0% found this document useful (0 votes)
55 views1 page

16EO0085 - Transmittal PE

The memorandum requests approval for construction quarantine passes for the contractor ARKY CONSTRUCTION AND SUPPLY working on replacing the Punong Bridge along the Sibuyan Circumferential Road in Romblon. It forwards the contractor's letter requesting passes and encloses a list of staff and workers assigned to the project with their ID pictures so they can continue work during quarantine restrictions.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
55 views1 page

16EO0085 - Transmittal PE

The memorandum requests approval for construction quarantine passes for the contractor ARKY CONSTRUCTION AND SUPPLY working on replacing the Punong Bridge along the Sibuyan Circumferential Road in Romblon. It forwards the contractor's letter requesting passes and encloses a list of staff and workers assigned to the project with their ID pictures so they can continue work during quarantine restrictions.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 1

Republic of the Philippines

DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS


OFFICE OF THE PROJECT ENGINEER
REGIONAL OFFICE IV-B
Odiongan, Tablas, Romblon

May 8, 2020

MEMORANDUM

FOR : WILFREDO S. MALLARI


Regional Director

ATTENTION : DOMINIC G. SERRANO


Chief, Construction Division

SUBJECT : Construction Quarantine Pass – Contract ID. 16EO0085

Respectfully forwarded is the letter dated 05 May 2020 of MR. ARIEL N. LIM, Owner,
ARKY CONSTRUCTION AND SUPPLY, contractor of Replacement of Punong Bridge & App.
(From Temporary To Permanent) Along Sibuyan Circumferential Road in Sibuyan Island,
Romblon requesting for the issuance of Construction Work Pass in compliance to
Department Order No. 35, series of 2020.

Enclosed also is the list of the contractor’s staff/ workers with their respective ID pictures
assign in the above-mentioned project.

Hoping for your favorable consideration and approval.

GODOFREDO B. VILLALON
Project Engineer