Block – A2
CHAPTER VI
                               BUILDING MANAGEMENT SYSTEM
Preamble:
The IT complex, comprises of high & medium rise towers. The engineering utilities are planned to
be stand-alone for each of the towers. In order to have close control and efficient monitoring of the
utilities, each of the towers is equipped with stand-alone Building Management System – BMS,
which encompasses generally the engineering utilities. This chapter overs the details of such
utilities covered by the BMS for the block A2 being proposed now,
BMS Architecture:
The BMS being proposed, as per the guidelines established in earlier blocks, generally
encompasses the engineering utilities. That too for the core and shell part of the development only
and for the interiors, the tenant / occupant shall be providing the BMS as per their choice. Also, for
specific blocks occupied by Tenants, as per their practice, the entire BMS is provided by them and
NOT by the promoters. However, for the needs of energy billing, instruments and devices along
with software and PC are installed by the Owners.
Utilities:
The BMS’s scope is limited to the engineering utilities and in most of the cases only monitoring
them is the prime scope. Only in cases control activity is initiated. The following are the utilities
being considered in the BMS.
                      HVAC system.
                               Chiller plant and Chiller Plant Management (CPM) system,
                               Secondary Pump control (stand-alone and by pump supplier)
                               AHU system,
                               Enthalpy wheel system,
                               Basement Ventilation Jet Fan System (stand-alone and clubbed with
                                fan supplier).
Block – A2
                       Other ventilation systems, viz., for toilets, STP, stairwell
                        pressurization, lift well pressurization, etc.,
                Other Utilities.
                       Basement pump room equipment including fire pumps, WTP, RO
                        plant, tank levels, cooling tower OHT transfer, etc.,
                       Sewage Treatment Plant system, cooling tower water          treatment
                        plant, CT water OHT transfer, tank levels, etc.,
                       Electrical system at MV panel level for gathering main power data,
                        at sub-panel levels for gathering energy meter data for energy billing
                        needs.
                       Integrating the DG system.
                Energy Billing.
                       Integrating the BTU meters installed at various points, the energy
                        meters and generating the energy billing for the various tenants based
                        on the monthly EB bill input.
                Basement car Park Jet Fan System.
                       Integrating the stand-alone jet fan DDC for status information.
Block – A2
         I/O Schedule:
         Representative detail of the I/Os for various systems are detailed hereunder:
                                    I/O Schedule for AHU (for 2nos. AHUs in 1 AHU room)
                                                   AI       AI (0-
 Sl.no                Description                                     AO   DI   DO         Input/Output Device
                                                (Ni1000)     10V)
  1       FAN on/off Command                                                     2   Potential free contact
  2       FAN Run status                                                    2        MCC supplier
  3       FAN A/M Status                                                    2        Potential free contact
  4       FAN Trip Status                                                   2        Potential free contact
                                                                                     DP Switch supply, Install and
  5       Diff. Pressure across Filter                                      2
                                                                                     Wiring BMS vendor
                                                                                     DP Switch supply, Install and
  6       Diff. Pressure across SA Fan                                      2
                                                                                     Wiring BMS vendor
          Room Return air Temperature                                                Temp. Sensor supply, Install and
  7       Sensor                                    1
                                                                                     Wiring BMS vendor
          AHU Coil outlet air Temperature                                            Temp. Sensor supply, Install and
  8       Sensor                                    2
                                                                                     Wiring BMS vendor
                                                                                     DP Sensor supply, Install and
  9       Duct Static Pressure sensor                          2                     Wiring to VFD by Tenant's HVAC
                                                                                     Contractor
  10      Fan Motor VFD Control                                        2             From DDC
                                                                                     Valve + Actuator supply, Install by
  11      Chilled Water Valve -2 Way                           2       2
                                                                                     HVAC vendor
                                                                                     Co2 Sensor Supply, Install by
  12      CO2 monitor                               1
                                                                                     Tenant's HVAC Contractor
                                                                                     Damper + Actuator supply, Install
  13      Fan Outlet VCD                                               2
                                                                                     by HVAC vendor
          Fire Trip Command from Control                                             From Control Module of Fire
  14      Module                                                            1
                                                                                     Alarm System.
          Software Integration of AHU BTU
          meter to download all features for                                         Btu meter supply by HVAC
  15
          billing.                                                                   vendor - 2 Nos
          Software Integration of AHU VFD
          to download all features as                                                VFD Supply by HVAC vendor - 2
  16
          specified.                                                                 Nos
          I/O's Required for AHU                    4            4      6  11    2
          Spare                                     1            1      3   2    1
          Total                                     5            5      9  13    3
          DDC Location                                  Respective AHU Rooms.
Block – A2
        I/O Schedule for 1 No. HRW , 1 No. TEF , 1 No. SPF (when ventilation fans are near HRW)
Block – A2
                                                     AI
                                                            AI (0-
Sl.no                 Description                  (Ni100              AO   DI   DO   Input/Output Device
                                                             10V)
                                                     0)
        Heat Recovery Wheel
 1      Supply Fan on/off Command                                                1    Potential free Contact
  2     Supply Fan Run status                                               1         MCC supplier
  3     Supply Fan A/M Status                                               1         Potential free Contact
 3A     Supply Fan Trip Status                                              1         Potential free Contact
  4     Exhaust Fan on/off Command                                               1    Potential free Contact
  5     Exhaust Fan Run status                                              1         MCC supplier
  6     Exhaust Fan A/M Status                                              1         Potential free Contact
 6A     Exhaust Fan Trip Status                                             1         Potential free Contact
  7     Diff. Pressure across SA Fan                                        1         DP Switch
  8     Diff. Pressure across EA Fan                                        1         DP Switch
  9     Diff. Pressure across SA Filter                                     1         DP Switch
 10     Velocity Sensor at Supply air duct.                    1                      Velocity Sensor.
 11     SA Enthalpy Sensor                                     1                      Enthalpy Sensor
 12     RA Enthalpy Sensor                                     1                      Enthalpy Sensor
 13     Heat Recovery Wheel on/off Command                                       1    Potential free Contact
 14     Heat Recovery Wheel run Status                                      1         MCC supplier
 15     Heat Recovery A/M Status                                            1         Potential free Contact
        Toilet Exhaust Fan
 16     FAN on/off Command                                                       1    Potential free Contact
 17     FAN Run status                                                      1         MCC supplier
 18     FAN A/M Status                                                      1         Potential free Contact
18A     FAN Trip Status                                                     1         Potential free Contact
 19     Diff. Pressure across SA Filter                                     1         DP Switch
        Stairwell Pressurization
 20     FAN on/off Command                                                       1    Potential free Contact
 21     FAN Run status                                                      1         MCC supplier
 22     FAN A/M Status                                                      1         Potential free Contact
22A     FAN Trip Status                                                     1         Potential free Contact
        Terrace Fire Tank
 23     Fire Water Tank Level - Low                                          1        Level Switch
 24     Spare                                        2          3      2     5   2
         I/O's Required                              2          6      2    24   7
        DDC Location                               Terrace - Outdoor
        Note: For Control Logic, refer technical
        specifications.
        HRW - Heat Recovery Wheel
        SPF - Stair Well Pressurization Fan
        TEF - Toilet Exhaust Fan
Block – A2
                                I/O Schedule for Basement Pump Room
                                                AI         AI                    Input / Output
 Sl.no             Description                                    AO   DI   DO
                                             (Ni1000)   (0-10V)                     Device
   1     Jockey Pump Run Status                                             1    MCC
   2     Main Fire Pump Run Status                                          1    MCC
         Stand-by electrical pump / Diesel
   3     Pump run status                                                    1    MCC
   4     Sprinkler Pump Run Status                                          1    MCC
   5     Fire Water Line Pressure                         1                      Pr. Sensor.
   6     Raw Water Pump-1 run status                                   1         MCC
   7     Raw Water Pump-2 run status                                   1         MCC
   8     Sand Filter Pressure Drop                                     1         DP Sensor
   9     ACF Pressure Drop                                             1         DP Sensor
  10     Drain Pit Pump-1 run status                                   1         MCC
  11     Drain Pit Pump-2 run status                                   1         MCC
  12     Drain Pit High Level                                          1         Level Switch
  13     Drain Pit Low Level                                           1         Level Switch
  14     Fire Water Tank Level - Low                                   1         Level Switch
  15     Raw Water Tank Level - Low                                    1         Level Switch
  16     Treated Water tank level - Low                                1         Level Switch
  17     Spare                                            1            1    1
         Software integration of 2 nos.
         Hydro-pneumatic pumps (for
  18     domestic & RO water) and get
         pump run status and line
         pressures. - MODbus
         I/O's Required for the pump            0         2       0    12   5
         room
              LOCATION OF DDC                Basement Pump Room.
Block – A2
                                                     I/O Schedule for STP
                                                                 AI         AI (0-                   Input / Output
 Sl.no                       Description                                             AO   DI   DO
                                                              (Ni1000)       10V)                       Device
   1     Effluent Transfer Pump Run status - 2nos.                                        2         PFC in MCC
   2     Blower Pump Run status - 2nos.                                                   2         PFC in MCC
   3     Screw Pump Run status - 2nos.                                                    2         PFC in MCC
   4     Sludge Recirculation Pump Run status - 2nos.                                     2         PFC in MCC
   5     Collection Pit Pump Run status - 2nos.                                           2         PFC in MCC
   6     Collection Pit Low Level - 1no                                                   1         Level Switch
   7     Raw Water Pump-1 & 2 run status                                                  2         PFC in MCC
   8     Sand Filter Pressure Drop                                                        1         DP Sensor
   9     ACF Pressure Drop                                                                1         DP Sensor
  10     Softener Feed Pump 1 & 2 Run Status                                              2         PFC in MCC
  11     Treated water tank High / low levels                                             2         Level Switch
  12     Softened Water tank High / low levels                                            2         Level Switch
         Softened water OHT transfer pump on/off
  13                                                                                           2    PFC in MCC
         command
  14     Softened water OHT transfer pump RUN Status                                      2         PFC in MCC
         STP SA & EA fans
                                                                                                    Potential free
  15     FAN on/off Command                                                                    2
                                                                                                    contact
  16     FAN Run status                                                                   2         MCC supplier
                                                                                                    Potential free
  17     FAN A/M Status                                                                   2
                                                                                                    contact
                                                                                                    Potential free
  18     FAN Trip Status                                                                  2
                                                                                                    contact
  19     Diff. Pressure across Fan                                                        2         DP Sensor.
  20     Spare                                                                            4     2
         Software integration of 1 no. Hydro-pneumatic
         pumping system (for flush water) and get pump run
  21     status and line pressures. - MODbus
         I/O's Required for the pump room                        0            0      0    35   6
                      LOCATION OF DDC                         STP Room
Block – A2
         CONSTANT PRIMARY & VARIABLE SECONDARY FLOW CHILLER PLANT MANAGER
                    INPUT / OUT PUT SUMMARY (3 WORKING + 1 STANDBY CHILLERS)
Sl #                POINTS DESCRIPTION                DI AI DO AO          REMARKS
 A     CHILLER PLANT CONTROL WITH PUMPS
 1     CHW PRIMARY PUMP RUN STATUS                    4           PFC FROM MCC PANEL
 2     CHW PRIMARY PUMP AUTO STATUS                   4           PFC FROM MCC PANEL
 3     CHW PRIMARY PUMP START/STOP                           4    START/STOP SIGNAL
 4     CHW PRIMARY PUMP TRIP STATUS                   4           PFC FROM MCC PANEL
 5     CHILLED WATER SUPPLY TEMPERATURE                  1        IMMERSION TEMP. SENSOR
 6     CHILLED WATER RETURN TEMPERATURE                  1        IMMERSION TEMP. SENSOR
 7     CHW SECONDARY PUMP RUN STATUS                  2           PFC FROM MCC PANEL
       FLOW ESTABLISHMENT THROUGH
  8    CHILLER                                           4        DIFF. PRESS TRANSDUCER
  9    CHILLER ON / OFF COMMAND                              4    PFC FROM MCC PANEL
 10    CHILLER ON / OFF STATUS                        4           PFC FROM MCC PANEL
 11    CHILLER ISOLATION VALVE OPEN/CLOSE                    4    OPEN/CLOSE SIGNAL
 12    CHILLER ISOLATION VALVE STATUS                 4           FROM VALVE END SWAITCH
 13    CONDENSER WATER PUMP RUN STATUS                4           PFC FROM MCC PANEL
 14    CONDENSER WATER PUMP AUTO STATUS               4           PFC FROM MCC PANEL
 15    CONDENSER WATER PUMP ON / OFF                         4    START/STOP SIGNAL
 16    CONDENSER WATER PUMP TRIP STATUS               4           PFC FROM MCC PANEL
 17    COOLING TOWER RUN STATUS                       3           PFC FROM MCC PANEL
 18    COOLING TOWER AUTO STATUS                      3           PFC FROM MCC PANEL
 19    COOLING TOWER ON / OFF                                3    START/STOP SIGNAL
 20    COOLING TOWER TRIP STATUS                      3           PFC FROM MCC PANEL
 21    COOLING TOWER SUMP TEMPERATURE                    3        IMMERSION TEMP. SENSOR
 22    SUMP LOW WATER LEVEL                           4           LEVEL SWITCH
 23     SPARE POINTS                                  4  1   2  1
       Software Integration of the Secondary pump VFD
 24    controller from pump suppliers.
                TOTAL NO. OF POINTS           51 10   21    1