Regulation No (5) for the year 2009 On the regulation of                         ﺑﺸﺄن2009  ﻟﺴﻨﺔ5 اﻟﻘﺎﻧﻮن رﻗﻢ
Railways in the Emirate of Dubai                                 ﺗﻨﻈﻴﻢ اﻟﺴﻜﻚ اﻟﺤﺪﻳﺪﻳﺔ ﻓﻲ دﺑﻲ
and related documents                                                                 واﻟﻮﺛﺎﺋﻖ اﻻﺧﺮى اﻟﻤﺘﻌﻠﻘﺔ ﺑﻪ
In Arabic & English                                                                ﺑﺎﻟﻠﻐﺘﻴﻦ اﻟﻌﺮﺑﻴﺔ واﻻﻧﺠﻠﻴﺰﻳﺔ
                                                           
This PDF document includes the Regulation No (5)                ﻟﺴﻨﺔ5 ﻳﺤﺘﻮي ﻫﺬا اﻟﻤﺴﺘﻨﺪ ﻋﻠﻰ ﻧﺺ اﻟﻘﺎﻧﻮن رﻗﻢ
for the year 2009 On the regulation of railways in                 ﺑﺸﺄن ﺗﻨﻈﻴﻢ اﻟﺴﻜﻚ اﻟﺤﺪﻳﺪﻳﺔ ﻓﻲ دﺑﻲ2009
the Emirate of Dubai and related documents ...                                     .واﻟﻮﺛﺎﺋﻖ اﻻﺧﺮى اﻟﻤﺘﻌﻠﻘﺔ ﺑﻪ
This file lists, inside it in the below pages, all the             ﻳﺘﻀﻤﻦ اﻟﻤﺴﺘﻨﺪات ﻓﻲ ﺻﻔﺤﺎﺗﻪ اﻟﺘﺎﻟﻴﺔ اﻟﻮﺛﺎﺋﻖ
documents in both languages Arabic and English                   .ﺑﺎﻟﻠﻐﺘﻴﻦ اﻟﻌﺮﺑﻴﺔ واﻻﻧﺠﻠﻴﺰﻳﺔ ﻣﻌﺎً اﻟﻮاﺣﺪ ﺗﻠﻮ اﻻﺧﺮ
one after another.
                     Regulation No (5) for the year 2009
                                     On
                the regulation of railways in the Emirate of Dubai
We, Hamdan bin Mohammed bin Rashid Al Maktoum, Crown Prince of Dubai -
President of the Executive Board,
Following the Law No. 3/ 2003 on the establishment of the Dubai Executive Council,
the law No. 17/ 2005 on the establishment of the Roads and Transport Authority,
the law No. 18/2006 on managing and ensuring the public funds of the Government of
Dubai,
Decree No. 41/2008 on the security force for transportation sector in the Emirate of
Dubai,
And the Executive Council Resolution No 8/ 2006 on the establishment of RTA
Agencies and adoption of it’s corporate and organizational structure,
Article (1)
This regulation shall hereinafter be called " Dubai Railway Regulation No. 5/2009."
Article (2)
The following words and phrases shall carry the meanings set forth, unless the context
indicates otherwise:
Railway vehicle: any vehicle that uses the infrastructure of the railway, including
locomotives, engines, trains, trams, and light inspection vehicle, self-propelled
maintenance vehicle, freight wagons, monorail vehicle.
Operations: the operation, movement or cause the operation or the movement of
railway vehicles designed for transportation or for carrying out maintenance,
modification works and development of infrastructure or railway vehicles.
Owner: any public or private company/ authority that owns the infrastructure of the
railway or railway vehicles, or both for the purposes of transportation.
Operator: the authorized party for the operation or maintenance of the railway
infrastructure or railway vehicles, or both for the purposes of transportation.
Contractor: the natural or legal person designated by the owner or the operator for
the purpose of carrying out the works related to railways, or execution of any work
that requires obtaining of permits or no objection certificates from the agency or
safety regulation authority.
Demonstration or Evidence of safety: the documents which prove that the railway
infrastructure and railway vehicles, as well as safety management system applied in
the operation and transportation systems are suitable for safe operation.
Safety requirements: the set of rules and standards that needs to be adhered while
designing of the railway infrastructure, railway vehicles and safety management
system which aims to eliminate or minimize the risk of the accidents frequency within
the internationally adopted limits in this regard.
Safety certificate: the certificate issued by the Safety regulation authority of the
owner, which demonstrate the safety of the railway infrastructure or railway vehicles,
or both.
Accident: the unexpected and undesirable occurrence directly associated with railway
operations, its railway infrastructure, which result or may result in human casualties
or damage to property.
Inspector: the RTA staff authorized to verify the safety of railway infrastructure and
railway vehicles operation, carry out technical investigation of accidents, check the
acts that are in contravention of the provisions of this regulation, and to recommend
necessary and urgent actions to address any action or development or matter that may
affect or pose a threat to the safety of the use of railways.
Article (3)
2 - separate the functions of authorizing the establishment of the railways and the
functions of safety regulation related to it’s operation, given the importance of its
safety aspects and assurance of its self-determination to provide maximum safety
levels and safe transport operation by railways.
Article (4)
For the purposes of this regulation/ order, RTA shall undertake the following: --
1 - Plan and develop railway networks in the Emirate, and supervise its planning and
development within the free zones and ensure the integration of different transport
systems in the Emirate.
2 - Make sure that the permits, issued by the agency or the certificates issued by the
safety regulation authority or the technical investigation of accidents, are free of any
conflict of interest, and that they are carried out with complete independence from the
owners and operators and rail contractors and other entities that have a relation in this
area.
3 - Conclude contracts and agreements with any party/ authority within or outside the
Emirate to participate and contribute in every matter related to transportation of goods
and passengers by railways.
Article (5)
The agency shall undertake to carry out the roles and responsibilities as follow: --
Article (6)
1 – Issue safety certificates to the railway infrastructure and railway vehicles owners.
2 - Issue operational safety certificate to the operators, and verify their compliance to
the requirements of this certificate.
3 - Check the compliance of legislations, by all parties, related to ensuring the
railways operation safety.
4 - Review the evidences of safety and protection of workers in the field of public
transports, passengers and the public from the risks that threaten the health and safety
arising from railway operations.
5 - Carry out the evaluation, analysis and research on the railway systems in order to
achieve a more secure/safe transport system.
6 - Develop and implement plans and programs to carry out inspection of the railway
networks and infrastructure, and railway vehicles to verify its operational safety.
7 – Carry out technical investigation into the incidents separately from the security
and criminal investigation, and reopen the investigation if there are new evidences.
8 - Provide necessary recommendations to improve the safety level in the aftermath of
incidents in order to prevent future recurrences.
9 - Any other functions and powers relating to the implementation of this regulation
or decision issued under it.
Article (7)
The By-laws of this regulation shall define the requirements for obtaining this permit
and necessary related documents to be produced at the time of issuance of the permit,
as well as the limits and the size of the area allocated to the railway and surrounding
area, and activities that may affect the safety of operation.
Article (8)
In order to grant the permit referred to in Article (7) of this regulation, the railway
systems shall be insured with a comprehensive insurance by any insurance company
authorized to operate in the Emirate.
Article (9)
No party shall engage in any activity that falls under the operator, consultant or
contractor’s jurisdiction and are related to railway infrastructure work unless qualified
and classified by the agency.
The By-laws of this regulation shall define the conditions and the requirements for
qualification and classification of these activities.
Article (10)
1 - The owner or the contractor shall, upon the completion of all work authorized by
the agency, proceed to the safety regulation authority to obtain the safety certificate;
this certificate shall be deemed valid for the work unless substantive changes to the
railway regulations, the railway infrastructure, or to the railway vehicles are made.
2 - The operator shall, prior to commencement of railway operation, proceed to safety
regulation authority to obtain the operational safety certificate, and the validity period
of this certificate shall be (5) years, unless terminated earlier for any of the reasons set
forth in this regulation or its by-laws.
3 - The by-laws of this regulation shall define the procedures and conditions for
obtaining the certificates referred to in clause (1) and (2) of this article and the
documents requirements shall also be met for the issuance of these certificates.
Article (11)
The party authorized for railway related works must comply with the following: --
1 – The technical terms and conditions and time-limit specified in the permit.
2 - Comply with the requirements and the specifications set forth in the evidence
approved by the agency in the implementation of the works authorized to them.
3 - Compliance with all safety requirements, including evidence of safety approved by
the safety regulation authority.
4 – the works authorized to them shall be completed in one go without any break.
5 – Return the condition- upon completion of the work - back where it was, in
accordance with the technical conditions and specifications approved by the agency
and concerned government entities in the Emirate.
Article (12)
Without prejudice to the provisions and the requirements of public safety set forth in
the current legislation, the owner, the operator and the contractor must comply with
the following:
1 - Take all necessary measures to reduce the risks arising from their engagement in
their work.
2 - Operate the railways in safe and sound way and that, by maintaining the
requirements of public/general safety during the railway operation in accordance with
the legislation in force in the area of safety and occupational health and safety
evidence/demonstration adopted by the safety regulation authority in this regard.
3 – Provide the safety regulation authority with the following information:
 - Incidents and events that occur during the construction, operation and maintenance.
- Measures taken to strengthen public safety on the railways.
- Details on the comprehensive insurance.
- any data or statistical information required by the safety regulation authority.
4 – Avoid any action that would endanger the safety of others at risk during the use of
the railways or their vicinity.
5 – Maintain / protect the railways in accordance with the requirements of the safety
certification.
6 – Notify the safety regulations authority in advance of any substantive change
intended to take place in the systems and processes of the railways or its
infrastructure.
Article (13)
In case the owner, the operator or the contractor fails to abide - as per the situations -
in eliminating/ removing the causes of the offense committed by him, contrary to the
provisions of this regulation or decision issued pursuant to it, within the given time
limit, the RTA shall carry out the work by using its own resources or seeking help
from any other competent body/ company and shall make the offending party bear
the expenses of this procedure in addition to a (25%) of the costs value as an
administrative and supervisory expenses.
Article (14)
Article (15)
The certification fees, stipulated in the schedule (1) attached to this regulation, shall
be paid as set out against each of them in the schedule.
Article (16)
In case of any accident involving the railways, the safety regulation authority has the
right to conduct technical investigation in it.
The By-laws of this regulation shall define the procedures and methods of the
investigation. In addition to the powers and measures that can be taken by the party in
charge, and the duties of those subject to it.
Article (17)
Any party shall not be allowed to carry out any work or refrain from it which could
jeopardize the railway infrastructure and railway vehicles and could pose a threat of
risk or tampering by any mean and in any way.
The By-laws of this regulation shall define the measures to be taken to protect the
railway infrastructure and railway vehicles, and acts which are prohibited to do.
Article (18)
Without prejudice to any greater penalty stipulated by any other legislation, anyone
who commits any of the offenses set forth in schedule No. (2) attached to this
regulation shall be penalized as set forth against each other in the schedule (2)
In addition to the penalty, the safety regulation authority has right to - as per the case -
take any of the following measures against the offender:
1 – stop the work until the causes of the violation is removed.
2 – Terminate or cancel the license granted to them.
3 – Terminate or cancel the safety certificate or the operational safety certificate.
Article (19)
Article (20)
Any stake holder has right to grievance appeal in writing on any of the decisions or
measures taken against him by the safety regulation authority or the agency during the
30 days from the date of notification of the decision or measure taken against him.
And this complaint shall be taken into consideration by the Committee constituted for
this purpose by a decision of the Chairman/president of the Board, and the Committee
shall decide on the appeal within (15) days from the date of submission, and the
decisions of the Grievance Committee shall be last & final.
Article (21)
RTA has right to seek help from government departments, agencies and public
bodies/authorities including the police personnel to assist in the application of the
provisions of this regulation, and these bodies/authorities shall assist them when
requested to do so.
Article (23)
The Chairman of the Board issues resolutions and regulations necessary to implement
this regulation.
Article (24)
This regulation shall be published in the Official Gazette and shall take effect from
the date of its publication.
                                    Schedule (1)
                     Provision of services and certification fees
- An annual operational safety fee, which is (25%) of the total fees under this
schedule, shall be added as per the schedule (2) and shall be paid on yearly basis.
                                  Schedule (2)
                               Violations and Fines
After perusal of Law No. (17) of 2005 Establishing the Roads and Transport
Authority, and
Regulation No. (5) of 2009 Concerning Railways in the Emirate of Dubai (hereinafter
referred to as the “Regulation”),
                                                    Definitions
                                                    Article (1)
The words and expressions set forth in this Decision shall have the meanings
indicated in Article (2) of the Regulation. The following words and expressions shall
have the meaning indicated opposite each of them, unless the context implies
otherwise:
Branch Line:                                The area of Railway, Infrastructure and the Railway
                                            Vehicles operating in it that is managed, owned or
                                            controlled by a Person other than the one who operates
                                            the Railway line connected to the Branch Line.
Safety:                                     The absence of any risk of harm or damage to the
                                            Railway, Railway Vehicles and Infrastructure, that is
                                            deemed unacceptable to the Safety Regulation
                                            Authority.
Construction:                               The erection of any new buildings or structures, or the
                                            variations to the Infrastructure facilities or Railway
                                            Vehicles.
Improvement Notice:                         A letter addressed by the Inspector to a Person who is
                                            in breach of the provisions of the Regulation or its
                                            Implementing By-law requesting him to take the
                                            necessary action to remedy that breach within a
                                            specific time limit.
1. Every effort has been made to produce an accurate and complete English version of this legislation.
However, for the purpose of its interpretation and application, reference must be made to the original
Arabic text. In case of conflict the Arabic text shall prevail.
Administrative Decision No. (68) of 2010 Issuing the Implementing By-law of Regulation No. (5) of 2009 Concerning Railways
in the Emirate of Dubai.
                                                     Page 1 of 19
Prohibition Notice:                         A letter addressed by the Inspector to the Owner,
                                            Operator, Contractor or Consultant demanding the
                                            suspension of works and implementation of the
                                            necessary measures to manage potential risks.
Person:                                     A natural Person, or a public or private legal Person.
Competent Authority:                        The Department of Economic Development or any
                                            other entity authorised to issue trade licences in the
                                            Emirate or in the UAE.
Infrastructure Protection
Code of Practice:                           The code issued by the Agency which specifies the
                                            sites, areas, standards, procedures and requirements for
                                            the protection of the Infrastructure.
Infrastructure Protection
Code of Practice Guidelines: Instructions issued by the Agency to indicate how the
                             Infrastructure Protection Code of Practice should be
                             implemented.
Railway Technical
Standards:                   The planning, engineering and technical rules,
                             requirements and standards issued by the Agency.
Infrastructure Protection
Zone:                        The Infrastructure sites and the surrounding areas
                             designated as such by the Infrastructure Protection
                             Code of Practice.
Restricted Activity:         Any activity that may jeopardise the safety of
                             Infrastructure or affect its performance.
Prequalification No
Objection Certificate:       A document issued by the Agency authorising a
                             Person to apply to the Competent Authorities to obtain
                             a trade licence to conduct business in relation to
                             Railways.
Restricted Activities No
Objection Certificate:       A document issued by the Agency authorising a
                             Person to carry out a Restricted Activity within the
                             Infrastructure Protection Zone.
Permit:                      Written permission issued by the Agency for the
                             construction of Railway Infrastructure, supply of
                             Railway Vehicles and any other works related to the
                             development and maintenance of Railway systems in
                             the Emirate.
                                                    Objectives
                                                    Article (2)
Administrative Decision No. (68) of 2010 Issuing the Implementing By-law of Regulation No. (5) of 2009 Concerning Railways
in the Emirate of Dubai.
                                                     Page 2 of 19
1. To ensure that the Railway in the Emirate is built and operated in a safe way and
   that it serves the intended purpose;
2. To determine the requirements for issuing Safety Certificates, the Operational
   Safety Certificates and Permits;
3. To lay down risk control measures related to Operation of the Railway;
4. To develop specific and permanent risk control monitoring mechanisms for the
   Operation of the Railway.
7. The granting of licences to Railway Vehicles and licences for the safety of
   transport service Infrastructure.
                                               Safety Certificates
                                                   Article (4)
Infrastructure and Railway Vehicles may not be operated for the transport of
passengers or any other commercial activity unless the Owner obtains a Safety
Certificate and the Operator obtains the Operational Safety Certificate.
Article (5)
Administrative Decision No. (68) of 2010 Issuing the Implementing By-law of Regulation No. (5) of 2009 Concerning Railways
in the Emirate of Dubai.
                                                     Page 3 of 19
3. The applications referred to in Paragraphs (1) and (2) of this Article shall be
   submitted on special forms and in accordance with the procedures approved by the
   Safety Regulation Authority in this regard, subject to the following conditions:
     a. The application must include the scope and nature of the Operation activities;
     b. Evidence of safety must be attached to the application;
     c. The applicant must submit a written acknowledgment in which he declares
        understanding and awareness of the safety risks and how to control and
        minimize them as practically as possible;
Article (6)
Article (7)
The Safety Regulation Authority may revoke or suspend the Safety Certificate or
Operational Safety Certificate under one or more of the following circumstances:
Article (8)
If the Owner or Operator requests to make material changes to any of the equipment
or activities, he must apply to the Safety Regulation Authority that assesses the
changes and issues the relevant certificate in case such changes are approved.
Article (9)
1. The Safety Regulation Authority shall maintain an accurate and up to date record
   of all applications and Safety Certificates and Operational Safety Certificates
   issued. The record shall include the following particulars:
Administrative Decision No. (68) of 2010 Issuing the Implementing By-law of Regulation No. (5) of 2009 Concerning Railways
in the Emirate of Dubai.
                                                     Page 4 of 19
     b. Scope, limitations and restrictions of the certificate issued;
     c. Compatibility of the Infrastructure with Railway Vehicles;
     d. The Person in whose name the certificate is registered;
     e. Date of submission of the request for the certificate and the date on which it is
        issued;
     f. Particulars of the relevant trade licence in respect of the licensed activity;
     g. Any amendments to the certificate, such as cancellations, suspensions,
        transfers, alterations or any other changes;
     h. Any other relevant particulars.
2. The Safety Regulation Authority shall notify the competent authorities of any
   amendments to the Safety Certificate or Operational Safety Certificate.
Article (10)
1. Be registered and hold a trade licence to operate the Railway in the Emirate;
2. Hold a Safety Certificate;
3. Hold an Operational Safety Certificate.
Article (12)
1. Should the Operator cease to be able to operate for any reason, the Owner may
   appoint a third party as temporary Operator.
2. The temporary Operator may operate pursuant to the existing Operational Safety
   Certificate for a maximum period of six (6) months, after which period the
   Operator must obtain a new certificate in accordance with the procedures adopted
   in this regard by the Safety Regulation Authority.
3. The Safety Regulation Authority may impose new conditions and restrictions on
   the Operation activities during the period in which the Operator operates under the
   existing Operational Safety Certificate.
Article (13)
1. The Agency’s approval, in case the Branch Line is to be connected to the main
   Railway network of the Emirate;
Administrative Decision No. (68) of 2010 Issuing the Implementing By-law of Regulation No. (5) of 2009 Concerning Railways
in the Emirate of Dubai.
                                                     Page 5 of 19
2. A Safety Certificate issued in accordance with the standards and requirements
   stipulated in this regard;
3. An Operational Safety Certificate issued in accordance with the standards and
   requirements in force.
Article (14)
The Operator must design a safety management system in accordance with the
following criteria:
1. The system must follow the design approved by the Safety Regulation Authority;
2. The system must meet to the risk management requirements, standards, techniques
   and procedures approved by the Safety Regulation Authority;
3. The system must identify and assess any safety risks that may arise from the
   Operation activities, or any activities related to the Operator;
4. The system must specify the measures adopted to manage any identified risks and
   control safety and security in relation to the Operation activities under ordinary,
   extraordinary and emergency conditions;
5. The system must state the procedures required to monitor, review and revise the
   extent of its efficiency measures referred to in Paragraph (4) of this Article;
6. The Operator shall submit to the Safety Regulation Authority a report that
   includes the following:
Article (15)
Prior to designing the safety management system referred to in Article (14) of this
Decision, the Operator must cooperate and coordinate with:
Article (16)
1. To revise the safety management system designed by it at least once every year, at
   such date as may be agreed with the Safety Regulation Authority;
Administrative Decision No. (68) of 2010 Issuing the Implementing By-law of Regulation No. (5) of 2009 Concerning Railways
in the Emirate of Dubai.
                                                     Page 6 of 19
2. To notify the Safety Regulation Authority of any changes to the system referred to
   in Paragraph (1) of this Article.
Article (17)
The Operator must provide the Safety Regulation Authority with regular annual
reports on the safety management system. The report must meet the following
conditions:
2. To meet the requirements stipulated by the Regulation and its Implementing By-
   law.
3. To include the following information:
Article (18)
In case of overlap of two or more Operation activities in such a way that safety risks
are increased, each Operator shall coordinate with all other Operators to develop an
overlap coordination plan to be implemented as necessary in order to minimise risks.
Article (19)
Each Operator must have an emergency management plan that indicates the measures
to be implemented in emergency situations, and must ensure that all emergency
response procedures are suitable and clear to all Persons and are practically
applicable.
Article (20)
The emergency management plan referred to in Article (19) of this Decision shall be
prepared and developed in coordination with the entities engaged in providing
emergency services, and shall be reviewed, maintained and made available to such
entities.
                                   Article (21)
The Operator shall ensure that all employees working on the Railway and
Infrastructure are adequately qualified and trained to perform their duties.
Administrative Decision No. (68) of 2010 Issuing the Implementing By-law of Regulation No. (5) of 2009 Concerning Railways
in the Emirate of Dubai.
                                                     Page 7 of 19
                                                    Article (22)
An Operator who wishes to assign the Operational Safety Certificate must notify the
Safety Regulation Authority in writing six (6) months prior to the date on which it
intends to assign such certificate.
Article (23)
The Operator must provide identity cards to all Persons involved in activities related
to the safety of the Railway Infrastructure and Railway Vehicles.
Article (24)
1. Carry the identity card referred to in Article (23) of this Decision and present it to
   the Inspector upon request;
2. Comply with the provisions and rules stipulated by the Regulation and its
   Implementing By-law;
3. Comply with the safety rules imposed by the Owner;
4. To take all necessary precautions to ensure their Personal safety;
5. Take all necessary precautions to ensure the safety of Persons who might be
   affected by their actions;
6. Cooperate with the Operator to fulfill the safety requirements.
Article (25)
The Operator shall ensure that any Person working on the Infrastructure or Railway
Vehicles follows a safety management system which is compatible with the safety
management system adopted by the Operator.
Article (26)
Administrative Decision No. (68) of 2010 Issuing the Implementing By-law of Regulation No. (5) of 2009 Concerning Railways
in the Emirate of Dubai.
                                                     Page 8 of 19
                                             Powers of Inspectors
                                                Article (27)
The duties and powers conferred upon the Agency Inspectors shall be deemed
independent from the powers and duties of the Safety Regulation Authority
Inspectors.
Article (28)
The Safety Regulation Authority Inspector shall have the following duties and
powers:
Administrative Decision No. (68) of 2010 Issuing the Implementing By-law of Regulation No. (5) of 2009 Concerning Railways
in the Emirate of Dubai.
                                                     Page 9 of 19
                                                    Article (29)
The Agency Inspector shall have the following duties and powers:
Article (30)
1. Upon the seizure of any evidence, the Inspector must provide the owner of the
   evidence with a receipt.
2. The Inspector must allow the owner of the seized evidence to examine it and take
   a copy thereof if it is a document, until such time as the seized material or
   document is returned.
3. After seizure of any evidence, including documents, the Inspector shall return
   such evidence to the owner as soon as practicable, except in the following
   situations:
Administrative Decision No. (68) of 2010 Issuing the Implementing By-law of Regulation No. (5) of 2009 Concerning Railways
in the Emirate of Dubai.
                                                     Page 10 of 19
     b. If the Inspector is entitled, by law or by a court order, to retain such evidence.
4. If the evidence is returned to the owner, the holder or possessor of such evidence
   must comply with any conditions and instructions issued by the Inspector in this
   regard.
Article (31)
Article (32)
The Inspector, who serves an Improvement Notice or Prohibition Notice, shall take
the following measures:
1. Identify the areas where the activity is prohibited, the materials that may not be
   used, and the procedures and activities that are prohibited;
2. Serve a copy of the notice to the defaulting parties;
3. Affix a copy of the notice of the prohibited materials if the defaulting Person
   cannot be identified.
Article (33)
The Inspector, within the scope of the powers conferred upon him, may enter the
following places to perform his duties:
Article (34)
The Inspector shall not disclose any information obtained during the exercise of his
duties, unless pursuant to:
Administrative Decision No. (68) of 2010 Issuing the Implementing By-law of Regulation No. (5) of 2009 Concerning Railways
in the Emirate of Dubai.
                                                     Page 11 of 19
1. Instructions of the Chairman of the Board of Directors;
The Person served with an Improvement Notice shall, within the period stipulated in
the notice (which may not be less than twenty eight (28) days from the date such
notice is served):
Article (36)
Any Person, served with a Prohibition Notice, may not use, move, sell, remove or
destroy any information or other materials without written approval from the
Inspector or the Safety Regulation Authority, as the case may be.
The Owner, Operator and Contractor shall inform and submit a report to the Safety
Regulation Authority about accidents occurring during construction, operation or
maintenance, including:
Administrative Decision No. (68) of 2010 Issuing the Implementing By-law of Regulation No. (5) of 2009 Concerning Railways
in the Emirate of Dubai.
                                                     Page 12 of 19
10. Any materials falling on the Railway tracks thus obstructing the track in front of
    Railway Vehicles.
Article (38)
     a. Take the necessary measures to implement the plan prepared by the Owner,
        Operator and Contractor, as the case may be;
     b. Guarantee the safety of the accident site;
     c. Protect the evidence until responsibility for the investigation is passed to the
        Inspector or the Inspector allows him to leave the site.
1. The Safety Regulation Authority must issue an identity card for each Inspector on
   which the powers conferred upon the Inspector pursuant to the Regulation and its
   Implementing By-law are stated.
2. The Inspector must carry the identity card referred to in Paragraph (1) of this
   Article and present it upon the request of any Person.
3. The Inspector must return the identity card referred to in Paragraph (1) of this
   Article to the Authority at the end of his service.
                                             Investigation Report
                                                 Article (40)
Administrative Decision No. (68) of 2010 Issuing the Implementing By-law of Regulation No. (5) of 2009 Concerning Railways
in the Emirate of Dubai.
                                                     Page 13 of 19
5. Upon receiving the report, the Safety Regulation Authority must add its
   recommendations and submit it to the Chief Executive Officer of Strategy and
   Corporate Governance.
6. The Chief Executive Officer of Strategy and Corporate Governance may:
     a. Submit a copy of the report, or part thereof, to any party he deems appropriate;
     b. Publish a copy of the report, or part thereof by any means as he deems
        appropriate.
Article (41)
1. The Safety Regulation Authority may instruct the Operator to investigate any
   reported incident, or any other incident that may endanger the safety of transport
   service activities carried out by the Operator on the Railway, in accordance with
   the applicable procedures.
2. The investigator shall identify the causes and factors that led to such incident.
3. The results of the investigation shall be submitted to the Safety Regulation
   Authority within the time limit specified.
Article (42)
Article (43)
The Agency shall, at all times, take an initiative-based and risk-free approach in
performing its duties with a view to develop and maintain a safe and efficient Railway
system in the Emirate.
Article (44)
1. Persons who perform any of the activities listed below shall present to the Agency
   a valid trade licence issued by the Competent Authority:
Administrative Decision No. (68) of 2010 Issuing the Implementing By-law of Regulation No. (5) of 2009 Concerning Railways
in the Emirate of Dubai.
                                                     Page 14 of 19
     b. Operating the Railway.
2. In order to obtain a trade licence from the Competent Authority for any of the
   activities listed in Paragraph (1) of this Article, the Person must first obtain a No
   Objection Certificate from the Agency.
Article (45)
For the purposes of Paragraph (2) of Article (44) the Agency shall coordinate with the
Safety Regulation Authority before issuing any No Objection Certificate, and shall
maintain a record of trade licence applications and particulars of the applications
received from the Competent Authority.
Article (46)
1. The Agency shall submit the necessary proposals for planning and development of
   the Railway and submit these to the Chairman of the Board of Directors.
2. When submitting the proposals referred to in Paragraph (1) of this Article, the
   Agency must:
3. The Agency may give the proposals referred to in Paragraph (2b) of this Article
   due consideration as it may deem appropriate, making all such further enquiries
   that are reasonably required to assess such proposals. In the event that a proposal
   is approved, the Agency must issue the necessary Permit for carrying out the
   works for which the proposal is submitted.
4. In order to achieve integration between the Railway network and other means of
   transport, the Agency shall cooperate and coordinate with the relevant authorities
   within or outside the Emirate according to the Roads and Transport Authority
   guidelines.
Administrative Decision No. (68) of 2010 Issuing the Implementing By-law of Regulation No. (5) of 2009 Concerning Railways
in the Emirate of Dubai.
                                                     Page 15 of 19
     d. Maintenance, repair, manufacture, modification, supply, installation, or any
        other activity related to Railway Operations, Infrastructure or Railway
        Vehicles.
2. No Person may obtain a trade licence from the Competent Authority to carry out
   any of the activities listed under Paragraph (1) of this Article unless he has been
   issued a Prequalification No Objection Certificate.
3. Prequalification No Objection Certificates shall be issued in accordance with the
   Railway Technical Standards.
4. Prequalification No Objection Certificates may include requirements and
   conditions which must be satisfied, and may specify the scope of licensed
   activities.
5. The Agency shall maintain a record of all Prequalification No Objection
   Certificate applications, including the details and final decisions regarding such
   applications.
6. Any Person who carries out any of the activities listed in Paragraph (1) of this
   Article without obtaining a valid Prequalification No Objection Certificate, or
   who fails to satisfy any of the requirements or conditions set forth in such
   certificate, shall be deemed in breach of the provisions of this Decision.
7. If a Person holding a Prequalification No Objection Certificate fails to satisfy the
   requirements or conditions set forth in such certificate, or fails to satisfy any
   technical requirements or specific performance standards prescribed in the
   standards and specifications guidelines approved by the Agency, the latter may, at
   its discretion, amend such certificate, review its terms or revoke it. The Agency
   shall notify such Person of its decision and provide him with a copy of the
   amended certificate.
8. The Agency must prepare bi-annual reports that contain assessments of the
   performance of Persons holding Prequalification No Objection Certificates who
   have carried out works on the Railways in the Emirate, and each such Person must
   be assessed and graded according to the extent to which they have complied with
   the requirements set forth in this Article.
9. The Agency shall provide the Safety Regulation Authority with a copy of the
   report referred to in Paragraph (8) of this Article.
Administrative Decision No. (68) of 2010 Issuing the Implementing By-law of Regulation No. (5) of 2009 Concerning Railways
in the Emirate of Dubai.
                                                     Page 16 of 19
                             Infrastructure Protection Code of Practice
                                            Article (49)
1. The Agency shall issue and regularly update the Infrastructure Protection Code of
   Practice, which includes:
1. Storage of goods;
2. Moving or operating cranes and other mechanical lifting equipment;
3. Drilling and digging wells;
4. Dredging of sea-beds, canals, wells and waterways;
5. Construction of tunnels and artesian wells;
6. Excavation of trenches and removal of the topsoil;
7. Demolition;
8. Use of explosives and fireworks and igniting fires;
9. Erection of scaffolding and other temporary structures;
10. Installation or replacement of power transmission lines;
11. Activities performed in the Infrastructure Protection Zone that should be
    monitored by the Agency.
Administrative Decision No. (68) of 2010 Issuing the Implementing By-law of Regulation No. (5) of 2009 Concerning Railways
in the Emirate of Dubai.
                                                     Page 17 of 19
                          Restricted Activities No Objection Certificates
                                            Article (51)
1. All Persons must request a No Objection Certificate from the Agency prior to
   commencing any Restricted Activity.
2. All Persons must request a Restricted Activities No Objection Certificate prior to
   commencing any development, design or construction works or other
   infrastructure works (other than those related to the Railway Infrastructure).
3. A No Objection Certificate, granted under this Article, must include the
   conditions and requirements laid down in the Infrastructure Protection Code of
   Practice.
4. The Agency shall coordinate and consult with the Operator prior to issuing the No
   Objection Certificate in accordance with the provisions of this Article.
5. Any request for a No Objection Certificate under this article shall be made in
   accordance with the Infrastructure Protection Code of Practice.
1. Agency Inspectors are authorised to prevent any Person from carrying out any
   Restricted Activity in an Infrastructure Protection Zone without obtaining a prior
   No Objection Certificate or in case of breach of any requirements or conditions
   stipulated in such certificate.
2. Upon issuing the suspension order referred to in Paragraph (1) of this Article, the
   Inspector must present his identity card to prove his capacity as Inspector.
3. A suspension order issued by an Inspector may be verbal or written. In the event
   of a verbal order, a written order from the Agency must ensue.
Article (53)
The Safety Regulation Authority shall coordinate with Government departments and
public entities and authorities, including the police personnel, to fulfill the objectives
of the Regulation and its Implementing By-law.
Article (54)
Operators, Contractors and Owners who have commenced work before this Decision
is issued, must adjust their situation in accordance with its provisions within six (6)
months from the date on which it comes into force.
Article (55)
The Chief Executive Officer of the Agency shall issue the instructions necessary for
the implementation of the provisions of this Decision.
Administrative Decision No. (68) of 2010 Issuing the Implementing By-law of Regulation No. (5) of 2009 Concerning Railways
in the Emirate of Dubai.
                                                     Page 18 of 19
                                                    Article (56)
This Decision shall come into force on the day on which it is issued and shall be
published in the Official Gazette.
Administrative Decision No. (68) of 2010 Issuing the Implementing By-law of Regulation No. (5) of 2009 Concerning Railways
in the Emirate of Dubai.
                                                     Page 19 of 19
                               Railway Protection Code of Practice
Contents
Preface iv
Definitions v
1   Introduction                                                                                    1
    1.1      General                                                                                1
    1.2      Scope                                                                                  1
    1.3      Railway Protection Guidelines                                                          2
    1.4      Associated documents                                                                   2
3   Restricted Activity                                                                            13
    3.1      General                                                                               13
    3.2      Description of Restricted Activity                                                    13
5   Design Considerations                                                                          42
    5.1      General                                                                               42
    5.2      Design Development and Building Proposals in Railway Protection Zone                  42
                                                                                                        ii
                               Railway Protection Code of Practice
8    Monitoring Requirements                                                   51
     8.1     General                                                           51
     8.2     Monitoring of the Railway Infrastructure                          53
     8.3     Monitoring of Construction Activity                               54
     8.4     Control Measures of Enabling Works                                56
     8.5     Reporting                                                         57
     8.6     Site Inspections by the Agency                                    57
     8.7     Incident / Accident Management                                    58
9    Risk Assessment                                                           59
     9.1      General                                                          59
     9.2      Measuring Hazards                                                59
     9.3      Process                                                          61
10 Enquiries 62
     Appendices                                                                63
             Appendix A- Risk register Form                                    63
                                                                                    iii
                                    Railway Protection Code of Practice
Preface
The Railway Protection Code of Practice identifies the Railway Protection Zone and Restricted Activity
within the Zone for all Railways in the Emirate of Dubai. It defines procedures to be followed prior to
carrying out Restricted Activity and other construction-related activities planned by any Government, ,
Public or Private entities in the vicinity of Railway Infrastructure.
This document is part of the Roads and Transport Authority’s (RTA) initiative to ensure safe and reliable
rail operation in Dubai. With the opening of Railway lines in Dubai, Railways will become the major mass
transportation mode in Dubai, forming an integral part of the public transport system and attracting a
significant number of passengers.
In order to ensure that the safe operation of the Railway system is maintained, it is necessary to regulate
By Law in order to protect the Railways Infrastructure, safe operation, staff and the travelling public.
The Railway Protection Code of Practice will assist in achieving the RTA’s vision of safe and smooth
transport for all.
All rights reserved. No section or element of this Railway Protection Code of Practice may be removed from this
document or be reproduced in any form without the written permission of Roads and Transport Authority.
                                                                                                                  iv
                            Railway Protection Code of Practice
Definitions
Accident            The unexpected and undesirable occurrence directly associated with railway
                    operations, its railway infrastructure, which result or may result in human
                    casualties or damage to property
Agency              Rail Agency of Roads & Transport Authority
Applicant           Any party applying for No Objection Certificate
Authority           Roads and Transport Authority
                    Technical documents issued, or adopted, by the Agency that can be applied as
Authority Railway
                    requirements for any railway, planned, designed, developed or operated in the
Standards
                    Emirate.
Battering           Sloping the exposed face of a excavation wall back either at a uniform angle, or
                    stepping it back uniformly.
Benching            Method of preventing of excavation walls by excavating the sides of an
                    excavation to form one or a series of horizontal levels or steps, usually with
                    vertical or near-vertical surfaces between levels.
Bunding             Embankment or wall which may form part or all of the perimeter of a
                    compound within which sits a storage tank. The bund is designed to contain any
                    spill resulting from a breach of the tank.
By-laws             Administrative Decision No. 68/2010 regarding Issuing, Implementation and
                    Regulation of Order No. 5/2009 Governing Railway Regulation in the Emirate of
                    Dubai
Contractor          An organization designated by the Owner or the Operator for the purpose of
                    carrying out the works related to railways, or execution of any work that
                    requires obtaining of permits or No Objection Certificates from the Agency
Control Measures    Provisions to reduce identified risks
Critical Zone       A zone within the Railway Protection Zone, which requires more stringent
                    Control Measures than the remainder of the Railway Protection Zone
Design NOC          A document issued by the Agency to authorize the preliminary or final design of
                    proposed works
Earth-moving        Any machinery designed for the purpose of moving earth including (but not
machinery           limited to) excavators, JCB’s, front-end loaders, scrapers, bob-cats, skid-steer
                    loaders and graders.
Emirate             Emirate of Dubai
                                                                                                       v
                            Railway Protection Code of Practice
Formwork             Either temporary or permanent moulds into which concrete or similar materials
                     are poured.
Incident             An occurrence which affects or could affect the safety of people or the Railway
                     Infrastructure
Information NOC      A document issued by the Agency providing information about the railway
                     network and infrastructure
Inspector            Staff authorized by the Authority to verify the safety of railway infrastructure
                     and railway vehicles operation, carry out investigations and recommend actions
                     to address situations that may affect the safety of the railways.
NOC                  A document issued by the Agency, authorizing an organization to perform
                     activities within the Rail Right of Way.
Operations           The operation, movement or cause of movement of Railway vehicles designed
                     for transportation or for carrying out maintenance, modification works and
                     development of infrastructure or Railway vehicles
Operator             The authorized party for the operation or maintenance of the Railway
                     Infrastructure or Railway vehicles, or both for the purposes of public
                     transportation
Owner                Any public or private company or authority that owns the infrastructure of the
                     Railway or Railway vehicles, or both, for the purposes of public transportation
Permit               A formal written approval granted by the Agency in respect of a proposal for
                     works relating to Railways in the Emirate
Person               A natural Person or a public or private legal Person
Railway              All establishments, facilities, systems and software necessary to operate
Infrastructure       Railways and to enable them to work safely, including but not limited to,
                     Railway tracks and associated track structures, service roads, signalling systems,
                     communications systems,       rail controlling systems , notices and signs, the
                     electric power supply, electric traction systems, the associated buildings,
                     stations, warehouses, machinery, equipment, structures, corridors, pass ways,
                     tunnels, bridges, sidewalks, barriers (iron gates), associated works, the work of
                     sanitation, and any construction or rail-related work
Railway Regulation   Regulation No. 5 of 2009 on the Regulation of Railways in the Emirate of Dubai
Railway              Railway transportation systems designed to transport passengers and goods,
                     guided by specific tracks, designed for the movement of the rails either a single
                     or dual track system or any other direction system, including heavy and light
                     rail, monorail services, tramways or Railways for maintenance or freight
                                                                                                          vi
                             Railway Protection Code of Practice
terminals
Railway Protection    The document issued by the Agency which specifies the standards, procedures
Code of Practice      and requirements for the protection of the Infrastructure in the Railway
                      Protection Zone
Railway Protection    The Railway Infrastructure sites and the surrounding areas designated as such
Zone                  by the Agency in the Railway Protection Code of Practice
Railway Vehicle       Any vehicle that uses the infrastructure of the Railway, including locomotives,
                      engines, trains, trams, light inspection vehicles, self-propelled maintenance
                      vehicles, freight wagons or monorail vehicles
Restricted Activity   Any activity considered by the Agency to (or to have potential to) jeopardise or
                      otherwise adversely affect any Railway, Railway Infrastructure and / or Railway
                      Vehicles and / or to pose a threat of risk or interference in any way with any
                      Railway, Railway Infrastructure and / or Railway Vehicles as further described in
                      the By-laws and / or in the Railway Protection Code of Practice
Risk Assessment       A report prepared by an Applicant seeking Railway Protection NOCs identifying
Report                potential risks and mitigation measures involved in carrying out any Restricted
                      Activity, development and building proposals within the Railway Protection
                      Zone
Safety                Free from unacceptable risks of loss or damage
Safety Regulation     Planning and Safety Regulation Department which the RTA established under
Authority             the Rail Regulation to ensure the safety of all Railways, Railway Infrastructure
                      and Railway Vehicles in the Emirate (as further set out in the Rail Regulation)
Shoring               Means a structure such as a metal hydraulic, mechanical or timber shoring
                      system that supports the sides of an excavation and which is designed to
                      prevent soil movement and cave-ins.
Structure Gauge       The boundary enclosing the clearances required outside the swept envelope to
                      enable the Railway to be operated in safety. The structure gauge includes
                      provision for staff safety, where staff are permitted on the Railway while
                      Railway Vehicles are running
Zone of Influence     The Zone of Influence of a Railway structure below ground is the area over
                      which applied external loads are likely to affect the Railway structure
                                                                                                          vii
                                   Railway Protection Code of Practice
1. Introduction
1.1     General
1.1.1   This Railway Protection Code of Practice is issued by the Agency to set out procedures,
        conditions and other requirements to comply with Administrative Decision No. 68/2010 with
        regard to the issuing, implementation and regulation of Order No. 5/2009 Governing Railway
        Regulation in the Emirate of Dubai.
1.1.2   The Agency at all times takes a risk-based approach to carrying out its duties and co-operates
        with the Safety Regulation Authority in the spirit of developing and maintaining a safe and
        efficient Railway system in the Emirate.
1.1.3   This Railway Protection Code of Practice provides mandatory requirements for any external party
        who intends to carry out Restricted Activity and other construction-related activities in the
        vicinity of Railway lines or facilities.
1.1.4   The Railway Protection Code of Practice identifies the Railway Protection Zone for all Railways in
        the Emirate of Dubai, which shall be controlled and must not be misused at any time, in order to
        ensure uninterrupted safe Railway operations and protection of Railway Infrastructure and
        people.
1.2     Scope
1.2.1   This Railway Protection Code of Practice is applicable to all Railways (under planning, under
        construction or in the operation and maintenance phases) in the Emirate of Dubai
1.2.2   This Code defines:
        (a) The mandatory procedures, conditions and other requirements that must be complied with
            in relation to the protection of Railways, Railway Infrastructure
        (b) Vehicles Railway Protection Zone; and
        (c) Restricted Activity
1.2.3   This Code outlines the submission procedures and requirements that must be followed in order
        to obtain No Objection Certificates (NOC’s) for conducting Restricted Activity or Activities and/or
        for development, building and construction proposals in any Railway Protection Zone
                                                                                                              1
                                 Railway Protection Code of Practice
                                                                                                               2
                                  Railway Protection Code of Practice
2.1     General
2.1.1   In principle, the Railway Protection Zone shall be kept clear of any disturbances or activities in
        order to ensure the safe operation of the Railway and protection of the Railway Infrastructure.
        All associated risks and mitigation measures for any potential disturbances to the Railway arising
        from Restricted Activity within the Railway Protection Zone shall be identified before carrying out
        such activities. The Railway Protection Zone is defined in the following sections for each type of
        Railway alignment.
2.1.2   Railway Protection Zones are defined and grouped into seven different types of Railway
        structures, as described in table below.
2.1.3   The classification of each zone is based on the shape and function of each Railway Infrastructure
        and facility.
2.1.4   Railway Protection Zones are defined in table 2.1 below:
                                                                                                              3
                                Railway Protection Code of Practice
                                                                                                       4
                                  Railway Protection Code of Practice
  Railway
                   Viaduct
Protection
                   (Type A)
  Zone-1
                                                                                                       5
                         Railway Protection Code of Practice
 Railway
              Viaduct
Protection
             (Type B)
 Zone-1
 Railway
              Tunnel
Protection
             (Type A)
 Zone-2
                                                                                                  6
                                Railway Protection Code of Practice
 Railway
                 Tunnel
Protection
                (Type B)
 Zone-2
 Railway
               Cut & Cover
Protection                        Zone-2C applies to Railway cut & cover sections (Railway guideway
             Section (Type A)
 Zone-3                           located inside cut & cover section) below ground level. The Railway
                                  Protection Zone is defined as the greater of the boundary formed by
                                  the Zone of Influence or 45m measured from the outermost edge of
                                  external cut & cover construction. For control measures and
                                  protection requirements with respect to activity adjacent to cut &
                                  cover retaining wall, refer to Railway Protection Zone-5: A
                                  Underground Station/Structure Type B
                                                                                                         7
                         Railway Protection Code of Practice
 Railway
             At-Grade
Protection
             (Type A)
 Zone-4
 Railway
             At-Grade
Protection
             (Type B)
 Zone-4
                                                                                                  8
                          Railway Protection Code of Practice
 Railway
              At-Grade
Protection
              (Type C)
 Zone-4
 Railway     Overground
Protection    Stations
 Zone-5       (Type A)
                                                                                                    9
                                 Railway Protection Code of Practice
45 m
 Railway      Underground
Protection   Station/Structure
 Zone-5          (Type B)
                  Street
 Railway
                 running
Protection
                Tramway
 Zone-6
                 (Type A)
                                                                                                          10
                              Railway Protection Code of Practice
 Railway
               Monorail
Protection
               (Type A)
 Zone-7
                 Other
 Railway
                Railway
Protection
             Infrastructure
 Zone-8
               (Type A)
                                                                                                      11
                         Railway Protection Code of Practice
 Railway
              Depot
Protection
             (Type B)
 Zone-8
                                                                                               12
                                  Railway Protection Code of Practice
3. Restricted Activity
3.1     General
3.1.1   Activity means any activity considered by the Agency to (or to have potential to) jeopardise or
        otherwise adversely affect any Railway, Railway Infrastructure and / or Railway Vehicles and / or
        to pose a threat of risk or interference in any way in each case with any Railway, Railway
        Infrastructure and/or Railway Vehicles
3.1.2   The By-Laws define the Restricted Activity as any activity likely to take place within the Railway
        Protection Zone. For ease of reference, an Activity number is given to each Restricted Activity as
        listed in the table 3.1 below.
                                  Table 3.1: List of Restricted Activities
          Activity No.                              Restricted Activity
              RA1         Storage of goods
              RA2         Movement or operation of cranes, hoists and other lifting equipment
              RA3         Installation of boreholes and wells
              RA4         Dredging of sea-beds and canal-beds
              RA5         Construction of underground passageways
              RA6         Excavation of trenches and earth movement
              RA7         Demolition
              RA8         Use of explosives and fireworks and the lighting of fires
              RA9         Erection of scaffolding and other temporary structures
              RA10        Installation or replacement of conduits for any utilities
                                                                                                             13
                                  Railway Protection Code of Practice
                                                                                                               14
                                  Railway Protection Code of Practice
4.1 General
4.1.1 Any party (hereafter called ‘the applicant’) intending to carry out Restricted Activity or Activities
        within any Railway Protection Zone shall apply to obtain a No Objection Certificate (NOC) from
        the Agency prior to commencing any such Restricted Activities. Additionally, any party intending
        to develop and/or design and/or construct buildings or other infrastructure for any purpose
        within any part of the Railway Protection Zone shall apply to obtain an NOC from the Agency
        prior to commencing such works (for the avoidance of doubt, other infrastructure‘here does not
        include Railway Infrastructure which requires a separate permit and is not within the scope of
        this document).
4.1.2 An NOC obtainment is mandatory in case developing and/or designing and/or constructing
        buildings or other infrastructure for any purpose lies outside the Railway Protection Zone but
        that may have effects on the Railway and/or its Infrastructure and/or its Operation.
4.1.3 An NOC may include requirements and/or conditions, which may differ depending on the status
        of the affected Railway, whether it is planned, under construction or operational
4.1.4 The Agency shall coordinate and liaise with the Operator of the relevant Railway likely to be
        affected by the Restricted Activity, prior to issuing any NOC under the By-Laws. Where Restricted
        Activity is proposed within the defined Railway Protection Zone of an operational Railway, the
        Applicant shall be required to comply with the Operator’s specific requirements and any relevant
        Permit to Work systems.
4.1.5 As part of NOC requirements, Applicants are required to submit a Risk Assessment Report. This
        report shall demonstrate that an appropriate assessment of risks has been undertaken. Further
        guidance is given in Section 11 and Appendix A of this Code.
4.1.6 The Railway Protection Code of Practice includes many common risks, but do not necessarily
        identify all risks. One of the purposes of a risk assessment is to identify the risks and define the
        control measures to mitigate these risks specific to a proposed Restricted Activity development
        and/or design and/or construction of buildings or other infrastructure within the Railway
        Protection Zone. Such risk assessment is also required in case the Restricted Activity/Activities lie
        outside the Railway Protection Zone but that may have effects on the Railway and/or its
        Infrastructure and/or its Operation.
                                                                                                                15
                                   Railway Protection Code of Practice
4.1.7 It is the applicants’ responsibility to obtain any other NOC’s which may be required from
        authorities and utility companies other than the Agency
4.1.8 Each NOC application shall include different types of supporting documents, showing the details
        of the particular Restricted Activity/Activities in the development and/or design and/or
        construction works.
4.1.9 All design drawings, specifications and reports for NOC applications shall be prepared and
        endorsed by a Dubai Municipality registered engineering office.
4.1.10 All survey works for NOC applications shall be performed and endorsed by a Dubai Municipality
        registered survey office
4.3.1 The following steps are involved in the NOC application and approval process:
    •   Applicants may register to use the RTA e-NOC system;
    •   Following registration, Applicants submit an application via the RTA website e-NOC portal or
        Customer Service Centre;
    •   The Agency’s Rail Right of Way Office will receive the NOC application and assess its
        potential impact upon any Railways (including all Railways that are planned, under
        construction or operational);
    •   The Rail Right of Way Office may request further information or meetings as part of the
         evaluation process;
    •   The Rail Right of Way Office will either issue the NOC or issue an objection; and
    •   Applicants may revise and resubmit NOC application via the RTA Customer Service Centre or e-
        NOC portal if an objection is given to the original application.
                                                                                                        16
                                 Railway Protection Code of Practice
4.4.1 All Applicants applying for NOC’s to carry out Restricted Activity/Activities, design and/or
        construction works for development and buildings within any Railway Protection Zone shall
        submit the required supporting documents as listed herein.
4.4.2 The required documents that shall be included in NOC applications are listed in the following
        sections:
4.4.2.1 Supporting Documents for Preliminary Design NOC Application
                                                                                                         17
                              Railway Protection Code of Practice
  Table 4.1: Summary of Required Documents for Design and Construction Works NOC Application
Documents                                      Prelim. Design          Detail Design         Construction
Risk Assessment Report                                                        ×                     ×
Preliminary Design Drawings                           ×
Detail Design Drawings                                                        ×                     ×
Design Reports                                        ×                       ×                     ×
Soil Investigation Report                             ×                       ×                     ×
Site Photographs                                      ×                       ×                     ×
Survey Plans                                                                                        ×
Monitoring Plans                                                                                    ×
Method Statement                                                                                    ×
Traffic Control Plan                                                                                ×
Drainage Control Plan                                                                               ×
Emergency Plan                                                                                      ×
Insurance Policy                                                                                    ×
         Table 4.2: Summary of Required Documents for Restricted Activity NOC Application
Document                                                      Restricted Activity
                                  RA1    RA2   RA3    RA4       RA5     RA6    RA7     RA8    RA9       RA10
Risk Assessment Report              ×     ×      ×        ×       ×      ×        ×     ×       ×       ×**
Preliminary Design Drawings                      ×
Detail Design Drawings                                    ×       ×      ×                     ×*        ×
Design Reports                                   ×        ×       ×      ×                     ×*
Soil Investigation Report                        ×        ×       ×      ×                     ×*
Site Photographs                    ×     ×      ×        ×       ×      ×        ×     ×       ×        ×
Survey Plans                                     ×        ×       ×      ×        ×            ×*        ×
Monitoring Plans                                                  ×      ×        ×     ×               ×**
Method Statement                    ×     ×      ×        ×       ×      ×        ×     ×      ×*        ×
Traffic Control Plan                      ×      ×        ×       ×      ×        ×             ×
Drainage Control Plan                                             ×      ×
Emergency Plan                      ×     ×      ×        ×       ×      ×        ×     ×       ×        ×
Insurance Policy                                          ×       ×      ×        ×     ×
                                                                                                               18
                                   Railway Protection Code of Practice
* Erection of simple scaffolding not higher than 2m or tent area not larger than 25 square meters do not
    need to include these documents
** Erection of simple scaffolding not higher than 2m or tent area not larger than 25 square meters do not
    need to include these documents
Note: The required documents for RA11 “Other Activities to be Controlled” are intentionally excluded
from the table, as these activities will be dealt with on a case by case basis
4.5.1 Risk Assessment Report: Prepared and endorsed by the responsible engineers and planners, this
         needs to clearly show how the proposed works may impact the Railway Operations and Railway
         Infrastructure during its pre-construction, construction and post-construction stages. A risk
         analysis approach shall be used to assess the degree of impact on the Railway Infrastructure in
         cases where proposed methodology and equipments fail. All potential risks arising from the
         proposed works that may impact the Railway Infrastructure whether it is under construction,
         operation or planning, shall require appropriate mitigation measures for each identified risk. The
         Report shall also explain the purpose and usage of the developments, buildings, infrastructure,
         construction or Restricted Activity. The risk assessment should demonstrate that they have
         carried out an appropriate assessment of the risks to the planned or operational Railway and
         associated infrastructure and systems, as a result of the intended works or activities, and that
         these risks have been mitigated to ensure ALARP is achieved. ALARP means that risks have been
         controlled to a tolerable level, and are ‘As Low As Reasonably Practicable’.
4.5.2 Preliminary / Detail Design Drawings: Prepared and endorsed by the responsible engineers and
         planners showing the applicants’ project plan. The plans shall be drawn to a legible scale. The
         Agency may request plans or drawings in a specific scale depending on the nature of the works
         proposed. The plans shall clearly show the location indicating the Railway Protection Zone,
         Critical Zone of the existing or planned Railways and how the planned works interfere with those
         zones. Sufficient section plans shall also be provided showing elevations and clearance distances
         between the planned works and the Railway Protection boundary lines.
4.5.3 Site Photographs: Showing concerned project areas in relation to the Railway Protection Zone.
         The photographs should be annotated with simple arrows, callouts or explanatory notes.
4.5.4 Design Reports: Prepared and endorsed by the responsible engineers shall justify that the
         geotechnical, structural, E&M (if applicable) designs have been performed in accordance with
         local and other applicable international standards. The report shall include a section showing
         engineering justification on safety and integrity of the existing or planned railway lines.
                                                                                                              19
                                 Railway Protection Code of Practice
4.5.5 Survey Plans: Prepared and endorsed by a responsible surveyor shall be submitted. The survey
        plans, as minimum shall show boundary lines of planned works, existing structures, coordinates,
        chainages, and boundary lines of Railway Protection Zone and Critical Zone.
4.5.6 Monitoring Plan: shall explain in detail how the ground movements, ground water, railway
        structures and tracks will be monitored during construction. The monitoring plan shall have a full
        list of monitoring devices and instruments to be used with their location, purpose, frequency and
        method of monitoring. The Agency has the right to impose any additional requirements deemed
        necessary to protect the Railway Infrastructure at the applicant’s cost. Applicants shall comply
        with the general monitoring requirements outlined in Section 5.3.
4.5.7 Method Statement: shall explain how the construction work will be executed showing full details
        of construction program, sequence, methods and man-power. The statement shall also include a
        full list of equipment and machinery to be used during construction.
4.5.8 Traffic Control Plan: shall explain temporary traffic diversions during the construction ensuring
        the safety of Railway users. The applicants shall provide schematic drawings showing the road
        diversion plans, list of signage and schedule.
4.5.9 Drainage Control Plan: is required to protect the Railway Infrastructure from excessive
        stormwater runoff caused by the construction works. The applicants shall carry out studies on
        how much stormwater runoff is expected to be generated based on current rainfall data and
        explain how the stormwater runoff will be controlled.
4.5.10 Emergency Plan: shall be prepared focusing on any potential incidents which may relate to the
        Railway Infrastructure. The emergency plan should be based on the incidents identified in the
        risk based Risk Assessment Report and how the incidents will be managed shall be clearly
        outlined in the document.
4.5.11 Insurance Policy: including third party property damage insurance and other insurance policies
        required by the government.
                                                                                                             20
                                  Railway Protection Code of Practice
The storing or placing, or causing or allowing the storage or placement of, any goods, material or item or
any solid, liquid or gaseous matter or substance
Risks
•   The load of material, heavy machinery or equipment placed directly above the underground Railway
    infrastructure may be higher than the design load for the Railway structure.
•   Storage or placing of combustible materials, including flammable liquid and gas, could pose a risk of
    fire and explosion.
•   Vehicles carrying dangerous goods (as defined in the UAE regulations), e.g. tankers carrying
    flammable materials, parked adjacent to the Railway Infrastructure may catch fire or explode.
•   Improper use of electrical equipment could pose a risk of electrical fire.
•   Blocking of station entrances or emergency egress points could cause injuries to people and could
    prevent people from exiting the Railway in case of emergency.
•   Blocking vents could affect the ventilation of underground facilities.
Control Measures
•   The total load of equipment and materials imposed on underground Railway structures and ground
    bearingcapacityshouldbecheckedagainstthedesigner’srequirementstoconfirmthesafetyofundergroun
    d Railway structures.
•   Combustible materials should not be stored or placed in the Critical Zone.
•   All vehicles carrying dangerous goods, e.g. tankers carrying flammable materials, where possible
    avoid entry to the critical zone and remain outside.
•   All powered equipment should be electrically safe and working within the safe load capacity. All
    equipment should be checked on a regular basis.
•   Equipment should be positioned so that station entrances, emergency egress points, and ventilation
    inlets and outlets are always kept clear.
•   Underground storage tanks and pipe work for any flammable and combustible liquids or gases should
    be non-pressurised and located outside the Critical Zone. The surface around the dispensing area
    should be graded such that any spills will be directed away from the Railway Infrastructure.
                                                                                                             21
                                  Railway Protection Code of Practice
•   UndergroundstoragetanksforanyflammableandcombustibleliquidsorgaseswithintheRailwayProtection
    Zone should be of double wall construction and provided with a leakage detection and monitoring
    system.
•   Any pipe work carrying flammable and combustible liquids or gases within the Railway Protection
    Zone should be provided with leakage detection and monitoring systems.
•   Above ground storage tanks and related infrastructure (i.e. pipe work, valves etc) for flammable and
    combustible liquids or gasses should be provided with fire rated walls if the tank or related
    infrastructure is close to the Railway Infrastructure.
•   Anti-corrosion materials should be used for storage tanks and pipe work.
•   Above ground surface storage tanks for flammable and combustible liquids, or gasses, should be of
    double-wall construction with their contents clearly identified. Depending on the location and size of
    the tank, leakage detection and monitoring should be considered.
•   If single skin above ground storage tanks for flammable and combustible liquids or gasses are used,
    bunding sufficient to hold the full contents of the tank and fire water must be installed.
•   Any tanks and related infrastructure (i.e. pipework, valves, etc) should be secured in such way that
    unauthorized access cannot be achieved.
•   Fire fighting facilities should be considered for flammable and combustible liquids, gasses and solids.
•   Combustible materials (i.e. cardboard, timber, rags, etc) should not be stored around or near tanks
    with flammable and combustible liquids or gasses.
•   Underground storage tanks and associated infrastructure should have their location, and depth and
    contents clearly indicated by signage.
•   Any generators and associated plant should be placed outside the critical zone with exhaust vents
    facing away from the Railway Infrastructure.
                                                                                                              22
                                Railway Protection Code of Practice
   Figure 4.1: RA1.1 - Loads imposed by placing or using heavy machinery or goods above Railway
                      structures should be checked against the allowable limits
Figure 4.2: RA1.2 - All flammable, combustible or explosive goods such as tankers, fuel containers, and
                        gas cylinders should be kept outside the Critical Zone
                                                                                                          23
                                   Railway Protection Code of Practice
4.6.2 Restricted Activity - RA2: Movement or Operation of Cranes, Hoists and other
        Lifting Equipment
Movement or operation of any crane, whether fixed or mobile, hoists, ladder, drilling or piling equipment,
excavator or any other mechanical equipment or vehicle
Risks
•   Equipment could topple and hit the Railway infrastructure and/or Railway Vehicles.
•   Equipment booms could slew and hit the Railway infrastructure and/or Railway Vehicles.
•   Materials being lifted could impact the Railway infrastructure and/or swing into the path of Railway
    Vehicles.
Control Measures
•   Equipment should be positioned such that any boom or extension, whilst stationary, in movement or
    operation, will not encroach on the area directly adjacent to the Railway Infrastructure; alternatively
    slew restricts or should be provided. (refer to figure RA2-1) Physical barriers should be provided at
    the boundary limit to control the movement of equipment.
•   Operation of equipment directly below Railway viaducts is only allowed subject to space constraints
    under close site supervision during operation. (refer to figure RA2-2)
•   Selection of equipment should consider all safety aspects of equipment operation.
•   Materials and equipment should not be lifted in or over the area directly adjacent to the Railway
    structure.
•   Location and fixingdetailsofallheavyequipmentshouldbeincludedintheApplicant’sNOCapplication.
•   Outriggers of equipment should be fully extended and supported on solid plates over firm ground
    under supervision of a competent engineer.
•   All equipment should be operated by competent and qualified personnel.
•   Daily safety checklists and records should be maintained at site.
•   Machines operating near station ventilation shafts and entrances should be positioned so that the
    fumes and exhaust gases are directed away from the air circulation shafts for underground Railway
    facilities and station entrances.
•   Dust and debris created by activities near stations should be controlled and minimised.
•   If it is unavoidable that activities involving lifting of loads directly above or adjacent to the elevated or
    at-grade Railway occur then      a temporary protection structure should be provided. The protection
    structure should be designed to withstand the impact of the heaviest loads expected.
                                                                                                                    24
                                  Railway Protection Code of Practice
•   Cranes, lifts, hoist and other lifting appliances must be tested and certified by a competent person at
    least once every 12 months.
•   Lifting accessories such as slings, belts and chains should be tested and certified by a competent
    person every 6 months AND inspected for damage before each use. Damaged lifting accessories
    must not be used.
•   Only technically qualified and experienced persons in the company approved by the Dubai Central
    Laboratory Dubai Municipality shall examine, test and certify cranes and other lifting equipment.
•   Personnel involved in the lifting operation (supervisor, coordinator, operator, slinger, signaler,
    erector, maintenance personnel) must have the minimum following attributes:
        a)   Competent to perform the tasks required of them;
        b) Adequately trained and/or successfully assessed;
        c)   Able to present a record of training and assessment;
        d) Physically able to carry out the work.
•   Appropriate communication system to be implemented for communications between the lifting
    operator and the signaler.
•   All equipment including (but not limited to) cranes, lifts, hoist and other lifting appliances must have
    maintenance records to prove that regular and satisfactory proactive and preventive maintenance is
    carried out.
•   All mechanical equipment and machinery must be maintained regularly, at least every 3 months,
    and/or in accordance with the operations and maintenance manual. All proactive and preventive
    maintenance carried out must be recorded.
•   For object handling or lifting activities preference should first be given to use machinery that has
    been designed specifically for this task, for example using a mobile crane for object handling rather
    than an excavator.
•   Any earth-moving equipment used for object handling must have a known safe working load for any
    lifting points or attachments and this safe working load must not be exceeded.
•   Any earth-moving machine used for object handling must have a rated object handling capacity table
    available inside the cab.
•   Any earth-moving equipment used for object handling must have a competent person who has been
    trained in object handling or lifting activities, including the ability to read and understand the rated
    object handling capacity table
•   Exclusion zones must be established to prevent the unwanted interaction of lifting equipment, loads
    being carried and people.
•   Risk assessments must be done to determine the safe working distance of lifting equipment from the
    edge of an excavation and controls implemented to prevent the collapse of the excavation wall.
                                                                                                               25
                               Railway Protection Code of Practice
Figure 4.3: RA2.1 - Equipment should not operate within, or be able to collapse into, the area directly
                                  adjacent to the Railway structure
 Figure 4.4: RA2.2 - Operation of equipment directly below Railway viaducts should keep minimum
                                    clearance from the structure
                                                                                                          26
                                   Railway Protection Code of Practice
•    All details of tower crane operations and equipment should be included in NOC applications, as
     described in Railway Protection Code of Practice.
•    Tower cranes should preferably be positioned behind the building under construction away from the
     Railway Infrastructure and adequately tied back to the building structure. (Refer to figure RA2-3)
•    Free standing tower cranes should be erected at a sufficient distance from the Railway so that the jib
     cannot topple into the Critical Zone of the Railway Infrastructure. (Refer to figure RA2-4)
•    Tower cranes should be tested before operation and a copy of the relevant inspection certificates
     should be made available before the commencement of operations
    Figure 4.5: RA2.3 - Tower crane and its parts erected behind building and tied back, should topple
                                          outside the Critical Zone
                                                                                                              27
                              Railway Protection Code of Practice
Figure 4.6: RA2.4 - Free standing tower crane or its parts should not topple inside the Critical Zone
                                                                                                        28
                                    Railway Protection Code of Practice
The installation of boreholes, wells, piles, ground anchors and horizontal tie-backs
Risks
•   Drilling, boring or ground anchoring could damage the Railway Infrastructure, including tunnels,
    station structures, piles and foundations.
•   Vibration could damage the Railway Infrastructure.
•   Drilling, boring or driving piles or the installation of wells could pose a risk due to lowering of
    groundwater levels.
Control Measures
•   Bore holes and piles should be outside the Critical Zone and the effect on Railway Infrastructure
    should be confirmed by a competent geotechnical engineer.
•   The location of the Railway Infrastructure should be clearly identified on site, before any works
    commence on any boreholes in the Railway Protection Zone. The positions of the proposed works
    within the Railway Protection Zone should be set out by a qualified surveyor.
•   The Applicant’s NOC Design Report should include a thorough study of ground water conditions and
    detail any control and/or protection measures to be taken.
•   Ground water conditions and vibration should be monitored until the completion of the work.
•   Consider using cast-in-situ piles instead of driven piles, where possible.
•   Cement-bentonite mixture or equivalent materials should be used for grouting of soil investigation
    bore holes.
•   Dust generated from the activities should be controlled and kept to a minimum level near stations
    and areas, where there is frequent movement of people.
•   The designer should consider cast in-situ piles instead of driven piles, if the vibration limits are
    unlikely to be complied with.
•   Location of underground structures, utilities and groundwater level should be checked before
    installation of ground anchors.
                                                                                                           29
                              Railway Protection Code of Practice
Figure 4.7: RA3 - Boreholes and piles should be outside the Critical Zone and should be checked for
                             potential impacts on Railway structures
                                                                                                      30
                                 Railway Protection Code of Practice
The dredging of sea beds or canal beds and the anchoring of vessels
Risks
• Tunnel structures could be damaged from dredging causing water ingress and structural failure.
• Tunnel waterproofing systems could be damaged from dredging activities above the Railway tunnels.
•   Dredging near piles under the water could damage the structural system of the piles causing
    settlement.
Control Measures
• Dredging should not be carried out within the Railway Protection Zone.
•   Vessels should not anchor inside the Railway Protection Zone of bridge sections and the Critical Zone
    of tunnel sections.
                                                                                                            31
                                Railway Protection Code of Practice
  Figure 4.8: RA4.1 - Anchoring of vessels should be outside the Critical Zone and dredging should be
                           outside the Railway Protection Zone for tunnels
Figure 4.9: RA4.2 - Anchoring of vessels and dredging should be outside the Railway Protection Zone for
                                               bridges
                                                                                                          32
                                 Railway Protection Code of Practice
The construction of an underground passageway to serve as a conduit for utilities; to provide access for
people, vehicles or equipment to an underground work site
Risks
•   Tunnelling and excavation works may cause changes to the original ground conditions, such as
    excessive ground loss or change in groundwater conditions; movement and vibration may affect the
    Railway Infrastructure.
Control Measures
•   Best engineering practice, standards and procedures should be implemented in the design and
    construction of passageways to ensure stability of the surrounding Railway Infrastructure.
•   Fully detailed work methodology and Risk Assessment Report as part of NOC application, should
    clearly indicate potential risks involved in the construction methods chosen and the control measures
    to mitigate them.
•   Monitoring plans need to be fully developed as part of the NOC application package.
•   Properly engineered ground support systems should be provided to prevent excessive ground loss
    and failure. Details of proposed support systems should be included in the method statements.
•   A thorough study of groundwater conditions is required. The possibility of lowering of ground water
    levels should be fully studied and mitigation measures should be provided in the NOC application.
•   Method statements should include a contingency plan so that any potential risk or signs of impending
    failure of the support system could be rectified immediately.
•   Manual excavation may be necessary for excavations close to the Railway Infrastructure and utilities.
•   A qualified surveyor should check the location of underground Railway Infrastructure and utilities
    before commencing any underground works
                                                                                                            33
                                    Railway Protection Code of Practice
The excavation of trenches or pits, earthworks and backfilling, or the shifting or pushing of earth or soil
from one area to another, whether or not such activities are carried out manually or by mechanical means
Risks
•   The operation of excavation equipment within the Critical Zone may damage the Railway
    Infrastructure.
•   Excessive vibration generated by machinery used for excavation or earth moving within the Critical
    Zone may cause damage to the Railway Infrastructure.
•   Changing groundwater conditions.
•   Excavation adjacent to the Railway Infrastructure may change existing stormwater conditions.
•   Excavation collapsing causing the destabilizing plant or Railway Infrastructure.
Control Measures
•   Best engineering practice, standards and procedures should be implemented in design and
    construction. The planned works should be designed to minimise disruption to Railway
    Infrastructure.
•   A thorough study of groundwater conditions is required. The possibility of lowering of groundwater
    levels should be fully studied and details of the proposed mitigation measures should be provided in
    the NOC application.
•   Monitoring plans need to be fully developed as part of the NOC application package.
•   The Peak Particle Velocity (ppv) should be limited to 15 mm/sec for continuous vibration and 30
    mm/sec for intermittent vibration.
•   Trenches should be backfilled and compacted immediately after completion of underground works
    such as laying of utilities or pipes.
•   Use of equipment or machinery should be strictly controlled near the Railway utility lines.
•   A qualified surveyor should check the location of underground Railway Infrastructure and utilities
    before commencing any underground works.
•   Excavations next to any openings leading to Railway underground structures or facilities, including
    stations, should include the provision of watertight walls to prevent water ingress into underground
    Railway Infrastructure. Sufficient stormwater drainage facilities should be provided for at-grade
    Railways such that stormwater flows are directed away from the Railway Infrastructure.
•   All excavations must be risk assessed to determine if shoring, benching or battering is required to
                                                                                                              34
                                    Railway Protection Code of Practice
      ensure the stability of the excavation walls. Generally excavations deeper than 1.5 meters will
      require some shoring, battering or benching.
•     Excavations may not require shoring, benching or battering if a geo-technical engineer carries out the
      following:
          a)   approves in writing all sides of the trench as safe from collapse; and
          b) states in writing how long the approval lasts if there is no stated natural occurrence that
               could affect adversely the stability of the trench; and
          c)   states in writing the natural occurrences that could affect adversely the stability of the
               trench.
•     Stockpile, over-burden or other materials must not be placed on the edge of the excavation (this
      includes earth moving machinery).
    Figure 4.10: RA6 - Excavation or earthmoving activities within the Critical Zone should not be carried
                            out before engineering analysis has been undertaken
                                                                                                               35
                                 Railway Protection Code of Practice
The tearing-down of buildings and other structures manually or using hydraulic equipment, wrecking ball,
or blasting method
Risks
•   Excessive vibration generated by demolition works using the blasting method could damage the
    Railway Infrastructure.
•   Demolition works could generate debris or objects that could be projected onto the Railway
    Infrastructure causing damage.
Control Measures
•   Best engineering practice, standards and procedures should be implemented in design and site
    works.
•   The Peak Particle Velocity (ppv) should be limited to 15 mm/sec for continuous vibration and 30
    mm/sec for intermittent vibration.
•   Blasting using explosives is not permitted within all Railway Protection Zones whether for elevated,
    underground or at-grade Railways.
•   When using hydraulic equipment or wrecking balls, proper shields or protection screens should be
    provided to ensure no debris or objects are projected on to the Railway Infrastructure.
Figure 4.11: RA7 - Robust safety protection screens should be provided during demolition works within
                                      the Railway Protection Zone
                                                                                                           36
                                    Railway Protection Code of Practice
4.6.8 Restricted Activity - RA8: Use of Explosives and Fireworks and the Lighting of
         Fires
The use of explosive material, fireworks and lighting of fire for any purpose including blasting, demolition,
removal of rocks, or construction
Risks
•    An explosion or a fire within the Railway Protection Zone could damage the Railway Infrastructure
     and disrupt Railway Operations.
•    Vibration generated from the use of explosives could damage the Railway Infrastructure and disrupt
     Railway Operations.
Control Measures
•    Use of explosives is not permitted within the Railway Protection Zone, except in very exceptional
     circumstances.
•    Use of fireworks or lighting of fires is not permitted within the Critical Zone.
•    Depending on the purpose and scale of the fireworks, they may be permitted within the Railway
     Protection Zone providing that sufficient precautionary measures are in place.
    Figure 4.12: RA8 - Fires should not be lit in the Critical Zone / Explosives should not be used in the
                                           Railway Protection Zone
                                                                                                                37
                                   Railway Protection Code of Practice
The erection of sheds, shelters, tents, scaffolding, temporary maintenance towers, ladders, hoardings and
other structures for any purpose
Risks
•   Scaffolding and other temporary structures could fall onto the Railway Infrastructure.
•   Scaffolding and other temporary structures could provide unauthorised access to the Railway
    Infrastructure Tents, shelters and temporary structures using combustible materials could pose a fire
    risk to the Railway Infrastructure.
•   The location and layout of tents, shelters and temporary structures could obstruct or interfere with
    Railway safety provisions such as emergency egress points, ventilation shafts and fire fighting
    facilities.
Control Measures
•   Temporary structures should not be erected within the Critical Zone of elevated or at grade Railway
    sections.
•   Temporary structures should be designed and checked by a competent engineer for stability and
    safety.
•   Erection of scaffolding and tower structures should be undertaken by a competent person under full
    supervision in accordance with the designer’s requirements.
•   Temporary structures should be so positioned to ensure that third parties cannot gain access to the
    Railway Infrastructure.
•   Materials used for the temporary structures should be flame resistant.
•   Adequate fire protection measures should be provided for temporary structures in compliance with
    the relevant regulations.
•   Temporary structures should be positioned such that fire fighting facilities, emergency egress points
    and ventilation shafts are kept clear of all obstacles.
•   Safety nets, safety mesh and/or containment screening should be securely installed on scaffolding,
    towers or buildings under construction, facing the Railway, to prevent materials or objects from
    falling onto the Railway Infrastructure.
•   Scaffolding and other structures erected within the Protection Zone should be positioned so that in
    the event of collapse it will not impact on the Railway Infrastructure. The height of the structure and
                                                                                                              38
                                 Railway Protection Code of Practice
    distance to the Railway Infrastructure will need to be considered in determining a safe distance and /
    or suitable control measures if sufficient distance cannot be obtained.
•   When installing or removing formwork, the formwork should be secured to prevent formwork falling
    from site. The safe working load of the proposed attachment method and the weight of the formwork
    must be considered when selecting an appropriate method.
•   All scaffolding, temporary structures and mobile scaffold towers must be inspected on a pre-
    determined basis (based on Dubai Municipality requirements and the level of risk) to ensure that no
    damage has occurred. A scaffold tag should be attached to the scaffolding, temporary structures and
    mobile scaffold towers detailing when it was assembled and when the next inspection is due.
Figure 4.13: RA9.1 - Tents or sheds should have appropriate fire protection measures
Figure 4.14: RA9.2 - Installation of Protection Screen for Building Under Construction
                                                                                                             39
                                  Railway Protection Code of Practice
The installation or replacement of conduits for any telecommunications, electrical and mechanical
utilities, including power transmission lines and associated structures
Risks
•   Installation of new transmission or power lines in the Railway Protection Zone could affect the safety
    of critical Railway systems and equipment.
•   Installation or replacement of conduits and associated works within the Railway Protection Zone
    could also pose the risks identified in Restricted Activity RA2, RA6 and RA9.
Control Measures
•   Fully trained and qualified personnel should operate the equipment and machinery.
•   The Risk Assessment Report included in the Applicant’s NOC package should include analysis of the
    possible generation of electromagnetic fields by the power lines or associated facilities such as sub-
    stations. Mitigation measures for this should be included in reports prepared by relevant specialists.
•   Risks which are identical to those in Restricted Activity RA2, RA6 and RA9 should follow the
    corresponding Control Measures for each Restricted Activity.
                                                                                                             40
                                 Railway Protection Code of Practice
Further Restricted Activity performed within the Railway Protection Zone that the Agency requires to be
controlled and may be added in future revisions of the Railway Protection Code of Practice
                                                                                                          41
                                 Railway Protection Code of Practice
5. Design Considerations
5.1     General
5.1.1   This section provides specific design considerations that should be adopted by the Applicants
        who intend to carry out design works for developments, buildings or other infrastructure in the
        Railway Protection Zone
5.1.2   The Applicant may propose other control measures which are at least as robust as the
        recommended measures given in this section.
                                                                                                               42
                                Railway Protection Code of Practice
                                                                                                          43
                                 Railway Protection Code of Practice
6.1     General
6.1.1   The Agency may require a site inspection as part of the NOC approval process, before making a
        decision on an NOC application
6.1.2   This inspection is a site verification process to ensure that the NOC application is not different
        from the actual site conditions. Depending on the conditions at site with respect to the Railway
        Infrastructure, the Agency may request for specific provisions, as deemed necessary, to protect
        the Railway Infrastructure and operations.
6.1.3   Costs associated with the specific provisions requested by the Agency shall be borne by the
        applicant
                                                                                                             44
                                 Railway Protection Code of Practice
                                                                                                        45
                                 Railway Protection Code of Practice
7.1     General
7.1.1   This Section provides requirements relating to technical issues and precautionary measures, to
        be taken by applicants during the implementation of approved works
7.1.2   The applicants shall be responsible for complying with all safety legislation published by other
        Government authorities in the Emirate of Dubai
7.1.3   In case of any discrepancies in criteria or standards between this Code of Practice and other
        Government requirements, the most conservative criteria shall be adopted
                                                                                                             46
                                Railway Protection Code of Practice
7.3.4   Flags or distinctive markers, such as warning tapes, should be provided at the boundary points of
        the Railway Critical Zone and Protection Zone, for any intended works
7.3.5   Buoys with flags or distinctive marks should be provided at the boundary points of the Railway
        Critical Zone and Protection Zone, in coordination with RTA Marine Agency, for marine works
                                                                                                            47
                                Railway Protection Code of Practice
Figure 7.3: Site Preparation – Marine Works Site above Railway Tunnels
7.3.6   Any construction works above the Railway such as building works or over bridges for any purpose
        should provide a full protection shelter which covers all of the affected area over the Railway
        Infrastructure. The shelter should be designed to withstand the impact of the heaviest object to
        be used in the construction work and be large enough not to disturb the structure gauge.
                                                                                                           48
                                 Railway Protection Code of Practice
                                                                                                                 49
                                Railway Protection Code of Practice
        ingress protection walls with a robust waterproofing system to prevent rainwater ingress into the
        underground station. The entrance level to the station should be above the flood threshold level
        or at least 1m above ground level, whichever is higher.
7.6     Demolition
7.6.1   For demolition activities, the Contractors should select demolition equipment which minimises
        vibration and noise levels. A list of equipment with specifications and detailed methods of
        demolition should be included in the NOC application
7.6.2   Use of explosives is not permitted in the Railway Protection Zone and demolition rubble should
        not be stored within the Railway Protection Zone or Zone of Influence
7.6.3   Vibration sensors should be installed on Railway structures for vibration monitoring
                                                                                                            50
                                Railway Protection Code of Practice
8. Monitoring Requirements
8.1     General
8.1.1   A major factor in the control of construction activities involves confirmation of whether work
        activities are causing movement to the existing Railway Infrastructure. Waiting until movement
        can be observed by the responsible engineer is usually too late to prevent damage and there is a
        need to observe small changes before they become significant
8.1.2   It is a common practice around the world to monitor possible movements of the ground and
        Railway Structures during construction activities undertaken in the vicinity of the Railway
        Infrastructure to eliminate potential adverse impacts on the Railway Infrastructure ensuring safe
        and uninterrupted Railway operations. This section provides general guidance in carrying out
        various monitoring activities required for the protection of the Railway Infrastructure during
        implementation of the approved construction works and Restricted Activity
8.1.3   Typical monitoring instruments widely used are listed in the table below
8.1.4 Competent geotechnical and structural engineers shall review the potential impacts on the
                                                                                                            51
                                   Railway Protection Code of Practice
         Railway Infrastructure in the vicinity of the proposed activities. Based on the nature and scale of
         the proposed activities, the geotechnical and structural engineers shall develop a monitoring
         plan indicating the proposed monitoring instruments, locations and frequencies together with
         alert and action levels and method and frequency of reporting
8.1.5    Depending on the scale and nature of excavations, the Contractor may choose either mechanical
         or electronic instruments. Mechanical instruments are useful for excavations of short duration,
         which do not require frequent readings and have few reading points. Electronic instruments with
         remote reading and automatic alarm features should be used for the excavations of relatively
         long durations requiring more frequent readings with many reading points
8.1.6    The Agency shall have the right to instruct changes to the proposed monitoring plan or any
         additional requirements deemed necessary to protect the Railway Infrastructure. Costs
         associated with the specific provisions requested by the Agency shall be borne by the applicant
8.1.7    The instruments should be maintained in accordance with the manufacturers’ manuals and
         should be kept away from moisture and other contaminants by providing appropriate protection
         covers
8.1.8    The instruments to be installed at site should have valid calibration certificates and should be
         tested before installation. After installation, the Contractor should make sure that all instruments
         are properly protected with warning signs to prevent unauthorized access. Labels showing the
         name of the instrument, company, responsible engineer and a contact phone number should be
         fixed on each instrument
8.1.9    The location of each instrument and the size of any protection boxes should not interfere with
         any part of the Railway operations and should be specified in the ‘Monitoring Plan’ submitted
         with the NOC application
8.1.10   The battery condition should be checked on a regular basis for battery powered instruments. The
         instruments should also be checked on daily basis and any malfunctioning instruments should be
         replaced immediately
8.1.11   It is recommended that the readings are taken at the same time of the day throughout the
         monitoring period to minimise any possible discrepancies in readings, which may be caused by
         temperature differences throughout the day
8.1.12   All instruments should have temperature correction features or allow for calculation based
         temperature corrections
8.1.13   All monitoring instruments to be used shall have valid calibration certificates from recognised
         bodies. The calibration frequency of the instruments shall comply with the manufacturers’
         recommendations
8.1.14   Appropriate monitoring instruments shall be used where applicable.
                                                                                                                52
                                  Railway Protection Code of Practice
8.1.15   If any monitoring results show signs of exceeding the allowable limits, the applicants must stop
         their works and provide immediate rectification measures to prevent any damage to the Railway
         Infrastructure
8.1.16   Computer generated outputs or manual records of monitoring data shall be analysed and
         endorsed by the responsible engineer. The conclusions drawn from the data shall be included in
         the periodic reports
8.1.17   All installed monitoring instruments shall not be removed until the Agency gives approval to do
         so, even after substantial stabilisation of the ground or structures have been observed
                                                                                                              53
                                Railway Protection Code of Practice
                                                                                                             54
                                   Railway Protection Code of Practice
8.3.5      An overall summary of monitoring location, purpose and instruments is outlined in the table
           below.
                                                                                                              55
                                   Railway Protection Code of Practice
                                                                                                               56
                                 Railway Protection Code of Practice
8.5     Reporting
8.5.1   Any changes to the approved plans or applications under review shall be notified to the Rail Right
        of Way Office of the Agency before implementation
8.5.2   Depending on the nature of the construction and engineering works planned, the Agency may
        request for periodic reports on a regular basis. Usually, periodic reports will be requested for
        works that require continuous monitoring activities on Railway Infrastructure or ground
        movement monitoring. The applicants shall ensure that all excessive movements (earth
        settlement) are detected and recorded and proper actions put in place. A periodic report shall
        typically include monitoring data and analysis, safety records, results of any corrective action
        request issued by the Agency, safety certificates and operators’ names and qualifications for
        heavy equipment and machines.
8.5.3   All applicants shall submit their completion reports within seven working days from the
        completion date. The report shall include clear photographs showing the comparison of the site
        areas marked ‘Before’ and ‘After’. All site areas within the Railway Protection Zone shall be
        reinstated to their original status or completed according to the approved plan. Any damage or
        defects to the Railway Infrastructure caused by the applicants shall be rectified at their own cost
        and clear photographs shall be shown in the report as evidence of rectification work carried out.
8.5.4   The Agency may conduct a completion inspection to confirm the status of completion and
        general condition of the Railway Infrastructure. The completion report shall also include a
        summary of the monitoring data and analysis if applicable. Instrumentation shall not be removed
        until the stability of the structures or ground has been confirmed
                                                                                                              57
                                 Railway Protection Code of Practice
                                                                                                              58
                                    Railway Protection Code of Practice
9. Risk Assessment
9.1      General
9.1.1    The Risk Assessment Report to be included in NOC applications should be based on the ALARP
         risk analysis approach, as outlined in EN 50126 ‘Railway applications—The specification and
         demonstration of Reliability, Availability,    Maintainability and Safety (RAMS)—Part1: Basic
         requirements and generic process’, where the probability or frequency of occurrence of an event
         or events leading to a hazard and the consequence of the hazard are estimated to determine the
         risk level
9.1.2    ‘ALARP’ means ‘As Low As Reasonably Practicable’, and involves weighing the risk against the
         trouble, time and money needed tocontrol it. Thus, ALARP describes the level to which risks can
         be expected to be controlled
9.1.3    A hazard is something (e.g. an object, a property of a substance, a phenomenon or an activity)
         that can cause adverse effects
Remote          Likely to occur sometime in the system life cycle. The hazard can be reasonably expected
                to occur.
Improbable      Unlikely to occur but possible. It can be assumed that the hazard may exceptionally occur.
Incredible Extremely unlikely to occur. It can be assumed that the hazard may not occur.
                                                                                                             59
                                         Railway Protection Code of Practice
9.2.2      The severity levels and the consequences associated with each severity level can be considered
           as in the table below
                                            Table 9.2: Hazard Severity Level
Category          Description                                                      Consequences to Service
Catastrophic        Fatalities and/or multiple severe injuries and/or major
                    damage to the environment.
Critical            Single fatality and/or severe injury and/or significant        Loss of a major system
                    damage to the environment.
Marginal            Minor injury and/or significant threat to the environment.     Severe system(s) damage
9.2.3      Considering both the frequency of occurrence against the severity of the possible outcome, using
           the following ALARP matrix, provides an initial risk category, i.e. ‘intolerable’, ‘undesirable’,
           ‘tolerable’ or ‘negligible’
9.2.4      Where initial risks are identified as ‘intolerable, ‘undesirable’ and ‘tolerable’, control measures
           should be introduced to reduce the risk to a level that is as low as reasonably practicable (ALARP)
9.2.5      ‘Intolerable’ risks must be eliminated
9.2.6      ‘Undesirable’ risks shall only be accepted when risk reduction is impracticable and with the
           agreement of the Agency.
9.2.7      ‘Tolerable’ risks are acceptable with adequate control measures and the agreement of the
           Agency
                                                                                                                 60
                                  Railway Protection Code of Practice
9.3     Process
9.3.1   Achieving ALARP involves four basic steps as shown below:
9.3.2   Throughout the ALARP process, the findings should be recorded in a formal Risk Register
        document
9.3.3   A Risk Register is a living document that should be continuously reviewed and updated
        throughout anyprojectoractivitylife-cycle,toensurethatallacceptedrisksremainALARP
9.3.4   A sample Risk Register Form is included Appendix A; all Risk Assessment Reports should include a
        completed Risk Register
                                                                                                           61
                                    Railway Protection Code of Practice
10. Enquiries
All technical enquiries or comments on this Railway Protection Code of Practice should be sent in writing
to:
Rail Right of Way Services Office
Rail Agency
RTA Offices
Marrakech Road,
P.O. Box 118899
Dubai, U.A.E
                                                                                                            62
                     Railway Protection Code of Practice
Appendices
Appendix A
Risk Register Form
                                                           63
                                                           Railway Protection Code of Practice
Restricted   Hazard Identified   Hazard   Risk   Consequence      Initial     Initial   Initial   Control Measures and   Mitigation   Residual   Residual     Residual
 Activity        (Cause)         Owner                           Severity   Frequency   Risk          Mitigations         Owner       Severity   Frequency        Risk
                                                                                                                                                                         64