0% found this document useful (0 votes)
155 views1 page

Production Schedule Film

The production schedule outlines the filming plan for a week in October, including script work, auditions, location scouting, and assembling the crew. Key events include finishing the script on October 16th, holding auditions on October 18th, and aiming to complete all preparatory work by October 20th to stay on schedule for the upcoming film production.

Uploaded by

api-426337323
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
155 views1 page

Production Schedule Film

The production schedule outlines the filming plan for a week in October, including script work, auditions, location scouting, and assembling the crew. Key events include finishing the script on October 16th, holding auditions on October 18th, and aiming to complete all preparatory work by October 20th to stay on schedule for the upcoming film production.

Uploaded by

api-426337323
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 1

Production Schedule

Please include location, time of film, what you are filming and
team members including actors

Date Plan of action Evaluation / behind the scenes

Week beginning

14th Oct  Production Catch up


Schedule
 Proposal

15th Oct  Script Catch up

16th Oct  Script Catch up – Script finished today


 Props list

17th Oct  Auditions Prep Catch up


 Location recees

18th Oct  Auditions Catch Up

19th Oct  Crew list Catch Up

20th Oct CATCH UP, FINISH Catch up


EVEYTHING