caution Order Register, Control Order Book properly at
the time of taking over charge – Violation of GR 5.01
- Allowing Shunting operation without issuing Shunting Authority.
- Controlling shunting for other movement without withdrawing Shunting Authority.
- Slide collars are not placed on SM’s Slide for the blocked lines.
- Lever collars are not placed on concerned levers for the blocked lines.
- Routes are not set against the blocked lines.
- Handling of block instruments by persons not authorized to do so – Violation of GR
5.01(4).
- Not testing of Emergency cross over daily.
- Not checking the correct setting of points physically at the time of shunting operation.
- Not following the Bell Code for signalling of trains – Violation of GR 14.05.
- Not exchanging of Identity for obtaining Line Clear in case of Block instrument
failures.
- Non returning Shunting Authority by the Loco Pilot after completion of shunting.
- Signing on Assurance Register without thoroughly reading the SWRs.
- Attaching of banking engines without coupling of brake pipes.
- Banking engines are attached to push is allowed to return back from Mid-section
without reaching the next station.
- Preparation of train passing records before hand.
- Not providing light on the BSLB boards during night time.
- Not ensuring the first train number to which the caution order is issued from the
notice station after repeating imposition of a new caution order.
- Panel & Block instrument is being operated by unauthorized person.
- Panel is not locked by ASMs while leaving panel for essential emergency purpose
locking arrangement exists.
- Shunting instructions at road side station are issued much in advance to actual
shunting. Later any change in shunting programme is relayed through Walkie-talkie
where as instructions exists for communicating shunting programme to Guard and
Loco Pilot in writing.
- Guard and Loco Pilot are not reporting to SM on duty to collect shunting authority
and to understand the programme clearly but shunting authority is handed over to
guard and Loco Pilot by TPs.
- During single line working the detail message is not relayed to adjoining station.
- Section clearance certificate is not obtained from Loco Pilot & Tower wagon Loco
Pilots after returning from blocked line on block ticket.
- During shunting in station yard hand operated points are not clamped and padlocked.
- While stabling vehicles at road side stations hand brake is not applied.
- Guards not undergoing breath-analyzer testing.
- Station staff do not exchange signal both sides.
- Extensive use of Walkie-talkie sets has resulted in adoption of the following short-cuts
- Not exchanging of signals between the Loco Pilot and Guard.
- Communicating change in programme through Walkie-talkie sets without withdrawing
the Shunting Authority.
59
- Advising Loco Pilots to pass defective signals at ON without issuing a proper
authority.
- Loco Pilots very seldom use the P.T. set for communicating with the TLC.
60
- Starting the train hoping to get the pilot memo at a place ahead or, accepting an
authority/caution order on run.
- Loco Pilots are accepting Private No./ID No. through VHF and starting the train
without getting proper authority.
- When getting total loss of tractive effort during cab changing Loco Pilot simply
removing the fuse CCLSA and not recording in the loco log book.
- Non recording of loco failures in the Loco Log Book and non reporting of failure
message to PCR / TLC.
- Not repeating signal aspect in proper way like condition of the signal / aspect of
signal but only saying OK/Yes/Right.
- Failure to report conflicting signals and other irregularities in the defective signal
register while signing off.
- LIs are not conducting foot plate inspection on regular basis with their assigned
Loco Pilots and counselling in Crew Lobby only. (For the purpose of record – one
foot-plate inspection is completed by “signing on” and “signing off” with the Loco
Pilot. It is not just riding in the cab of a locomotive for a short stretch of a
few block sections.
- Acknowledgements of Asst. Loco Pilots are not being taken in safety, technical and
general order book.
- Loco Pilots & Guards are not exchanging signal before starting at a station instead
are communicating only on Walkie-talkie.
- Signal aspect and line nomination is being asked on Walkie-talkie by Loco Pilots.
- Trains started with pressure creation by faster pumping method. In such cases
pressure is created but without full release of train.
- Trains are accelerated immediately after braking without waiting for release for
brakes.
- Diesel Loco with low water are worked by filling of raw water.
iv) Miscellaneous
- Uneven loading – Goods Supervisors posted at loading points do not supervise the
uneven loading of wagons as per IRCM, Vol.II, para – 1507 – 1511.
- Excessive loading of parcels in the SLR causing friction of SLR floor with wheels.
- Inadequate supply of fire extinguisher in the Pantry Car and Pantry Car staff not
trained in use of fire extinguishers.
- Gas cylinders are not kept in the LPG chamber in Pantry Cars, Pipe line connection
is not provided to connect the LPG cylinders kept in the chamber with the
ovens.
- Pantry cars used without Explosive clearance for retro fitment of LPG cooking
facilities.
3. CIVIL ENGINEERING
i) Level Crossing
62
- Road Bump, Sign Boards, height gauges, lights of gate lamps, warning bells are not
properly maintained.
- Check rails of standard type not provided.
- Pipes for fixing banner flag and H.S.Lamp not provided.
- Gate keepers’ equipments deficient and not maintained properly.
- Gate barriers closed but not inter-locked during passage of train
- Gate barriers can be lifted after gate signal is lowered.
ii) At Stations
- Points and Crossing not maintained properly.
- Joint inspection by SI & PWI not done regularly.
- Points giving excess throw and having worn out tongue rails.
- Welding on crossing noses and wing rails done improperly.
- Extra shoulder width of ballast not provided in turn- in curves.
- Cross over rail gauge face not lubricated.
- Gangs working at site without proper protection.
- Poor drainage system at Station Yards.
- Loop lines not maintained properly.
- Scanty ballast on loop line and station/yards.
- Gauge tie-plates under crossing deficient.
- Unserviceable wooden sleepers in points and crossings.
- Incorrect fixing of stretcher bar.
- Rail joints not packed properly. Gap not maintained properly.
iii) Mid Section
- Check rails not provided with 6 curves
- Released materials lying at site in secured position.
- Excess ballast stacked near rail
- Sighting tell-tale marks to caution Loco Pilots during fog/smog not marked during
foggy seasons.
- Bad Running due to non-consolidation after track renewal works.
- Deficiency and dropping of keys noticed.
- Curve alignment not maintained properly.
- Rail closures not covered under speed restrictions.
- Rail closures used on joints without proper securing.
- Only one or two fish bolts used in place of four.
- Wooden blocks not placed below 10 year old joints with JFP
- Gas cut rails and Gas cut closures are used frequently – Violation of IRPWM Para
253 (4).
- Quality of through packing not good.
- Proper track protection not done at work site location – Violation of GR 15.09
- Proper caution order not imposed before commencing of work on track – violation
of SR 15.08.10.
- Temporary metallic jumper not used while cutting of running rails or
discontinuing of rail joints for repairs etc. – Violation of TRPWM Para 284.
- Fixation of Engineering Indicators – Caution Indicators, Speed Indicators, T/P and
T/G Board are either not fixed or not provided at correct location – Violation
of SR 15.09.02.
- Material Trolley / Rail Dolly working is done without informing the SM and without
ensuring proper protection – Violation of SR 15.27.05.
- Rail Dolly / Lorry working done in Track Circuit Zone without informing of SM on
duty resulting signal failures – Violation of SR 15.27.05.
63
- Working of rail dolly is not permitted in sections having gradient steeper than 1 in
200. In absence of traffic blocks for diplorry working rail, rail dolly working is
resorted to in sections having gradient steeper than 1 in 200.
- Structural bond on electric masts are not reconnected after Track Machine work –
Violation of IRPWM Para 282(3)(c).
- Patrol Chart not provided with the Patrolmen as well as the concerned SMs –
Violation of SR 15.05.04.
- Not supplying of Proper equipment to the Patrolman – Violation of SR 15.05.09.
- Compliance of defects recorded in Joint Inspection of Points & Crossings Register
not reflected in the Register in time – Violation of JPO.
- Non-availability of Proper Safety Equipment in Track Machines – Violation of IRTMM
Para 4.4.1.
- Proper ramp not provided after TRT and PQRS working of track.
- Contractor Labour working without presence of Railway Supervisor at site Violation
of IRPWM Para 826.
- Contractor Supervisors deployed at work site without a Competency Certificate of
AEN and Safety Training of ZRTC / SNY – Violation of IRPWM Para 826
- Welding of running Rails being done without taking Traffic Block.
- Maintenance /Repair work of track in Track Circuiting area being done without
presence of the S&T Staff.
- Maintenance / Repair work done at points and crossings areas without presence of
the S&T staff.
- Careless unloading of engineering materials like Sleepers, Rails etc. damaging
other fittings like OHE masts etc.
- Fouling boards dislodged during track maintenance work not replaced in its proper
place.
- Provision of non-standard Fouling boards.
- Not fixing of required number of fish bolts at the fish plated joints.
- Deficiency of Competency Certificate and Counselling of the Track Machine
Operators.
- At Engg. Works site banner flag and detonators not placed at prescribed distance.
- Gateman keeping ‘C’ class LC gate (non interlocked) half open though it should
be kept normally closed road traffic.
- During Mid Section block the PWI does not take ID covers from SMs for their
identification.
- While welding, sufficient cooling is not done due to insufficient block .
- The process of one rail joint welding needs at least 11/2-hour traffic block to
complete all its operations. In absence of sufficient block, the traffic is passed over
the welded joint before giving sufficient time to either grinding or cooling.
- Distressing of LWR is being done in 2 parts instead of SEJ to SEJ as supposed to be
done.
- The speed restriction boards provided do not tally with actual caution orders issued
to Loco Pilots.
- TP/TG boards are missing at Engg. Works Sites.
- The prescribed distance of speed restriction caution boards are not provided.
- Painting not done under sleepers on Bridge girder.
- Non standard sand hamp provided at stations.
- Patrolmen not exchanging diary or obtaining signature of SM during their patrol.
Signatures are taken subsequently.
- Trackmen working in the electrified territory without insulated gloves.
- The loading siding lines cluttered with ore/materials resulting frequent derailment.
64
4. ELECTRICAL (TRD)
- Practice of providing discharge/earth rod on contact wire during power block
working: Discharge rod not fixed on registration tube and the rod not tied with
mast.
- Provision of additional earth rod whenever earth rod whenever zone of a particular
working gang exceeds one kilometre.
- Staff engaged in work without helmet and hand gloves. Use of safety tools (eg.
Protective ropes) should be ensured.
- While working on ladder not wearing tool jacket to avoid supply of spanner and
tools by throwing from below.
- Operation of isolator switch not done by using hand gloves and gumboots.
- Isolator operation on load in prohibited as per ACTM. Isolator opened on load for
saving time of Power block as well as to minimize the no-tension section.
- Tower wagon movements by verbal order are to be avoided.
- PTW on equipment / elementary section should be issued after receiving
confirmation of the concerned equipment / switches.
- Non provision of cross bonds at the level crossing gates.
- Non switching off OHE on the other line in case of tripping of OHE on one line in
double / multiple line section.
- Tree trimming exercise not carried out by ensuring 2 m safe zone or under power
block condition.
5. ELECTRICAL (GENERAL)
- Sealed E.L. Boxes are not loaded in the SLRs of coaching trains at the originating
stations.
- Non-standard fuse is used in place of proper rating HRC fuses.
- Temporary connection is given in case of failure of AC coach by pre-cooling cable
instead of introducing IVC system.
- Coach with defective TL equipment, EFT (Emergency Feed Terminal)from adjacent
coach is provided without isolating alternator, battery and reduction in load of
defective coach.
- Earthing of the supply system is not checked as per schedule.
- Battery topping done with tap water.
- Improper screwed nut-bolt fittings locked by welding.
- Standard fuses replaced by handmade fuses in electric circuits.
6. ELECTRIC LOCO
- P1 & P2 pressure switches are not being calibrated on the same test bench on
which pressure gauges are being calibrated.
- Safety chains for SL are not provided in placed of safety clamps.
- Cleaning of ‘V’ cone not carried out.
- Unscreened sand filled in sanding apparatus.
- Auto drain valve not fully overhauled, as kit is not available.
65
7. MECHANICAL
- TXR uses literate hand to examine rolling stock instead of going himself.
- Defects and deficiencies of wagons noticed by TXR not recorded properly.
- BFR loads are not provided with stranchion rods.
- Maintenance Instructions of rolling stock not available at train examination point.
- Air Compressor defective / not operated for want of power.
- Trains allowed with defective brake gear assembly such as deficient brake blocks,
worn out brake shoes, bent brake and pull rods and deficient safety brackets.
- Engineering keys used in place of Knuckle pin in CBC.
- Trains allowed with inadequate brake power. Deficiencies of Distributor valve,
Control rod, SAB, brake blocks and pull rods.
- Trains allowed with titled axle box, dropping buffers insufficient springs and
deficient ‘Load Empty Linkages”.
- Stop Board and Danger Lamp not placed on both side of the train during C&W
examination.
- Welding work being done without earthing connected to avoid damage on bearings.
- Not recording the deficiency of Passenger Amenity items in the DRS Card jointly
with RPF staff.
- Not ensuring packing and securing of loads while certifying the load inside the Steel
Plant.
- Mixing up of different greases during topping up in sick lines.
- C&W staff not informing SM or Guard while attending trouble shooting on line.
- Loco Pilots & Guards are not ensuring full vacuum before starting vacuum train.
- Helmets, gloves and shoes are not used by maintenance staff.
- Excessive piston stroke or non-griping in CASNUB bogie:- Rather than adjusting the
’A’ dimension, end pull road is adjusted or one siphon pipe clip is put at the
control rod end.
- Non-standard piece knuckle pin is used with welding a washer on top.
- The CBC locker or toggle is provided with counter weight by welding.
- MS plate is placed at CBC striker casting with welding to compensate for sank wear.
- CBC being uncoupled not by lifting but by gas cutting wagon floor to take out
locking pin.
- Log books of major M&P not maintained as a result fuel accountal not kept
properly.
66
An alert person is best Safety Device
“Be Always Alert”