APET Electrical
APET Electrical
Supply, installation, testing & Commissioning of following sub-station equipmens as per specs mentioned below. Prices of
items shall included all equipments as specified along with necessary fixing hardware & related work involves.
Supply,installation,testing and commissioning of Double pole structure (AS PER APPROVED STANDARD) with required
arrangement for terminating 11 KV overhead/underground conductor/DOG cable on one side and 11 KV ,3 x 95 sq.mm. Al
conductor XLPE cable on the other side including providing triple pole ,mechanically operated mounted on insulators and
1
steel frame with operating mechanism worked from ground level,expulsion fuses of 11 KV ,required rating along with 11 KV
200 amp air break isolator(as per local requirement) suitable for outdoor application ,earth switch, Metal oxide type
Lightning arrester complete with all fittings complete as required.
Supply Set -
Installation Set -
2 11KV H.T METERING PANEL
HT outdoor Metering panel as certified by the local govt. electricity board, consisting of the following components. The
Panel shall be made out of 2.5mm cold rolled, mild steel, metal clad, free standing, totally enclosed, cubical type and
compartmentalised suitable for operation on 11kV, 3phase, 50Hz, AC earthed system.
The Panel shall contain the equipment and components as described below. Complete with busbar interconnections,
control wiring, designation labels, Caution notices, EB sealing and pad locking facilities wherever required. Necessary space
provision for entry of HT cables from the bottom through detachable gland plates.
The Panel shall be finished with one coat of Air drying Epoxy primer and two coats of Epoxy paints of shade 631 0f IS:5
3 11kV SINGLE PANEL HT VCB (OUTDOOR) NEAR HT METER BOARD FOR LOCAL ISOLATION IN IP-55 ENCLOSURE
Design, manufacture and supply of Single panel, 11kV HT VCB switch board with following accessories:
Incoming
1 no. 630A, 11kV, 350MVA, TP, MDO type vertically isolated, horizontal drawout type, motorised spring charged, manually
operated, trip free, dust & vermin proof, vacuum circuit breaker(VCB) with mechanical OFF/ON indicators & provided with
following:
Note:
This panel should contain inbuilt power pack unit for arranging 24V DC auxillary power supply for panel proetction. •
Output Load : min 100W Nominal, • Continuous Load : 100 Watts. (For 10 minutes). Make - Alan, This HT VCB panel should
have alaram and proection system for tramsfofmer marshalling and oil level indications.)
3 nos. CT chamber with double wound single phase, cast resin CT, 15VA burden with core-1 for metering (CL-1) and core-2
for protection (CL-5P10) and of 60/5/5A ratio.
1 set 0-60A Digital Ammeter with selector switch.
1 set IDMT self power relay with 3 elements for over current (50-200%) and 1 element for earth fault protection(10-40%).
(IDMT relay should be numerical type)
1 set Anti Pumping Relay, Master Trip Relay & Trip circuit supervision relay.
1 set Potential transformers, 3 phase, 3 limb, drawout type, resin cast 11000/(√3)/110/(√3) ratio class-1 accuracy, 100VA
burden, with HV fuse on primary side and MCB on secondary side.(fixed type)
A set of breaker ON/OFF/Trip/DC control supply/Trip circuit healthy/ Spring Charged & R,Y, B phase indication lamps.
Supply,installation,testing and commissioning of 160 KVA 11000V / 433 V, 3 phase 50 Hz 5-Star rated 3 Phase 50HZ out-
door copper wound plinth mounted delta/star connected oil immersed naturally oil cooled core (ONAN) type Transformer
with no load voltage ratio of 11000V/433V,with off load tap changing switch with tapping of -7.5% to +7.5% in steps of
1.5% .Transformer shall be suitable for operation in an ambient temp.upto 50Deg.C and shall be supplied with suitable
neutral terminal on LT side and all accessories such as silica gel breather, magnetic oil gauge, conservator, dial type
4
temperature indicator, with voltage sensing relay, cable end boxes on LT side earthing terminals explosion vent drain valve
with plug inclusive of first filling of oil as per IS 335(witrh latest ammendments) .The transformer shall confirm to IS 1180
(with latest ammendments )in all respects like insulation levels,tempetrature rise,impedance voltage and losses.(including
testing at manufacturers premises and first filling of oil) and with adopter box if necessary as approved by consultants.
(Transformer marshalling box should be digital type protection system, not along guage type)
Transformer shall be supplied with 250A, 4P Isolator housed in weather proff box mounted on LT Terminals
Supply Set -
Installation Set -
Design, fabrication, testing & commissioning of 250A 4P, 35kA, MCCB LT Isolator in IP-65 weather proff enclosure suitable
5 to fix on RCC frame to be located near power transfomer. Prices shall be inclusive of necessary bus-bard & extension box
suitable to accept incoming & outgoing cables.
Supply Set -
Installation Set -
Supplying, testing at works, laying, testing & commissioning of following sizes of 11 KV XLPE insulated Aluminium conductor
6 armoured cables in existing hume pipe or laid in existing trenches; complete as required and as per specifications complete
as required and as per specifications.
Excavation and back filling of Cable trenches including Digging & Refilling up to 750/1000 mm Deep x 900mm Wide with
7 Sand Cushioning: 100 mm below and above cables along with table mould bricks layer on top. Cost shall be inclusive of
Cable route markers at every 30 mtrs span.
Supply RM -
Installation RM -
Making End Termination of the following sizes of HT XLPE insulated conductor armoured cable including providing terminal
8 lugs,double compression glands crimping the joints,providing insulation tape, effecting terminal connections to the
equipment complete as required: (un-earthed)
Liasioning with State Electricity Board for getting approvals, clearances for load sanction of 11KV, 65KVA approximately and
obtaining connection etc as per client's load requirement details. Complete for energising the installation with State
9 Electricity Board power as required. [All necessary client document, sub-station equipment drawings / details to be
provided by client] Actual department fee againt receipt to be paid/remburshed by client, bidder to quote of other liasion
& coordination charges.
Supply Ls -
Installation -
Actual Qty
SL No Description Unit Remarks
Liasoining with CEIG ,PCB & necessary authorities and obtaining relevant approvals for the entire DG installation consisting
10
of the above.
Supply Ls -
Installation -
Supply and fixing in position the approved "shock treatment charts" framed in teak wood frame and covered with glass in
11
front as required in two languages (Hindi & English)
Supply Nos -
Installation Nos -
Supply and fixing in position the best quality "Danger Boards" of approved shape and size as specified by Local Electricity
12
Authorities written in English and Local languages.
Supply & Laying of non skid rubber mat 914.4mm wide and 15mm thick 11kV grade as per latest IS 15652/2006 as required
13 including cuttingto required length complete as per requirement of local electricity authorities.(ISI marked class A working
voltage up to 3.3KV one slide plain and another side antiskid pattern)
Supply RM -
Installation RM -
Supply of fire buckets 5 nos. 15 litre capacity duly filled with fine sand and fixed on an angle iron frame as per requirement
14 of local authorities. The fire buckets shall be painted red from outside and white from inside, including lettered as FIRE with
white colour with extra handle at bottom.(optional with Lid)
Supply Set -
Installation Set -
15 Supply of Rubber hand gloves 11kV grade, as per IS: 4770-1968.
Supply Pair -
Installation Pair -
Supply of standard first aid box as approved by Indian red cross society / St.John Ambulance Brigade and conforming to
16
IS:2217-1963.
Supply Set -
Installation Set -
Arranging, installation, finishing the work, testing & commissioning of trenchless cutting work involves for laying the HT
17 cable under the existing tar/concrete road along with suitable dia of UPVC pipe for cable protection. Price should be
inclusive of all necessary fees, permission from the concerned department for completing the works.
Supply RM -
Installation RM -
MS chequered plates of 5mm thick to create ramp or cover above the cable trench inside the electrical room or elsewhere
as applicable. Plates as mention above shall be supplied with mill edges, required handles & other fixing accessories as
18
required cost shall be inclusive of two coats of approved enamel paint over two coats of etching primer after duly removing
the dust and oily substance.
Supply Sq.Mtr -
Installation Sq.Mtr -
Supply of laying of following UPVC pipe of 6Kg/ cm2 including road cutting, excavation to a depth of 1000mm, back filling
19
and sealing of ends and making good as required and approved:
i. 200mm dia
Supply RM -
Installation RM -
20 YARD FENCING & JELLY SPREADING ETC.
a) Providing 2200 mm high chain link fencing for HT & Transformer & DG Yard Sq.mtr
Providing gate, each of 1.50mm width (min) in two (side hung) leaves of 750 mm each to match the chain link fence
b) Nos
including necessary hinges, locking arrangements, etc., complete.
c) Supplying and spreading 40mm nominal size stone aggregate as directed (voids not considered for measurement) CUM
Designing, earthing diggins, re-filling, civl / concrete works as requires for below sub-station requipments, all plints should
be 100mm bigger than the actual size of respective equipment & 150mm high from natural ground level with necessary
21
sleeves, trenches as requires for talkng cable & earthing strips: (structure should be certified from reputed structural
engineers)
Supply, installation, teting & commissioning of end termination for following sizes of LT XLPE Aluminum/copper armoured
2 cables
(double compression):
4 Supply, installation, teting & commissioning of end termination for following sizes of LT PVC copper unarmoured cables:
Supply, installation, teting & commissioning of following size of G.I Ladder type cable tray with all accessories i.e. bends,
7
TEE, Elbows etc.
8 Supply, installation, testing & commissioning of following size of G.I Perforated type cable tray with all accessories i.e.
bends, TEE, Elbows etc.
9 Supply, installation of cable tagging for all H.T & L.T Cables and control cables.(Engraved metal type)
Supply Job -
Installation Job -
10 Supply, installation, testing & commissioning of MS fabricated supports with 2 coat of enamel paint for installation of above
cable trays:
Supply Kgs -
Installation Kgs -
Excavation and Back filling of Cable trenches including Digging & Refilling upto 750/600 mm Deep x 600mm Wide with Sand
11 Cushioning : 50 mm below and above cables along with table mould bricks layer on top for external lighting cables.
Supply RM -
Installation RM -
SUB TOTAL
C PANEL & DISTRIBUTION BOARDS
Supply, installation, testing & commissioning of Main distribution boards/ sub distribution boards/ fabricated out of 14
gauge CRCA sheet steel in cubicle formation with steel of suitable size angle iron, channels, T irons, flats wherever
necessary for large distribution boards/panels, where as 16 gauge CRCA sheet steel for final distribution boards. Cable
gland plates shall be provided at bottom for out door type panel & top and bottom for Indoor type panel.
The boards shall be treated with all anticorrosive process before painting as per standards with 2 coats of red oxide primer
& final approved shade of powder coating. 2 nos. earthing terminals shall be provided for 3 phase distribution boards. The
boards shall be suitable for 433 V, 3 phase, 4 wire, 50 Hz supply system. Lifting hooks shall be provided in case of large
boards. Boards shall be fabricated in easily transportable sections & length, height, depth etc to match with site
conditions. An approval shall be taken for each panel before final manufacture.
Front side of the panel should be painted as per the approved shade from Consultants / Architects.
1 Nos. 100A, 4P, 25KA, MOT. MCCB with inbuilt prot. of OL/SC/OV/EF, having an arrangement of cable connection on one
side & bus-bar connections on other side. with auxcillary NO/NC contacts for necesessary electrical interlocking.
1 nos. 100A TP Neutral contactors with necessary NO/NC contacts for interlocking from PLC panel.
1 Nos. 100A, 4P, 25KA, MOT. MCCB with inbuilt prot. of OL/SC/OV/EF, having an arrangement of cable connection on one
side & bus-bar connections on other side. with auxcillary NO/NC contacts for necesessary electrical interlocking.
1 nos. 100A TP Neutral contactors with necessary NO/NC contacts for interlocking from PLC panel.
f. 24V DC automatic electronic battery charger with trickle & boost facility, amphere meter for charging current &
voltmeter for battery voltage & complete with all safeties for over charging.
e) AMF Relay
Microprocessor based PLC relay for following logic:
Auto Star/Stop of D.G sets
8 slot Window annunciation screen
f) Battery charger components shall be:
1 No. 415/24V with Transformer.
1 No. Rectifier.
1 No. 96 Sq.mm 0-30A DC ammeter.
1 No. 96 Sq.mm 0-30A DC voltmeter.
These battery charger components shall be mounted within the panel. However, batteries shall be supplied additionally.
Suitable control terminals shall be provided to receive inputs from PLC panel & back to PLC panel.
Voltmeter (96 x 96 sq. mm. of range 0 - 500 Volt. with selector switch and required PT. Ammeter (96 x 96 sq. mm. ) of
range 0-250A for 100 KVA Transformer with selector switch and required CT's. 2 Sets of 3 Nos. phase indicating lamps
suitable for 230 V/AC fittings with individually 2 A SP MCB back up.
1 Nos. KWHr.meter with required CT's / PT's 3 Nos. phase indicating lamps suitable for 230 VAC fittings with 2 A SP MCB
backup.
2 Nos. indicating lamp on each incomer feeder for indicating the status of feeder with 2 A SP MCB back up.
2 Nos. over current relay and 1 no. earth fault relay with IDMT characteristics along with adjustable time delayed short
circuit release.
Over voltage and under voltage relay with a tripping mechanism for persisted voltage of 110 % or 90 % of rated voltage
shall be provided & No voltage relay shall be provided for giving signal to DG panel.
1 Set of 3 phase, 4 wire, 250/5A, Digital flush type Class-I accuracy multifunction meter. (Plus 96 of Electrex or equivalent)
(Transformer)
2 Set of 3 phase, 4 wire, 250/5A, Digital flush type Class-I accuracy multifunction meter. (Plus 96 of Electrex or equivalent)
(DG SET)
1 Sets of 300A, 4P, 415V, 25KA for 1 Sec Electrolytic grade Aluminium bus bars with PVC insulated heat shrinkable colour
coded sleeves mounted on SMC supports. Current density shall not be more than 1.0 Amp. / Sq.mm.
Note :- All MCCB's shall be provided with rotary operated mechanism & pad locking arrangement.
1 No. 8 Steps APFCR relay mounted on capacitor panel and suitably connected to Main LT panel for correction of PF to
0.98 / Unity
Incoming MCCB with standard protections shall be provided with the following :
1no. Multi data meter with necessary CT as requires.
b) Capacitors
5 Nos. 5 KVAR Capacitor
c) Bus Bars
1 sets of 100 Amps TPN Aluminium Bus Bars of suitable length. Bus bars shall be colour coded and insulated by heat
shrinkable sleeves & clip on shrouds for joints.
d) Outgoing Feeders
All outgoing feeders shall be provided with ON/OFF indicating lamps with 2 A SP MCB protection.
5 Nos.32 amp TP MCCB with MN 20C or equivalent capacitor duty contactor and all accessories suitable for operation of 5
KVAR capacitor.
Note :- All MCCB's shall be provided with rotary operated mechanism & pad locking arrangement.
Capacitor Panel as described as above and as per specification complete in all respects.
Supply Set -
Installation Set -
3 School Block Panel
a) Incomer
1 Nos. 100A, 4P, 25KA MCCB with an arrangement of cable connection on one side & bus-bar connections on other side.
125A TPN , 415V, 25KA for 1 Sec Electrolytic grade Al. bus bars with PVC insulated heat shrinkable colour coded sleeves
mounted on SMC supports. Current density shall not be more than 1.0 Amp. / Sq.mm.
d) Outgoings
2 No 63A, 4P, C-curve,10KA, MCB's.
9 No 40A, 4P, C-curve,10KA, MCB's.
1 No 40A, DP, C-curve,10KA, MCB's.
SCHOOL BLOCK PANEL as described as above and as per specification complete in all respects.
Supply Set -
Installation Set -
4 DI Block Panel
a) Incomer
Actual Qty
SL No Description Unit Remarks
1 Nos. 100A, 4P, 25KA MCCB with an arrangement of cable connection on one side & bus-bar connections on other side.
125A TPN , 415V, 25KA for 1 Sec Electrolytic grade Al. bus bars with PVC insulated heat shrinkable colour coded sleeves
mounted on SMC supports. Current density shall not be more than 1.0 Amp. / Sq.mm.
d) Outgoings
1 No 63A, 4P, 25KA, MCCB's.
3 No 63A, 4P, C-curve,10KA, MCB's.
7 No 40A, 4P, C-curve,10KA, MCB's.
1 No 40A, DP, C-curve,10KA, MCB's.
DI BLOCK PANEL as described as above and as per specification complete in all respects.
Supply Set -
Installation Set -
5 Utility / Pump Panel
a) Incomer
1 Nos. 100A, 4P, 25KA MCCB with an arrangement of cable connection on one side & bus-bar connections on other side.
125A TPN , 415V, 25KA for 1 Sec Electrolytic grade Al. bus bars with PVC insulated heat shrinkable colour coded sleeves
mounted on SMC supports. Current density shall not be more than 1.0 Amp. / Sq.mm.
d) Outgoings
1 No 80A, 4P, 25KA, MCCB's.
5 No 63A, 4P, C-curve,10KA, MCB's.
2 No 40A, 4P, C-curve,10KA, MCB's.
Utility / Pump Panel as described as above and as per specification complete in all respects.
Supply Set -
Installation Set -
6 LIFT Panel / DB
The panel shall consisting of the followings:-
a) Incoming:
63A 4P 100mA, ELCB 1 No.
b) Bus Bar:
63A TPN insulated Alu. Bus bar: 16kA for 1 set
c) Outgoing:
a). 32A 4P ELCB 30mA: 2No
b). 32A DP MCB: 2Nos
c). Switch Socket Outlet: 1
d) Metering:
(0-500V) Digital Voltmeter with Phase selector switch - 1 set and 6A TPN MCB
(0-100A) Digital Ammeter with CTs and Phase selector switch - 1 set.
Phase indication lamps with fuse and control switches - 3 Nos.
Supply Set -
Installation Set -
7 EMERGENCY / UPS PANEL
a) Incomer
1 Nos. 40A, DP,10KA D-curve, MCB with an arrangement of cable connection on one side & bus-bar connections on other
side.
70A DP,230V, 10KA for 1 Sec Electrolytic grade Al. bus bars with PVC insulated heat shrinkable colour coded sleeves
mounted on SMC supports. Current density shall not be more than 1.0 Amp. / Sq.mm.
d) Outgoings
4 No 32A, DP, D-curve,10KA, MCB's
EMERGENCY / UPS PANEL as described as above and as per specification complete in all respects.
Supply Set -
Installation Set -
9 Final Distribution Boards
Design, fabrication, assembling, wiring, supply, installation, testing & commissioning of Final Distribution boards made out
of pre-treated and powder coated 1.2mm sheet steel and glazed steel door in double door enclosure with MCB's / ELCB's
mounted on din channel, insulated prong bus bars rated for 100/63A and with separate neutral and earth terminals and in
1,2,3 & 4 pole versions as asked for or as required along with the cable end boxes on all sides of the DB's as per the
requirement or Cup-board layout suggested by Architect/Consultant.
a) LIGHTING DB's
6 WAY 7 SEGMENT DB
Incomer
1 No. 40A, 10KA, 4P, C-Curve, MCB
Phase incomer
3 Nos. 40A, 100mA, DP ELCB's each per phase and with separate neutral link per phase.
1 no. Surge suppressor 1.6KV with built-in protection fuse (Zotup Make)
Outgoing
15 Nos. 10A, 10KA, SP, C-Curve MCB's
6 WAY 7 SEGMENT LDB's as described above
Supply Set -
Installation Set -
b) LIGHTING+POWER DB's
8 WAY 7 SEGMENT DB
Incomer
1 No. 40A, 10KA, 4P, C-Curve
Phase incomer
3 Nos. 40A, 100mA, DP ELCB's each per phase and with separate neutral link per phase.
1 no. Surge suppressor 1.6KV with built-in protection fuse (Zotup Make)
Outgoing
20 Nos. 10A /16A, 10KA, SP, C-Curve MCB's
8 WAY 7 SEGMENT LDB's as described above
Supply Set 0.900 4.500 5.400
Installation Set 0.900 4.500 5.400
c) L+PDB
8 WAY TPN DB
Incomer
1 No. 63A, 10KA, 4P, C-Curve, MCB & 3 Nos. 63A, 100mA, DP ELCB's each per phase and with separate neutral link per phase.
1 no. Surge suppressor 1.6KV with built-in protection fuse (Zotup Make)
Outgoing
20 Nos. 10A/16A, 10KA, SP, C-Curve MCB's
8 WAY TPN L+PDB's as described above
Supply Set -
Installation Set -
d) LIGHTING DB's
6 WAY TPN DB
Incomer
1 No. 40A, 10KA, 4P, C-Curve, MCB & 3 Nos. 40A, 100mA, DP ELCB's each per phase and with separate neutral link per phase.
1 no. Surge suppressor 1.6KV with built-in protection fuse (Zotup Make)
Outgoing
15 Nos. 10A, 10KA, SP, C-Curve MCB's
6 WAY TPN LDB's as described above
Supply Set -
Installation Set -
Actual Qty
SL No Description Unit Remarks
e) POWER DB
8 WAY TPN DB
Incomer
1 No. 63A, 10KA, 4P, C-Curve MCB & 3 Nos. 63A, 100mA, DP ELCB's each per phase and with separate neutral link per phase.
1 no. Surge suppressor 1.6KV with built-in protection fuse (Zotup Make)
Outgoing
20 Nos. 16A/20, 10KA SP, C-Curve MCB's
8 WAY TPN PDB's as described above
Supply Set -
Installation Set -
f) UPS DB's
8 WAY TPN DB
Incomer
1 No. 40A, 10KA, 4P, D-Curve, MCB & 3 nos. 40A, DP, D-Curve MCB for each phase with separate neutral & dedicated earth
link.
1 no. Surge suppressor 1.6KV with built-in protection fuse (Zotup Make)
Outgoing
18 Nos. 16A, 10KA, SP, D-Curve MCB's
8 WAY TPN UPSDB's as described above
Supply Set -
Installation Set -
g) UPS DB's
16 WAY SPN DB
Incomer
1 No. 40A, 10KA, DP, D-Curve, MCB & 1 nos. 40A, DP, 30mA, RCBO with separate neutral & dedicated earth link.
Outgoing
14 Nos. 16A, 10KA, SP, D-Curve MCB's
1 No. 32A, 10KA, DP, D-Curve, MCB & 1 nos. 32A, DP, 30mA, RCBO with separate neutral & dedicated earth link.
Outgoing
6 Nos. 10A, 10KA, SP, D-Curve MCB's
8 WAY SPN ELDB's as described above
Supply Set 2.250 2.250
Installation Set 2.250 2.250
i) VTPN DB
8 WAY VTPN DB
Incomer
1 No. 63A, 25KA, 4P, C-Curve MCCB.with separate neutral & dedicated earth link.
Outgoing
8 Nos. 32A, 10KA, SP, C-Curve MCB's
3 Nos. 40A, 25KA, TP, MCCB's
2 Nos. 63A, 25KA, TP, MCCB's
8 WAY VTPN DB's as described above
Supply Set -
Installation Set -
Installation, testing and commissioning of following sizes of sheet metal enclosed outdoor type (IP 55) Feeder Pillar with
j) lockable double doors complete with interconnections ,with copper wires ,tapes ,bonding to earth and painting complete as
required .
1 set. of 70/100 Amps TPN Aluminium Bus Bars of suitable length Bus bars shall be insulated by heat shrinkable sleaves &
clip on shroud for joints
Actual Qty
SL No Description Unit Remarks
Outgoings
1 Nos. of 63 Amp FP MCB, 10 KA breaking capacity along with 1 No. 65A, AC-3 duty contractor & timer
1 set. of 70 Amps TPN Aluminium Bus Bars of suitable length Bus bars shall be insulated by heat shrinkable sleaves & clip on
shroud for joints
Outgoings
7 Nos. of 10 Amp TP MCB, 10 KA breaking capacity
7 Nos. 20A DP MCB, 10 KA breaking capacity
External Feeder piller described as above
Supply Set -
Installation Set -
Supply and installation of 1 No 32/ 40 Amp TPN MCB C Curve 10 kA in Metallic enclosure box. (for AC Units, UPS, pumps,
k)
etc.,)
Supply Each -
Fixing Each -
l) Supply and installation of 1 No 63 Amp TPN MCB C Curve 10 kA in Metallic enclosure box. (for AC Units, UPS, pumps, etc.,)
Supply Each -
Fixing Each -
SUB TOTAL
D EARTHING SYSTEM
1 Supplying and fixing of following copper /GI tapes & Copper / AI. wires / cables along with cable end terminations & all
necessary fixing accessories, and effecting connections :
Genral Notes:
i.The earthing connections/joints should be bolted, riveted, welded, brazed type.
ii.All welded/brazed joints should be treated with anti-corrosive paints to protect it from corrosion/rusting.
iii. All non-current carrying metal parts of the electrical installation shall be earthed as per IS: 3043 – 1966 with latest
amendment.
Providing standard plate earth with 600x600x3.15mm electrolitic copper plate, conforming to IS3043 with latest
ammendments,and as per standards including supply of all materials at a depth of 3.5Mtr with copper plate and providing
Nos 4.000 4.000
chamber complete with cover and excavation, refilling and necessary civil masionary as required.( Transformer-Neutral 2
Nos, DG Neutral-2Nos)
Supply ,installation,testing and commissioning of earth pits comprising 600 x 600 x 6.3 mm. thick GI electrode, 40 mm. dia
medium class GI pipe, GI funnel with 20 gauge GI wire mesh, masonry chamber with concrete base, CI manhole cover with
Set 1.600 1.600
frame (300 mm. x 300 mm.) painted with bitumastic paint, test link joint and packing the mixture of Charcoal and salt
around plate electrode complete as required ,as per specifications and as per IS: 3043
c) Pipe earthing
Providing standard pipe earth station with 38mm dia 2.5mtr long medium class GI pipe conforming to IS 3043 including
supply of GI pipe,saddles,clamps,nuts,bollts,and all other materials and providing chamber complete with all Nos -
interconnections as required and as directed by Enginner- in- charge.
Supply , Installation & Commissioning of Safe Earth Electrodes, Ready-Made type ( type-39) complete with B grade
Crystaline fill , 12 SWG 80-100 micron GI, 3000mm long , 80mm diameter, complete with backfill compound (@ 2bags per Nos -
electrode ) supplied by the manufacturer.
2 GI Wire/strips
Supply and laying following sizes of GI Wire/strips including supply of fixing clamps and accessories when laid inside the
building and inclusive of excavation & refilling of earth when laid outside the building and interconnections with earth pit
and equipment, terminations/ interconnections in an approved manner as per IS:3043 (with latest amendments) inclusive
of supply of all hardwares complete as required.
a) 50x6mm GI strip ( For HT panel, For Transformer & DG- body earthing and risers) Mtr -
b) 32x6mm COPPER strip (For Transformer and DG Neutral Earthing) Mtr -
c) 25x6mm GI strip ( Body earthing for SUB- panels, DBs and Lightning arresters ) Mtr -
d) 8SWG GI wire for AC Units/ Plumbing / External/basement DB Mtr -
e) 6 sq.mm PVC insulated copper wire in existing cable tray or in existing conduits.. Mtr -
f) 10 sq.mm PVC insulated copper wire on existing cable trays. Mtr -
g) 25x3 GI strip (insulated) Mtr -
Actual Qty
SL No Description Unit Remarks
h) 25x3 Cu strip (Insulated) Mtr -
Supply and fixing of earth terminal box comprising of 25 x 6mm copper bus with necessary insulator, top and bottom
3 opening of suitable size as per site condition and interconnections complete as required and approved by the No -
consultant/client
SUB TOTAL
E SUPPLY & INSTALLTION OF LIGHT FIXTURES
Supply and installation of following light fittings with lamps complete with necessary Electronic/copper ballast, and all other
accessories prewired including lamps, fittings conforming to IS-10322 with latest amendments of the following
types.Installation of light fittings with flexible hose, suspension rod/chain.clamps etc. required for such installation and
complete as per specifications including painting with approved shade paint and necessary interconnections.
1 2x20W Surface mounted luminaire suitable of LED Lamps for inside the Classrooms & Work Space (WIPRO LL12-161 20 W
(ProLED) + WCO12-122208 -40W-housing for ProLED)
Supply -
Installation Nos. 36.000 148.000 184.000
2 36W Surface mounted low glare mirror optic Luminaire(Square light) for Meeting and conference room.( Make:WIPRO
Garnet 36W : D533665)
Supply -
Installation Nos. -
3 12W bulk head LED fixture or equivalent (WIPRO: Garnet 12W DA11265)
Supply -
Installation Nos. -
4 18W LED Indoor Wall mounted Linear Luminaire with light angled reflector for above teaching boards at each classrooms.(
Make:WIPRO Optima WIF 36)
Supply -
Installation Nos. -
Supply -
Installation Nos. -
6 24W LED Light fixture for Corridor & general area lights. ( Make:WIPRO LL20-221-XXX-60-XX (Trim LED)
Supply -
Installation Nos. 9.000 72.000 81.000
Supply -
Installation Nos. -
8 7W LED wall mounted mirror light fixture ( Make:WIPRO : Garnet Magma P27005)
Supply -
Installation Nos. -
9 18W LED Pestop Wall light fixture ( Make: Varshine Flying Insect Killer || UV Tubes || Dual Side Operate )
Supply -
Installation Nos. -
10 Exhaust Fan Dia of 450mm with MS painted Louvers (Havells / Equ.)
Supply Nos. -
Installation Nos. -
Supply Nos. -
Installation Nos. -
15 36W Suspended type Luminiare for Double height places.
Supply Nos. -
Installation Nos. -
16 Wall mounted / angle holder mounted pin type 18W LED bulb(WIPRO 18 W IRIS LED SLIM RO/SQ SM LD 80/81) along with
Havells Polycarbonate Fancy angle Holder and fixing accessories
Supply -
Installation Nos. -
17 Circular type Surface mounted 18W LED light fixture with housed in aluminium powder quoted enclosure with diffuser
(Model: LD80-101-XXX-60-SM LED)
Supply -
Installation Nos. 9.000 27.000 36.000
Supply -
Installation Nos. -
Supply -
Installation Nos. -
Supply -
Installation Nos. -
Supply -
Installation Nos. -
Supply -
Installation Nos. -
Supply -
Installation Nos. -
Supply -
Installation Nos. -
Supply -
Installation Nos. -
26 Mirror Light
Make : Wipro Model : G531027
Supply -
Installation Nos. -
Supply -
Installation Nos. -
28 Supply, erection, testing and commissioning of 4.5 M high pole with following specifications and components :-
20A connector & 6A MCB fixed in weather proff marshall box (hensel/sintex make) on pole suitable for termination of
i. armoured aluminium cable as required and wiring to Luminaries from the 6A MCB, with 3x2.5 sq.mm. PVC insulated
copper, stranded conductor (P+N+PE) wire including terminations till the light fixture.
29 Supply, erection, testing and commissioning of external lighting 40mm dia GI agular pole of 3.0 meter lenght suitable for
mounting on wall with all fixing accessories.
Supply -
Installation Nos. -
30 Gate light light fixture with 450mm dia dome on top with 18Watt LED LAMPS complete with necessary electronic citcuits
etc.
Supply -
Installation Nos. -
31 External pole light in IP-65 enclosure with 50 Watt LED Lamp complete with all accessories.
Supply -
Installation Nos. -
32 IP-65 Focus light for external Logo with 70Watt Lamp complete with all accessories.
Supply -
Installation Nos. -
¾” OD 16 Gauge powder quoted MS pipe of following length for fan suspension with necessary groove for cables and
33
rubber bush-kits for anti-vibration as required & accessories including
a) 0.75M Length
Supply Nos. -
Installation Nos. -
b) 0.9M Length
Supply Nos. -
Installation Nos. -
c) 1.2M Length
Supply Nos. -
Installation Nos. -
d) 1.5M Length
Supply Nos. -
Installation Nos. -
Integrated solar street light [All in one] with following features / specification
High efficiency SMD 50W LED with Integral PIR sensor housed in Extruded aluminium construction WP mono-crystalline
34 silicon panel with 12.8V 44Ah Lithium Ferro Phosphate (LifePo4) battery. Lighting system efficiency up to 120 Lm/W, CCT –
6000° K to 6500°K with CRI >80, Output Power 50W/12V, Over Voltage Protection Full Power upto12 hrs. & saving mode up
to 48 hrs. complete with all accessories
Make : Wipro LR14-721-XXX-65-XX
Supply Nos. -
Installation Nos. -
SUB TOTAL
F SUBMAIN /CIRCUIT/ POINT WIRING
Supply, laying, testing and commissioning of wiring with FRLS PVC insulated stranded copper conductor wire 660 /1100 V
1 grade in existing surface / recessed conduit including ferruling, terminations at both ends with suitable lugs, hylem pull box
cover etc. complete
a) 4 x 10 sq.mm Cu. Wiring cable + 2 x 4sq.mm Cu. Solid green PVC insulated Earth wire in existing conduit
b) 4 x 6 sq.mm Cu. Wiring cable + 2 x 2.5sq.mm Cu. Solid green PVC insulated Earth wire in existing conduit
Supply Rm -
Installation Rm -
Wiring for light, ceiling fan, exhaust fan, call bell & 5 A plug points in existing conduits with FR PVC insulated stranded
2 copper conductor wires a from DB via switch to the point of any length with providing and fixing of PVC connector, hylem
junction
a) From DB to first point 2 x 2.5 sq.mm Cu. Wiring cable + 1 x 1.5sq.mm Cu. Solid green PVC insulated Earth wire in existing
conduit.
b) Loop point 2 x 1.5 sq.mm Cu. Wiring cable + 1 x 1.5sq.mm Cu. Solid green PVC insulated Earth wire in existing conduit.
3 Supply, laying cost inclusive of conduits etc and termination of control cables from Transformer marshalling box to HT
panel, input supply to marshalling box , mains sensing cable to AMF panel etc.
a) 4C x 2.5sqmm copper wire in wire in existing conduits (control cables for AMF panel, DG to AMF)
Supply Rm -
Installation Rm -
b) 2C x 2.5sqmm copper wire in wire in existing conduits (control cables for CT sensing )
Supply Rm -
Installation Rm -
Circuit wiring with 2R x 2.5 mm2 + 1 x 2.5 mm2 (Earth) for box/ furniture earth wire for power socket outlets on the work
4
stations/ table/ counter / wall 25mm dia 2mm thick FRLS PVC Conduit complete with all accessories.
5 Circuit wiring with 2R x 4 mm2 + 1 x 2.5 mm2 (Earth) for box/ furniture earth wire for power socket outlets on the work
stations/ table/ counter / wall 25mm dia 12mm thick FRLS PVC Conduit complete with all accessories.
Circuit wiring with 2 x 2.5 sq.mm Cu. Wiring cable + 1 x 2.5sq.mm Cu. Solid green PVC insulated Earth wire in existing
6
conduit.
Supply Rm -
Installation Rm -
7 Circuit wiring with 2 x 4.0 sq.mm Cu. Wiring cable + 1 x 2.5sq.mm Cu. Solid green PVC insulated Earth wire in existing
conduit.
Supply Rm -
Installation Rm -
8 Circuit wiring with 3 x 6.0 sq.mm stranded copper conductor wire etc. complete as required in existing conduit.
Supply Rm -
Installation Rm -
Providing and fixing in position the following heavy duty ISI marked PVC conduit including all accessories (i.e clamps, nuts,
9 bolts, bends, junction boxes, pull boxes etc.) concealed or exposed as called for including necessary civil work such as
chaseing / cutting of wall etc.
a) 20mm dia.
Supply Rm 116.250 116.250
Installation Rm 116.250 116.250
b) 25mm dia.
Supply Rm 550.110 3,116.330 694.180 4,360.620
Installation Rm 550.110 3,116.330 694.180 4,360.620
c) 32mm dia.
Supply Rm 16.000 16.000
Installation Rm 16.000 16.000
d) 40mm dia.
Supply Rm 60.000 60.000
Installation Rm 60.000 60.000
Providing and fixing in position the following 16G MS conduit including bends, juction boxes, pull boxes, GI pull wire and
10 necessary civil works such as chasing and making good of the wall for concealed conduiting or surface conduiting which
shall inclu
a) 20mm dia.
Supply Rm -
Installation Rm -
b) 25mm dia.
Supply Rm -
Installation Rm -
c) 32mm dia.
Supply Rm -
Installation Rm -
11 Supplying and laying, fixing in position of the following sizes 1.8mm conduit.
a) 20mm dia GI Flexible Hose
Supply Rm -
Installation Rm -
Actual Qty
SL No Description Unit Remarks
b) 25mm dia GI Flexible Hose
Supply Rm -
Installation Rm -
SUB TOTAL
G SWITCH SOCKET OUTLETS
G.1 Supply, fixing, testing & commissioning of modular type switches, shuttered switched socket outlets, electronic fan
regulator , 1 phase / 3 phase, 16A, 20A, 32A metal clad sockets with DP/TPN MCB & plug top for these metal clad sockets.
Set of UPS power 3 nos. 10/13A, Intel type, modular type socket outlet including 1 No. 16A Switch along with necessary
3
modular housing plate & face plate with suitable size of G.I outlet box.
Supply Nos. -
Installation Nos. -
Set of UPS power 2 nos. 10/13A, Intel type, modular type socket outlet including 1 No. 16A Switch along with necessary
4
modular housing plate & face plate with suitable size of G.I outlet box.
Supply Nos. -
Installation Nos. -
5 Floor power outlet box not less than 200mm x 200mm suitable for 4nos. 6A sockets.
Supply Nos. -
Installation Nos. -
6 Floor power/Data outlet box with 1 no. 16A Power socket + 1 no. telephone outlet + 1 no. Data outlet.
Supply Nos. -
Installation Nos. -
7 6A one way switch in existing box.
Supply Nos. 165.600
Material Supply
Installation Nos. 165.600
8 16A one way switch in existing box.
Supply Nos. -
Installation Nos. -
9 6A (5 pin) switched socket outlet in existing box.
Supply Nos. 42.600
Material Supply
Installation Nos. 42.600
10 6A one way switch with 1 no. electronic fan regulator.
Supply Nos. 99.000
Material Supply
Installation Nos. 99.000
Supply and fixing of 16A,3 pin industrial socket metal clad single phase socket outlet with 16A, DP, 30mA, ELCB/RCCB fixied
11 in a suitable size metal sheet box suitable for switches and sockets,including supply of fixing materials interconnections
complete as required and approved by the consultant/client.
Supply Nos. -
Installation Nos. -
Supply and fixing of 32A,3 pin industrial socket metal clad single phase socket outlet with 16A DP, 30mA, ELCB/RCCB fixied
12 in a suitable size metal sheet box suitable for switches and sockets,including supply of fixing materials interconnections
complete as required and approved by the consultant/client..
Supply Nos. -
Installation Nos. -
13 1 Module Blank Plate
Supply Nos. 48.000
Material Supply
Installation Nos. 48.000
Providing & fixing of following sizes 18 G M.S.anodised Outlet boxeswith earth point, at its position concealed or exposed as
14
called for including necessary civil work such as chase cutting & making good in all respects as the case may be:
15 Supply and fixing of following sizes of modular front plates screwless along with necessary raparound, fixing accessories.
Suppply, installation, testing & commissioning of the following IP-66 weather proff moulded socets with rotary switches as
G.2
requires complete with recessed / surface mounted enclosure as applicable. (Clipsal / Mennekes Make)
1 32A, 5 Round Pin socket, 32A 5-Pin angular plug top with 32A triple pole switch both housed in single vertical enclosure
with necessary fixing arrangement & gas kits.
Supply Nos. -
Installation Nos. -
2 20A, 5 Round Pin socket, 20A 5-Pin angular plug top with 20A triple pole switch both housed in single vertical enclosure
with necessary fixing arrangement & gas kits.
Supply Nos. -
Installation Nos. -
20A, 5 Round Pin socket, 20A 5-Pin angular plug top with 20A 4P, 30mA RCCB/RCBO housed in single vertical enclosure with
3
necessary fixing arrangement & gas kits.
Supply Nos. -
Installation Nos. -
4 20A, 3 Round Pin socket, 20A 3-Pin angular plug top with 20A DP, 30mA, RCCB/RCBO housed in single vertical enclosure
with necessary fixing arrangement & gas kits.
Supply Nos. -
Installation Nos. -
5 20A, 3 Round Pin socket, 20A 3-Pin angular plug top with 20A double pole switch both housed in single vertical enclosure
with necessary fixing arrangement & gas kits.
Supply Nos. -
Installation Nos. -
6 16A, 3 Round Pin socket, 16A 3-Pin angular plug top with 16A double pole switch both housed in single vertical enclosure
with necessary fixing arrangement & gas kits.
Supply Nos. -
Installation Nos. -
SUB TOTAL
H CAMERAS & DVR
Supply and fixing and necessary pvc conduit of following cameras with supporting slave monitors, weather proof with
1 complete set of camera with a provision for integrating to BMS and as a full set as required and as approved by client
/consultants.
a) Bullet cameras with infrared and night vision lamps and with zoom facility (for external and terrace area)(10M) Nos. -
b) Dome cameras ( for lift lobby and other internal areas) Nos. -
c) DVR for the above suitable to integrate to system as a full set Nos. -
d) RG59 Co-axial cable for cameras RM -
Providing and fixing in position the following heavy duty ISI marked PVC conduit including all accessories (i.e clamps, nuts,
2 bolts, bends, junction boxes, pull boxes etc.) concealed or exposed as called for including necessary civil work such as
chaseing / cutting of wall etc.
a) 20mm dia.
Supply Rm -
Installation Rm -
b) 25mm dia.
Supply Rm 138.800 948.300 57.800 1,144.900
Installation Rm 138.800 948.300 57.800 1,144.900
c) 32mm dia.
Supply Rm -
Installation Rm -
d) 40mm dia.
Actual Qty
SL No Description Unit Remarks
Supply Rm -
Installation Rm -
SUB TOTAL
I LIGHTING PROTECTION
Supply, installation, testing and commissioning of Lighting protection with a covering radius of 70meter complete with
1 Accessories comprising lighting arrestor early steamers device, Mast, Mast Base, Welded Together, Insulated 2m FRP Mast -
Black, inline coupling, terminal lug and all required fixing accessories complete as required.(Make: Ericco)
Supply Set -
Installation Set -
Supply,installation,testing and commissioning of Earthing material comprising Maintenance free earth pits made of ground
2 enhancing material of required qty and copper bonded ground rods of size 1/2" and 10' length and one eqrth rod clamp,
including all fixing accessories as required.
Supply Set -
Installation Set -
Supply,laying,testing and commissioning of Down Conductor with fixings accessories for Conventional Copper tape 25 x
3 3mm or 70 sq. mm flexible copper cable, with all fixing accessories, and termination at both ends, and suitable to be able to
discharge lightning currents with minimum safety distance.
Supply Set -
Installation Set -
SUB TOTAL
J CONDUITING AND WIRING FOR VOICE & DATA
Providing and fixing in position the following heavy duty ISI marked PVC conduit including all accessories (i.e clamps, nuts,
1 bolts, bends, junction boxes, pull boxes etc.) concealed or exposed as called for including necessary civil work such as chase
cutting & making good:
3 Supply, laying, testing & commissioning of Co-axial RG-6 cable with foam polythene in existing conduits.
Supply RM -
Installation RM -
4 Supply and laying Cat-6 cable in existing conduits for Data networking (1 Box = 305 RM).
Supply Box 1.903 1.903
Installation Box 1.903 1.903
Supply, laying, testing & commissioning of tinned copper PVC insulatedand sheathed, unarmoured telephone cables in
5 existing pipe on walls, ceiling, existing cable trays complete with clamps, cable markers etc.including ferruling and
termination atboth end
Supply, laying, testing and commissioning of 0.5mm dia tinned copper PVC insulated and PVC sheathed unarmoured
7
telephone cables in already laid conduits including marking, end terminations etc. complete as required.
EPABX FOR INTERCOM SYSTEM Digital EPABX M DX - 30 EPABX equiped with 30 extensions, 5 incoming P&T lines
10 ( Extendable upto 50 Extensions & 10 P &T Lines), operator console, FCBC 48V / 6AH Batteries with Battery charger
including & one krone type MDF.
Supply Set -
Installation Set -
11 Supply and fixing 1.6 mm GI Voice /data boxes (as approved) to suite 4 / 2 Node face plate "M.K, Clipsal" make boxes.
Supply Nos. -
Installation Nos. -
Supply & fixing of 14 SWG GI sheet raceways with all bends, floor junction boxes and 2 mm thick top openable cover
12 including fixing the raceway in floor / ceiling / on vertival on the walls with all necessary hardwares as required. (Price shall
be inclusve of necesssary floor chipping, providing chicken wire mess etc.)
Floor Junction Box Make : MK, Legrand, OBO,Anchore
Supplying & installing of Galvanised Iron 50MM Dia heavy duty "C" Class pipes in Ceiling/ shaft / underground & fitting like
tees , elbows, bends, reducers, flanges & M.S. Structural supports as required, cutting, welding/threading, fixing & making
13
good etc. Cost also includes painting the pipe with anti-corrosive coat.(Civil works involved like ground digging shall be part
of C&I team)
Supply RM -
Installation RM -
14 Supply, fixing, effecting proper connection, testing and commissioning of HDMI socket outlets in suitable size of GI box for
AV network cost inclusive of cables of 2.5-3.0 Meters (Make: M.K, Legrand)
Supply Set -
Installation Set -
15 Supply, fixing, effecting proper connection, testing and commissioning of VGI socket outlets in suitable size of GI box for AV
network cost inclusive of cables of 2.5-3.0 Meters (Make: M.K, Legrand)
Supply Set -
Installation Set -
16 Supply & laying HDMI cable in existing conduits for AV network.
Actual Qty
SL No Description Unit Remarks
Supply RM -
Installation RM -
17 Supply & laying VGA cable in existing conduits for AV network.
Supply RM -
Installation RM -
18 Supply, installation, testing & commissioning of HDMI cable end termination (Soldering) as per requires specs.
Supply Set -
Installation Set -
19 Supply, installation, testing & commissioning of VGA cable end termination (Soldering) as per requires specs.
Supply RM -
Installation RM -
Note :
a) Get raceway sample approval from the Architect & consultant before supply / fabrication.
SUB TOTAL
K UPS & INVERTER
Supply, installation, testing & commissioning of 1-Phase Input & 1-Phase output 3.0 KVA Inverter with 90 Min. Battery
back-up with SMF battries. Price shall be inclusive of necessary accessories i.e. battery rac , DC cabling & power cabling
1 from nearest tapping point. Nos. -
Battery rack cost shall be inclusive of fire rated metal enclosure
(For Emergency Lighting)
Supply, installation, testing & commissioning of micro processor controlled a set of 1 x 10 KVA/8.0 KW, True On line double
2 conversion 3 Phase input and 1 Phase 230 V output with a min. creast factor of 3:1 on full load & surge factor of 1.15time
consisting of following.
a) 1 No. Rectifier + Inverter, Integrated in each UPS module without Isolation transformers.
b) Battery Circuit breaker in CRCA housing with all required fixing controlling, mounting / fixing accerrories & hardware.
Sealed Maintenance free batteries for 30 Mins. combined backup time on 10 kVA load module including inerconnectors,
d) Rack and accessories. Cost of above items shall includes the fabrication of black colour powder coated (80 microns) battery
stand of suitable size / height (as requires for cable terminations) with complete base floor to sit on existing slab (Battery
Makes:- Quanta, Exide, GY)
e) Interconnecting suitable runs of uninyvin cable copper flexible between UPS, Battery breaker & Batteries. (No cable to run
on floor. Refer UPS Room layout to quantify actual quantities).
Supply, installation, testing & commissioning of micro processor controlled a set of 1 x 5 KVA/4.0 KW, True On line double
3 conversion 3 Phase input and 1 Phase 230 V output with a min. creast factor of 3:1 on full load & surge factor of 1.15time
consisting of following.
a) 1 No. Rectifier + Inverter, Integrated in each UPS module without Isolation transformers.
b) Battery Circuit breaker in CRCA housing with all required fixing controlling, mounting / fixing accerrories & hardware.
Sealed Maintenance free batteries for 12-15 Mins. combined backup time on 5 kVA load module including inerconnectors,
d) Rack and accessories. Cost of above items shall includes the fabrication of black colour powder coated (80 microns) battery
stand of suitable size / height (as requires for cable terminations) with complete base floor to sit on existing slab (Battery
Makes:- Quanta, Exide, GY)
e) Interconnecting suitable runs of uninyvin cable copper flexible between UPS, Battery breaker & Batteries. (No cable to run
on floor. Refer UPS Room layout to quantify actual quantities).
1 Supply & Installation of 1Nos. Of 50.0KVA,415V,50HZ 3phase 4 wire diesel generator set spec as follows
Diesel engine shall be complete with necessary controls and safety devices conforming to relevent ISS/BSS with latest
amendments.Diesel Engine shall be suitable for continuous operation of generator set duty inclusive of fly wheel flexible
coupling air cleaner corrosion resistor radiator fan with guard fuel pump fuel filter Eectronic governor,electrical starting
system with starter 24V battery,voltage regulator,instrument panel ,with RPM indicator,exhaust silencer,protections
against low lubrication oil pressure,high water temperature.Alternator shall be 415V 3 phase 50HZ 4 wire 0.8 power factor
self excited self regulated brushless type drip proof conforming to IS 4722 with latest amendments and voltage regulation
1.1
of +1or-1%,with class H insulation and with IP23 standard enclosure and with suitable adopter box.The engine and
alternator shall be coupled over a sturdy common base frame.Day fuel tank (990 Ltrs) with necessary fuel hoses to the
engine and fist filling of deisel and lub oils and as per detailed specifications as required and with a AMF Panel with
necessary breaker / relay / contactor/ indicator and metering as supplied by the supplier as per standards with necessary
fixing arrangement. The entire set shall be enclosed in a accoustique enclosure with necessary relay/ breakers and as full
set of work as approved by client / consultants. All Civil Works Exculded
1.2 The entire set shall be tested at factory for full load conditions and tested at site with load after installation
Supply Set -
Installation Set -
2 Supply & Installation of 1Nos. Of 5KVA,415V,50HZ 3phase 4 wire diesel generator set spec as follows
Diesel engine shall be complete with necessary controls and safety devices conforming to relevent ISS/BSS with latest
amendments.Diesel Engine shall be suitable for continuous operation of generator set duty inclusive of fly wheel flexible
coupling air cleaner corrosion resistor radiator fan with guard fuel pump fuel filter Eectronic governor,electrical starting
system with starter 24V battery,voltage regulator,instrument panel ,with RPM indicator,exhaust silencer,protections
against low lubrication oil pressure,high water temperature.Alternator shall be 415V 3 phase 50HZ 4 wire 0.8 power factor
self excited self regulated brushless type drip proof conforming to IS 4722 with latest amendments and voltage regulation
2.1
of +1or-1%,with class H insulation and with IP23 standard enclosure and with suitable adopter box.The engine and
alternator shall be coupled over a sturdy common base frame.Day fuel tank (990 Ltrs) with necessary fuel hoses to the
engine and fist filling of deisel and lub oils and as per detailed specifications as required and with a AMF Panel with
necessary breaker / relay / contactor/ indicator and metering as supplied by the supplier as per standards with necessary
fixing arrangement. The entire set shall be enclosed in a accoustique enclosure with necessary relay/ breakers and as full
set of work as approved by client / consultants. All Civil Works Exculded
2.2 The entire set shall be tested at factory for full load conditions and tested at site with load after installation
Supply Set -
Installation Set -
2 D.G Exhaust pipe
Supply and installation of exhaust pipe of suitable size for exhausting the smoke up to a height of about 4meters above
Terrace level including supply of required size pipe with suitable supports and clading with 50mm thick glass wool with
chicken mesh and ALUMINIUM sheet rapping including supply of all materials required complete as required and as
directed by Engineer in charge and as per standards.
b) Supply and laying 25mm dia medium class ms pipe inclusive of all fittings required for fuel line from fuel tank to the
generators
Supply Mtr -
Installation Mtr -
SUB TOTAL
GRAND TOTAL
PROJECT: AZIM PREMJI EDUCATIONAL TRUST
CLIENT : AZIM PREMJI FOUNDATION
PMC : CBRE South Asia Pvt Ltd.
VENDOR: M/s GOEL CONSTRUCTION CO.
MEASUREMENT SHEET - PRIMARY BLOCK
DIMENSION
SL No DESCRIPTION UNIT NOS Quantity
Length Breadth Height/ Depth
3 Nos. 40A, 100mA, DP ELCB's each per phase and with separate neutral link per phase.
1 no. Surge suppressor 1.6KV with built-in protection fuse (Zotup Make)
Outgoing
20 Nos. 10A /16A, 10KA, SP, C-Curve MCB's
8 WAY 7 SEGMENT LDB's as described above
Ground Floor
L+P DB Set 1 1.000
6 24W LED Light fixture for Corridor & general area lights. (Make:WIPRO LL20-221-XXX-
60-XX (Trim LED)
Primary Block
Classrom, P-001 Nos. 5 5.000
Classrom, P-002 Nos. 5 5.000
KG-2, P-003 Nos. 5 5.000
KG-1, P-004 Nos. 5 5.000
Creche, P-005 Nos. 5 5.000
Wall mounted / angle holder mounted pin type 18W LED bulb(WIPRO 18 W IRIS LED
16 SLIM RO/SQ SM LD 80/81) along with Havells Polycarbonate Fancy angle Holder and
fixing accessories
17 Circular type Surface mounted 18W LED light fixture with housed in aluminium powder
quoted enclosure with diffuser (Model: LD80-101-XXX-60-SM LED)
32 IP-65 Focus light for external Logo with 70Watt Lamp complete with all accessories.
Wiring for light, ceiling fan, exhaust fan, call bell & 5 A plug points in existing conduits
2 with FR PVC insulated stranded copper conductor wires a from DB via switch to the
point of any length with providing and fixing of PVC connector, hylem junction
a) From DB to first point 2 x 2.5 sq.mm Cu. Wiring cable + 1 x 1.5sq.mm Cu. Solid green
PVC insulated Earth wire in existing conduit.
Corridor SB-A outside Classroom P-001 E1-1 to outside Classroom P-003 SB-A RMT 3 20.260 60.780
RMT 881.535
TOTAL QTY
RMT 293.845
PAYABLE QTY AS ON DATE RMT 80% 235.076
b) Loop point 2 x 1.5 sq.mm Cu. Wiring cable + 1 x 1.5sq.mm Cu. Solid green PVC insulated
Earth wire in existing conduit.
Classroom, P-001
F1 to SB-G RMT 7 5.600 39.200
F1 to F2 RMT 4 2.710 10.840
F3 to F2 RMT 3 3.710 11.130
F4 to F1 RMT 4 4.770 19.080
F5 to F4 RMT 3 2.760 8.280
L1 to L2 RMT 3 2.700 8.100
L2 to L3 RMT 3 3.800 11.400
L4 to L3 RMT 3 2.800 8.400
L1 to SB-G RMT 3 6.560 19.680
L5 TO L6 RMT 3 2.800 8.400
L6 to SB-G RMT 3 10.788 32.364
L7 TO L8 RMT 3 4.800 14.400
L8 TO SB-H RMT 3 4.050 12.150
Classroom, P-002
F1 to SB-G RMT 7 5.600 39.200
F1 to F2 RMT 4 2.760 11.040
F3 to F2 RMT 3 3.760 11.280
F4 to F1 RMT 4 4.770 19.080
F5 to F4 RMT 3 2.760 8.280
L1 to L2 RMT 3 2.700 8.100
L2 to L3 RMT 3 3.800 11.400
L4 to L3 RMT 3 2.800 8.400
L1 to SB-G RMT 3 6.560 19.680
L5 TO L6 RMT 3 2.800 8.400
L6 to SB-G RMT 3 10.738 32.214
L7 TO L8 RMT 3 4.800 14.400
L8 TO SB-H RMT 3 4.050 12.150
Classroom, P-003
F1 to SB-G RMT 7 4.100 28.700
F1 to F2 RMT 4 2.760 11.040
F3 to F2 RMT 3 3.760 11.280
F4 to F1 RMT 4 4.770 19.080
F5 to F4 RMT 3 2.760 8.280
L1 to L2 RMT 3 2.700 8.100
L2 to L3 RMT 3 3.710 11.130
L4 to L3 RMT 3 2.710 8.130
L1 to SB-G RMT 3 5.250 15.750
L5 TO L6 RMT 3 2.720 8.160
L6 to SB-G RMT 3 9.430 28.290
L7 TO L8 RMT 3 4.720 14.160
L8 TO SB-H RMT 3 8.770 26.310
KG-1, P-004
F1 to SB-G RMT 7 4.340 30.380
F1 to F2 RMT 3 3.760 11.280
F3 to F1 RMT 3 3.980 11.940
F4 to F1 RMT 4 4.200 16.800
F5 to F4 RMT 3 3.760 11.280
L1 to L2 RMT 3 3.920 11.760
L2 to L3 RMT 3 3.710 11.130
L4 to L3 RMT 3 3.930 11.790
L1 to SB-G RMT 3 6.000 18.000
L5 TO L6 RMT 3 3.710 11.130
L6 to SB-G RMT 3 10.370 31.110
L7 TO L8 RMT 3 3.710 11.130
L8 TO SB-H RMT 3 5.770 17.310
Creche Room, P-005
F1 to SB-G RMT 7 5.780 40.460
F1 to F2 RMT 3 3.760 11.280
F3 to F1 RMT 3 3.890 11.670
F4 to F1 RMT 4 4.030 16.120
F5 to F4 RMT 3 3.760 11.280
L1 to L2 RMT 3 3.710 11.130
L2 to L3 RMT 3 5.450 16.350
L1 to SB-H RMT 3 2.440 7.320
L4 TO L5 RMT 3 3.710 11.130
L5 to SB-G RMT 3 7.370 22.110
L6 TO L7 RMT 3 3.850 11.550
L8 TO L7 RMT 3 3.760 11.280
L8 to SB-G RMT 3 11.000 33.000
Corridor
L1 TO L2 RMT 3 8.600 25.800
L2 TO SB-A RMT 3 8.150 24.450
E1 TO E2 RMT 3 8.600 25.800
E2 TO SB-A RMT 3 12.150 36.450
L3 TO L4 RMT 3 12.760 38.280
L4 TO SB-A RMT 3 3.250 9.750
E3 TO SB-A RMT 3 9.350 28.050
Toilet Corridor
L5 TO L6 RMT 3 3.100 9.300
L6 TO SB-A RMT 3 5.550 16.650
E3 TO E4 RMT 3 3.100 9.300
E4 TO SB-A RMT 3 8.250 24.750
Toilet
L4 TO L2 RMT 3 2.800 8.400
L1 TO L2 RMT 3 4.000 12.000
L2 TO SB-A RMT 6 4.500 27.000
L3 TO SB-A RMT 1 3.700 3.700
exhaust fan to SB-F RMT 3 4.350 13.050
ScP Play Ground Level Corridor
L1 to L2 RMT 3 6.550 19.650
L1 to SB-A RMT 3 4.730 14.190
L3 to SB-A RMT 3 16.830 50.490
Creche Toilet
Light to SB-F RMT 3 2.475 7.425
Elec Rm
Wall Light to SB-F RMT 4 3.600 14.400
wall Light to exhaust fan RMT 3 1.300 3.900
RMT 1,447.963
TOTAL QTY
RMT 482.654
PAYABLE QTY AS ON DATE RMT 80% 386.123
Circuit wiring with 2R x 4 mm2 + 1 x 2.5 mm2 (Earth) for box/ furniture earth wire for
5 power socket outlets on the work stations/ table/ counter / wall 25mm dia 12mm
thick FRLS PVC Conduit complete with all accessories.
RMT 380.250
TOTAL QTY
RMT 126.750
PAYABLE QTY AS ON DATE RMT 80% 101.400
Providing and fixing in position the following heavy duty ISI marked PVC conduit
including all accessories (i.e clamps, nuts, bolts, bends, junction boxes, pull boxes etc.)
9 concealed or exposed as called for including necessary civil work such as chaseing /
cutting of wall etc.
b) 25mm dia.
SB to Canopy 1st Light Point Canopy RMT 1 3.035 3.035
1st-2nd Light Point Canopy RMT 1 6.065 6.065
2nd-3rd Light Point Canopy RMT 1 6.065 6.065
1st Light Point Canopy-slab Vertical RMT 1 1.900 1.900
2nd Light Point Canopy-slab Vertical RMT 1 1.800 1.800
1st light Point Canopy to Upper Slab Fan Box RMT 1 4.500 4.500
2nd light Point Canopy to Upper Slab Fan Box RMT 1 4.500 4.500
L1-5 Cuicuit upper slab toilet Light loopping with lower slab vertical droping RMT 1 2.300 2.300
L1-5 Circuit Light to Light lopping in Crech Room RMT 6 3.200 19.200
L1-5 Circuit Light to SB Lopping in Crech Room RMT 2 8.900 17.800
L1-5 Circuit SB to DB Light Circuit of Crech Room ( Half Slab) RMT 1 16.800 16.800
L1-4 Circuit Light to Light lopping in KG1 Room RMT 6 3.200 19.200
L1-4 Circuit Light to SB Lopping in KG1 Room RMT 2 7.800 15.600
L1-4 Circuit SB to DB Light Circuit of KG1 Room( Half Slab) RMT 1 16.800 16.800
L1-6 Circuit Flood light to Emergancy Light of Crech & KG1 Passage RMT 1 16.000 16.000
L1-6 Circuit Light to Light of KG2 &Classroom1,2 Passage RMT 1 16.700 16.700
L1-6 Circuit Light to KG2 SB RMT 1 2.000 2.000
L1-6 Circuit Light to Classroom1 SB RMT 1 1.100 1.100
E1-1 Circuit Light to DB ( Half Slab) RMT 1 1.400 1.400
L1-1 Circuit Light to Light lopping in KG2 Room RMT 5 4.250 21.250
L1-1 Circuit Light to Light Lopping in KG2 Room RMT 3 4.400 13.200
L1-1 Circuit Light to SB Lopping in KG2 Room RMT 1 2.300 2.300
L1-1 Circuit SB to DB Light Circuit of KG2 Room( Half Slab) RMT 1 10.900 10.900
L1-1 Circuit Fan to SB Looping in KG2 Room RMT 1 2.000 2.000
L1-2 Circuit Light to Light lopping in Classroom-2 Room RMT 4 4.250 17.000
L1-2 Circuit Light to Light Lopping in Classroom-2 Room RMT 3 4.400 13.200
L1-2 Circuit Light to SB Lopping in Classroom-2 Room RMT 1 1.700 1.700
L1-2 Circuit SB to DB Light Circuit of Classroom-2 Room( Half Slab) RMT 1 7.400 7.400
L1-2 Circuit Fan to SB Looping in Classroom-2 Room RMT 1 2.200 2.200
L1-3 Circuit Light to Light lopping in Classroom-2 Room RMT 4 4.250 17.000
L1-3 Circuit Light to Light Lopping in Classroom-2 Room RMT 3 4.400 13.200
L1-3 Circuit Light to SB Lopping in Classroom-2 Room RMT 1 1.700 1.700
L1-3 Circuit SB to DB Light Circuit of Classroom-2 Room( Half Slab) RMT 1 4.420 4.420
L1-3 Circuit Fan to SB Looping in Classroom-2 Room RMT 1 2.200 2.200
P1-1 Power Cuircuit DB to SB in Classroom-1 RMT 1 11.300 11.300
P1-1 Power Cuircuit SB Classroom-1 to SB Classroom-2 Lopping RMT 1 6.500 6.500
P1-2 Power Cuircuit DB to SB in KG-2 RMT 1 13.300 13.300
P1-3 Power Cuircuit DB to SB in KG-1 RMT 1 19.900 19.900
Power Circuit DB to Drinking Area and RO RMT 1 14.000 14.000
Pour-02
Corridor L1 to L2 RMT 1 2.600 2.600
L2 to SB-A RMT 1 2.600 2.600
L2 to L3 RMT 1 2.700 2.700
L3 to L4 RMT 1 2.600 2.600
Toilet L4 to L5 RMT 1 2.500 2.500
L5 to L8 RMT 1 3.300 3.300
L8 to SB-A RMT 1 1.300 1.300
SB-A to L7 RMT 1 2.100 2.100
L7 to L6 RMT 1 2.300 2.300
L7 to L5 RMT 1 3.500 3.500
Corridor toilet SB-A to L+P DB-2 RMT 1 5.300 5.300
L5 to L+P DB-2 RMT 1 1.100 1.100
Light Circuit
Ckt to L+P DB-2 RMT 6 4.700 28.200
Power Circuit
Power 25mm power to L+P DB RMT 4 4.700 18.800
Wall Conduit for Lighting
Creche L1-5 to SB-G RMT 2 2.200 4.400
SB-G to SB-H RMT 1 5.400 5.400
KG-1 P1-3 to SB-H RMT 2 3.200 6.400
SB-H to SB-G RMT 1 5.400 5.400
L1-4 to SB-G RMT 2 2.000 4.000
L1-4 to SB-G RMT 1 2.200 2.200
KG-2 L1-1 to SB-G RMT 2 1.600 3.200
SB-H to SB-H RMT 1 0.200 0.200
P-002 classroom L1-2 to SB-G RMT 2 2.200 4.400
L1-2 to SB-H RMT 1 6.000 6.000
P1-1 to SB-H RMT 2 2.800 5.600
P-001 classroom P1-1 to SB-H RMT 2 3.000 6.000
L1-2 to SB-G RMT 2 1.600 3.200
Corridor L1-6 to SB-A RMT 1 1.600 1.600
E1-1 to SB-A RMT 2 1.600 3.200
Ground Floor - Wall Conduit for Light Looping
Toilet L1-6 to SB-A RMT 2 1.900 3.800
Toilet Corridor L1-6 to SB-A RMT 2 2.200 4.400
Corridor L1-6 to SB-A RMT 1 2.800 2.800
Creche Toilet L1-5 to SB-F RMT 2 1.000 2.000
1st Floor - Ceiling Conduit for Light Looping
Crehe Toilet L1 to SB-F RMT 1 0.975 0.975
Creche Toilet SB-F to L1-5 RMT 1 3.400 3.400
RO Room L1 to GF SLAB RMT 2 6.500 13.000
RO Room Power to GF Slab RMT 2 6.100 12.200
Supply, fixing, testing & commissioning of modular type switches, shuttered switched
G.1 socket outlets, electronic fan regulator , 1 phase / 3 phase, 16A, 20A, 32A metal clad
sockets with DP/TPN MCB & plug top for these metal clad sockets.
15 Supply and fixing of following sizes of modular front plates screwless along with
necessary raparound, fixing accessories.
a) 1 module
Corridor Nos. 6 6.000
Creche toilet Nos. 1 1.000
1 no. Surge suppressor 1.6KV with built-in protection fuse (Zotup Make)
Outgoing
20 Nos. 10A /16A, 10KA, SP, C-Curve MCB's
1 No. 32A, 10KA, DP, D-Curve, MCB & 1 nos. 32A, DP, 30mA, RCBO with
separate neutral & dedicated earth link.
Outgoing
6 Nos. 10A, 10KA, SP, D-Curve MCB's
8 WAY SPN ELDB's as described above
Ground Floor
UPS DB Set 1 1.000
1st Floor
UPS DB Set 1 1.000
2nd Floor
UPS DB Set 1 1.000
Supplying and fixing of following copper /GI tapes & Copper / AI. wires /
1) cables along with cable end terminations & all necessary fixing accessories,
and effecting connections :
Genral Notes:
i.The earthing connections/joints should be bolted, riveted, welded, brazed
type.
ii.All welded/brazed joints should be treated with anti-corrosive paints to
protect it from corrosion/rusting.
iii. All non-current carrying metal parts of the electrical installation shall be
earthed as per IS: 3043 – 1966 with latest amendment.
Ground Floor
S-018 Classroom Nos. 8 8.000
S-017 Classroom Nos. 4 4.000
S-016 Classroom Nos. 4 4.000
Chemistry Lab Nos. 8 8.000
S-013 Classroom Nos. 4 4.000
S-012 Classroom Nos. 4 4.000
S-011 Classroom Nos. 4 4.000
Computer Lab Nos. 4 4.000
Medical room Nos. 3 3.000
Records room Nos. 2 2.000
Admin room Nos. 2 2.000
1st Floor
S-115 Classroom Nos. 8 8.000
S-114 Classroom Nos. 4 4.000
S-113 Classroom Nos. 4 4.000
Physics Lab Nos. 8 8.000
S-111 Classroom Nos. 4 4.000
S-110 Classroom Nos. 4 4.000
S-109 Classroom Nos. 4 4.000
Staff room Nos. 11 11.000
Meeting Room Nos. 2 2.000
2nd Floor
S-215 Classroom Nos. 8 8.000
S-214 Classroom Nos. 4 4.000
S-213 Classroom Nos. 4 4.000
Biology Lab Nos. 8 8.000
S-211 Classroom Nos. 4 4.000
S-210 Classroom Nos. 4 4.000
S-209 Classroom Nos. 4 4.000
S-201 Classroom Mathematics Lab Nos. 8 8.000
S-202 Classroom Nos. 4 4.000
S-203 Classroom Nos. 4 4.000
6 24W LED Light fixture for Corridor & general area lights. (Make:WIPRO
LL20-221-XXX-60-XX (Trim LED)
Ground Floor
Corridor Nos. 17 17.000
Girls Toilet Nos. 4 4.000
Boys Toilet Nos. 4 4.000
Elec Rm Nos. 1 1.000
1st Floor
Corridor Nos. 14 14.000
Girls Toilet Nos. 4 4.000
Boys Toilet Nos. 4 4.000
2nd Floor
Corridor Nos. 16 16.000
Girls Toilet Nos. 4 4.000
Boys Toilet Nos. 4 4.000
Ground Floor
Classroom, S-011 Nos. 5 5.000
Classroom, S-012 Nos. 5 5.000
Classroom, S-013 Nos. 5 5.000
Chemistry Lab, S-014 Nos. 6 6.000
Classroom, S-016 Nos. 5 5.000
Classroom, S-017 Nos. 5 5.000
Classroom, S-018 Nos. 5 5.000
Admin Room Nos. 1 1.000
Medical Room Nos. 2 2.000
Computer Lab Nos. 5 5.000
1st Floor
Classroom, S-109 Nos. 5 5.000
Classroom, S-110 Nos. 5 5.000
Classroom, S-111 Nos. 5 5.000
Physics Lab, S-112 Nos. 6 6.000
Classroom, S-113 Nos. 5 5.000
Classroom, S-114 Nos. 5 5.000
Classroom, S-115 Nos. 5 5.000
Meeting Room Nos. 1 1.000
Staff Room Nos. 8 8.000
2nd Floor
Classroom, S-209 Nos. 5 5.000
Classroom, S-210 Nos. 5 5.000
Classroom, S-211 Nos. 5 5.000
Biology Lab, S-212 Nos. 6 6.000
Classroom, S-213 Nos. 5 5.000
Classroom, S-214 Nos. 5 5.000
Classroom, S-215 Nos. 5 5.000
Classroom, S-201 Nos. 5 5.000
Classroom, S-202 Nos. 5 5.000
Classroom, S-203 Nos. 5 5.000
Wall mounted / angle holder mounted pin type 18W LED bulb(WIPRO 18 W
16 IRIS LED SLIM RO/SQ SM LD 80/81) along with Havells Polycarbonate Fancy
angle Holder and fixing accessories
Ground Floor
Medical room entry Nos. 1 1.000
Diff abled toilet Nos. 1 1.000
Ro Room Nos. 1 1.000
1st Floor
Elec rm Nos. 1 1.000
Diff abled toilet Nos. 1 1.000
Ro Room Nos. 1 1.000
2nd Floor
Elec rm Nos. 1 1.000
Diff abled toilet Nos. 1 1.000
Ro Room Nos. 1 1.000
Circular type Surface mounted 18W LED light fixture with housed in
17 aluminium powder quoted enclosure with diffuser (Model: LD80-101-XXX-60-
SM LED)
Ground Floor
Built in seat Area Nos. 3 3.000
Toilet Corridor Nos. 3 3.000
entrance lobby Nos. 6 6.000
1st Floor
Built in seat Area Nos. 4 4.000
Toilet Corridor Nos. 3 3.000
2nd Floor
Stair Case Nos. 1 1.000
Toilet Corridor Nos. 3 3.000
first floor below Nos. 4 4.000
32 IP-65 Focus light for external Logo with 70Watt Lamp complete with all
accessories.
1) Supply, laying, testing and commissioning of wiring with FRLS PVC insulated
stranded copper conductor wire 660 /1100 V grade in existing surface /
recessed conduit including ferruling, terminations at both ends with suitable
lugs, hylem pull box cover etc. complete
4 x 10 sq.mm Cu. Wiring cable + 2 x 4sq.mm Cu. Solid green PVC insulated
a)
Earth wire in existing conduit
Ground Floor
School main panel to L+P DB-2 (Chemistry Lab) RMT 3 29.400 88.200
School main panel to L+P DB-1 Elec Rm RMT 3 29.400 88.200
1st Floor
School main panel to L+P DB-2 (Physics Lab) RMT 3 29.400 88.200
School main panel to L+P DB-1 Elec Rm RMT 3 29.400 88.200
2nd Floor
School main panel to L+P DB-1 Elec Rm RMT 3 43.000 129.000
School main panel to L+P DB-2 (Biology Lab) RMT 3 43.000 129.000
Wiring for light, ceiling fan, exhaust fan, call bell & 5 A plug points in existing
2 conduits with FR PVC insulated stranded copper conductor wires a from DB
via switch to the point of any length with providing and fixing of PVC
connector, hylem junction
a) From DB to first point 2 x 2.5 sq.mm Cu. Wiring cable + 1 x 1.5sq.mm Cu.
Solid green PVC insulated Earth wire in existing conduit.
Ground Floor
Classroom S-018, L2-1 To L+P (DB-2) RMT 3 25.500 76.500
Classroom S-017, L2-2 To L+P (DB-2) RMT 3 10.900 32.700
Classroom S-016, L2-3 To L+P (DB-2) RMT 3 7.700 23.100
Chemistry Lab, L2-4 To L+P (DB-2) RMT 3 9.000 27.000
Corridor S-014, L2-5 To L+P (DB-2) RMT 3 8.700 26.100
Corridor , L+P (DB-2) to L2-5 outside S-018 RMT 3 13.500 40.500
External Light 1 to DB RMT 6 9.300 55.800
Classroom S-013, L1-1 To L+P (DB-1) RMT 3 20.500 61.500
Classroom S-012, L1-2 To L+P (DB-1) RMT 3 10.900 32.700
Classroom S-011, L1-3 To L+P (DB-1) RMT 3 6.000 18.000
Corridor, L1-5 to L+P (DB-1) SB-J Built in Seat Area RMT 3 38.285 114.855
Corridor, E1-1 to UPS DB SB-F outside S-012 RMT 3 22.125 66.375
Corridor, E1-1 SB-J to SB-F Built in Seat Area RMT 3 42.140 126.420
Corridor, E1-1 SB-F to SB-A outside S-016 RMT 3 19.095 57.285
Corridor, E1-1 SB-A to SB-A outside S-018 RMT 3 18.440 55.320
Corridor, E1-1 SB-J to SB-J outside Computer Lab RMT 3 21.540 64.620
Corridor, L1-7 SB-G to SB-J outside Computer Lab RMT 3 2.000 6.000
Entrance Lobby , L1-8 To L+P (DB-1) RMT 3 25.600 76.800
Entrance Lobby , E1-1 To UPS DB RMT 3 25.600 76.800
Outside Boys Toilet SB-J to Girls Toilet SB-J RMT 3 14.900 44.700
Boys toilet 2XSB-J to SB-J RMT 3 1.000 3.000
Admin Room SB-F to SB-K RMT 6 6.400 38.400
Medical Room SB-I to SB-K RMT 6 13.775 82.650
Corridor, L1-5 to L+P (DB-1) RMT 3 10.800 32.400
Girl's Toilet S-010, L1-4 To L+P (DB-1) RMT 3 9.300 27.900
Medical Room S-005, L1-6 To L+P (DB-1) RMT 3 22.800 68.400
Computer Lab S-004, L1-7 to L+P (DB-1) RMT 3 28.300 84.900
Ro room 2XSB-J to SB-F RMT 3 13.900 41.700
Diff Abled Toilet SB-I to SB-F RMT 3 2.250 6.750
elec Rm L1-4 SB-F to 2XSB-J RMT 3 13.300 39.900
1st Floor
Classroom S-115, L2-1 To L+P (DB-2) RMT 3 16.650 49.950
Classroom S-114, L2-2 To L+P (DB-2) RMT 3 10.450 31.350
Classroom S-113, L2-3 To L+P (DB-2) RMT 3 4.250 12.750
Physics Lab S-112, L2-4 To L+P (DB-2) RMT 3 7.350 22.050
Corridor, L2-4 To L+P (DB-2) RMT 3 6.950 20.850
Corridor L+P (DB-2) to L2-5 SB-A RMT 3 15.450 46.350
Built in seat area, UPS DB to E1-1 SB-J RMT 3 23.150 69.450
CB-SCS Corridor UPS DB to SB-A E1-1 RMT 3 32.450 97.350
Girls Toilet L+P DB-1 to 2S SB-J L1-3 RMT 3 8.350 25.050
Diff Abled Toilet 2XSB-J TO SB-F L1-3 RMT 3 7.400 22.200
Toilet Corridor 2XSB-J TO SB-J L1-3 RMT 3 11.500 34.500
Toilet Corridor UPS DB TO SB-J E1-1 RMT 3 12.750 38.250
Boys toilet SB-A to SB-J L1-3 RMT 3 1.000 3.000
Corridor UPS DB TO SB-A OUTSIDE S-113 E1-1 RMT 3 44.750 134.250
Corridor SB-A TO SB-A OUTSIDE S-115 E1-1 RMT 3 24.150 72.450
Classroom S-111, L2-5 To L+P (DB-2) RMT 3 10.350 31.050
Classroom S-110, L1-1 To L+P (DB-1) RMT 3 10.650 31.950
Classroom S-109, L1-2 To L+P (DB-1) RMT 3 5.750 17.250
Built in seat area, L1-4 To L+P (DB-1) RMT 3 22.950 68.850
RO Room S-105, L1-3 To L+P (DB-1) RMT 3 5.150 15.450
Staff Room S-101, L1-5 to L+P (DB-1) RMT 3 32.450 97.350
L1-6 to L+P (DB-1) RMT 3 21.250 63.750
Corridor, L1-7 to L+P (DB-1) RMT 3 32.450 97.350
Elec room L1-3 SB-J to 2XSB-J RMT 3 7.800 23.400
Ro Room SB-F to 2X SB-J RMT 3 9.700 29.100
2nd floor
Classroom S-215, L2-5 To L+P (DB-2) RMT 3 17.550 52.650
Classroom S-214, L2-4 To L+P (DB-2) RMT 3 10.450 31.350
Classroom S-213, L2-3 To L+P (DB-2) RMT 3 4.250 12.750
Biology Lab S-212, L2-2 To L+P (DB-2) RMT 3 7.050 21.150
Corridor, L2-6 To L+P (DB-2) RMT 3 7.250 21.750
Classroom S-211, L2-5 To L+P (DB-2) RMT 3 10.250 30.750
Classroom S-210, L1-8 To L+P (DB-1) RMT 3 10.750 32.250
Classroom S-209, L1-7 To L+P (DB-1) RMT 3 5.750 17.250
Classroom S-203, L1-3 To L+P (DB-1) RMT 3 17.550 52.650
Classroom S-202, L1-2 To L+P (DB-1) RMT 3 22.450 67.350
Classroom S-201, L1-1 To L+P (DB-1) RMT 3 29.650 88.950
Boy's Toilet S-207, L1-5 to L+P (DB-1) RMT 3 13.350 40.050
Toilet Corridor SB-J to SB-A L1-5 RMT 3 1.000 3.000
Toilet Corridor L+P DB-1 to L1-4 SB-J RMT 3 12.600 37.800
SB-J TO SB-F STAIRCASE RMT 3 10.900 32.700
SB-J TO SB-A OUTSIDE S-203 RMT 3 12.900 38.700
SB-J TO SB-A OUTSIDE S-204 RMT 3 19.400 58.200
Diff Abled Toilet 2XSB-J TO SB-F L1-6 RMT 3 7.200 21.600
Toilet Corridor UPS DB TO SB-J E1-1 RMT 3 12.600 37.800
SB-J to SB-A outside S-213 E1-1 RMT 3 34.100 102.300
SB-J to SB-A outside S-203 E1-1 RMT 3 12.700 38.100
SB-A to SB-A outside S-203 E1-1 RMT 3 41.920 125.760
Girl's Toilet S-208, L1-6 to L+P (DB-1) RMT 3 6.650 19.950
Elec rm 2XSB-J to SB-F L1-6 RMT 3 1.500 4.500
Ro Room SB-F to SB-J Toilet Corridor L1-6 RMT 3 10.700 32.100
RMT 3,685.785
TOTAL QTY
TOTAL QTY
RMT 1,228.595
PAYABLE QTY AS ON DATE RMT 80% 982.876
b) Loop point 2 x 1.5 sq.mm Cu. Wiring cable + 1 x 1.5sq.mm Cu. Solid green PVC
insulated Earth wire in existing conduit.
Ground Floor
Classroom, S-018
F1 to SB-G RMT 7 5.400 37.800
F1 to F2 RMT 5 4.700 23.500
F3 to F2 RMT 3 3.850 11.550
F4 to F2 RMT 3 2.950 8.850
F5 to F1 RMT 3 4.150 12.450
L1 to L2 RMT 3 4.700 14.100
L2 to SB-H RMT 3 3.950 11.850
L4 to L3 RMT 3 2.900 8.700
L3 to SB-G RMT 3 6.650 19.950
L5 TO L6 RMT 3 3.800 11.400
L5 TO L7 RMT 3 2.950 8.850
L6 TO L8 RMT 3 2.900 8.700
L8 TO SB-G RMT 3 7.550 22.650
Classroom, S-017
F1 to SB-G RMT 7 3.800 26.600
F1 to F2 RMT 5 4.700 23.500
F3 to F2 RMT 3 4.050 12.150
F4 to F2 RMT 3 3.350 10.050
F5 to F1 RMT 3 3.350 10.050
L1 to L2 RMT 3 4.700 14.100
L2 to SB-H RMT 3 3.150 9.450
L4 to L3 RMT 3 3.900 11.700
L3 to SB-G RMT 3 5.250 15.750
L5 TO L6 RMT 3 4.000 12.000
L5 TO L7 RMT 3 3.350 10.050
L6 TO L8 RMT 3 3.900 11.700
L8 TO SB-G RMT 3 5.950 17.850
Classroom, S-016
F1 to SB-G RMT 7 3.800 26.600
F1 to F2 RMT 5 4.700 23.500
F3 to F2 RMT 3 4.050 12.150
F4 to F2 RMT 3 3.350 10.050
F5 to F1 RMT 3 3.350 10.050
L1 to L2 RMT 3 4.700 14.100
L2 to SB-H RMT 3 3.150 9.450
L4 to L3 RMT 3 3.900 11.700
L3 to SB-G RMT 3 5.250 15.750
L5 TO L6 RMT 3 4.000 12.000
L5 TO L7 RMT 3 3.350 10.050
L6 TO L8 RMT 3 3.900 11.700
L8 TO SB-G RMT 3 5.950 17.850
Classroom, S-013
F1 to SB-G RMT 7 3.800 26.600
F1 to F2 RMT 5 4.700 23.500
F3 to F2 RMT 3 4.050 12.150
F4 to F2 RMT 3 3.350 10.050
F5 to F1 RMT 3 3.350 10.050
L1 to L2 RMT 3 4.700 14.100
L2 to SB-H RMT 3 3.150 9.450
L4 to L3 RMT 3 3.900 11.700
L3 to SB-G RMT 3 5.250 15.750
L5 TO L6 RMT 3 4.000 12.000
L5 TO L7 RMT 3 3.350 10.050
L6 TO L8 RMT 3 3.900 11.700
L8 TO SB-G RMT 3 5.950 17.850
Classroom, S-012
F1 to SB-G RMT 7 3.800 26.600
F1 to F2 RMT 5 4.700 23.500
F3 to F2 RMT 3 4.050 12.150
F4 to F2 RMT 3 3.350 10.050
F5 to F1 RMT 3 3.350 10.050
L1 to L2 RMT 3 4.700 14.100
L2 to SB-H RMT 3 3.150 9.450
L4 to L3 RMT 3 3.900 11.700
L3 to SB-G RMT 3 5.250 15.750
L5 TO L6 RMT 3 4.000 12.000
L5 TO L7 RMT 3 3.350 10.050
L6 TO L8 RMT 3 3.900 11.700
L8 TO SB-G RMT 3 5.950 17.850
Classroom, S-011
F1 to SB-G RMT 7 3.800 26.600
F1 to F2 RMT 5 4.700 23.500
F3 to F2 RMT 3 4.050 12.150
F4 to F2 RMT 3 3.350 10.050
F5 to F1 RMT 3 3.350 10.050
L1 to L2 RMT 3 4.700 14.100
L2 to SB-H RMT 3 3.150 9.450
L4 to L3 RMT 3 3.900 11.700
L3 to SB-G RMT 3 5.250 15.750
L5 TO L6 RMT 3 4.000 12.000
L5 TO L7 RMT 3 3.350 10.050
L6 TO L8 RMT 3 3.900 11.700
L8 TO SB-G RMT 3 5.950 17.850
Chemistry Lab, S-014
F1 to SB-G RMT 9 4.635 41.715
F1 to F2 RMT 3 3.200 9.600
F1 to F3 RMT 6 3.770 22.620
F3 to F4 RMT 3 3.200 9.600
F3 to F5 RMT 4 3.770 15.080
F5 to F6 RMT 4 3.200 12.800
L1 TO L2 RMT 3 3.770 11.310
L1 TO SB-G RMT 3 3.000 9.000
L3 TO L4 RMT 3 3.390 10.170
L3 TO SB-G RMT 3 9.540 28.620
L5 TO L6 RMT 3 3.390 10.170
L6 TO SB-G RMT 3 12.100 36.300
L7 to L8 RMT 3 3.770 11.310
L8 TO SB-H RMT 3 4.200 12.600
CB-SSC Ramp Area
L1 TO L2 RMT 3 6.220 18.660
Corridor
L2 to SB-J RMT 3 8.990 26.970
E1 to E2 RMT 3 3.400 10.200
E2 to SB-J RMT 3 3.820 11.460
E3 to E4 RMT 3 12.110 36.330
E3 to SB-J RMT 3 10.370 31.110
Built in seat area
L3 to L4 RMT 3 5.230 15.690
L4 to SB-J RMT 3 7.610 22.830
L5 to L6 RMT 3 6.620 19.860
L6 to SB-J RMT 3 7.370 22.110
E5 to SB-J RMT 3 4.310 12.930
Corridor Toilet Side
L1 to L2 RMT 3 6.300 18.900
L2 to L3 RMT 3 6.300 18.900
L1 to SB-J RMT 3 5.600 16.800
Toilet Entry Corridor
L3 to SB-J RMT 3 2.800 8.400
Computer Lab, S-004
F1 to SB-G RMT 7 3.550 24.850
F1 to F2 RMT 5 4.920 24.600
F3 to F2 RMT 3 4.130 12.390
F4 to F2 RMT 3 3.350 10.050
F5 to F1 RMT 3 3.350 10.050
L1 to L2 RMT 3 3.650 10.950
L2 to SB-H RMT 3 2.100 6.300
L4 to L3 RMT 3 8.770 26.310
L3 to SB-G RMT 3 8.510 25.530
L5 TO L6 RMT 3 4.660 13.980
L5 TO L7 RMT 3 3.850 11.550
L6 TO L8 RMT 3 3.320 9.960
L8 TO SB-G RMT 3 8.790 26.370
Records Room
L1 to L2 RMT 3 3.100 9.300
L2 to SB-F RMT 3 3.300 9.900
Admin Room
L1 to L2 RMT 3 2.950 8.850
L2 to SB-K RMT 3 3.650 10.950
F1 to SB-K RMT 3 4.875 14.625
Entry Court
L1 to L2 RMT 3 4.400 13.200
L2 to SB-J RMT 3 5.600 16.800
Entrance Lobby
L1 to L3 RMT 3 4.300 12.900
L3 To L5 RMT 3 4.300 12.900
L5 to L6 RMT 3 3.100 9.300
L6 to L4 RMT 3 4.300 12.900
L1 to SB-J RMT 3 10.300 30.900
E1 to SB-J RMT 3 13.400 40.200
Corridor near Chemistry Lab
E1 to E2 RMT 3 6.195 18.585
E1 to SB-F RMT 3 4.100 12.300
L1 to L2 RMT 3 9.935 29.805
L2 to SB-A RMT 3 3.300 9.900
E3 to SB-A RMT 3 7.985 23.955
L3 to L4 RMT 3 12.950 38.850
L4 to SB-A RMT 3 4.600 13.800
Boys Toilet
L1 to SB-A RMT 4 5.600 22.400
L1 to L4 RMT 4 5.500 22.000
L4 to L3 RMT 3 2.600 7.800
L2 to SB-A RMT 6 7.300 43.800
L2 to F1 RMT 5 3.650 18.250
F1 to F2 RMT 4 2.650 10.600
F2 to F3 RMT 3 2.300 6.900
Girls Toilet
L1 to SB-J RMT 5 3.300 16.500
L1 to L2 RMT 3 3.100 9.300
L1 to L4 RMT 3 5.200 15.600
L4 to L3 RMT 3 3.100 9.300
F1 to SB-J RMT 5 10.450 52.250
F1 to F2 RMT 4 2.650 10.600
F2 to F3 RMT 3 2.300 6.900
diff abled toilet wall light to SB-F RMT 4 7.000 28.000
wall light to exhaust fan RMT 3 0.800 2.400
elec rm Light to SB-I RMT 3 2.900 8.700
Ro room wall Light to SB-F RMT 4 4.884 19.536
wall light to exhaust fan RMT 3 3.300 9.900
1st Floor
Classroom, S-115
F1 to SB-G RMT 7 5.400 37.800
F1 to F2 RMT 5 4.700 23.500
F3 to F2 RMT 3 3.850 11.550
F4 to F2 RMT 3 2.950 8.850
F5 to F1 RMT 3 4.150 12.450
L1 to L2 RMT 3 4.700 14.100
L2 to SB-H RMT 3 3.950 11.850
L4 to L3 RMT 3 2.900 8.700
L3 to SB-G RMT 3 6.650 19.950
L5 TO L6 RMT 3 3.800 11.400
L5 TO L7 RMT 3 2.950 8.850
L6 TO L8 RMT 3 2.900 8.700
L8 TO SB-G RMT 3 7.550 22.650
Classroom, S-114
F1 to SB-G RMT 7 3.800 26.600
F1 to F2 RMT 5 4.700 23.500
F3 to F2 RMT 3 4.050 12.150
F4 to F2 RMT 3 3.350 10.050
F5 to F1 RMT 3 3.350 10.050
L1 to L2 RMT 3 4.700 14.100
L2 to SB-H RMT 3 3.150 9.450
L4 to L3 RMT 3 3.900 11.700
L3 to SB-G RMT 3 5.250 15.750
L5 TO L6 RMT 3 4.000 12.000
L5 TO L7 RMT 3 3.350 10.050
L6 TO L8 RMT 3 3.900 11.700
L8 TO SB-G RMT 3 5.950 17.850
Classroom, S-113
F1 to SB-G RMT 7 3.800 26.600
F1 to F2 RMT 5 4.700 23.500
F3 to F2 RMT 3 4.050 12.150
F4 to F2 RMT 3 3.350 10.050
F5 to F1 RMT 3 3.350 10.050
L1 to L2 RMT 3 4.700 14.100
L2 to SB-H RMT 3 3.150 9.450
L4 to L3 RMT 3 3.900 11.700
L3 to SB-G RMT 3 5.250 15.750
L5 TO L6 RMT 3 4.000 12.000
L5 TO L7 RMT 3 3.350 10.050
L6 TO L8 RMT 3 3.900 11.700
L8 TO SB-G RMT 3 5.950 17.850
Classroom, S-111
F1 to SB-G RMT 7 3.800 26.600
F1 to F2 RMT 5 4.700 23.500
F3 to F2 RMT 3 4.050 12.150
F4 to F2 RMT 3 3.350 10.050
F5 to F1 RMT 3 3.350 10.050
L1 to L2 RMT 3 4.700 14.100
L2 to SB-H RMT 3 3.150 9.450
L4 to L3 RMT 3 3.900 11.700
L3 to SB-G RMT 3 5.250 15.750
L5 TO L6 RMT 3 4.000 12.000
L5 TO L7 RMT 3 3.350 10.050
L6 TO L8 RMT 3 3.900 11.700
L8 TO SB-G RMT 3 5.950 17.850
Classroom, S-110
F1 to SB-G RMT 7 3.800 26.600
F1 to F2 RMT 5 4.700 23.500
F3 to F2 RMT 3 4.050 12.150
F4 to F2 RMT 3 3.350 10.050
F5 to F1 RMT 3 3.350 10.050
L1 to L2 RMT 3 4.700 14.100
L2 to SB-H RMT 3 3.150 9.450
L4 to L3 RMT 3 3.900 11.700
L3 to SB-G RMT 3 5.250 15.750
L5 TO L6 RMT 3 4.000 12.000
L5 TO L7 RMT 3 3.350 10.050
L6 TO L8 RMT 3 3.900 11.700
L8 TO SB-G RMT 3 5.950 17.850
Classroom, S-109
F1 to SB-G RMT 7 3.800 26.600
F1 to F2 RMT 5 4.700 23.500
F3 to F2 RMT 3 4.050 12.150
F4 to F2 RMT 3 3.350 10.050
F5 to F1 RMT 3 3.350 10.050
L1 to L2 RMT 3 4.700 14.100
L2 to SB-H RMT 3 3.150 9.450
L4 to L3 RMT 3 3.900 11.700
L3 to SB-G RMT 3 5.250 15.750
L5 TO L6 RMT 3 4.000 12.000
L5 TO L7 RMT 3 3.350 10.050
L6 TO L8 RMT 3 3.900 11.700
L8 TO SB-G RMT 3 5.950 17.850
SSc CB entry L1 to SB-A RMT 3 9.700 29.100
Staff room F1 to SB-H RMT 5 5.500 27.500
F1 to F2 RMT 3 4.200 12.600
F1 to Exhaust fan RMT 3 1.800 5.400
F1 to F3 RMT 3 7.900 23.700
L1 to L2 RMT 3 4.300 12.900
L2 to L3 RMT 3 4.200 12.600
L3 to SB-H RMT 3 5.800 17.400
L4 to L5 RMT 3 4.300 12.900
L5 to SB-H RMT 3 11.100 33.300
F4 to SB-G RMT 7 5.300 37.100
F4 to F5 RMT 6 4.250 25.500
F5 to F6 RMT 4 4.250 17.000
F6 to F7 RMT 3 4.200 12.600
F4 to F8 RMT 4 4.200 16.800
L6 to SB-G RMT 3 7.130 21.390
L6 to L7 RMT 3 4.180 12.540
L7 to L8 RMT 3 4.315 12.945
L8 to L9 RMT 3 4.180 12.540
L10 to SB-G RMT 3 14.760 44.280
L10 to L11 RMT 3 4.180 12.540
Meeting Room
F1 to SB-k RMT 3 3.850 11.550
L1 to SB-K RMT 3 5.050 15.150
L2 to SB-K RMT 3 5.050 15.150
Built in seat area L1 to L2 RMT 3 4.300 12.900
L1 to SB-J RMT 3 4.100 12.300
E1 to E2 RMT 3 3.500 10.500
E1 TO SB-J RMT 3 7.100 21.300
CORRIDOR L1 TO L2 RMT 3 6.195 18.585
L2 TO L3 RMT 3 6.200 18.600
L1 TO SB-J RMT 3 5.600 16.800
TOILET entry corridor L1 to L2 RMT 3 2.100 6.300
L2 to L3 RMT 3 4.300 12.900
L3 TO SB-J RMT 3 2.800 8.400
Diff Abled Toilet L1 to SB-F RMT 3 4.000 12.000
L1 TO F1 RMT 3 1.200 3.600
Physics Lab F1 to SB-G RMT 8 4.635 37.080
F1 to F2 RMT 3 3.200 9.600
F1 to F3 RMT 6 3.770 22.620
F3 to F4 RMT 3 3.200 9.600
F3 to F5 RMT 4 3.770 15.080
F5 to F6 RMT 4 3.200 12.800
L1 TO L2 RMT 3 3.770 11.310
L1 TO SB-G RMT 3 3.000 9.000
L3 TO L4 RMT 3 3.390 10.170
L3 TO SB-G RMT 3 9.540 28.620
L5 TO L6 RMT 3 3.390 10.170
L6 TO SB-G RMT 3 12.240 36.720
L7 to L8 RMT 3 3.770 11.310
L8 TO SB-H RMT 3 4.200 12.600
Corridor E1 to E2 RMT 3 11.890 35.670
E1 to SB-J RMT 3 22.500 67.500
L4 to L5 RMT 3 9.930 29.790
L4 to SB-A RMT 3 3.300 9.900
E3 to SB-A RMT 3 7.980 23.940
E4 to E5 RMT 3 6.225 18.675
E4 to SB-A RMT 3 9.000 27.000
L6 to L7 RMT 3 6.300 18.900
L7 to SB-A RMT 3 8.300 24.900
Corridor L8 to SB-A RMT 3 10.860 32.580
Boys Toilet
L1 to SB-A RMT 5 5.300 26.500
L1 to L2 RMT 5 3.000 15.000
L2 to L3 RMT 5 3.000 15.000
L3 to L4 RMT 3 2.600 7.800
F1 to SB-A RMT 5 14.350 71.750
F1 to F2 RMT 4 2.300 9.200
F2 to F3 RMT 3 2.650 7.950
Girls toilet -
L4 to SB-J RMT 5 3.400 17.000
L4 to L3 RMT 3 3.000 9.000
L4 to L2 RMT 3 2.800 8.400
L2 to L1 RMT 3 3.000 9.000
F3 to SB-J RMT 5 7.950 39.750
F3 to F1 RMT 4 6.950 27.800
F2 to F1 RMT 3 2.650 7.950
Diff abled Toilet wall light to SB-F RMT 4 4.000 16.000
wall light to exhaust fan RMT 3 0.800 2.400
ro room wall Light to SB-F RMT 3 1.800 5.400
Elec rm Light to SB-F RMT 3 2.100 6.300
2nd Floor
Classroom, S-215
F1 to SB-G RMT 7 5.400 37.800
F1 to F2 RMT 5 4.700 23.500
F3 to F2 RMT 3 3.850 11.550
F4 to F2 RMT 3 2.950 8.850
F5 to F1 RMT 3 4.150 12.450
L1 to L2 RMT 3 4.700 14.100
L2 to SB-H RMT 3 3.950 11.850
L4 to L3 RMT 3 2.900 8.700
L3 to SB-G RMT 3 6.650 19.950
L5 TO L6 RMT 3 3.800 11.400
L5 TO L7 RMT 3 2.950 8.850
L6 TO L8 RMT 3 2.900 8.700
L8 TO SB-G RMT 3 7.550 22.650
Classroom, S-214
F1 to SB-G RMT 7 3.800 26.600
F1 to F2 RMT 5 4.700 23.500
F3 to F2 RMT 3 4.050 12.150
F4 to F2 RMT 3 3.350 10.050
F5 to F1 RMT 3 3.350 10.050
L1 to L2 RMT 3 4.700 14.100
L2 to SB-H RMT 3 3.150 9.450
L4 to L3 RMT 3 3.900 11.700
L3 to SB-G RMT 3 5.250 15.750
L5 TO L6 RMT 3 4.000 12.000
L5 TO L7 RMT 3 3.350 10.050
L6 TO L8 RMT 3 3.900 11.700
L8 TO SB-G RMT 3 5.950 17.850
Classroom, S-213
F1 to SB-G RMT 7 3.800 26.600
F1 to F2 RMT 5 4.700 23.500
F3 to F2 RMT 3 4.050 12.150
F4 to F2 RMT 3 3.350 10.050
F5 to F1 RMT 3 3.350 10.050
L1 to L2 RMT 3 4.700 14.100
L2 to SB-H RMT 3 3.150 9.450
L4 to L3 RMT 3 3.900 11.700
L3 to SB-G RMT 3 5.250 15.750
L5 TO L6 RMT 3 4.000 12.000
L5 TO L7 RMT 3 3.350 10.050
L6 TO L8 RMT 3 3.900 11.700
L8 TO SB-G RMT 3 5.950 17.850
Classroom, S-211
F1 to SB-G RMT 7 3.800 26.600
F1 to F2 RMT 5 4.700 23.500
F3 to F2 RMT 3 4.050 12.150
F4 to F2 RMT 3 3.350 10.050
F5 to F1 RMT 3 3.350 10.050
L1 to L2 RMT 3 4.700 14.100
L2 to SB-H RMT 3 3.150 9.450
L4 to L3 RMT 3 3.900 11.700
L3 to SB-G RMT 3 5.250 15.750
L5 TO L6 RMT 3 4.000 12.000
L5 TO L7 RMT 3 3.350 10.050
L6 TO L8 RMT 3 3.900 11.700
L8 TO SB-G RMT 3 5.950 17.850
Classroom, S-210
F1 to SB-G RMT 7 3.800 26.600
F1 to F2 RMT 5 4.700 23.500
F3 to F2 RMT 3 4.050 12.150
F4 to F2 RMT 3 3.350 10.050
F5 to F1 RMT 3 3.350 10.050
L1 to L2 RMT 3 4.700 14.100
L2 to SB-H RMT 3 3.150 9.450
L4 to L3 RMT 3 3.900 11.700
L3 to SB-G RMT 3 5.250 15.750
L5 TO L6 RMT 3 4.000 12.000
L5 TO L7 RMT 3 3.350 10.050
L6 TO L8 RMT 3 3.900 11.700
L8 TO SB-G RMT 3 5.950 17.850
Classroom, S-209
F1 to SB-G RMT 7 3.800 26.600
F1 to F2 RMT 5 4.700 23.500
F3 to F2 RMT 3 4.050 12.150
F4 to F2 RMT 3 3.350 10.050
F5 to F1 RMT 3 3.350 10.050
L1 to L2 RMT 3 4.700 14.100
L2 to SB-H RMT 3 3.150 9.450
L4 to L3 RMT 3 3.900 11.700
L3 to SB-G RMT 3 5.250 15.750
L5 TO L6 RMT 3 4.000 12.000
L5 TO L7 RMT 3 3.350 10.050
L6 TO L8 RMT 3 3.900 11.700
L8 TO SB-G RMT 3 5.950 17.850
Classroom, S-203
F1 to SB-G RMT 7 3.800 26.600
F1 to F2 RMT 5 4.700 23.500
F3 to F2 RMT 3 4.050 12.150
F4 to F2 RMT 3 3.350 10.050
F5 to F1 RMT 3 3.350 10.050
L1 to L2 RMT 3 4.700 14.100
L2 to SB-H RMT 3 3.150 9.450
L4 to L3 RMT 3 3.900 11.700
L3 to SB-G RMT 3 5.250 15.750
L5 TO L6 RMT 3 4.000 12.000
L5 TO L7 RMT 3 3.350 10.050
L6 TO L8 RMT 3 3.900 11.700
L8 TO SB-G RMT 3 5.950 17.850
Classroom, S-202
F1 to SB-G RMT 7 3.800 26.600
F1 to F2 RMT 5 4.500 22.500
F3 to F2 RMT 3 4.050 12.150
F4 to F2 RMT 3 3.350 10.050
F5 to F1 RMT 3 3.350 10.050
L1 to L2 RMT 3 4.700 14.100
L2 to SB-H RMT 3 3.150 9.450
L4 to L3 RMT 3 3.900 11.700
L3 to SB-G RMT 3 5.250 15.750
L5 TO L6 RMT 3 4.000 12.000
L5 TO L7 RMT 3 3.350 10.050
L6 TO L8 RMT 3 3.900 11.700
L8 TO SB-G RMT 3 5.950 17.850
Classroom, S-201
F1 to SB-G RMT 7 5.400 37.800
F1 to F2 RMT 5 4.700 23.500
F3 to F2 RMT 3 3.850 11.550
F4 to F2 RMT 3 2.950 8.850
F5 to F1 RMT 3 4.150 12.450
L1 to L2 RMT 3 4.700 14.100
L2 to SB-H RMT 3 3.950 11.850
L4 to L3 RMT 3 2.900 8.700
L3 to SB-G RMT 3 6.650 19.950
L5 TO L6 RMT 3 3.800 11.400
L5 TO L7 RMT 3 2.950 8.850
L6 TO L8 RMT 3 2.900 8.700
L8 TO SB-G RMT 3 7.550 22.650
BIOLOGY Lab F1 to SB-G RMT 8 4.635 37.080
F1 to F2 RMT 3 3.200 9.600
F1 to F3 RMT 6 3.770 22.620
F3 to F4 RMT 3 3.200 9.600
F3 to F5 RMT 4 3.770 15.080
F5 to F6 RMT 4 3.200 12.800
L1 TO L2 RMT 3 3.770 11.310
L1 TO SB-G RMT 3 3.000 9.000
L3 TO L4 RMT 3 3.390 10.170
L3 TO SB-G RMT 3 9.540 28.620
L5 TO L6 RMT 3 3.390 10.170
L6 TO SB-G RMT 3 12.240 36.720
L7 to L8 RMT 3 3.770 11.310
L8 TO SB-H RMT 3 4.200 12.600
Corridor L1 to L2 RMT 3 4.700 14.100
L2 to L3 RMT 3 6.300 18.900
L1 to SB-A RMT 3 3.800 11.400
L4 to SB-A RMT 3 13.100 39.300
E1 to E2 RMT 3 5.200 15.600
E1 to SB-A RMT 3 3.600 10.800
CORRIDOR L1 TO L2 RMT 3 6.195 18.585
L2 TO L3 RMT 3 6.200 18.600
L1 TO SB-J RMT 3 5.600 16.800
TOILET entry corridor L1 to L2 RMT 3 2.100 6.300
L2 to L3 RMT 3 4.300 12.900
L3 TO SB-J RMT 3 2.800 8.400
Corridor E1 to E2 RMT 3 6.100 18.300
E1 to SB-J RMT 3 23.750 71.250
L4 to L5 RMT 3 10.000 30.000
L4 to SB-A RMT 3 3.300 9.900
E3 to SB-A RMT 3 8.000 24.000
E4 to E5 RMT 3 6.220 18.660
E5 to SB-A RMT 3 19.500 58.500
Stair Case L1 to SB-F RMT 3 5.900 17.700
L12 to L13 RMT 3 6.300 18.900
L13 to L14 RMT 3 6.300 18.900
L14 to L15 RMT 3 6.300 18.900
L15 to SB-A RMT 3 5.800 17.400
L8 to L9 RMT 3 6.300 18.900
L8 to L7 RMT 3 4.700 14.100
L7 To SB-A RMT 3 3.600 10.800
L10 to L11 RMT 3 6.220 18.660
L11 to SB-A RMT 3 19.400 58.200
L3 to SB-A (Front of Staircase) RMT 3 5.900 17.700
Boys Toilet
L1 to SB-A RMT 5 5.200 26.000
L1 to L4 RMT 5 3.900 19.500
L4 to L3 RMT 4 3.000 12.000
L3 to L2 RMT 3 2.400 7.200
F1 to SB-A RMT 5 8.050 40.250
F1 to F2 RMT 4 6.900 27.600
F2 to F3 RMT 3 2.300 6.900
Girls Toilet
L1 to SB-J RMT 5 3.500 17.500
L1 to L2 RMT 3 3.000 9.000
L1 to L4 RMT 3 3.200 9.600
L4 to L3 RMT 3 3.000 9.000
F1 to SB-J RMT 5 8.400 42.000
F1 to F2 RMT 4 7.300 29.200
F2 to F3 RMT 3 2.650 7.950
Diff Abled Toilet Wall light to SB-F RMT 4 4.300 17.200
wall light to exhaust fan RMT 3 0.800 2.400
ro room wall Light to SB-F RMT 3 1.800 5.400
Elec rm Light to SB-F RMT 3 2.100 6.300
RMT 7,980.681
TOTAL QTY
RMT 2,660.227
PAYABLE QTY AS ON DATE RMT 80% 2,128.182
Circuit wiring with 2R x 2.5 mm2 + 1 x 2.5 mm2 (Earth) for box/ furniture
4 earth wire for power socket outlets on the work stations/ table/ counter /
wall 25mm dia 2mm thick FRLS PVC Conduit complete with all accessories.
Ground Floor
Wifi outside Chemistry Lab to 8 way spn db RMT 3 21.100 63.300
Wifi outside Classroom S-017 to 8 way spn db RMT 3 31.900 95.700
UPS DB to Wifi Inside Computer Lab RMT 3 33.950 101.850
UPS DB to U1-3 P1 RMT 3 27.950 83.850
U1-3 P2 to U1-3 P1 RMT 3 2.300 6.900
U1-3 P2 to U1-3 P3 RMT 3 2.200 6.600
UPS DB to U1-4 P1 RMT 3 33.850 101.550
U1-4 P2 to U1-4 P1 RMT 3 2.200 6.600
UPS DB to U1-5 P2 RMT 3 35.450 106.350
U1-5 P2 to U1-5 P1 RMT 3 3.100 9.300
UPS DB to U1-6 P1 RMT 3 38.550 115.650
U1-6 P2 to U1-6 P1 RMT 3 1.900 5.700
U1-6 P3 to U1-6 P2 RMT 3 1.900 5.700
U1-6 P3 to U1-6 P4 RMT 3 1.900 5.700
U1-6 P4 to U1-6 P5 RMT 3 2.200 6.600
Admin room
UPS DB to U1-8 RMT 3 23.600 70.800
UPS DB to U1-7 RMT 3 24.400 73.200
UPS DB to U1-1 RMT 3 20.750 62.250
U1-1 to Wifi RMT 3 3.600 10.800
UPS DB to U1-1 P2 RMT 3 25.550 76.650
U1-1 P2 to U1-1 P1 RMT 3 1.900 5.700
Wifi outside Classroom S-011 to 8 way spn db RMT 3 8.300 24.900
1st Floor
Wifi outside Physics Lab to 8 way spn db RMT 3 20.600 61.800
Wifi outside Classroom S-114 to 8 way spn db RMT 3 30.300 90.900
Wifi outside Classroom S-115 to 8 way spn db RMT 3 8.800 26.400
Staff Room U1-1 to 8 way spn db RMT 3 21.300 63.900
Staff Room U1-1 P1 to U1-1 P2 RMT 3 2.100 6.300
U1-1 P2 to U1-1 P3 RMT 3 2.100 6.300
U1-1 P3 to U1-1 P4 RMT 3 1.900 5.700
U1-1 P4 to U1-1 P5 RMT 3 2.000 6.000
U1-1 P5 to U1-1 P6 RMT 3 2.300 6.900
Staff Room Wifi-1 to Wifi-2 RMT 3 7.600 22.800
Wifi -1 to 8 way spn db RMT 3 24.600 73.800
Chemistry Lab 2XSB-M to L+P DB-2 RMT 3 8.750 26.250
staff room floor Ups ckt-1 to UPS DB RMT 3 28.150 84.450
staff room floor Ups ckt-2 to UPS DB RMT 3 27.650 82.950
staff room floor Ups ckt-3 to UPS DB RMT 3 29.250 87.750
Meeting Room U1-2 to wifi Staff room RMT 3 10.600 31.800
2nd Floor
Wifi outside Biology Lab to 8 way spn db RMT 3 22.000 66.000
Wifi outside Classroom S-214 to 8 way spn db RMT 3 31.300 93.900
Wifi outside Classroom S-209 to 8 way spn db RMT 3 8.200 24.600
Wifi outside Classroom S-203 to 8 way spn db RMT 3 18.700 56.100
Wifi outside Classroom S-204 to 8 way spn db RMT 3 25.200 75.600
Chemistry Lab P2-3 SB-M to L+P DB-2 RMT 3 11.850 35.550
Chemistry Lab P2-3 SB-M to L+P DB-2 RMT 3 8.550 25.650
RO ROOM L+P DB-1 TO SB-D RMT 3 7.450 22.350
RMT 2,129.400
TOTAL QTY
RMT 709.800
PAYABLE QTY AS ON DATE RMT 80% 567.840
Circuit wiring with 2R x 4 mm2 + 1 x 2.5 mm2 (Earth) for box/ furniture earth
5 wire for power socket outlets on the work stations/ table/ counter / wall
25mm dia 12mm thick FRLS PVC Conduit complete with all accessories.
Ground Floor
Classroom S-018 P2-1 To SB-H RMT 3 9.700 29.100
Classroom S-017 P2-1 to L+P DB-2 RMT 3 14.000 42.000
Classroom S-016 P2-2 to L+P DB-2 RMT 3 11.000 33.000
Chemistry Lab P2-3 To L+P DB-2 RMT 3 11.900 35.700
P2-3 to SB-M RMT 3 9.800 29.400
L+P DB-2 to SB-M RMT 3 8.800 26.400
P2-3 to SB-M RMT 3 5.300 15.900
SB-M to SB-M RMT 3 6.000 18.000
Classroom S-013 P1-1 to L+P DB-2 RMT 3 24.100 72.300
Classroom S-012 P1-2 to SB-H RMT 3 9.700 29.100
Classroom S-011 P1-2 to L+P DB-1 RMT 3 11.700 35.100
Ro Room P1-4 to L+P DB-1 RMT 3 10.200 30.600
Medical Room L+P DB-1 to Sb-M P1-3 RMT 3 23.950 71.850
Computer Lab SB-M to SB-H P1-3 RMT 3 12.200 36.600
1st Floor
Classroom S-115 P2-1 To SB-H RMT 3 9.800 29.400
Classroom S-114 P2-1 to L+P DB-2 RMT 3 13.500 40.500
Classroom S-113 P2-2 to L+P DB-2 RMT 3 10.800 32.400
P2-3 to SB-M RMT 3 8.400 25.200
P2-3 to SB-M RMT 3 10.500 31.500
P2-3 to SB-M RMT 3 10.000 30.000
Classroom S-111 P2-4 to L+P DB-2 RMT 3 16.500 49.500
Classroom S-110 P1-1 to SB-H RMT 3 9.700 29.100
Classroom S-109 P1-1 to L+P DB-1 RMT 3 9.500 28.500
staff Room P1-2 to L+P DB-1 RMT 3 34.700 104.100
P1-2 to SB-H RMT 3 15.700 47.100
Ro Room P1-3 to L+P DB-1 RMT 3 5.400 16.200
2nd Floor
Classroom S-215 P2-1 To SB-H RMT 3 9.700 29.100
Classroom S-214 P2-1 to L+P DB-2 RMT 3 14.000 42.000
P2-3 to SB-M RMT 3 9.800 29.400
P2-3 to SB-M RMT 3 5.300 15.900
SB-M to SB-M RMT 3 6.000 18.000
Classroom S-211 P2-4 to L+P DB-2 RMT 3 19.000 57.000
Classroom S-210 P1-1 to SB-H RMT 3 9.700 29.100
Classroom S-209 P1-1 to L+P DB-1 RMT 3 10.500 31.500
Classroom S-203 P1-3 to L+P DB-1 RMT 3 22.500 67.500
Classroom S-202 P1-3 to SB-H RMT 3 9.700 29.100
Classroom S-201 P1-3 to SB-H RMT 3 9.700 29.100
RMT 1,346.250
TOTAL QTY
RMT 448.750
PAYABLE QTY AS ON DATE RMT 80% 359.000
Providing and fixing in position the following heavy duty ISI marked PVC
9 conduit including all accessories (i.e clamps, nuts, bolts, bends, junction
boxes, pull boxes etc.) concealed or exposed as called for including necessary
civil work such as chaseing / cutting of wall etc.
a) 20mm dia.
1st Floor - Wall Conduit for Power
Staff Room P1 to P2 RMT 1 1.850 1.850
P2 to P3 RMT 1 1.900 1.900
P3 to P4 RMT 1 2.900 2.900
P4 to P5 RMT 1 2.400 2.400
P5 to P6 RMT 1 2.500 2.500
P4 to P7 RMT 1 3.000 3.000
Corridor P7 to P8 RMT 1 2.000 2.000
P8 to P9 RMT 1 2.100 2.100
P9 to Electrical Room RMT 1 24.000 24.000
P6 to Electrical Room RMT 1 23.600 23.600
P1 to Electrical Room RMT 2 25.000 50.000
c) 3 module
Ground Floor
Computer Lab Nos 8 8.000
Chemistry Lab Nos 3 3.000
1st Floor
Physics Lab Nos 3 3.000
2nd Floor
Biology Lab Nos 3 3.000
Providing and fixing in position the following heavy duty ISI marked PVC
2 conduit including all accessories (i.e clamps, nuts, bolts, bends, junction
boxes, pull boxes etc.) concealed or exposed as called for including necessary
civil work such as chaseing / cutting of wall etc.
b) 25mm dia.
Ground Floor - Ceiling Conduit for Security Camera
SW .10 10 to 5-011 RMT 1 10.000 10.000
SW .10 10 to 5-012 RMT 1 16.400 16.400
SW .10 10 to 5-013 RMT 1 22.400 22.400
SW .10 10 to 5-016 RMT 1 30.000 30.000
SW.10 to Corridor RMT 1 21.000 21.000
S-017 to Corridor RMT 1 12.200 12.200
S-018 to corridor RMT 1 12.200 12.200
Admin Room to Sw.10 RMT 6 15.600 93.600
Admin Room to S-0.8 RMT 5 14.100 70.500
Admin room to Corridor RMT 1 8.000 8.000
Admin Room to Enterancel Lab RMT 1 1.600 1.600
Admin Room to Computer Lab RMT 4 15.000 60.000
Computer Lab to Corridor RMT 1 3.600 3.600
Computer Lab to Corridor RMT 1 23.600 23.600
Computer Lab to Class room Lab RMT 2 24.000 48.000
1st Floor - Ceiling Conduit for Security Camera (1st Pour)
S-115 Classroom Junction box near Chemistry Lab DB RMT 1 20.000 20.000
S-114 Classroom Junction box near Chemistry Lab DB RMT 1 13.400 13.400
Corridor Staircase Junction box near Chemistry Lab DB RMT 1 18.000 18.000
S-113 Classroom Junction box near Chemistry Lab DB RMT 1 8.800 8.800
S-PS3 Electrical Room Junction box near Chemistry Lab DB RMT 4 20.000 80.000
S-111 Classroom Electrical Room RMT 1 19.100 19.100
S-OP6 Corridor Electrical Room RMT 1 17.000 17.000
S-110 Classroom Electrical Room RMT 1 13.000 13.000
S-109 Classroom Electrical Room RMT 1 8.200 8.200
1st Floor - Ceiling Conduit for Security Camera (2nd Pour)
Staff room camera-1 to electric room RMT 1 15.300 15.300
Camera-2 to camera-1 RMT 1 5.000 5.000
Corridor camera-3 to electric room RMT 1 9.300 9.300
Terrace Floor - Ceiling Conduit for Security Camera (1st Pour)
S-215 CAMERA to J.B. RMT 1 18.400 18.400
S-214 CAMERA to J.B. RMT 1 12.400 12.400
S-213 CAMERA to J.B. RMT 1 7.200 7.200
S-212 CAMERA to J.B. RMT 1 15.000 15.000
CORRIDOR CAMERA to S-ES1 RMT 1 16.900 16.900
S-211 CAMERA to S-ES1 RMT 1 19.400 19.400
S-210 CAMERA to S-ES1 RMT 1 13.400 13.400
S-209 CAMERA to S-ES1 RMT 1 7.800 7.800
CORRIDOR JB to S-ES1 RMT 4 24.600 98.400
Terrace Floor - Ceiling Conduit for Security Camera (2nd Pour)
Math Lab C1 to C2 RMT 1 10.800 10.800
Corridor S-ES1 to C2 RMT 1 24.000 24.000
S-202 C3 to C4 RMT 1 7.100 7.100
S-203 C4 to S-ES1 RMT 1 22.000 22.000
Lobby Below C5 to C6 RMT 1 7.000 7.000
Corridor C6 to S-ES1 RMT 1 8.300 8.300
Supply Set -
Installation Set -
Providing and fixing in position the following heavy duty ISI marked PVC
1 conduit including all accessories (i.e clamps, nuts, bolts, bends, junction
boxes, pull boxes etc.) concealed or exposed as called for including necessary
civil work such as chase cutting & making good:
4 Supply and laying Cat-6 cable in existing conduits for Data networking (1 Box
= 305 RM).
Ground Floor
Camera Outside Classroom, S-018 RMT 1 45.200 45.200
Camera near Computer Lab Staircase RMT 1 25.200 25.200
Camera entrnace Lobby RMT 1 8.200 8.200
Camera Lift Area RMT 1 14.600 14.600
Camera Outside Classroom, S-016 RMT 1 41.700 41.700
Computer Lab
U1-6 D5 to Rack RMT 1 22.400 22.400
U1-6 D4 to Rack RMT 1 21.000 21.000
U1-6 D3 to Rack RMT 1 22.700 22.700
U1-6 D2 to Rack RMT 1 24.000 24.000
U1-6 D1 to Rack RMT 1 25.600 25.600
U1-5 D1 to Rack RMT 1 22.200 22.200
U1-5 D2 to Rack RMT 2 19.600 39.200
U1-4 D1 to Rack RMT 2 18.000 36.000
U1-4 D2 to Rack RMT 2 19.800 39.600
U1-3 D1 to Rack RMT 1 16.900 16.900
U1-3 D2 to Rack RMT 1 14.900 14.900
U1-3 D3 to Rack RMT 1 17.000 17.000
Admin Room
U1-1 D1 to Rack RMT 1 9.200 9.200
U1-1 D2 to Rack RMT 1 7.500 7.500
U1-1 D3 to Rack RMT 1 5.300 5.300
1st Floor -
Camera Outside Physics Lab RMT 1 42.350 42.350
Wifi Outside Physics Lab RMT 1 42.700 42.700
2nd Floor -
Lift Area Camera RMT 1 37.000 37.000
Ground Floor
Dinning Area Nos. 20.000 20.00
Wiring for light, ceiling fan, exhaust fan, call bell & 5 A plug points in
2 existing conduits with FR PVC insulated stranded copper conductor
wires a from DB via switch to the point of any length with providing
and fixing of PVC connector, hylem junction
b) Loop point 2 x 1.5 sq.mm Cu. Wiring cable + 1 x 1.5sq.mm Cu. Solid
green PVC insulated Earth wire in existing conduit.
Ground Floor
Dinning Area
L1 to SB-O RMT 3 6.700 20.100
L1 to L2 RMT 3 4.000 12.000
L2 to L3 RMT 3 4.000 12.000
L3 to L4 RMT 3 4.000 12.000
F2 to SB-O RMT 6 9.900 59.400
F2 to F1 RMT 3 4.000 12.000
F2 to F3 RMT 4 4.000 16.000
F3 to F4 RMT 3 4.000 12.000
L6 to SB-O RMT 3 11.560 34.680
L5 to L6 RMT 3 4.000 12.000
E1 to SB-O RMT 3 15.060 45.180
E1 to E2 RMT 3 4.000 12.000
F6 to SB-0 RMT 6 12.900 77.400
F6 to F5 RMT 3 4.000 12.000
F6 to F7 RMT 4 4.000 16.000
F7 to F8 RMT 3 4.000 12.000
L8 to SB-O RMT 3 14.560 43.680
L7 to L8 RMT 3 4.000 12.000
L9 to L8 RMT 3 4.000 12.000
L9 to L10 RMT 3 4.000 12.000
F10 to SB-O RMT 6 16.100 96.600
F10 to F9 RMT 3 4.000 12.000
F10 to F11 RMT 4 4.000 16.000
F11 to F12 RMT 3 4.000 12.000
L12 to SB-O RMT 3 17.760 53.280
L12 to L11 RMT 3 4.000 12.000
L12 to L13 RMT 3 4.000 12.000
L13 to L14 RMT 3 4.000 12.000
F14 to SB-O RMT 6 19.700 118.200
F13 to F14 RMT 3 4.000 12.000
F14 to F15 RMT 4 4.000 16.000
F15 to F16 RMT 3 4.000 12.000
E4 to SB-0 RMT 3 21.360 64.080
E3 to E4 RMT 3 4.000 12.000
L15 to SB-O RMT 3 24.860 74.580
L15 to L16 RMT 3 4.000 12.000
F18 to SB-O RMT 6 23.000 138.000
F18 to F17 RMT 3 4.000 12.000
F18 to F19 RMT 4 4.000 16.000
F19 to F20 RMT 3 4.000 12.000
L18 to SB-0 RMT 3 24.660 73.980
L17 to L18 RMT 3 4.000 12.000
L18 to L19 RMT 3 4.000 12.000
L19 to L20 RMT 3 4.000 12.000
1st Floor
Library
F1 to SB-T,H RMT 8 5.860 46.880
F1 to F3 RMT 7 3.800 26.600
F3 to F5 RMT 6 3.800 22.800
F5 to F6 RMT 5 3.700 18.500
F6 to F4 RMT 4 3.800 15.200
F4 to F2 RMT 3 3.800 11.400
L1 to SB-T,H RMT 3 11.960 35.880
L1 to L2 RMT 3 9.500 28.500
L3 to L4 RMT 3 3.7 11.100
L3 to SB-T,H RMT 3 10.710 32.130
F6 to SB-S,H,A RMT 8 13.300 106.400
F6 to F5 RMT 7 3.700 25.900
F7 to F8 RMT 3 3.700 11.100
F7 to F10 RMT 4 3.800 15.200
F9 to F10 RMT 3 3.700 11.100
L7 to SB-S,H,A RMT 3 12.400 37.200
L7 to L6 RMT 3 7.000 21.000
L6 to L8 RMT 3 3.800 11.400
L5 to SB-S,H,A RMT 3 15.200 45.600
L5 to L10 RMT 3 10.300 30.900
L9 to SB-S,H,A RMT 3 8.600 25.800
L9 to L12 RMT 3 7.000 21.000
L12 to L11 RMT 3 3.700 11.100
L13 to L14 RMT 3 3.330 9.990
L13 to SB-T RMT 3 7.515 22.545
F11 to SB-T RMT 3 6.100 18.300
F15 to SB-T,H RMT 6 3.900 23.400
F15 to F16 RMT 3 3.800 11.400
F14 to F15 RMT 4 3.800 15.200
F14 to F13 RMT 3 3.800 11.400
L17 to SB-T,H RMT 3 8.600 25.800
L19 to L17 RMT 3 7.100 21.300
L16 to SB-T,H RMT 3 12.150 36.450
L16 to L18 RMT 3 7.100 21.300
L20 to SB-U,O RMT 3 5.940 17.820
L20 to L21 RMT 3 3.690 11.070
F17 to SB-U,O RMT 3 4.595 13.785
WF1 to WF2 RMT 3 4.200 12.600
WF1 to WF3 RMT 3 4.200 12.600
WF1 to SB-Q RMT 5 8.250 41.250
WF5 to WF6 RMT 3 4.200 12.600
WF4 to WF5 RMT 4 4.200 16.800
WF4 to SB-Q RMT 5 13.400 67.000
L24 to SB-U,O RMT 5 12.190 60.950
L24 to L23 RMT 4 8.300 33.200
L23 to L22 RMT 3 8.500 25.500
RMT 1,946.385
TOTAL QTY
RMT 648.795
PAYABLE QTY AS ON DATE RMT 80% 519.036
Providing and fixing in position the following heavy duty ISI marked
PVC conduit including all accessories (i.e clamps, nuts, bolts, bends,
9 junction boxes, pull boxes etc.) concealed or exposed as called for
including necessary civil work such as chaseing / cutting of wall etc.
b) 25mm dia.
L1-1 SB-0 to 6 Fan Box RMT 1 20.000 20.000
L1-1 SB-0 to 7 Fan Box RMT 1 16.700 16.700
L1-1 SB-0 to 8 Fan Box RMT 1 13.100 13.100
L1-1 SB-0 to 9 Fan Box RMT 1 9.900 9.900
L1-1 SB-0 to 10 Fan Box RMT 1 6.900 6.900
Library Nos. 12 12
b) LIGHTING+POWER DB's
8 WAY 7 SEGMENT DB
Incomer
1 No. 40A, 10KA, 4P, C-Curve
Phase incomer
3 Nos. 40A, 100mA, DP ELCB's each per phase and with separate neutral link per phase.
1 no. Surge suppressor 1.6KV with built-in protection fuse (Zotup Make)
Outgoing
20 Nos. 10A /16A, 10KA, SP, C-Curve MCB's
8 WAY 7 SEGMENT LDB's as described above
Invoice No: 169/2024-25 dtd 09.11.2024 Set 7 7.00
Wiring for light, ceiling fan, exhaust fan, call bell & 5 A plug points in existing conduits
2 with FR PVC insulated stranded copper conductor wires a from DB via switch to the
point of any length with providing and fixing of PVC connector, hylem junction
MEASUREMENT SHEET - MATERIAL SUPPLY
DIMENSION
SL No DESCRIPTION UNIT NOS Quantity Remarks
Length Breadth Height/ Depth
a) From DB to first point 2 x 2.5 sq.mm Cu. Wiring cable + 1 x 1.5sq.mm Cu. Solid green
PVC insulated Earth wire in existing conduit.
2R x 2.5 sqmm = 6200 mtrs & 1R x 1.5 sqmm = 3100 mtrs RMT 1 9,300.00 3,100.00 RMT Factor = 1/3
b) Loop point 2 x 1.5 sq.mm Cu. Wiring cable + 1 x 1.5sq.mm Cu. Solid green PVC insulated
Earth wire in existing conduit.
3R x 1.5 sqmm = 10230 mtrs RMT 1 10,230.00 3,410.00 RMT Factor = 1/3
Circuit wiring with 2R x 2.5 mm2 + 1 x 2.5 mm2 (Earth) for box/ furniture earth wire for
4 power socket outlets on the work stations/ table/ counter / wall 25mm dia 2mm thick
FRLS PVC Conduit complete with all accessories.
3R x 2.5 sqmm = 1045 mtrs RMT 1 1,045.000 348.333 RMT Factor = 1/3
Circuit wiring with 2R x 4 mm2 + 1 x 2.5 mm2 (Earth) for box/ furniture earth wire for
5 power socket outlets on the work stations/ table/ counter / wall 25mm dia 12mm
thick FRLS PVC Conduit complete with all accessories.
2R x 4 sqmm = 200 mtrs & 1R x 2.5 sqmm = 100 mtrs RMT 1 300.00 100.00 RMT Factor = 1/3
Supply, fixing, testing & commissioning of modular type switches, shuttered switched
G.1 socket outlets, electronic fan regulator , 1 phase / 3 phase, 16A, 20A, 32A metal clad
sockets with DP/TPN MCB & plug top for these metal clad sockets.
15 Supply and fixing of following sizes of modular front plates screwless along with
necessary raparound, fixing accessories.
a) 1 module Nos.
Invoice No: 149 dtd 08.10.2024 Nos. 5 5.00