Intake Structure Design

The document summarizes the design of various structures for a hydro power intake, including: - The trash rack piers are designed to withstand a differential head of up to 6m. - A middle pier supporting the trash rack is designed as a column to support a load of 21,200kN including the weight of the pier and deck slab. - A gate pier is designed to support a total load of 27,000kN from the weight of the pier and loads from the hoist platform slab. - A beam (B1) at the hoist platform level is designed to support a uniform load of 69.2kN/m from the slab as well as a 250k

Uploaded by

Sripara Krishna
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
100% found this document useful (1 vote)
770 views4 pages

Intake Structure Design

The document summarizes the design of various structures for a hydro power intake, including: - The trash rack piers are designed to withstand a differential head of up to 6m. - A middle pier supporting the trash rack is designed as a column to support a load of 21,200kN including the weight of the pier and deck slab. - A gate pier is designed to support a total load of 27,000kN from the weight of the pier and loads from the hoist platform slab. - A beam (B1) at the hoist platform level is designed to support a uniform load of 69.2kN/m from the slab as well as a 250k

Uploaded by

Sripara Krishna
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 4

Design of intake structure :

As per cl.5.3.9 of IS 9761-1995 ("Hydro power Intakes -'-Criteria for Hydraulic Design") ,
the trash rack pier shall be designed for a differential head of 3 to 6mts .
depending upon the efficiency of the cleaning of Trash rack

Considering the Max differential head of 6 m for the design of Trash rack piers,
Total Horizontal force H = 706.05 Kn
=(6*10 +0)*3.9225*6/2
Length of the Pier = 10500 mm
Avg. width of pier = 2000.00 mm
Bed Level of the trash rack pier = 41.417 m
Top level of the trash rack pier = 73.000 m
Ht.of the Trash rack pier =73-41.417 = 31.583 m
C/C of D/T = 17.00 m
Avg.Spacing of the trash rack pier = 3.92 m

Design of middle pier :


Vertical loads on the pier :
Ht of the pier = 31.58 m
Area of c/s of the pier = 21 Sq.m
Wt. of the pier =31.583*21*25 = 16581.075 Kn

Loads from the Deck slab :


Avg. Thickness of Top slab = 0.5 m
Length of the slab along the flow direction = 10.5 m
Avg. width of pier = b = 2000.00 mm
Wt. of slab on pier =0.5*10.5*3.9225*25/2 = 257.41406 Kn

Live Load on the slab =10.5*3.9225*10 = 411.8625 Kn

Total Load on Pier = = 17250.352 Kn


say 21200 Kn

Moments middle pier


Max differential water head = 6m
Horizontal load on trash rack pier =6*10*3.9225*6/2 706.05
C.G of the horizontal force from bottom 26.733

Max.BM in Trash rack pier = 18874.83 Kn-m


F.B.M = = 28312.252 Kn-m
DESIGN OF middle pier as column -
DESCRIPTION
P IN Kn. 21200.00 Kn
Mx IN Kn-M (Moments about xx) 18874.83 Kn-m
My IN Kn-M (Moments about yy) 424.00 Kn-m
Pu 31800.00 Kn
Mux 28312.25 Kn-m
Muy 636.00 Kn-m
COLUMN SIZE. (B) 2000.00 mm
COLUMN SIZE. (D) 10500.00 mm
ASSUMED STEEL IN SQ.MM 126000.00 Sq.mm
% OF STEEL p 0.60 %
Grade of concrete(Fck) 25.00
p/Fck. 0.02
Pu/Fck*B*D 0.06
Puz 274050.00
Pu/Puz 0.12
n 1.00
Mux1' =0.05*2000*10500*10500*25/1000000275625.00
Muy1' =0.04*2000*2000*10500*25/1000000 42000.00
(Mux/Mux1)n +( Muy/Muy1)n 0.12
safe
Provide T32 @ 150 c/c (avg spacing)

Design of Gate Pier:

Pier size of the pier = 2000 x 12500 mm


Bed Level of the D.T pier = 41.417 m
Top level of the D.T pier = 73.00 m
Ht.of the D/T pier bellow 79.0m to E.L 41.417 31.58 m
Avg, spacing of c/c of supports = 8.50 m
Max. water level in fore bay 67.161
pump floor level 51.30
Max. water head on piers 15.86
Total Horizontal load 10691.78 Kn
Max moment at pump floor level 56527.447 Kn-m

Vertical loads on the Gate pier :


Area of c/s of the pier = 25000000 Sq.mm
= 25 Sq.m
Ht.of the D/T pier = 31.58 m
Area of c/s of the pier = 25000000 Sq.mm
= 25 Sq.m
Wt. of the pier =25*31.583*25 = 19739.375 Kn

Loads from the hoist platform slab at E.L73 :

a) Slab Load , =(12500/1000*(17/2)*0.4*25)= 1062.5 Kn


b) Beam Load =(2*(17/2)*0.5*1*25) = 212.50 Kn
c) L.L on Slab =(12500/1000*(17/2)*10) = 1062.5 Kn
d) Wt. of gate & hoist 500 kn

Total Load = 22911.51 Kn


say 27000 Kn

DESIGN OF D/T PIER :-

P IN Kn. 27000.00 Kn
Mx IN Kn-M 56527.45 Kn-m
My IN Kn-M Min. eccentricity 540.00 Kn-m
moment
Pu 40500.00 Kn
Mux 84791.17 Kn-m
Muy 810.00 Kn-m
PIER SIZE. (B) 2000.00 mm
PIER SIZE. (D) 12500.00 mm
ASSUMED STEEL IN SQ.MM 150000.00 Sq.mm
% OF STEEL p 0.60 %
Grade of concrete 25.00
p/Fck. 0.02
Pu/Fck*B*D 0.06
Puz 326250.00
Pu/Puz 0.12
n 1.00
Mux1' =0.05*2000*12500*12500*25/1000000390625.00
Muy1' =0.04*2000*2000*12500*25/1000000 50000.00
(Mux/Mux1)n +( Muy/Muy1)n 0.23
safe
Provide T32 @ 130 c/c (avg spacing)
Design of Beam - B1 at Hoist plotform level at EL73 m
( Beam in between the D.T piers in vent)
B D
Beam size = 500 x 1000 mm
Eff. Depth of beam 950 mm
Load on the slab =0.3*25+10 17.5 kn/m
Span of the Beam = l 7.16 m
Slab Panel Size = = 7.16 x 6.25
U.D.L on The Beam = =(12500/4/1000)*(17.5) 54.6875 kn
Self-wt. =500*1000*25/1000^2 12.5 kn
Wt. of railing 2 kn/m
Total Load coming on the beam = w 69.2 kn
Point load due to gate wt. 250 kn
Max BM = w*l^2/10 =69.1875*7.155^2/10 354.19866 kn-m
Moment due to point load = 223.59375
Total moment = 577.79241
F.B.M = =577.79241046875*1.5 866.68862 kn-m

Mu/b*d*d =866.688615703125*10^6/(500*950^2) 1.92

pt = 0.498 %
Ast =0.498*500*1150/100 2863.5 mm^2

Provide T 32 - 4 No.s straight and 2 No.s extra at Top at supports


Provide T 32 - 4No.s straight and 2 No.s extra at Bottom at mid span

Check for SHEAR

Shear Force = 372.51828 kn


Max.shear force =*250/2+354.19866046875/2 177.09933 kn
pt = 0.498 %
Load taken by Concrete =0.36*500*950/1000 171 kn
Load taken up by stirrups =S.F = =177.099330234375-171 6.0993302 kn
S.F / d =6.09933023437506/950*10 0.06 Kn/cm

Provide T 12 - 2 Legged Stirrups @125 mm c/c at the ends


Provide T 12 - 2 Legged Stirrups @200mm c/c at Mid-span