0% found this document useful (0 votes)
869 views9 pages

7-Point Container Inspection Check List: 5. Front Wall 6. Ceiling/Roof

This document provides a 7-point container inspection checklist. A 7-point inspection of all containers is required to verify the physical integrity and reliability of locking mechanisms before loading. Containers showing damage or tampering must not be used and should be reported immediately. Inspectors must follow guidelines for container inspections to ensure integrity.

Uploaded by

dharmawan
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
869 views9 pages

7-Point Container Inspection Check List: 5. Front Wall 6. Ceiling/Roof

This document provides a 7-point container inspection checklist. A 7-point inspection of all containers is required to verify the physical integrity and reliability of locking mechanisms before loading. Containers showing damage or tampering must not be used and should be reported immediately. Inspectors must follow guidelines for container inspections to ensure integrity.

Uploaded by

dharmawan
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
You are on page 1/ 9

Form #200-007B

7-Point Container Inspection Check List


Procedures must be in place to verify the physical integrity of the container structure prior to stuffing, to include the reliability
of the locking mechanisms of the doors. A 7-point container inspection is required for all containers. Containers that have
damage or appear to have been tampered with are not to be used for Jasco Shipments and should be reported to the
carrier immediately. The guidelines of the C-TPAT Container & Seal Inspection Instructions (under separate attachment)
should be followed at all times to insure the integrity of the container.

DATE: CONTAINER NO:

INSPECTOR’S NAME:

6. Ceiling/Roof 5. Front Wall

4. Left Side

3. Right Side
2. Inside/Outside Doors

1. Outside/Undercarriage
7. Floor (Inside)

SIDES SATISFACTORY REMARKS

1. Outside/Undercarriage Yes No
(Before Entering Facility)

Yes No
2. Inside/Outside Doors

Yes No
3. Right Side

Yes No
4. Left Side

Yes No
5. Front Wall

Yes No
6. Ceiling/Roof

Yes No
7. Floor (Inside)

Printed Name Signature

Rev 3/14/11 Date


Form #200-007B

7-Point Container Inspection Check List


Procedures must be in place to verify the physical integrity of the container structure prior to stuffing, to include the reliability
of the locking mechanisms of the doors. A 7-point container inspection is required for all containers. Containers that have
damage or appear to have been tampered with are not to be used for Jasco Shipments and should be reported to the
carrier immediately. The guidelines of the C-TPAT Container & Seal Inspection Instructions (under separate attachment)
should be followed at all times to insure the integrity of the container.

DATE: CONTAINER NO:

INSPECTOR’S NAME:

6. Ceiling/Roof 5. Front Wall

4. Left Side

3. Right Side
2. Inside/Outside Doors

7. Floor (Inside) 1. Outside/Undercarriage

SIDES SATISFACTORY REMARKS

1. Outside/Undercarriage Yes No
(Before Entering Facility)

Yes No
2. Inside/Outside Doors

Yes No
3. Right Side

Yes No
4. Left Side

Yes No
5. Front Wall

Yes No
6. Ceiling/Roof
6. Ceiling/Roof

Yes No
7. Floor (Inside)

Printed Name Signature

Rev 3/14/11 Date


st
to include the reliability
Containers that have
e reported to the
eparate attachment)
Form #200-007B

7-Point Container Inspection Check List


Procedures must be in place to verify the physical integrity of the container structure prior to stuffing, to include the reliability
of the locking mechanisms of the doors. A 7-point container inspection is required for all containers. Containers that have
damage or appear to have been tampered with are not to be used for Jasco Shipments and should be reported to the
carrier immediately. The guidelines of the C-TPAT Container & Seal Inspection Instructions (under separate attachment)
should be followed at all times to insure the integrity of the container.

DATE: CONTAINER NO:

INSPECTOR’S NAME:

6. Ceiling/Roof 5. Front Wall

4. Left Side

3. Right Side
2. Inside/Outside Doors

1. Outside/Undercarriage
7. Floor (Inside)

SIDES SATISFACTORY REMARKS

1. Outside/Undercarriage Yes No
(Before Entering Facility)

Yes No
2. Inside/Outside Doors

Yes No
3. Right Side

Yes No
4. Left Side

Yes No
5. Front Wall

Yes No
6. Ceiling/Roof
6. Ceiling/Roof

Yes No
7. Floor (Inside)

Printed Name Signature

Rev 3/14/11 Date


st
to include the reliability
Containers that have
e reported to the
eparate attachment)

You might also like