0% found this document useful (0 votes)
307 views3 pages

Bms Points

The document lists various pumps and equipment for a water treatment plant and fire service and the points available for building management system (BMS) connectivity. It includes details on the number of pumps, their location, and available monitoring points like contactors, meters, and indicators that can provide data to the BMS on pump status, water quality parameters, levels and consumption. Connectivity to the BMS will be via contactors, Modbus, or analog outputs.

Uploaded by

Prashanth Raman
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
307 views3 pages

Bms Points

The document lists various pumps and equipment for a water treatment plant and fire service and the points available for building management system (BMS) connectivity. It includes details on the number of pumps, their location, and available monitoring points like contactors, meters, and indicators that can provide data to the BMS on pump status, water quality parameters, levels and consumption. Connectivity to the BMS will be via contactors, Modbus, or analog outputs.

Uploaded by

Prashanth Raman
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
You are on page 1/ 3

PROJECT : HEXAWARE

SUBJECT : BMS POINTS for PHE and Fire Service.

SL No Description Location No. of Pumps


Working Standby PROVISION AVAILABLE IN THE PHE PANEL FUNCTION REQUIRED

1 Water Treatment Plant


NO/NC contactors available in the motor control
a Filter Feed Pumps Pump room 1 1 On/Off , Trip Status Monitoring
panel. Further connectivity shall be by BMS
NO/NC contactors available in the motor control
Chlorine dosing 1 On/Off , Trip Status Monitoring
panel. Further connectivity shall be by BMS
NO/NC contactors available in the motor control
UV sterilizer dosing 1 On/Off , Trip Status Monitoring
panel. Further connectivity shall be by BMS
pH Meter 1 0-10 VDC / 4-20 mA Output pH Monitoring
Conductivity Meter 1 0-10 VDC / 4-20 mA Output Conductivity levels
On line chlorine measurement 1 0-10 VDC / 4-20 mA Output Chlorine levels

NO/NC contactors available in the motor control


b RO Option TERRACE On/Off , Trip Status Monitoring
panel. Further connectivity shall be by BMS
NO/NC contactors available in the motor control
Circulation pump 1 1 On/Off , Trip Status Monitoring
panel. Further connectivity shall be by BMS
NO/NC contactors available in the motor control
Hydro Pneumatic pump – RO supply 1 1 On/Off , Trip Status Monitoring
panel. Further connectivity shall be by BMS

a Treated (Hydro Pneumatic) Pump room 4 1 Modbus RS485 Communication Provision

NO/NC contactors available in the motor control


3 HVAC Plant room/Phe Plant sump pumps Pump room 1 1 On/Off , Trip Status Monitoring
panel. Further connectivity shall be by BMS

NO/NC contactors available in the motor control


6 External Terrace rain water Pumps Ground 2 2 On/Off , Trip Status Monitoring
panel. Further connectivity shall be by BMS

NO/NC contactors available in the motor control


7 Organic waste convertor External 1 On/Off , Trip Status Monitoring
panel. Further connectivity shall be by BMS

8 Hot Water System


NO/NC contactors available in the motor control
Return Pump Terrace 1 1 On/Off , Trip Status Monitoring
panel. Further connectivity shall be by BMS
NO/NC contactors available in the motor control
Circulation pump Terrace 2 2 On/Off , Trip Status Monitoring
panel. Further connectivity shall be by BMS

Water Consumption Monitoring ,


9 Water meter for domestic Pump room 1 Backnet Output
Data Logging

Water Consumption Monitoring ,


Water meter for Flushing STP plant room 1 Backnet Output
Data Logging

Water Consumption Monitoring ,


Water meter for Terrace Rain water Pump room 1 Backnet Output
Data Logging

Water Consumption Monitoring ,


Water meter for HVAC STP plant room 1 Backnet Output
Data Logging

Fire pumps load


PROJECT : HEXAWARE
Panel 1
PROJECT : HEXAWARE
NO/NC contactors available in the motor control
1 Sprinkler Pump 1 On/Off , Trip Status Monitoring
panel. Further connectivity shall be by BMS.
NO/NC contactors available in the motor control
2 Hydrant pump 1 On/Off , Trip Status Monitoring
panel. Further connectivity shall be by BMS.
NO/NC contactors available in the motor control
3 Diesel Pump Pump room 1 On/Off , Trip Status Monitoring
panel. Further connectivity shall be by BMS.
NO/NC contactors available in the motor control
4 Jockey pump 1 On/Off , Trip Status Monitoring
panel. Further connectivity shall be by BMS.
NO/NC contactors available in the motor control
4 Water Curtain pump 1 On/Off , Trip Status Monitoring
panel. Further connectivity shall be by BMS.

STP- Separate Panel


a Flushing (Hydro Pneumatic) STP plant room 2 1 Modbus RS485 Communication Provision

NO/NC contactors available in the motor control


b Cooling Tower Pumps STP plant room 1 1 On/Off , Trip Status Monitoring
panel. Further connectivity shall be by BMS.

NO/NC contactors available in the motor control


c Irrigation pumps STP plant room 1 1 On/Off , Trip Status Monitoring
panel. Further connectivity shall be by BMS.

Water Level Indicator


1 Fire Tank B1 2 0-10 VDC / 4-20 mA Output

2 Raw Water Tank B1 2 0-10 VDC / 4-20 mA Output

3 Treated Water Tank B1 2 0-10 VDC / 4-20 mA Output

4 Over Head tank


Fire Water 4 0-10 VDC / 4-20 mA Output
Domestic Water 4 0-10 VDC / 4-20 mA Output
5 HVAC Makeup water tank Terrace – NE 1 0-10 VDC / 4-20 mA Output

You might also like