0% found this document useful (0 votes)
115 views2 pages

137 KW Heat Pump Plant Room

This drawing shows a plant room layout for a 137 kW heat pump system. It includes labeling for existing and new piping connections. Key system components shown are a boiler, air compressor and nitrogen chiller, PHE (plate heat exchanger) units, cold water pumps, PHE primary pumps, and feed water and bypass lines. Notes indicate that pipe levels will be finalized on site and equipment locations are indicative.

Uploaded by

ajay singh
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
115 views2 pages

137 KW Heat Pump Plant Room

This drawing shows a plant room layout for a 137 kW heat pump system. It includes labeling for existing and new piping connections. Key system components shown are a boiler, air compressor and nitrogen chiller, PHE (plate heat exchanger) units, cold water pumps, PHE primary pumps, and feed water and bypass lines. Notes indicate that pipe levels will be finalized on site and equipment locations are indicative.

Uploaded by

ajay singh
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 2

By Pass Line

Feed Water Line

R0 09.02.2021 CONSTRUCTION DRAWING

NO. DATE DESCRIPTION

REVISION DESCRIPTION
ESCO CONTRACTOR :

SIEMENS LTD. - BT DIVISION


PLOT NO. 6A, TOWER-C, 1ST FLOOR,
SECTOR-18, MARUTI INDUSTRIAL AREA,
GURGAON-122015, HARYANA
DRAWN BY CHECKED BY VERIFIED BY APPROVED BY

H.PANWAR ABHINAV PARDEEP SACHIN

DRAWING TITLE:

137 KW HEAT PUMP PLANT ROOM

Existing Piping
DRAWING NUMBER:
4
SL-TIG-SCH-HP-137-R0
New Piping
4 4
SCALE REVISION
4 4
1 : 40 / 20 R0
TO FEED WATER TANK
(FIRST FLOOR)
AIR COMP. & NITROGEN

CHILLER

(09A) BOILER

To/From WHR UNIT


(3 MTR. HEIGHT)

PHE
M
~
VFD

M
~
VFD

P-65-MS
P-65-MS
BY PASS LINE

P-400-MS P-400-MS
TO / FROM CHILLED
WATER RETURN LINE

P-65-MS

P-65-MS
PHE

P-80-MS

P-80-MS

P-100-MS
P-100-MS
Note: Pipe levels shall be as per site conditions.
Equipment locations are indicative, needs to be finalized at site.

EXISTING SYSTEM

COLD WATER PUMPS


PROPOSED MODIFICATION

PHE PRIMARY PUMPS


LEGENDS

VFD

VFD
VFD

VFD
(BFV) BUTTERFLY VALVE
TANKS
PUMP AS PER SPECIFICATION

(NRV) NON RETURN VALVE

(Y STR) Y STRAINER

FM
FM
(12) EOU-I/V (KILO LAB) PG (PG) PRESSURE GUAGE
EVAPORATOR CONDENSER

LEGENDS

(BFV) BUTTERFLY VALVE


TO HOT
137 KW HEAT PUMP WATER TANK PUMP AS PER SPECIFICATION

(NRV) NON RETURN VALVE

(Y STR) Y STRAINER

PG PRESSURE GUAGE

TS TEMPERATURE SENSOR

LS LEVEL SENSOR

M MOTOR
~
FM FLOW METER

3 WAY VALVE

HEAT PUMP
PARAMETERS DESIGN

HEAT PUMP ON

HOT WATER IN TEMP (C 45

HOT WATER OUT TEMP (C 55

CONDENSER FLOW (GPM) 11.8

CHW.IN TEMP (C 11

CHW.OUT TEMP (C 6

(11T) ENGG. STORE SOLAR POND EVAPORATOR FLOW (CMH) 17

COMP. POWER (KW) 137

PHE PRIMARY(CONDENSER) PUMPS


FLOW HEAD POWER
PUMP PARAMETERS
(M (MTR.) (K.W)

NEW DESIGN 19.5 CMH 15 1.5

NEW DESIGN 19.5 CMH 15 1.5

PHE SECONDARY(CONDENSER) PUMPS


FLOW HEAD POWER
PUMP PARAMETERS
(M (MTR.) (K.W)

NEW DESIGN 6 CMH 20 1.5


DG SET
NEW DESIGN 6 CMH 20 1.5

EVAPORATOR (CHILLED WATER )PUMPS


FLOW HEAD POWER
PUMP PARAMETERS
(M (MTR.) (K.W)

NEW DESIGN 12 CMH 15 0.75

NEW DESIGN 12 CMH 15 0.75

(08H) WATER GENRATION PLANT R0 18-01-2021 CONSTRUCTION DRAWING


(09) WORK SHOP
NO. DATE DESCRIPTION

REVISION DESCRIPTION
ESCO CONTRACTOR :

SIEMENS LTD. - BT DIVISION


PLOT NO. 6A, TOWER-C, 1ST FLOOR,
SECTOR-18, MARUTI INDUSTRIAL AREA,
GURGAON-122015, HARYANA
DRAWN BY CHECKED BY VERIFIED BY APPROVED BY

H.PANWAR ABHINAV PARDEEP SACHIN

DRAWING TITLE:

(09E) SUBSTATION PROPOSED HEAT PUMP SCHEMATIC


HOT WATER PUMPS
PG FOR CENTER UTILITY
M
~
ANION WATER TANK VFD
PG DRAWING NUMBER:
M
(09M) ENGG. OFFICE ~
VFD
SL-TIG-SCH-HP-137-R0

SCALE REVISION

A-0 @ NTS R0

You might also like