Form #200-007B
7-Point Container Inspection Check List
Procedures must be in place to verify the physical integrity of the container structure prior to stuffing, to include the reliability
of the locking mechanisms of the doors. A 7-point container inspection is required for all containers. Containers that have
damage or appear to have been tampered with are not to be used for Jasco Shipments and should be reported to the
carrier immediately. The guidelines of the C-TPAT Container & Seal Inspection Instructions (under separate attachment)
should be followed at all times to insure the integrity of the container.
DATE: CONTAINER NO:
INSPECTOR’S NAME:
6. Ceiling/Roof 5. Front Wall
4. Left Side
3. Right Side
2. Inside/Outside Doors
1. Outside/Undercarriage
7. Floor (Inside)
SIDES SATISFACTORY REMARKS
1. Outside/Undercarriage Yes No
(Before Entering Facility)
Yes No
2. Inside/Outside Doors
Yes No
3. Right Side
Yes No
4. Left Side
Yes No
5. Front Wall
Yes No
6. Ceiling/Roof
Yes No
7. Floor (Inside)
Printed Name Signature
Rev 3/14/11 Date
Form #200-007B
7-Point Container Inspection Check List
Procedures must be in place to verify the physical integrity of the container structure prior to stuffing, to include the reliability
of the locking mechanisms of the doors. A 7-point container inspection is required for all containers. Containers that have
damage or appear to have been tampered with are not to be used for Jasco Shipments and should be reported to the
carrier immediately. The guidelines of the C-TPAT Container & Seal Inspection Instructions (under separate attachment)
should be followed at all times to insure the integrity of the container.
DATE: CONTAINER NO:
INSPECTOR’S NAME:
6. Ceiling/Roof 5. Front Wall
4. Left Side
3. Right Side
2. Inside/Outside Doors
7. Floor (Inside) 1. Outside/Undercarriage
SIDES SATISFACTORY REMARKS
1. Outside/Undercarriage Yes No
(Before Entering Facility)
Yes No
2. Inside/Outside Doors
Yes No
3. Right Side
Yes No
4. Left Side
Yes No
5. Front Wall
Yes No
6. Ceiling/Roof
6. Ceiling/Roof
Yes No
7. Floor (Inside)
Printed Name Signature
Rev 3/14/11 Date
st
to include the reliability
Containers that have
e reported to the
eparate attachment)
Form #200-007B
7-Point Container Inspection Check List
Procedures must be in place to verify the physical integrity of the container structure prior to stuffing, to include the reliability
of the locking mechanisms of the doors. A 7-point container inspection is required for all containers. Containers that have
damage or appear to have been tampered with are not to be used for Jasco Shipments and should be reported to the
carrier immediately. The guidelines of the C-TPAT Container & Seal Inspection Instructions (under separate attachment)
should be followed at all times to insure the integrity of the container.
DATE: CONTAINER NO:
INSPECTOR’S NAME:
6. Ceiling/Roof 5. Front Wall
4. Left Side
3. Right Side
2. Inside/Outside Doors
1. Outside/Undercarriage
7. Floor (Inside)
SIDES SATISFACTORY REMARKS
1. Outside/Undercarriage Yes No
(Before Entering Facility)
Yes No
2. Inside/Outside Doors
Yes No
3. Right Side
Yes No
4. Left Side
Yes No
5. Front Wall
Yes No
6. Ceiling/Roof
6. Ceiling/Roof
Yes No
7. Floor (Inside)
Printed Name Signature
Rev 3/14/11 Date
st
to include the reliability
Containers that have
e reported to the
eparate attachment)