100% found this document useful (2 votes)
1K views14 pages

Construction Quality Checklist

The document provides quality control inspection records for a new crushing plant project, including pre-pouring concrete inspection, reinforcing bar installation inspection, and pouring concrete inspection. It documents inspection of forms, rebar, embedments, foundation, and other items against design drawings and specifications. Inspection results are recorded along with signatures and dates from site engineers, QC engineers, and project managers.

Uploaded by

Awal Oeddink
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
100% found this document useful (2 votes)
1K views14 pages

Construction Quality Checklist

The document provides quality control inspection records for a new crushing plant project, including pre-pouring concrete inspection, reinforcing bar installation inspection, and pouring concrete inspection. It documents inspection of forms, rebar, embedments, foundation, and other items against design drawings and specifications. Inspection results are recorded along with signatures and dates from site engineers, QC engineers, and project managers.

Uploaded by

Awal Oeddink
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 14

QC-CVL-201

NEW CRUSHING PLANT PROJECT

PRE POURING CONCRETE INSPECTION RECORD


Area / Building Name/Foundation : Date :
Part / Location : Report Doc/No. :
Reference Drawing / spec : Ref. Code/Std. :
RESULT RESULT
YES NO NA FORMS YES NO NA REBAR

SURVEY CHECKED GRADE


ORIENTATION SIZE
LOCATION (COORD) SPLICES
SIZE / DIMENSION SPACING
ELEVATION BEND/HOOK
CLEAN AND OILED CLEANLINESS
CHAMFER/ GRADE/ POUR-STRIP CONCRETE COVER
STRAIGHT,LEVEL,PLUMB
ADEQUATE BRACING/SHORING/ TIES SUB FOUNDATION

EMBEDMENTS PILES/PHT
COMPACTION
SURVEY CHECKED CLEANLINESS
EMBEDDED PARTS (LOCATION,PROJECTION) MOISTURE
EMBEDDED PARTS (DIAMETER,LENGTH ,TYPE) LEAN CONCRETE
ANCHOR BOLTS (LOCATION,PROJECTION) ELEVATION
ANCHOR BOLTS (DIAMETER,LENGTH ,TYPE) U/G MECH & ELECT
STEEL PLATE
STEEL ANGLE MISC
CONDUITS
WATER STOP BLOCKUTS
SURFACE ROUGHENED/CH
BONDING AGENT
ORDER CONCRETE TO THE FOLLOWING SPECIFICATIONS : HOT/COLD WEATHER PROT
MIX DESIGN : Mpa JOINTS (EXPANTION / CON
QUANTITY : M3 SPECIAL PLACING EQUIP. R
SLUMP : Cm (TREMIES,PUMPS,FORM V
ADMIXTURES : Lt THERMO COUPLE
NO. OF TEST CYLINDER/SET =: Ea
Name Signature Date

Site Engineer / supervisor

QC Engineer

PROJECT MANAGER PT. KBK


Witnessed/Aprroved/Reviewed
QC-CVL-201

E ROUGHENED/CHIPPING

LD WEATHER PROTECTION
EXPANTION / CONSTRUCTION )
PLACING EQUIP. REQUIRED
S,PUMPS,FORM VIBRATORS)
Date & Time
QC-CVL-202

NEW CRUSHING PLANT PROJECT

REINFORCING BAR INSTALLATION INSPECTION RECORD


Area / Building Name/Foundation : Date :
Part / Location : Report Doc/No. :
Reference Drawing / spec : Ref. Code/Std. :
RESULT
No ITEM DESCRIPTION REMARKS
YES NO NA

1 Size/ Number of Bars

2 Bending Radius

3 Spacing between Rebar

4 Lap Length/ Development Length

5 Hook (Extra length/Shape)

6 Stirrup (Shape/ Location/ Pitch/ Hook)

7 Starter Bars (Shape/ Length/ Location)

8 Concrete Cover (Top/ Side/ Bottom)

9 Reinforcing for Opening

10 Column/ Beam (Untorsionality)

11 Quality of Cleaning (no loose rust, oil, paint, dried mortar)

12 Rebar Support for Stability (Wiring/ Chairs/ Spacers)

13 Rebar Grade

14 Splicing (Weld Joint/ Welder Qualification/ Welding Procedure)

15
....................................................................
16
...................................................................

Name Signature Date & Tim

Site Engineer / supervisor


Site Engineer / supervisor

QC Engineer

PROJECT MANAGER PT. KBK

Witnessed/Aprroved/Reviewed
QC-CVL-202

REMARKS

Date & Time


QC-CVL-203

NEW CRUSHING PLANT PROJECT

POURING CONCRETE INSPECTION RECORD


Area / Building Name/Foundation : Date :
Part / Location : Report Doc/No. :
Reference Drawing / spec : Ref. Code/Std. :
RESULT
No ITEM DESCRIPTION REMARKS
YES NO NA

A PRE CONCRETE PLACEMENT/ INSPECTION

1 Area is Cleaned and Free from Foreign/Deletenous object

2 Adequate Number of Manpower, Tools, and Equipment

3 Pouring Method is Acceptable

4 Protection against Rain and Hot/Cold Weather Protection

5 Availability of Batching Plant and Mixer Truck

6 Provide Enough Lighting and Power for Night Pours

B CONCRETE PLACEMENT & CONSOLIDATION

7 Concrete Slump Test Taken and Approved

8 Concrete Cylinders Sample was taken

9 Proper Concrete Consolidation/Vibration

C POST CONCRETE PLACEMENT

10 Type/ Method Application of Concrete Curing

11 Timely Application of Concrete Curing

12 Concrete Finish type Accordance with Specs

13 Timely Removal of Formwork

14 Concrete surface in good condition

(Free from Cracks, Segragation , Honey comb)

Name Signature Date & Tim


Site Engineer / supervisor

QC Engineer

PROJECT MANAGER PT. KBK

Witnessed/Aprroved/Reviewed
QC-CVL-203

REMARKS

Date & Time


Report Page
PT. KASONGAN BUMI KENCANA Doc/No Date :

SURVEY DATA REPORT


Project Title : NEW CRUSHING PLANT PROJECT
Item Work : Dimensi actual anchor bolt
Location :
Ref . Drawing : Instrument :
Design Actual DEVIATION
NO Point Keterangan
X Y Z X Y Z X Y Z

Drawing :
Nam Signature Date / Time
Surveyor
Site Engineer / Supervisor
QC Engineer
PTKBK Project Manager