Relay Signal Test

The document reports on the testing of protection signals for a 400/38.5kV STATCOM project in Aurangabad, India. It was found that all protection signals were reporting correctly to the SCADA system, with their appropriate alarms, states and events. The tests were witnessed by engineers from GE, the contractor Techno Electric, and the customer PGCIL.

Uploaded by

Ramesh Epili
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
291 views20 pages

Relay Signal Test

The document reports on the testing of protection signals for a 400/38.5kV STATCOM project in Aurangabad, India. It was found that all protection signals were reporting correctly to the SCADA system, with their appropriate alarms, states and events. The tests were witnessed by engineers from GE, the contractor Techno Electric, and the customer PGCIL.

Uploaded by

Ramesh Epili
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 20

REALY SIGNAL TEST REPORT

PROJECT: PGCIL, 400/38.5KV CRP & SAS


STATCOM-AURANGABAD (KX8E)

CLIENT: M/s TECHNO ELECTRIC & ENGG CO. LTD.,


END CUSTOMER: M/s PGCIL.

400KV-B424 HV-P643_87_PROTECTION SIGNALS TESTING DATE: 18/12/2017


SCADA REPORTING STATUS
OPTOS (Alarms/States/Events) REMARKS
400KV MAIN CB STATUS OK -
400KV TIE CB STATUS OK -
REF PRTN OPTD OK -
TRAFO SPARE PH SELECT OK -
BUCHOLZ TRIP RPH OK -
WTI HV TRIP RPH OK -
WTI LV TRIP RPH OK -
PRV-1 TRIP RPH OK -
BUCHOLZ TRIP YPH OK -
WTI HV TRIP YPH OK -
WTI LV TRIP YPH OK -
PRV-1 TRIP YPH OK -
BUCHOLZ TRIP BPH OK -
WTI HV TRIP BPH OK -
WTI LV TRIP BPH OK -
PRV-1 TRIP BPH OK -
BUCHOLZ TRIP SPH OK -
WTI HV TRIP SPH OK -
WTI LV TRIP SPH OK -
PRV-1 TRIP SPH OK -
86A RELAY OPTD OK -
86A SUPVN OK -
38.5KV LBB OPTD OK -

TESTED BY WITNESSED BY WITNESSED BY

SIGNATURE SIGNATURE SIGNATURE

NAME Mr. YOGANANTHAM.J NAME Mr. TARAK NANDHI NAME Mr. S.W.KOLTE
DESIGNATIO DESIGNATIO
DESIGNATION SAS ENGINEER SITE INCHARGE MANAGER
N N
M/s GE – T & D INDIA Limited., M/s TECHNO ELECTRIC ENGG CO. LTD.,
M/s PGCIL.
DATE:- 06-01-2018

Page 1 of 20
REALY SIGNAL TEST REPORT

PROJECT: PGCIL, 400/38.5KV CRP & SAS


STATCOM-AURANGABAD (KX8E)

CLIENT: M/s TECHNO ELECTRIC & ENGG CO. LTD.,


END CUSTOMER: M/s PGCIL.

PROTECTION
HV O/C STG-1 OPTD (R,Y,B) OK
HV O/C STG-2 OPTD (R,Y,B) OK -
GENERAL TRIP OK -
DIFF PRTN OPTD (R,Y,B) OK -
2ND HARMONICS OK -
5TH HARMONICS OK -
HV E/F STG-1 OPTD OK -
HV E/F STG-2 OPTD OK
OVERFLUX HV ALARM & TRIP OK

TESTED BY WITNESSED BY WITNESSED BY

SIGNATURE SIGNATURE SIGNATURE

NAME Mr. YOGANANTHAM.J NAME Mr. TARAK NANDHI NAME Mr. S.W.KOLTE
DESIGNATIO DESIGNATIO
DESIGNATION SAS ENGINEER SITE INCHARGE MANAGER
N N
M/s GE – T & D INDIA Limited., M/s TECHNO ELECTRIC ENGG CO. LTD.,
M/s PGCIL.
DATE:- 06-01-2018

Page 2 of 20
REALY SIGNAL TEST REPORT

PROJECT: PGCIL, 400/38.5KV CRP & SAS


STATCOM-AURANGABAD (KX8E)

CLIENT: M/s TECHNO ELECTRIC & ENGG CO. LTD.,


END CUSTOMER: M/s PGCIL.

400KV-B424 LV-P643_64_PROTECTION SIGNALS TESTING DATE: 18/12/2017


SCADA REPORTING STATUS
OPTOS (Alarms/States/Events) REMARKS
38.5KV LBB PRTN OPTD OK -
HV BCU HEALTHY OK -
LV BCU HEALTHY OK -
OTI TRIP RPH OK -
SPR TRIP RPH OK -
PRV-2 TRIP RPH OK -
OTI TRIP YPH OK -
SPR TRIP YPH OK -
PRV-2 TRIP YPH OK -
OTI TRIP BPH OK -
SPR TRIP BPH OK -
PRV-2 TRIP BPH OK -
OTI TRIP SPH OK -
SPR TRIP SPH OK -
PRV-2 TRIP SPH OK -
400KV BB PRTN OPTD OK -
400KV LBB PRTN OPTD OK -
BUCHOLZ ALARM RPH OK -
BUCHOLZ ALARM YPH OK -
BUCHOLZ ALARM BPH OK -
BUCHOLZ ALARM SPH OK -
86B RELAY OPTD OK -
86B SUPVN OK -

TESTED BY WITNESSED BY WITNESSED BY

SIGNATURE SIGNATURE SIGNATURE

NAME Mr. YOGANANTHAM.J NAME Mr. TARAK NANDHI NAME Mr. S.W.KOLTE
DESIGNATIO DESIGNATIO
DESIGNATION SAS ENGINEER SITE INCHARGE MANAGER
N N
M/s GE – T & D INDIA Limited., M/s TECHNO ELECTRIC ENGG CO. LTD.,
M/s PGCIL.
DATE:- 06-01-2018

Page 3 of 20
REALY SIGNAL TEST REPORT

PROJECT: PGCIL, 400/38.5KV CRP & SAS


STATCOM-AURANGABAD (KX8E)

CLIENT: M/s TECHNO ELECTRIC & ENGG CO. LTD.,


END CUSTOMER: M/s PGCIL.

PROTECTION
IV O/C STG-1 OPTD (R,Y,B) OK -
IV O/C STG-2 OPTD (R,Y,B) OK -
GENERAL TRIP OK -
DEF PRTN OPTD (R,Y,B) OK -
2ND HARMONICS OK -
5TH HARMONICS OK -
IV E/F STG-21 OPTD OK -
IV E/F STG-2 OPTD OK -
OVERFLUX HV ALARM & TRIP OK -
HV REF HIGH IMPEDENCE OPTD OK -

TESTED BY WITNESSED BY WITNESSED BY

SIGNATURE SIGNATURE SIGNATURE

NAME Mr. YOGANANTHAM.J NAME Mr. TARAK NANDHI NAME Mr. S.W.KOLTE
DESIGNATIO DESIGNATIO
DESIGNATION SAS ENGINEER SITE INCHARGE MANAGER
N N
M/s GE – T & D INDIA Limited., M/s TECHNO ELECTRIC ENGG CO. LTD.,
M/s PGCIL.
DATE:- 06-01-2018

Page 4 of 20
REALY SIGNAL TEST REPORT

PROJECT: PGCIL, 400/38.5KV CRP & SAS


STATCOM-AURANGABAD (KX8E)

CLIENT: M/s TECHNO ELECTRIC & ENGG CO. LTD.,


END CUSTOMER: M/s PGCIL.

400KV-B423 TIE-P743_50BF_PROTECTION SIGNALS TESTING DATE: 18/12/2017


SCADA REPORTING STATUS
OPTOS (Alarms/States/Events) REMARKS
TIE BCU HEALTHY OK -

FUTURE BAY BCU HEALTHY OK -

LBB INITIATION 3PH (R,Y,B) OK -

SPARE - -

SPARE - -

PROTECTION
TIE CB LBB OPTD OK -

CB FAIL BACKTRIP OK -

CB FAIL RETRIP OK -

TESTED BY WITNESSED BY WITNESSED BY

SIGNATURE SIGNATURE SIGNATURE

NAME Mr. YOGANANTHAM.J NAME Mr. TARAK NANDHI NAME Mr. S.W.KOLTE
DESIGNATIO DESIGNATIO
DESIGNATION SAS ENGINEER SITE INCHARGE MANAGER
N N
M/s GE – T & D INDIA Limited., M/s TECHNO ELECTRIC ENGG CO. LTD.,
M/s PGCIL.
DATE:- 06-01-2018

Page 5 of 20
REALY SIGNAL TEST REPORT

PROJECT: PGCIL, 400/38.5KV CRP & SAS


STATCOM-AURANGABAD (KX8E)

CLIENT: M/s TECHNO ELECTRIC & ENGG CO. LTD.,


END CUSTOMER: M/s PGCIL.

38.5KV-B604 MSR_1-P643_87R_PROTECTION SIGNALS TESTING DATE: 19/12/2017


SCADA REPORTING STATUS
OPTOS (Alarms/States/Events) REMARKS
CB OPEN OK -

BB PRTN OPTD OK -

LBB OPTD OK -

BCU HEALTHY OK -

86A TRIP RELAY OPTD OK -

86A TRIP RELAY SUPVN OK -

PROTECTION
DIFF PRTN OPTD (R,Y,B) OK -

2ND HARMONICS OK -

5TH HARMONICS OK -

GENERAL TRIP OK -

TESTED BY WITNESSED BY WITNESSED BY

SIGNATURE SIGNATURE SIGNATURE

NAME Mr. YOGANANTHAM.J NAME Mr. TARAK NANDHI NAME Mr. S.W.KOLTE
DESIGNATIO DESIGNATIO
DESIGNATION SAS ENGINEER SITE INCHARGE MANAGER
N N
M/s GE – T & D INDIA Limited., M/s TECHNO ELECTRIC ENGG CO. LTD.,
M/s PGCIL.
DATE:- 06-01-2018

Page 6 of 20
REALY SIGNAL TEST REPORT

PROJECT: PGCIL, 400/38.5KV CRP & SAS


STATCOM-AURANGABAD (KX8E)

CLIENT: M/s TECHNO ELECTRIC & ENGG CO. LTD.,


END CUSTOMER: M/s PGCIL.

38.5KV-B604 MSR_1-P141_50/51_PROTECTION SIGNALS TESTING DATE: 19/12/2017


SCADA REPORTING STATUS
OPTOS (Alarms/States/Events) REMARKS
87R DIFF RELAY OPTD OK -

87R RELAY HEALTHY OK -

86B TRIP RELAY OPTD OK -

86B TRIP RELAY SUPVN OK -

PROTECTION
O/C STG-1 OPTD OK -

O/C STG-2 OPTD OK -

GROUND FAULT OK -

GENERAL TRIP OK -

TESTED BY WITNESSED BY WITNESSED BY

SIGNATURE SIGNATURE SIGNATURE

NAME Mr. YOGANANTHAM.J NAME Mr. TARAK NANDHI NAME Mr. S.W.KOLTE
DESIGNATIO DESIGNATIO
DESIGNATION SAS ENGINEER SITE INCHARGE MANAGER
N N
M/s GE – T & D INDIA Limited., M/s TECHNO ELECTRIC ENGG CO. LTD.,
M/s PGCIL.
DATE:- 06-01-2018

Page 7 of 20
REALY SIGNAL TEST REPORT

PROJECT: PGCIL, 400/38.5KV CRP & SAS


STATCOM-AURANGABAD (KX8E)

CLIENT: M/s TECHNO ELECTRIC & ENGG CO. LTD.,


END CUSTOMER: M/s PGCIL.

38.5KV-B605 MSR_2-P643_87R_PROTECTION SIGNALS TESTING DATE: 19/12/2017


SCADA REPORTING STATUS
OPTOS (Alarms/States/Events) REMARKS
CB OPEN OK -

BB PRTN OPTD OK -

LBB OPTD OK -

BCU HEALTHY OK -

86A TRIP RELAY OPTD OK -

86A TRIP RELAY SUPVN OK -

PROTECTION
DIFF PRTN OPTD (R,Y,B) OK -

2ND HARMONICS OK -

5TH HARMONICS OK -

GENERAL TRIP OK -

TESTED BY WITNESSED BY WITNESSED BY

SIGNATURE SIGNATURE SIGNATURE

NAME Mr. YOGANANTHAM.J NAME Mr. TARAK NANDHI NAME Mr. S.W.KOLTE
DESIGNATIO DESIGNATIO
DESIGNATION SAS ENGINEER SITE INCHARGE MANAGER
N N
M/s GE – T & D INDIA Limited., M/s TECHNO ELECTRIC ENGG CO. LTD.,
M/s PGCIL.
DATE:- 06-01-2018

Page 8 of 20
REALY SIGNAL TEST REPORT

PROJECT: PGCIL, 400/38.5KV CRP & SAS


STATCOM-AURANGABAD (KX8E)

CLIENT: M/s TECHNO ELECTRIC & ENGG CO. LTD.,


END CUSTOMER: M/s PGCIL.

38.5KV-B605 MSR_2-P141_50/51_PROTECTION SIGNALS TESTING DATE: 19/12/2017


SCADA REPORTING STATUS
OPTOS (Alarms/States/Events) REMARKS
87R DIFF RELAY OPTD OK -

87R RELAY HEALTHY OK -

86B TRIP RELAY OPTD OK -

86B TRIP RELAY SUPVN OK -

PROTECTION
O/C STG-1 OPTD OK -

O/C STG-2 OPTD OK -

GROUND FAULT OK -

GENERAL TRIP OK -

TESTED BY WITNESSED BY WITNESSED BY

SIGNATURE SIGNATURE SIGNATURE

NAME Mr. YOGANANTHAM.J NAME Mr. TARAK NANDHI NAME Mr. S.W.KOLTE
DESIGNATIO DESIGNATIO
DESIGNATION SAS ENGINEER SITE INCHARGE MANAGER
N N
M/s GE – T & D INDIA Limited., M/s TECHNO ELECTRIC ENGG CO. LTD.,
M/s PGCIL.
DATE:- 06-01-2018

Page 9 of 20
REALY SIGNAL TEST REPORT

PROJECT: PGCIL, 400/38.5KV CRP & SAS


STATCOM-AURANGABAD (KX8E)

CLIENT: M/s TECHNO ELECTRIC & ENGG CO. LTD.,


END CUSTOMER: M/s PGCIL.

38.5KV-B606_P141_50/51_PROTECTION SIGNALS TESTING DATE: 28/12/2017


SCADA REPORTING STATUS
OPTOS (Alarms/States/Events) REMARKS
BUCHHOLZ TRIP OK -

WTI TRIP OK -

OTI TRIP OK -

BUSBAR OPTD OK -

BCU HEALTHY OK -

86B TRIP RELAY OPTD OK -

86B SUPVN OK -

PROTECTION
THERMAL OVERLOAD OK -

GROUND OVERCURRENT OK -

TIME SYNC OK -

OVER CURRENT (R,Y,B)

TESTED BY WITNESSED BY WITNESSED BY

SIGNATURE SIGNATURE SIGNATURE

NAME Mr. YOGANANTHAM.J NAME Mr. TARAK NANDHI NAME Mr. S.W.KOLTE
DESIGNATIO DESIGNATIO
DESIGNATION SAS ENGINEER SITE INCHARGE MANAGER
N N
M/s GE – T & D INDIA Limited., M/s TECHNO ELECTRIC ENGG CO. LTD.,
M/s PGCIL.
DATE:- 06-01-2018

Page 10 of 20
REALY SIGNAL TEST REPORT

PROJECT: PGCIL, 400/38.5KV CRP & SAS


STATCOM-AURANGABAD (KX8E)

CLIENT: M/s TECHNO ELECTRIC & ENGG CO. LTD.,


END CUSTOMER: M/s PGCIL.

38.5KV-BB & ET_P141_27/59_PROTECTION SIGNALS TESTING DATE: 28/12/2017


SCADA REPORTING STATUS
OPTOS (Alarms/States/Events) REMARKS
DC-2 SUPPLY OK -

87 RELAY HEALTHY OK -

51/59N RELAY HEALTHY OK -

WTI ALARM OK -

OTI ALARM OK -

MOLG ALARM OK -

BUCHHOLZ ALARM OK -

PROTECTION
UNDER VOLTAGE OK -

OVER VOLTAGE OK -

TIME SYNC OK -

TESTED BY WITNESSED BY WITNESSED BY

SIGNATURE SIGNATURE SIGNATURE

NAME Mr. YOGANANTHAM.J NAME Mr. TARAK NANDHI NAME Mr. S.W.KOLTE
DESIGNATIO DESIGNATIO
DESIGNATION SAS ENGINEER SITE INCHARGE MANAGER
N N
M/s GE – T & D INDIA Limited., M/s TECHNO ELECTRIC ENGG CO. LTD.,
M/s PGCIL.
DATE:- 06-01-2018

Page 11 of 20
REALY SIGNAL TEST REPORT

PROJECT: PGCIL, 400/38.5KV CRP & SAS


STATCOM-AURANGABAD (KX8E)

CLIENT: M/s TECHNO ELECTRIC & ENGG CO. LTD.,


END CUSTOMER: M/s PGCIL.

38.5KV-BB & ET_P141_51/59N_PROTECTION SIGNALS TESTING DATE: 28/12/2017


SCADA REPORTING STATUS
OPTOS (Alarms/States/Events) REMARKS
DC-1 SUPPLY OK -

87 RELAY HEALTHY OK -

27/59 RELAY HEALTHY OK -

WTI TRP OK -

BUCHHOLZ TRIP OK -

OTI TRIP OK -

PROTECTION
GROUND OVER CURRENT OK -

NEUTRAL OVER VOLTAGE OK -

TIME SYNC OK -

TESTED BY WITNESSED BY WITNESSED BY

SIGNATURE SIGNATURE SIGNATURE

NAME Mr. YOGANANTHAM.J NAME Mr. TARAK NANDHI NAME Mr. S.W.KOLTE
DESIGNATIO DESIGNATIO
DESIGNATION SAS ENGINEER SITE INCHARGE MANAGER
N N
M/s GE – T & D INDIA Limited., M/s TECHNO ELECTRIC ENGG CO. LTD.,
M/s PGCIL.
DATE:- 06-01-2018

Page 12 of 20
REALY SIGNAL TEST REPORT

PROJECT: PGCIL, 400/38.5KV CRP & SAS


STATCOM-AURANGABAD (KX8E)

CLIENT: M/s TECHNO ELECTRIC & ENGG CO. LTD.,


END CUSTOMER: M/s PGCIL.

38.5KV-BB & ET_CU_P743_PROTECTION SIGNALS TESTING DATE: 29/12/2017


SCADA REPORTING STATUS
OPTOS (Alarms/States/Events) REMARKS
BB PRTN IN SERVICE OK -

BB PRTN OUT OF SERVCE OK -

SPARE - -

SPARE - -

PROTECTION
BB ZONE-1 OPTD OK -

BB CIRCUITARY FAULT OK -

GENERAL TRIP OK -

LBB PRTN OPTD OK -

RELAY HEALTHY OK

TESTED BY WITNESSED BY WITNESSED BY

SIGNATURE SIGNATURE SIGNATURE

NAME Mr. YOGANANTHAM.J NAME Mr. TARAK NANDHI NAME Mr. S.W.KOLTE
DESIGNATIO DESIGNATIO
DESIGNATION SAS ENGINEER SITE INCHARGE MANAGER
N N
M/s GE – T & D INDIA Limited., M/s TECHNO ELECTRIC ENGG CO. LTD.,
M/s PGCIL.
DATE:- 06-01-2018

Page 13 of 20
REALY SIGNAL TEST REPORT

PROJECT: PGCIL, 400/38.5KV CRP & SAS


STATCOM-AURANGABAD (KX8E)

CLIENT: M/s TECHNO ELECTRIC & ENGG CO. LTD.,


END CUSTOMER: M/s PGCIL.

38.5KV-BB_RBB3_PU_P743_PROTECTION SIGNALS TESTING DATE: 29/12/2017


SCADA REPORTING STATUS
OPTOS (Alarms/States/Events) REMARKS
BCU HEALTHY OK -

LBB INITIATION 3PH OK -

MAIN CB OPEN OK -

MAIN CB CLOSE OK -

PROTECTION
BB OPTD OK -

CB FAIL RETRIP OK -

CB FAIL BACKTRIP OK -

TIME SYNC OK -

TESTED BY WITNESSED BY WITNESSED BY

SIGNATURE SIGNATURE SIGNATURE

NAME Mr. YOGANANTHAM.J NAME Mr. TARAK NANDHI NAME Mr. S.W.KOLTE
DESIGNATIO DESIGNATIO
DESIGNATION SAS ENGINEER SITE INCHARGE MANAGER
N N
M/s GE – T & D INDIA Limited., M/s TECHNO ELECTRIC ENGG CO. LTD.,
M/s PGCIL.
DATE:- 06-01-2018

Page 14 of 20
REALY SIGNAL TEST REPORT

PROJECT: PGCIL, 400/38.5KV CRP & SAS


STATCOM-AURANGABAD (KX8E)

CLIENT: M/s TECHNO ELECTRIC & ENGG CO. LTD.,


END CUSTOMER: M/s PGCIL.

38.5KV-BB_B601_PU_P743_PROTECTION SIGNALS TESTING DATE: 29/12/2017


SCADA REPORTING STATUS
OPTOS (Alarms/States/Events) REMARKS
BCU HEALTHY OK -

LBB INITIATION 3PH OK -

MAIN CB OPEN OK -

MAIN CB CLOSE OK -

PROTECTION
BB OPTD OK -

CB FAIL RETRIP OK -

CB FAIL BACKTRIP OK -

TIME SYNC OK -

TESTED BY WITNESSED BY WITNESSED BY

SIGNATURE SIGNATURE SIGNATURE

NAME Mr. YOGANANTHAM.J NAME Mr. TARAK NANDHI NAME Mr. S.W.KOLTE
DESIGNATIO DESIGNATIO
DESIGNATION SAS ENGINEER SITE INCHARGE MANAGER
N N
M/s GE – T & D INDIA Limited., M/s TECHNO ELECTRIC ENGG CO. LTD.,
M/s PGCIL.
DATE:- 06-01-2018

Page 15 of 20
REALY SIGNAL TEST REPORT

PROJECT: PGCIL, 400/38.5KV CRP & SAS


STATCOM-AURANGABAD (KX8E)

CLIENT: M/s TECHNO ELECTRIC & ENGG CO. LTD.,


END CUSTOMER: M/s PGCIL.

38.5KV-BB_B602_PU_P743_PROTECTION SIGNALS TESTING DATE: 29/12/2017


SCADA REPORTING STATUS
OPTOS (Alarms/States/Events) REMARKS
BCU HEALTHY OK -

LBB INITIATION 3PH OK -

MAIN CB OPEN OK -

MAIN CB CLOSE OK -

PROTECTION
BB OPTD OK -

CB FAIL RETRIP OK -

CB FAIL BACKTRIP OK -

TIME SYNC OK -

TESTED BY WITNESSED BY WITNESSED BY

SIGNATURE SIGNATURE SIGNATURE

NAME Mr. YOGANANTHAM.J NAME Mr. TARAK NANDHI NAME Mr. S.W.KOLTE
DESIGNATIO DESIGNATIO
DESIGNATION SAS ENGINEER SITE INCHARGE MANAGER
N N
M/s GE – T & D INDIA Limited., M/s TECHNO ELECTRIC ENGG CO. LTD.,
M/s PGCIL.
DATE:- 06-01-2018

Page 16 of 20
REALY SIGNAL TEST REPORT

PROJECT: PGCIL, 400/38.5KV CRP & SAS


STATCOM-AURANGABAD (KX8E)

CLIENT: M/s TECHNO ELECTRIC & ENGG CO. LTD.,


END CUSTOMER: M/s PGCIL.

38.5KV-BB_B603_PU_P743_PROTECTION SIGNALS TESTING DATE: 29/12/2017


SCADA REPORTING STATUS
OPTOS (Alarms/States/Events) REMARKS
BCU HEALTHY OK -

LBB INITIATION 3PH OK -

MAIN CB OPEN OK -

MAIN CB CLOSE OK -

PROTECTION
BB OPTD OK -

CB FAIL RETRIP OK -

CB FAIL BACKTRIP OK -

TIME SYNC OK -

TESTED BY WITNESSED BY WITNESSED BY

SIGNATURE SIGNATURE SIGNATURE

NAME Mr. YOGANANTHAM.J NAME Mr. TARAK NANDHI NAME Mr. S.W.KOLTE
DESIGNATIO DESIGNATIO
DESIGNATION SAS ENGINEER SITE INCHARGE MANAGER
N N
M/s GE – T & D INDIA Limited., M/s TECHNO ELECTRIC ENGG CO. LTD.,
M/s PGCIL.
DATE:- 06-01-2018

Page 17 of 20
REALY SIGNAL TEST REPORT

PROJECT: PGCIL, 400/38.5KV CRP & SAS


STATCOM-AURANGABAD (KX8E)

CLIENT: M/s TECHNO ELECTRIC & ENGG CO. LTD.,


END CUSTOMER: M/s PGCIL.

38.5KV-BB_B604_PU_P743_PROTECTION SIGNALS TESTING DATE: 29/12/2017


SCADA REPORTING STATUS
OPTOS (Alarms/States/Events) REMARKS
BCU HEALTHY OK -

LBB INITIATION 3PH OK -

MAIN CB OPEN OK -

MAIN CB CLOSE OK -

PROTECTION
BB OPTD OK -

CB FAIL RETRIP OK -

CB FAIL BACKTRIP OK -

TIME SYNC OK -

TESTED BY WITNESSED BY WITNESSED BY

SIGNATURE SIGNATURE SIGNATURE

NAME Mr. YOGANANTHAM.J NAME Mr. TARAK NANDHI NAME Mr. S.W.KOLTE
DESIGNATIO DESIGNATIO
DESIGNATION SAS ENGINEER SITE INCHARGE MANAGER
N N
M/s GE – T & D INDIA Limited., M/s TECHNO ELECTRIC ENGG CO. LTD.,
M/s PGCIL.
DATE:- 06-01-2018

Page 18 of 20
REALY SIGNAL TEST REPORT

PROJECT: PGCIL, 400/38.5KV CRP & SAS


STATCOM-AURANGABAD (KX8E)

CLIENT: M/s TECHNO ELECTRIC & ENGG CO. LTD.,


END CUSTOMER: M/s PGCIL.

38.5KV-BB_B605_PU_P743_PROTECTION SIGNALS TESTING DATE: 29/12/2017


SCADA REPORTING STATUS
OPTOS (Alarms/States/Events) REMARKS
BCU HEALTHY OK -

LBB INITIATION 3PH OK -

MAIN CB OPEN OK -

MAIN CB CLOSE OK -

PROTECTION
BB OPTD OK -

CB FAIL RETRIP OK -

CB FAIL BACKTRIP OK -

TIME SYNC OK -

TESTED BY WITNESSED BY WITNESSED BY

SIGNATURE SIGNATURE SIGNATURE

NAME Mr. YOGANANTHAM.J NAME Mr. TARAK NANDHI NAME Mr. S.W.KOLTE
DESIGNATIO DESIGNATIO
DESIGNATION SAS ENGINEER SITE INCHARGE MANAGER
N N
M/s GE – T & D INDIA Limited., M/s TECHNO ELECTRIC ENGG CO. LTD.,
M/s PGCIL.
DATE:- 06-01-2018

Page 19 of 20
REALY SIGNAL TEST REPORT

PROJECT: PGCIL, 400/38.5KV CRP & SAS


STATCOM-AURANGABAD (KX8E)

CLIENT: M/s TECHNO ELECTRIC & ENGG CO. LTD.,


END CUSTOMER: M/s PGCIL.

38.5KV-BB_B606_PU_P743_PROTECTION SIGNALS TESTING DATE: 29/12/2017


SCADA REPORTING STATUS
OPTOS (Alarms/States/Events) REMARKS
BCU HEALTHY OK -

LBB INITIATION 3PH OK -

MAIN CB OPEN OK -

MAIN CB CLOSE OK -

PROTECTION
BB OPTD OK -

CB FAIL RETRIP OK -

CB FAIL BACKTRIP OK -

TIME SYNC OK -

TESTED BY WITNESSED BY WITNESSED BY

SIGNATURE SIGNATURE SIGNATURE

NAME Mr. YOGANANTHAM.J NAME Mr. TARAK NANDHI NAME Mr. S.W.KOLTE
DESIGNATIO DESIGNATIO
DESIGNATION SAS ENGINEER SITE INCHARGE MANAGER
N N
M/s GE – T & D INDIA Limited., M/s TECHNO ELECTRIC ENGG CO. LTD.,
M/s PGCIL.
DATE:- 06-01-2018

Page 20 of 20