0% found this document useful (0 votes)
61 views1 page

Welding Machine Inspection Log: Ras Abu Aboud Stadium Project

This document is a welding machine inspection log for the Ras Abu Aboud Stadium project in 2019. It lists information for two welding machines such as their ID numbers, manufacturers, inspection and expiry dates, and notes that they were approved and active as of September 2019. A legend at the bottom explains that "Active YES/NO" refers to whether the equipment was working on site or not present.

Uploaded by

Richu Pali
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
61 views1 page

Welding Machine Inspection Log: Ras Abu Aboud Stadium Project

This document is a welding machine inspection log for the Ras Abu Aboud Stadium project in 2019. It lists information for two welding machines such as their ID numbers, manufacturers, inspection and expiry dates, and notes that they were approved and active as of September 2019. A legend at the bottom explains that "Active YES/NO" refers to whether the equipment was working on site or not present.

Uploaded by

Richu Pali
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

RAS ABU ABOUD STADIUM PROJECT

WELDING MACHINE INSPECTION LOG


YEAR 2019
First
Onwer/Supplier TPC Expiry
Sr No Equipment Type ID No# Manufacturer Inspection Status Active Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec
Name Date
Date
1 Welding Machine G1804- 722-000234 HBK SF ASKAYNAK 17.08.2020 03.09.2019 Approved Yes √

2 Welding Machine G1804- 722-000248 HBK SF ASKAYNAK 17.08.2020 03.09.2019 Approved Yes √

10

11

12

13

14

15

16

Legend
Active YES/NO- If "Yes equipment working in Site
If "No" Equipment is not present in site