The document is a procurement approval format for a 44MW solar project. It compares pricing and other details for a main HT panel from different vendors - ABB, Schneider, and SGPL. ABB is ranked L2 with a quoted price of 588,240 while Schneider is ranked L3 with a price of 731,880. SGPL is ranked L1 with a price of N/A. The delivery timelines are also specified. A second quotation evaluation sheet compares pricing from Siechem and Lapp India for DC solar cables. Siechem is ranked L1 with a total price of 588,240 while Lapp India is ranked L2 with a total price of 731,880. Delivery

Uploaded by

rajesh
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
93 views3 pages

Basic QES Form

The document is a procurement approval format for a 44MW solar project. It compares pricing and other details for a main HT panel from different vendors - ABB, Schneider, and SGPL. ABB is ranked L2 with a quoted price of 588,240 while Schneider is ranked L3 with a price of 731,880. SGPL is ranked L1 with a price of N/A. The delivery timelines are also specified. A second quotation evaluation sheet compares pricing from Siechem and Lapp India for DC solar cables. Siechem is ranked L1 with a total price of 588,240 while Lapp India is ranked L2 with a total price of 731,880. Delivery

Uploaded by

rajesh
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 3

` SCM Guidelines - Annexure H - PAF /Rev 00 / 01-07-18

ANNEXURE H - PROCUREMENT APPROVAL FORMAT


Project Name 44MW GRT, TN Material Group Main HT Panel
ABB / Schneider / GE /
Project Number R/18/0020 Approved Makes Siemens / SGPL
Branch Bangalore Non Approved Makes -
Cumulative Variance Sales stage support - Vendor -

Item Own Cost ABB Schneider SGPL Benchmark Price


Finalised - BASE 0 588,240 731,880 - -
Payment Terms
Deviation from OC (588,240) (731,880) -
% Deviation from OC #DIV/0! #DIV/0! #DIV/0!
% Diff between L1 & L2 #DIV/0!
Delivery from Letter of 14-16 Weeks 10 Weeks 8-9 Weeks
Acceptance*
Guarantee / Warranty 60/63 Months 60/63 Months 60/63 Months
Ranking L2 L3 L1

Remarks or Recomendation
- Reason for negative
- Reason for L2
- Under what circumstances the order was finalised

* Delivery period - Is in line with the project schedule - YES/NO

FOR COMMODITY ITEMS


ESTIMATION PURCHASE
Month & Year LP/LME Month & Year LP/LME % Variance

To be filled manually
QUOTATION EVALUATION SHEET - DC Cable
Project : Flash Electronics and Flash Vivin

Siechem Lapp India

Sl.No Item Description Unit Qty


Date: 26.10.2018 Date: 26.10.2018

Unit Rate Total Unit Rate Total

1 CABLE - DC Solar String cable 1C*4 SQMM {Red(5000 MTS) Black(5000 MTS)} MTR 10000 25.8 258000 32.1 321,000

2 CABLE - CU FLEXIBLE 1C*4 SQMM {Red(6800 MTS) Black(6000 MTS)} MTR 12800 25.8 330240 32 410,880

Ex-Works Package 588,240 731,880


GST 18.0% Extra 18.0% Extra
Freight & Insurance (F&I) FORD FORD FORD FORD
Total Landed Price (Incl. Tax) 588,240 731,880
POSITION
Delivery 3-4 Weeks 3-4 Weeks
GTP/DRG Submission 10 Days 10 Days
Price Basic FIRM FIRM
100% payment within 60 Days from 30 days from Invoice Date
Payment Terms the date of Invoice
Warranty / Guarantee 24 Months 18 Months
UATION SHEET - DC Cable
Job No.( R/18/0113 ) (R/18/0108)

Budget / Cost
Date: 26.10.2018

Unit Rate Total Budgted Qty Unit Rate Total Other Ref