Kamarajar ST Poorvika

The document outlines the proposal for the installation of a new 100 KVA distribution transformer (DT) for Poorvika Mobiles in Kanchipuram due to an overload issue at the existing bus stand DT. It includes details on the necessary equipment, materials, and estimated costs for the project, as well as the layout of the high-tension (HT) and low-tension (LT) lines. The total estimated cost for the project is 524,570 INR.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
101 views12 pages

Kamarajar ST Poorvika

The document outlines the proposal for the installation of a new 100 KVA distribution transformer (DT) for Poorvika Mobiles in Kanchipuram due to an overload issue at the existing bus stand DT. It includes details on the necessary equipment, materials, and estimated costs for the project, as well as the layout of the high-tension (HT) and low-tension (LT) lines. The total estimated cost for the project is 524,570 INR.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 12

HT LAY OUT OF Prop DT 100 KVA For Exg1

SKETCH SHOW IN THE LOCATION OF Thiru:- N.Uvaraj D.No

Kanchi 110
kva ss

Nellukara street stree


Bus stand Singnal T1
T2
18 18
17
E
33

Kamarajar street
D
17 C2
C1 5 10
2
C
to be pro lt line cut 18
point area B

Bus stand
Annaarangam fedder

Reference:-
Exg HT 11 kv Babu suriya # with 3 wire Line with ACSR 7/4.09 fed from IN DOOR SS 33 KV/
Exg LT 3 Ph 5 Wire Line with ACSR 7/3.35 (P) + ASCR 72.59 (N) fed from bus stand SS 500 k
Exg LT 3 Ph 4 Wire Line with ACSR 7/3.35 4W P&N at loc B to F Distance of 70 mtr
Now Prop HT ABC Cable for Ph only at Loc--T ,T1,E,D to Loc -C1 for a distance of 103 mtr fo
Now Prop New DT 100 kva SS ( poorvika mobiles ) at Board side for party premises due to
sqmtr for DT erection on Plinth concreting Base at Board side

Now Prop New DT 100 kva SS ( poorvika mobiles ) due to bus stand DT 500 KVA over load
pont area in proposed 100 kva DT Supply at loc (D & E)
Now Prop Single pole AB Switch with HG Fuse set at Loc-C2 at Board side

Now to be Laying LT 4 x 240 sqmm UG Cable XLPE at loc C2 (prop DT) to Loc- C3 (prop MPB)

MPB Now to be erected 1 No HRC fuse M.S 4 way pillar box at Loc C at Party side
Now to be effected Addl Load Commercial (TF-V ) ) Exg SC No- 603-029-71 8for a Load of-4
Kanchipuram.
Now to be effected Addl Load Commercial (TF-V ) ) Exg SC No- 603-029-71 8for a Load of-4
Kanchipuram.

Now to be erected 1 No single Square pole in due to road side stud pole & stayset not ness

Exg psc 8.0 mtr pole


Prop DT 100 KVA For Exg11 kv Babu Suirya Feeder
ON OF Thiru:- N.Uvaraj D.No-1B Kamarajar street Kanchipuram

reet stree
T Indoor SS 33kv/11kv

18 Babu suraiya fedder

A
POORVIKA
MOBILES
Exg sc no
C3 603-029-718
exg
load=47.0kw
add.load 43.0
total=90.0kw

Bus stand

9 fed from IN DOOR SS 33 KV/11KV


) fed from bus stand SS 500 kva at loc SS,A to B
F Distance of 70 mtr
1 for a distance of 103 mtr for Board side
e for party premises due to building area more than 750
de

stand DT 500 KVA over load to Loc C to C2 to be LT Line cut

t Board side

op DT) to Loc- C3 (prop MPB) for a distance of 10 mtr at Party side

c C at Party side
- 603-029-71 8for a Load of-43.0 KW at D.No-1,Kamarajar Street
- 603-029-71 8for a Load of-43.0 KW at D.No-1,Kamarajar Street

e stud pole & stayset not nessuary concreting Base at Loc T2

Assistant Engineer
O & M/ Sankaramut
Total
T

C
D
T2
T1

C1
Loc No

Sag 5%
C2 to MPB
C1 PRO SS C2
5
10
17
33
17
18
18
Span

2 118
1
1
9.0 mtrs Squre PSC Pole w BP

Nos
1
1
9.0 mtrs PSC Pole W B/P

No
3
1
1
1 base plate

No
6
2
1
1
1
1

LT 3 ph Cross arm

Nos
4
2
1
1

Back Clmp 9.0 mts PSC

Nos
1
1

Back Clmp 8.0 mts PSC

Nos
1
1

Tapping channel
No
3
3

11 KV Poliymer Disc W Metalpart


set
6
6

12

LT Shakle wth metal parts


set
2
1
1

Alumknob
Nos
HT Pole Schedule Board side
5

10
Mtr
ard side

1
1
Stay set w guy

set
15
51
99
51
54
54
ABC CABLE

324
Mtr
3
63
60
AAAC 7/3.15 Jumbering

Mtr
3
63
60
AAAC 7/2.50 earthng

mtr
5
1
1
1
1
1
bolt& nut

loc
5
LT 4X240 UG CABLE

15
10

mtr
LT UG Cable Aluminium LUGS

8
8

Nos
240 sqmm

1
1

Mtr
M.S 4 way pillar box

1
1 structure material clamp set

set
1
1

HT 11 KV SP HG Fuse set

set
1
1

HT 11 KV SP AB Switchset
set
1
1

Distribution Transformer 100 kva


No
T

Loc No
Credit

0 0 1
No No No
DETAILED ESTIMATE Party side
Sl No Description Qty Rate Per Amount
HT/LT OH Feeder erected
1 9 mtr PSC pole W BP (1+1=2) 1 Each 5134 Each 5134
2 V Cross arm 4-6' 1 Each 1540 Each 1540
3 Tapping channel 1 Each 1320 Each 1320
4 Back Clamp 9.0 mtr Pole 2 Each 142 Each 284
5 HT TI Fitting 1 Each 224 Each 224
6 11 KV poliymer Disc with MP 3 Each 712 Each 2136
7 HT Pin Insulator 5 Sets 157 Sets 785
8 Stay s clamp 9.0 mtr 2 pair 251 Sets 502
9 AAAC 7/3.15 Cond 16 Mtrs 67970 Mtrs 1088
10 Bolts and Nuts 2 loc 503 loc 1006
11 LT UG Cable 4X240 sqmm Alu-LUGS 8 Each 22 Each 176
12 LT UG Cable 4X240 sqmm 15 Mtrs 878 Mtrs 13170
13 4 Way Mini Pilar box FRP 1 Each 23286 Each 23286
single pole AB Switch & HG Fuse set 0
9 mtr long RCC pole (Square No
1 Section)W BP 1 7339 Nos 7339
2 11 KV poliymer Disc with MP 3 Nos 712 Nos 2136
3 Tapping channel 1 Nos 1320 Nos 1320
4 Back Clamp 9.0 Pole 3 Each 104 Each 312
511 KV single pole mounted HG fuse set complete1 No 5892.00 Each 6
6 AB Switch for 11 KV single pole mounted 1 No 27405 Mtrs 27405

11 KV Single pole mouted structure 1 Nos 5724 Nos 5724


7 material clamp set
8 Structure Earthing Arrangement 1 Sets 4989 Sets 4989
9 Stay set complete 1 Sets 1853 Sets 1853
10 Bolts and Nuts 1 loc 503 loc 503
Cost of Materials 102237
Add. Contingencies @ 5% 5112
Sub-Total 107349
Add. Contingencies @ 3 % 3220
Sub-Total 110570
Add Labur& Transport @ 30% 33171
Sub-Total 143741
Estimate & supervision 22% 31623
GST 18% 5971
Total 181334
Chargeble to consumer Orsay Rs 181330

Board side Eqiument 100 KV SS


Sl No Description Qty Rate Per Amount
1 100KVA/11KV /433v DT( star rated) 1 No 231129 Nos 231129
2 Double Compartment Box 1 No 5768 Nos 5768
3 LT CT Meter 240 V/5A 1 No 2258 Nos 2258
4 LT CT Coil 150 / 5 A 3 No 282 Nos 846
Cost of Materials 240001
Add. Contingencies @ 1% 2400
Sub-Total 242401
Add Labur& Transport @ 20% 48480
Sub-Total 290881
Estimate & supervision 15% 43632
GST 18% 8726
Total 343240
Orsay RS 343240
ABSTRACT

HT OH SYSTEM & single pole AB


181330
Switch & HG Fuse set erected Party
I side
II Eqiument 100 KV SS Board side 343240
Gross & Net Total 524570
"COUTER SIGN "

Assistant Executive
Engineer
O&M/Town/Kanchipuram Assistant Engineer
O & M/ Sankaramut