RAMS Evaluation: Light Fittings Installation

This document evaluates the risks, methods, and safety procedures for installing light fittings as part of a construction project in Abu Dhabi. It contains a checklist of required information for a Risk Assessment and Method Statement (RAMS) submitted by a subcontractor. The checklist includes requirements for assessments of risks, personal protective equipment, emergency arrangements, work methodology, permits, and diagrams. Comments from reviewers are recorded to request any missing information before final acceptance of the RAMS.

Uploaded by

Anandu Ashokan
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
599 views3 pages

RAMS Evaluation: Light Fittings Installation

This document evaluates the risks, methods, and safety procedures for installing light fittings as part of a construction project in Abu Dhabi. It contains a checklist of required information for a Risk Assessment and Method Statement (RAMS) submitted by a subcontractor. The checklist includes requirements for assessments of risks, personal protective equipment, emergency arrangements, work methodology, permits, and diagrams. Comments from reviewers are recorded to request any missing information before final acceptance of the RAMS.

Uploaded by

Anandu Ashokan
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
You are on page 1/ 3

RAMS EVALUATION SHEET

North and South Car Park Connectivity


Corridors, and Concourse Link Bridge
Project name Project No M1467
Al Maryah Island, Abu Dhabi, United
Arab Emirates
Method Statement and Risk Genfocus
Activity Assessment for Installation of Light Subcontractor Electromechanical
Fittings Contracting Est.
Anticipated start Issue/Revision GEMC-ME-A-MST-005 Rev-
30-04-2019
date number 00

Status Comment
These RAMS are deemed to cover the requirements of MCL as per the MCL RAMS Pro-Forma (SAF 072) and are
A
suitable for purpose

B All MCL comments need to be incorporated into the RAMS before they can be accepted.

C Not accepted for implementation. Resubmission required.


Please note – ALL comments MUST be incorporated within the RAMS before it will be accepted for implementation. Once
Status A achieved, it does not relieve the contractor of their contractual obligations and ownership of the RAMS nor
compliance with local /federal laws.
Status Date Received Date Sent

For MCL Use ONLY


Appraisal Signatories Name Position Signature Date

Reviewed                  

Status A achieved                  

The RAMS documentation submitted by the subcontractor should include the following
RISK ASSESSMENTS Yes ■ No PERSONAL PROTECTIVE EQUIPMENT Yes ■ No
COSHH (MSDS) Yes No ■ EMERGENCY ARRANGEMENTS Yes ■ No
FULL DESCRIPTION OF METHODOLOGY AND MATERIALS, WASTE REMOVAL
SEQUENCE OF WORK Yes ■ No
HOUSEKEEPING AND STORAGE Yes ■ No

ACCESS / EGRESS Yes ■ No ENVIRONMENTAL Yes ■ No


OCCUPATIONAL HEALTH Yes ■ No LOGISTICS Yes ■ No

452142738.doc Page 1 of 3 RAMS EVALUATION SHEET


WORK AT HEIGHT Yes ■ No TECHNICAL INFORMATION Yes No ■
COMMUNICATION/MANAGEMENT/
PLANT / EQUIPMENT/TOOLS Yes ■ No
TRAINING Yes ■ No

PERMITS Yes ■ No DIAGRAMS/CERTIFICATES Yes No ■


Please note – referring to the RAMS Pro Forma (SAF 072) will assist in what information is needed

Comments Initials

452142738.doc Page 2 of 3 RAMS EVALUATION SHEET


Continuation Sheets Used Yes No

452142738.doc Page 3 of 3 RAMS EVALUATION SHEET