Saep 76
Saep 76
Contents
1 Scope................................................................. 2
2 Applicable Documents....................................... 2
3 Definitions.......................................................... 4
4 General Requirements....................................... 4
5 Decommissioning of Offshore Pipelines............ 6
6 Onshore Pipelines............................................. 9
Revision Summary................................................. 10
1 Scope
1.1 This SAEP describes the procedures to be followed for the decommissioning/
abandonment of offshore pipelines.
1.2 The requirements are mainly for offshore pipelines; however, decommissioning
of onshore pipeline segments connected to offshore pipelines is discussed in
Section 6.
1.3 The treatment of temporarily mothballed, idled or out of service pipelines with
potential for re-use based on future need is not within the scope of this
procedure.
1.4 The methods and procedures set forth herein are minimum requirements and are
not a release from the responsibility for prudent action that circumstances make
advisable.
2 Applicable Documents
The requirements contained in the following documents apply to the extent specified in
this procedure.
Page 2 of 12
Document Responsibility: Offshore Structures Standards Committee SAEP-76
Issue Date: 7 September 2016
Next Planned Update: 7 September 2019 Decommissioning of Offshore Pipelines
Industry Practices
URN 09D/734 Decommissioning of Offshore Oil and Gas
Installations and Pipelines - UK’s Department of
Page 3 of 12
Document Responsibility: Offshore Structures Standards Committee SAEP-76
Issue Date: 7 September 2016
Next Planned Update: 7 September 2019 Decommissioning of Offshore Pipelines
3 Definitions
Demarcation Point: A point along the onshore portion of the line, established in the
Project Proposal, to mark the location at which the submarine pipeline ends as
referenced in the installation contract.
Free Span: A pipe segment which is not supported by the seabed due to uneven
seabed, pipeline crossings, tie-in to subsea structures, soil scouring, etc.
Pipeline Stabilization: The measures required to stabilize the pipeline on the seabed
during its design life or after abandonment.
Subsea Pipelines: All lines used for the transportation of fluids and/or gases, installed
on or below the sea bed between an offshore facility and the demarcation point onshore
or another offshore facility.
4 General Requirements
4.1 Any decommissioning methods that are not addressed in this procedure shall be
reviewed and approved by the Chairman of the Offshore Structures Standards
Committee.
Page 4 of 12
Document Responsibility: Offshore Structures Standards Committee SAEP-76
Issue Date: 7 September 2016
Next Planned Update: 7 September 2019 Decommissioning of Offshore Pipelines
4.5 Each pipeline to be abandoned shall be disconnected from all production sources
and supplies.
4.6.3 Galvanic anodes are not required to be disconnected unless they can be
utilized for other neighboring pipelines.
4.6.4 Remove any CP devices such as spark gaps installed across the
insulating flanges.
4.7.2 Propellants used to drive cleaning scrapers shall be safe enough to be left
after scraping/cleaning, non-corrosive and environmentally acceptable.
4.7.3 Sea water if used as a propellant shall be treated with oxygen scavenger,
corrosion inhibitor and a biocide as per SAES-A-007.
4.7.4 Compressible driving fluids shall not be used if waxy residues are
present in large amounts.
4.7.5 Disposal of the waste water from cleaning/flushing of the pipeline shall
meet the requirements of SAEP-327.
Page 5 of 12
Document Responsibility: Offshore Structures Standards Committee SAEP-76
Issue Date: 7 September 2016
Next Planned Update: 7 September 2019 Decommissioning of Offshore Pipelines
4.7.6 It shall be ensured that no residues and scale are left in the pipeline and
the pipeline is left safe and clean on the seabed.
4.9.1 The procedure shall comply with GI-0002.100, “Work Permit System,”
GI-0006.012, “Isolation, Lockout, and Use of Hold Tags,” and
GI-0002.711 “Fire and Safety Watch.”
4.9.2 The procedure shall include detailed requirements for safe working
conditions. Abandonment shall be performed under qualified
supervision by trained personnel aware of and familiar with hazards to
personnel, public, and environment.
4.9.3 The procedure shall detail the safety measures associated with all
mechanized abandonment equipment.
4.9.4 The procedure shall include all required data such as pipe diameter, wall
thickness, grade, etc.
Page 6 of 12
Document Responsibility: Offshore Structures Standards Committee SAEP-76
Issue Date: 7 September 2016
Next Planned Update: 7 September 2019 Decommissioning of Offshore Pipelines
5.1.3 The degree of past and likely future burial/exposure of the pipeline and
its potential effect on the marine environment shall be considered.
Page 7 of 12
Document Responsibility: Offshore Structures Standards Committee SAEP-76
Issue Date: 7 September 2016
Next Planned Update: 7 September 2019 Decommissioning of Offshore Pipelines
Soil conditions
Debris and scour
Proximity to other pipelines and structures
Naturally occurring radioactive materials (NORM) status of the
pipeline
Furthermore, previous survey history/records of the pipeline with
appropriate data shall be used to confirm the current status of the
pipeline.
5.2.4 The employed recovery technique used for pipeline abandonment shall
ensure no damage to the pipelines/structures in proximity.
5.2.5 The most suitable pipeline recovery method shall be selected after due
consideration of all the requirements. The recovery methods may
include but are not limited to:
Reverse reel lay
Reverse S-lay
Reverse J-lay
Davit lift barge
Towing
5.2.5.1 Reverse reel lay method shall be used for recovering small
diameter pipelines (up to 16” and possibly higher diameter
depending on the reel capacity). Reverse reel lay recovery will
eliminate cutting the pipeline into short lengths and the need
for a supply vessel for subsequent storage and transportation to
onshore.
Page 8 of 12
Document Responsibility: Offshore Structures Standards Committee SAEP-76
Issue Date: 7 September 2016
Next Planned Update: 7 September 2019 Decommissioning of Offshore Pipelines
5.2.8 After an abandoned pipeline has been recovered, the seabed shall be
restored to a condition which matches its surroundings.
5.2.12 When the offshore section of the pipeline is being recovered, the shore
approach section shall be left in place provided it has sufficient cover
and will not be exposed subsequently or have a deleterious effect on the
environment.
5.2.13 Pipeline recovery shall be analyzed on a case by case basis, the criteria in
each case being dependent on the condition of the pipeline.
6 Onshore Pipelines
6.1 The requirements in this section apply only to onshore pipeline segments
connected to offshore pipelines. Furthermore, general requirements outlined in
Section 4 are applicable for onshore pipelines.
Page 9 of 12
Document Responsibility: Offshore Structures Standards Committee SAEP-76
Issue Date: 7 September 2016
Next Planned Update: 7 September 2019 Decommissioning of Offshore Pipelines
6.3 The preferred option for onshore pipeline abandonment shall be by leaving in
place considering minimal environmental impact and safety risks.
6.4 Buried onshore pipelines which are expected to remain buried, the following
requirements do not apply:
Qualitative risk assessment.
Environmental impact assessment.
6.5 If it is not practical to abandon the pipeline in place then the access, recovery,
disposal and land restoration shall be planned to minimize environmental impact
and safety risks.
6.6 The removal of onshore pipelines should be conducted in a way that does not
negatively impact any ecologically sensitive areas (defined in SAEP-13).
Revision Summary
7 September 2016 New Saudi Aramco Engineering Procedure that describes the procedures to be followed
for the decommissioning of offshore pipelines.
Page 10 of 12
Document Responsibility: Offshore Structures Standards Committee SAEP-76
Issue Date: 7 September 2016
Next Planned Update: 7 September 2019 Decommissioning of Offshore Pipelines
2. Inventory of materials.
3. Pre decommissioning survey (required for offshore pipeline recovery option and for
onshore pipelines segments connected to offshore pipelines).
4. Cleaning/flushing procedure.
10. Pipeline material disposal plan (required for recovery option only).
Page 11 of 12
Document Responsibility: Offshore Structures Standards Committee SAEP-76
Issue Date: 7 September 2016
Next Planned Update: 7 September 2019 Decommissioning of Offshore Pipelines
R - RESPONSIBLE
PROPONENT
DRILLING
A - ACCOUNTABLE
MARINE
P&CSD
PFDD
RMD
CSD
OPD
HSU
GES
EPD
LPD
FPD
C - CONSULTED
GA
CD
ID
I - INFORMED
TASKS
1. BUSINESS CASE
1.1 Late Life Operation & Field assessment R A/R I C R I
1.2 Decision to Abandon R A/R C I I I I I I C R C
1.3 Regulatory Permits & Approvals R A C
1.4 Contracting Strategy A R C
2. PRE-DECOMMISSIONING
2.1 Asset & Site Evaluation A I R R C
2.2 Decommissioning Alternatives C A C C C C I C C C R
2.3 Engineering Studies I A C I C C I C R I R I
2.4 Disposal Planning A I C C C R
3. DECOMMISSIONING EXECUTION
3.1 Pipelines/Facilities Making Safe I A/R C C C I C R I R
3.2 Pipeline Cleaning/Flushing I A/R C C C I C R I R
3.3 Disconnection and Decommissioning of CP I A/R I C C I C R I R
3.3 Leaving in Place I A/R I R C C R C A R
3.4 Pipeline Removal I A I R C C R I A R
4. POST-DECOMMISSIONING
4.1 Site Remediation C I C A R I
4.2 Waste Disposal A C I C R R
ACRONYMS
ID INSPECTION DEPARTMENT
PFDD PRODUCING AND FACILITIES DEPARTMENT P&CSD PROCESS AND CONTROL SYSTEMS DEPARTMENT
GA GOVERNMENT AFFAIRS OPD OFFSHORE PROJECTS DEPARTMENT
CD CONTRACTING DEPARTMENT GES GENERAL ENGINEERING SERVICES CONTRACTOR
LPD LOSS PREVENTION DEPARTMENT RMD RESERVOIR MANAGEMENT DEPARTMENT
CSD CONSULTING SERVICES DEPARTMENT FPD FACILITIES PLANNING DEPARTMENT
EPD ENVIRONMENTAL PROTECTION DEPARTMENT HSU HYDROGRAPHIC SURVEY UNIT