02.08.19 0 Initial Submission: M/S Yongma Engineering Co. LTD in Association With Sterling Indotech Consultants

This document is the initial submission for the design of an abutment pier and open foundation for a flyover at kilometer 151+400 for lanes A1 and A2. It was prepared by VDB Projects Pvt. Ltd. for the National Highways Authority of India and their proof consultant M/S Yongma Engineering Co. Ltd. in association with Sterling Indotech Consultants. The safety consultant was Horizon Consultants Pvt. Ltd. and the design consultant was Pavas Engineering & Management Consultants Pvt Ltd.

Uploaded by

Syed Talha Zaid
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
394 views4 pages

02.08.19 0 Initial Submission: M/S Yongma Engineering Co. LTD in Association With Sterling Indotech Consultants

This document is the initial submission for the design of an abutment pier and open foundation for a flyover at kilometer 151+400 for lanes A1 and A2. It was prepared by VDB Projects Pvt. Ltd. for the National Highways Authority of India and their proof consultant M/S Yongma Engineering Co. Ltd. in association with Sterling Indotech Consultants. The safety consultant was Horizon Consultants Pvt. Ltd. and the design consultant was Pavas Engineering & Management Consultants Pvt Ltd.

Uploaded by

Syed Talha Zaid
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 4

02.08.

19 0 INITIAL SUBMISSION PSK MNR


DATE REV. NO. DESCRIPTION Designed Checked
REVISIONS
EPC CONTRACTOR : CLIENT
VDB PROJECTS PVT. LTD. NATIONAL HIGHWAYS AUTHORITY OF I
BANGALORE (Ministry of Shipping, Road, Transport
Highways)
AUTHORITY ENGINEER PROOF CONSULTANT :
M/S YONGMA ENGINEERING CO. LTD
IN ASSOCIATION WITH
STERLING INDOTECH CONSULTANTS TECHNICAL CONSULTANCY SERVICES

SAFETY CONSULTANT : DESIGN CONSULTANT :

PAVAS ENGINEERING & MANAGEME


HORIZON CONSULTANTS PVT. LTD
CONSULTANTS PVT LTD, HYDERABA
PROJECT : SIX LANING OF DEDICATED PORT ROAD TO KRISHNAPATNAM PORT (PACKAGE I) FROM KM. 0+000 to KM. 18+000
EPC MODE
JOB No.

TOTAL NO. OF PAGES TITLE :


NAME SIGN DATE
DSGN PSK 02.08.19 DESIGN OF ABUTMENT PIER AND OPEN FOUNDATION FOR FLYOVER AT
CHKD MNR 02.08.19 151+400 FOR A1 & A2
DESIGN OF ABUTMENT PIER AND OPEN FOUNDATION FOR FLYOVER AT
151+400 FOR A1 & A2
APPD PRK 02.08.19
CODE
DOC. No. PEMCPL/VDB/KP1/FLO/151+400/DC/201
IRC

RELEASED FOR PRELIMINARY TENDER INFORMATION P APPROVAL


MNR PRK
Checked Approved

NATIONAL HIGHWAYS AUTHORITY OF INDIA


(Ministry of Shipping, Road, Transport &
Highways)

TECHNICAL CONSULTANCY SERVICES

PAVAS ENGINEERING & MANAGEMENT


CONSULTANTS PVT LTD, HYDERABAD
KRISHNAPATNAM PORT (PACKAGE I) FROM KM. 0+000 to KM. 18+000 ON

UTMENT PIER AND OPEN FOUNDATION FOR FLYOVER AT KM.


151+400 FOR A1 & A2
CODE REV.

IRC 0

CONSTRUCTION