By Pass Line
Feed Water Line
R0 09.02.2021 CONSTRUCTION DRAWING
NO. DATE DESCRIPTION
REVISION DESCRIPTION
ESCO CONTRACTOR :
SIEMENS LTD. - BT DIVISION
PLOT NO. 6A, TOWER-C, 1ST FLOOR,
SECTOR-18, MARUTI INDUSTRIAL AREA,
GURGAON-122015, HARYANA
DRAWN BY CHECKED BY VERIFIED BY APPROVED BY
H.PANWAR ABHINAV PARDEEP SACHIN
DRAWING TITLE:
137 KW HEAT PUMP PLANT ROOM
Existing Piping
DRAWING NUMBER:
4
SL-TIG-SCH-HP-137-R0
New Piping
4 4
SCALE REVISION
4 4
1 : 40 / 20 R0
TO FEED WATER TANK
(FIRST FLOOR)
AIR COMP. & NITROGEN
CHILLER
(09A) BOILER
To/From WHR UNIT
(3 MTR. HEIGHT)
PHE
M
~
VFD
M
~
VFD
P-65-MS
P-65-MS
BY PASS LINE
P-400-MS P-400-MS
TO / FROM CHILLED
WATER RETURN LINE
P-65-MS
P-65-MS
PHE
P-80-MS
P-80-MS
P-100-MS
P-100-MS
Note: Pipe levels shall be as per site conditions.
Equipment locations are indicative, needs to be finalized at site.
EXISTING SYSTEM
COLD WATER PUMPS
PROPOSED MODIFICATION
PHE PRIMARY PUMPS
LEGENDS
VFD
VFD
VFD
VFD
(BFV) BUTTERFLY VALVE
TANKS
PUMP AS PER SPECIFICATION
(NRV) NON RETURN VALVE
(Y STR) Y STRAINER
FM
FM
(12) EOU-I/V (KILO LAB) PG (PG) PRESSURE GUAGE
EVAPORATOR CONDENSER
LEGENDS
(BFV) BUTTERFLY VALVE
TO HOT
137 KW HEAT PUMP WATER TANK PUMP AS PER SPECIFICATION
(NRV) NON RETURN VALVE
(Y STR) Y STRAINER
PG PRESSURE GUAGE
TS TEMPERATURE SENSOR
LS LEVEL SENSOR
M MOTOR
~
FM FLOW METER
3 WAY VALVE
HEAT PUMP
PARAMETERS DESIGN
HEAT PUMP ON
HOT WATER IN TEMP (C 45
HOT WATER OUT TEMP (C 55
CONDENSER FLOW (GPM) 11.8
CHW.IN TEMP (C 11
CHW.OUT TEMP (C 6
(11T) ENGG. STORE SOLAR POND EVAPORATOR FLOW (CMH) 17
COMP. POWER (KW) 137
PHE PRIMARY(CONDENSER) PUMPS
FLOW HEAD POWER
PUMP PARAMETERS
(M (MTR.) (K.W)
NEW DESIGN 19.5 CMH 15 1.5
NEW DESIGN 19.5 CMH 15 1.5
PHE SECONDARY(CONDENSER) PUMPS
FLOW HEAD POWER
PUMP PARAMETERS
(M (MTR.) (K.W)
NEW DESIGN 6 CMH 20 1.5
DG SET
NEW DESIGN 6 CMH 20 1.5
EVAPORATOR (CHILLED WATER )PUMPS
FLOW HEAD POWER
PUMP PARAMETERS
(M (MTR.) (K.W)
NEW DESIGN 12 CMH 15 0.75
NEW DESIGN 12 CMH 15 0.75
(08H) WATER GENRATION PLANT R0 18-01-2021 CONSTRUCTION DRAWING
(09) WORK SHOP
NO. DATE DESCRIPTION
REVISION DESCRIPTION
ESCO CONTRACTOR :
SIEMENS LTD. - BT DIVISION
PLOT NO. 6A, TOWER-C, 1ST FLOOR,
SECTOR-18, MARUTI INDUSTRIAL AREA,
GURGAON-122015, HARYANA
DRAWN BY CHECKED BY VERIFIED BY APPROVED BY
H.PANWAR ABHINAV PARDEEP SACHIN
DRAWING TITLE:
(09E) SUBSTATION PROPOSED HEAT PUMP SCHEMATIC
HOT WATER PUMPS
PG FOR CENTER UTILITY
M
~
ANION WATER TANK VFD
PG DRAWING NUMBER:
M
(09M) ENGG. OFFICE ~
VFD
SL-TIG-SCH-HP-137-R0
SCALE REVISION
A-0 @ NTS R0