RAMS EVALUATION SHEET
North and South Car Park Connectivity
                        Corridors, and Concourse Link Bridge
Project name                                                               Project No               M1467
                        Al Maryah Island, Abu Dhabi, United
                        Arab Emirates
                        Method Statement and Risk                                                   Genfocus
Activity                Assessment for Installation of Light               Subcontractor            Electromechanical
                        Fittings                                                                    Contracting Est.
Anticipated start                                                          Issue/Revision           GEMC-ME-A-MST-005 Rev-
                        30-04-2019
date                                                                       number                   00
  Status        Comment
                These RAMS are deemed to cover the requirements of MCL as per the MCL RAMS Pro-Forma (SAF 072) and are
     A
                suitable for purpose
     B          All MCL comments need to be incorporated into the RAMS before they can be accepted.
     C          Not accepted for implementation. Resubmission required.
 Please note – ALL comments MUST be incorporated within the RAMS before it will be accepted for implementation. Once
 Status A achieved, it does not relieve the contractor of their contractual obligations and ownership of the RAMS nor
 compliance with local /federal laws.
 Status                                     Date Received                               Date Sent
For MCL Use ONLY
 Appraisal Signatories         Name                          Position                       Signature             Date
 Reviewed                                                                                                              
 Status A achieved                                                                                                     
 The RAMS documentation submitted by the subcontractor should include the following
 RISK ASSESSMENTS                                  Yes   ■   No       PERSONAL PROTECTIVE EQUIPMENT         Yes ■        No
 COSHH (MSDS)                                     Yes        No   ■   EMERGENCY ARRANGEMENTS                Yes ■        No
 FULL DESCRIPTION OF METHODOLOGY AND                                  MATERIALS, WASTE REMOVAL
 SEQUENCE OF WORK                                  Yes ■     No
                                                                      HOUSEKEEPING AND STORAGE              Yes ■        No
 ACCESS / EGRESS                                   Yes ■     No       ENVIRONMENTAL                         Yes ■        No
 OCCUPATIONAL HEALTH                               Yes ■     No       LOGISTICS                             Yes ■        No
452142738.doc                                Page 1 of 3                           RAMS EVALUATION SHEET
 WORK AT HEIGHT                                 Yes ■   No       TECHNICAL INFORMATION                 Yes           No     ■
                                                                 COMMUNICATION/MANAGEMENT/
 PLANT / EQUIPMENT/TOOLS                        Yes ■   No
                                                                 TRAINING                              Yes   ■       No
 PERMITS                                        Yes ■   No       DIAGRAMS/CERTIFICATES                 Yes           No     ■
 Please note – referring to the RAMS Pro Forma (SAF 072) will assist in what information is needed
 Comments                                                                                                        Initials
452142738.doc                             Page 2 of 3                          RAMS EVALUATION SHEET
 Continuation Sheets Used                                         Yes   No
452142738.doc               Page 3 of 3   RAMS EVALUATION SHEET