The document outlines a list of bridge construction projects planned for implementation from FY 2016 to 2019, detailing project IDs, descriptions, allocated amounts, and schedules. Each project is categorized under the National Bridge Construction/Replacement Program with specific focus on design and build bridges across Luzon. The status of each project is noted as either in preliminary detailed engineering or contract approval in progress, with completion dates set for June 2020.

Uploaded by

polla
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
31 views26 pages

Stat 4

The document outlines a list of bridge construction projects planned for implementation from FY 2016 to 2019, detailing project IDs, descriptions, allocated amounts, and schedules. Each project is categorized under the National Bridge Construction/Replacement Program with specific focus on design and build bridges across Luzon. The status of each project is noted as either in preliminary detailed engineering or contract approval in progress, with completion dates set for June 2020.

Uploaded by

polla
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 26

FY 2016-2019 LIST OF PROJECT COMPONENTS TO BE IMPLEMENTED

REGULAR INFRA - Central Office-Implemented


as of 31 January 2020

CENTRAL OFFICE - BRIDGES MANAGEMENT CLUSTER

SCHEDULE (DATES)

PROJECT COMPONENT TYPE OF ALLOTED NYS REASON


ID / PROJECT WORK AMOUNT START COMPLETIO
COMPONENT A. PLANNED N
DESCRIPTION B. REVISED A. PLANNED
C. ACTUAL B. REVISED
C. ACTUAL
P00053107LZ-CW1 Construction of 43,321,000. A. 6/1/2018 A. 6/1/2020 In Preliminary
Construction of Bridge - Bridge 00 B. 6/1/2018 B. 6/1/2020 Detailed
National Bridge C. C. Engineering
Construction/Replacem
ent (Design & Build
Bridges) - Bridge
Construction and
Replacement Program I
1
- Design and Build
Bridges for Luzon -
Peru Bridge 2 and
Approaches includes
Right-of-Way
Acquisition, Jct. Logac-
Lasam-Gagabutan Rd,
Cagayan
P00053108LZ-CW1 Construction of 43,321,000. A. 6/1/2018 A. 6/1/2020 In Preliminary
Construction of Bridge - Bridge 00 B. 6/1/2018 B. 6/1/2020 Detailed
National Bridge C. C. Engineering
Construction/Replacem
ent (Design & Build
Bridges) - Bridge
Construction and
Replacement Program I
2
- Design and Build
Bridges for Luzon -Peru
Bridge 3 and
Approaches includes
Right-of-Way
Acquisition, Jct. Logac-
Lasam-Gagabutan Rd,
Cagayan

PCMA 1/31/2020 12:04:54 AM Page 1 of 26


Advance Filter/s Used: Status: Not Yet Started;
P00053109LZ-CW1 Construction of 216,603,000 A. 6/1/2018 A. 6/1/2020 In Preliminary
Construction of Bridge - Bridge .00 B. 6/1/2018 B. 6/1/2020 Detailed
National Bridge C. C. Engineering
Construction/Replacem
ent (Design & Build
Bridges) - Bridge
Construction and
Replacement Program I
3
- Design and Build
Bridges for Luzon -
Tulong Creek Bridge 3
and Approaches
includes Right-of-Way
Acquisition, Jct.Logac-
Lasam-Gagabutan Rd,
C
P00053110LZ-CW1 Construction of 53,744,000. A. 6/1/2018 A. 6/1/2020 In Preliminary
Construction of Bridge - Bridge 00 B. 6/1/2018 B. 6/1/2020 Detailed
National Bridge C. C. Engineering
Construction/Replacem
ent (Design & Build
Bridges) - Bridge
Construction and
Replacement Program I
4
- Design and Build
Bridges for Luzon -
Divisoria Br. and
Approaches includes
Right-of-Way
Acquisition, Cagayan
Valley Rd, Cagayan 3rd
District
P00053111LZ-CW1 Construction of 98,356,000. A. 6/1/2018 A. 6/1/2020 In Preliminary
Construction of Bridge - Bridge 00 B. 6/1/2018 B. 6/1/2020 Detailed
National Bridge C. C. Engineering
Construction/Replacem
ent (Design & Build
Bridges) - Bridge
Construction and
Replacement Program I
5
- Design and Build
Bridges for Luzon - Sta.
Ana Br. and
Approaches includes
Right-of-Way
Acquisition, Dugo-
Sn.Vicente Rd
(Mission-Sta.Ana Sec

PCMA 1/31/2020 12:04:54 AM Page 2 of 26


Advance Filter/s Used: Status: Not Yet Started;
P00053112LZ-CW1 Construction of 37,906,000. A. 6/1/2018 A. 6/1/2020 In Preliminary
Construction of Bridge - Bridge 00 B. 6/1/2018 B. 6/1/2020 Detailed
National Bridge C. C. Engineering
Construction/Replacem
ent (Design & Build
Bridges) - Bridge
Construction and
Replacement Program I
6
- Design and Build
Bridges for Luzon -
Urungan Br. and
Approaches includes
Right-of-Way
Acquisition, Cagayan
Valley Rd, Cagayan 1st
District
P00053113LZ-CW1 Construction of 37,906,000. A. 6/1/2018 A. 6/1/2020 In Preliminary
Construction of Bridge - Bridge 00 B. 6/1/2018 B. 6/1/2020 Detailed
National Bridge C. C. Engineering
Construction/Replacem
ent (Design & Build
Bridges) - Bridge
Construction and
Replacement Program I
7
- Design and Build
Bridges for Luzon -
Pepengao Br. and
Approaches includes
Right-of-Way
Acquisition, Cagayan
Valley Rd, Cagayan 1st
District
P00053114LZ-CW1 Construction of 50,872,000. A. 6/1/2018 A. 6/1/2020 In Preliminary
Construction of Bridge - Bridge 00 B. 6/1/2018 B. 6/1/2020 Detailed
National Bridge C. C. Engineering
Construction/Replacem
ent (Design & Build
Bridges) - Bridge
Construction and
Replacement Program I
8
- Design and Build
Bridges for Luzon -
Malamag Bridge and
Approaches includes
Right-of-Way
Acquisition, Daang
Maharlika (LZ), Isabela
1st Dis

PCMA 1/31/2020 12:04:54 AM Page 3 of 26


Advance Filter/s Used: Status: Not Yet Started;
P00053115LZ-CW1 Construction of 38,360,000. A. 6/1/2018 A. 6/1/2020 In Preliminary
Construction of Bridge - Bridge 00 B. 5/8/2018 B. 9/29/2019 Detailed
National Bridge C. C. Engineering
Construction/Replacem
ent (Design & Build
Bridges) - Bridge
Construction and
Replacement Program I
9
- Design and Build
Bridges for Luzon -
Olango Bridge 2 and
Approaches includes
Right-of-Way
Acquisition, Ilagan-
Delfin Albano-Mallig
Rd, Isab
P00053116LZ-CW1 Construction of 21,438,000. A. 6/1/2018 A. 6/1/2020 In Preliminary
Construction of Bridge - Bridge 00 B. 5/8/2018 B. 9/29/2019 Detailed
National Bridge C. C. Engineering
Construction/Replacem
ent (Design & Build
Bridges) - Bridge
Construction and
Replacement Program I
10
- Design and Build
Bridges for Luzon -
Olango Bridge 1 and
Approaches includes
Right-of-Way
Acquisition, Ilagan-
Delfin Albano-Mallig
Rd, Isab
P00053117LZ-CW1 Construction of 37,906,000. A. 6/1/2018 A. 6/1/2020 In Preliminary
Construction of Bridge - Bridge 00 B. 5/8/2018 B. 10/29/2019 Detailed
National Bridge C. C. Engineering
Construction/Replacem
ent (Design & Build
Bridges) - Bridge
Construction and
Replacement Program I
11
- Design and Build
Bridges for Luzon -
Manano Br. and
Approaches includes
Right-of-Way
Acquisition, Ilagan-
Delfin Albano-Mallig
Rd, Isabela 2

PCMA 1/31/2020 12:04:54 AM Page 4 of 26


Advance Filter/s Used: Status: Not Yet Started;
P00053118LZ-CW1 Construction of 20,232,000. A. 6/1/2018 A. 6/1/2020 In Preliminary
Construction of Bridge - Bridge 00 B. 5/8/2018 B. 3/27/2020 Detailed
National Bridge C. C. Engineering
Construction/Replacem
ent (Design & Build
Bridges) - Bridge
Construction and
Replacement Program I
12
- Design and Build
Bridges for Luzon -
Carappigan Br. and
Approaches includes
Right-of-Way
Acquisition, Gamu-
Roxas Rd, Isabela 2nd
District
P00053119LZ-CW1 Construction of 39,623,000. A. 6/1/2018 A. 6/1/2020 In Preliminary
Construction of Bridge - Bridge 00 B. 5/8/2018 B. 2/26/2020 Detailed
National Bridge C. C. Engineering
Construction/Replacem
ent (Design & Build
Bridges) - Bridge
Construction and
Replacement Program I
13
- Design and Build
Bridges for Luzon -
Nagappagan Br. and
Approaches includes
Right-of-Way
Acquisition, Ilagan-
Bigao-Palanan Rd,
Isabela 1st
P00053120LZ-CW1 Construction of 20,232,000. A. 6/1/2018 A. 6/1/2020 In Preliminary
Construction of Bridge - Bridge 00 B. 5/8/2018 B. 2/26/2020 Detailed
National Bridge C. C. Engineering
Construction/Replacem
ent (Design & Build
Bridges) - Bridge
Construction and
Replacement Program I
14
- Design and Build
Bridges for Luzon -
Bayabo Bridge and
Approaches includes
Right-of-Way
Acquisition, Gamu-
Roxas Rd, Isabela 2nd
District

PCMA 1/31/2020 12:04:54 AM Page 5 of 26


Advance Filter/s Used: Status: Not Yet Started;
P00053121LZ-CW1 Construction of 57,275,000. A. 6/1/2018 A. 6/1/2020 Contract Approval
Construction of Bridge - Bridge 00 B. 6/1/2018 B. 6/1/2020 in Progress
National Bridge C. C.
Construction/Replacem
ent (Design & Build
Bridges) - Bridge
Construction and
15 Replacement Program I
- Design and Build
Bridges for Luzon -
Malilibag Bridge and
Approaches includes
Right-of-Way
Acquisition, Apayao
Lone District
P00053122LZ-CW1 Construction of 147,601,000 A. 6/1/2018 A. 6/1/2020 Contract Approval
Construction of Bridge - Bridge .00 B. 6/1/2018 B. 6/1/2020 in Progress
National Bridge C. C.
Construction/Replacem
ent (Design & Build
Bridges) - Bridge
Construction and
16 Replacement Program I
- Design and Build
Bridges for Luzon -
Tanglaban Bridge and
Approaches (Burbor
Bridge) includes Right-
of-Way Acquisition,
Apayao (Calanasan)
P00053123LZ-CW1 Construction of 31,630,000. A. 6/1/2018 A. 6/19/2020 Contract Approval
Construction of Bridge - Bridge 00 B. 6/1/2018 B. 6/19/2020 in Progress
National Bridge C. C.
Construction/Replacem
ent (Design & Build
Bridges) - Bridge
Construction and
Replacement Program I
17
- Design and Build
Bridges for Luzon -
Mabbat Bridge and
Approaches includes
Right-of-Way
Acquisition, Claveria-
Calanasan Rd, Apayao
Lone Dis

PCMA 1/31/2020 12:04:54 AM Page 6 of 26


Advance Filter/s Used: Status: Not Yet Started;
P00053124LZ-CW1 Construction of 57,275,000. A. 6/1/2018 A. 6/1/2020 Contract Approval
Construction of Bridge - Bridge 00 B. 6/1/2018 B. 6/1/2020 in Progress
National Bridge C. C.
Construction/Replacem
ent (Design & Build
Bridges) - Bridge
Construction and
Replacement Program I
18
- Design and Build
Bridges for Luzon -
Malitao Bridge 1 and
Approaches includes
Right-of-Way
Acquisition, Apayao-
(Solsona) Ilocos Norte
Rd, A
P00053125LZ-CW1 Construction of 57,275,000. A. 6/1/2018 A. 6/1/2020 Contract Approval
Construction of Bridge - Bridge 00 B. 6/1/2018 B. 6/1/2020 in Progress
National Bridge C. C.
Construction/Replacem
ent (Design & Build
Bridges) - Bridge
Construction and
Replacement Program I
19
- Design and Build
Bridges for Luzon -
Malitao Bridge 2 and
Approaches includes
Right-of-Way
Acquisition, Apayao-
(Solsona) Ilocos Norte
Road,
P00053126LZ-CW1 Construction of 81,962,000. A. 6/1/2018 A. 6/1/2020 Contract Approval
Construction of Bridge - Bridge 00 B. 6/1/2018 B. 6/1/2020 in Progress
National Bridge C. C.
Construction/Replacem
ent (Design & Build
Bridges) - Bridge
Construction and
Replacement Program I
20
- Design and Build
Bridges for Luzon -
Annaran Bridge 1 and
Approaches includes
Right-of-Way
Acquisition, Apayao-
(Solsona) Ilocos Norte
Rd, A

PCMA 1/31/2020 12:04:54 AM Page 7 of 26


Advance Filter/s Used: Status: Not Yet Started;
P00053128LZ-CW1 Construction of 167,868,000 A. 6/1/2018 A. 6/1/2020 Contract Approval
Construction of Bridge - Bridge .00 B. 6/1/2018 B. 6/1/2020 in Progress
National Bridge C. C.
Construction/Replacem
ent (Design & Build
Bridges) - Bridge
Construction and
Replacement Program I
21
- Design and Build
Bridges for Luzon -
Claveria Br. and
Approaches includes
Right-of-Way
Acquisition, Manila
North Rd, Cagayan 2nd
District
P00114117MN-CW1 Retrofitting / 194,160,000 A. 2/23/2016 A. 12/5/2016 Awaiting Change
Retrofitting / Strengthening of .00 B. 2/23/2016 B. 12/5/2016 of Implementing
Strengthening of Bridge Bridge C. C. Office (based on
- approved
22
Rehabilitation/Retrofitti authority)
ng of Quirino Bridge
along Cotabato-Lanao
Road, Cotabato City
P00142618LZ-CW1 Construction of 25,733,000. A. 5/1/2017 A. 12/13/2017 In Preliminary
Construction of Bridge - Bridge 00 B. 8/21/2018 B. 1/20/2020 Detailed
Bay II Bridge and C. C. Engineering
Approaches including
23 Right-of-Way
Acquisition along
Calamba-Sta. Cruz-
Famy Jct. Road,
Laguna
P00142618LZ-CW2 Construction of 7,605,000.0 A. 3/24/2016 A. 7/25/2016 In Preliminary
Construction of Concrete Road 0 B. 2/21/2019 B. 1/7/2020 Detailed
Concrete Road - Bay II C. C. Engineering
Bridge and Approaches
24 including Right-of-Way
Acquisition along
Calamba-Sta. Cruz-
Famy Jct. Road,
Laguna
P00142629LZ-CW1 Construction of 31,107,000. A. 5/1/2017 A. 2/18/2018 In Preliminary
Construction of Bridge - Bridge 00 B. 5/21/2018 B. 10/8/2019 Detailed
Cogorin Bridge and C. C. Engineering
Approaches including
25
Right-of-Way
Acquisition along MSR
Jct-Lopez-Catanauan
Road, Quezon

PCMA 1/31/2020 12:04:54 AM Page 8 of 26


Advance Filter/s Used: Status: Not Yet Started;
P00142629LZ-CW2 Construction of 12,150,000. A. 5/1/2017 A. 2/18/2018 In Preliminary
Construction of Concrete Road 00 B. B. 10/8/2019 Detailed
Concrete Road - 11/21/2018 C. Engineering
Cogorin Bridge and C.
26 Approaches including
Right-of-Way
Acquisition along MSR
Jct-Lopez-Catanauan
Road, Quezon
P00142655LZ-CW1 Construction of 32,557,000. A. 5/1/2017 A. 12/18/2017 Funds for
Construction of Bridge - Bridge 00 B. 5/1/2017 B. 12/18/2017 Reversion
Marat Bridge and C. C.
Approaches including
27 Right-of-Way
Acquisition along Jct
Talubin-Barlig-Natonin
Paracelis-Callacad
Road, Mt. Province
P00142655LZ-CW2 Construction of 2,613,000.0 A. 5/1/2017 A. 12/18/2017 Funds for
Construction of Concrete Road 0 B. 5/1/2017 B. 12/18/2017 Reversion
Concrete Road - Marat C. C.
Bridge and Approaches
28 including Right-of-Way
Acquisition along Jct
Talubin-Barlig-Natonin
Paracelis-Callacad
Road, Mt. Province
P00142658LZ-CW1 Construction of 33,504,000. A. 5/1/2017 A. 2/8/2018 In Preliminary
Construction of Bridge - Bridge 00 B. 9/21/2018 B. 2/8/2020 Detailed
Nanguma Bridge and C. C. Engineering
Approaches including
29
Right-of-Way
Acquisition along Rizal
Bdry.-Famy-Quezon
Road, Laguna
P00142658LZ-CW2 Construction of 8,235,000.0 A. 5/1/2017 A. 2/8/2018 In Preliminary
Construction of Concrete Road 0 B. 3/21/2019 B. 1/20/2020 Detailed
Concrete Road - C. C. Engineering
Nanguma Bridge and
30 Approaches including
Right-of-Way
Acquisition along Rizal
Bdry.-Famy-Quezon
Road, Laguna
P00142678LZ-CW1 Construction of 16,105,000. A. 5/1/2017 A. 9/25/2017 In Preliminary
Construction of Bridge - Bridge 00 B. 7/21/2018 B. 1/7/2020 Detailed
Sala Bridge and C. C. Engineering
Approaches including
31
Right-of-Way
Acquisition along
Manila South Road,
Laguna

PCMA 1/31/2020 12:04:54 AM Page 9 of 26


Advance Filter/s Used: Status: Not Yet Started;
P00142678LZ-CW2 Construction of 5,524,000.0 A. 5/1/2017 A. 9/25/2017 In Preliminary
Construction of Concrete Road 0 B. 1/21/2019 B. 1/1/2020 Detailed
Concrete Road - Sala C. C. Engineering
Bridge and Approaches
32
including Right-of-Way
Acquisition along
Manila South Road,
Laguna
P00142685LZ-CW1 Construction of 52,155,000. A. 5/1/2017 A. 7/15/2018 In Preliminary
Construction of Bridge - Bridge 00 B. 3/21/2018 B. 8/13/2019 Detailed
San Francisco Bridge C. C. Engineering
and Approaches
33
including Right-of-Way
Acquisition along MSR
Jct-Lopez-Catanauan
Road, Quezon
P00142685LZ-CW2 Construction of 12,892,000. A. 5/1/2017 A. 7/15/2018 In Preliminary
Construction of Concrete Road 00 B. 9/21/2018 B. 8/4/2019 Detailed
Concrete Road - San C. C. Engineering
Francisco Bridge and
34 Approaches including
Right-of-Way
Acquisition along MSR
Jct-Lopez-Catanauan
Road, Quezon
P00142688LZ-CW1 Construction of 29,128,000. A. 5/1/2017 A. 2/3/2018 In Preliminary
Construction of Bridge - Bridge 00 B. 4/21/2018 B. 9/24/2019 Detailed
San Miguel Dau Bridge C. C. Engineering
and Approaches
35
including Right-of-Way
Acquisition along MSR
Jct-Lopez-Catanauan
Road, Quezon
P00142688LZ-CW2 Construction of 11,853,000. A. 5/1/2017 A. 2/3/2018 In Preliminary
Construction of Concrete Road 00 B. B. 10/5/2019 Detailed
Concrete Road - San 10/21/2018 C. Engineering
Miguel Dau Bridge and C.
36 Approaches including
Right-of-Way
Acquisition along MSR
Jct-Lopez-Catanauan
Road, Quezon
P00142691LZ-CW1 Construction of 28,516,000. A. 5/1/2017 A. 2/18/2018 In Preliminary
Construction of Bridge - Bridge 00 B. 6/21/2018 B. 10/7/2019 Detailed
Sangirin Bridge and C. C. Engineering
Approaches including
37
Right-of-Way
Acquisition along
Quezon Alabat-Perez
Road, Quezon

PCMA 1/31/2020 12:04:54 AM Page 10 of 26


Advance Filter/s Used: Status: Not Yet Started;
P00142691LZ-CW2 Construction of 14,741,000. A. 5/1/2017 A. 2/18/2018 In Preliminary
Construction of Concrete Road 00 B. B. 10/5/2019 Detailed
Concrete Road - 12/21/2018 C. Engineering
Sangirin Bridge and C.
38 Approaches including
Right-of-Way
Acquisition along
Quezon Alabat-Perez
Road, Quezon
P00142696LZ-CW1 Construction of 10,758,420. A. 5/1/2017 A. 8/12/2017 In Preliminary
Construction of Bridge - Bridge 00 B. 2/21/2018 B. 6/13/2019 Detailed
Sta. Maria III Bridge C. C. Engineering
and Approaches
39 including Right-of-Way
Acquisition along
Talisay-Laurel-
Agoncillo Road,
Batangas
P00142696LZ-CW2 Construction of 4,911,000.0 A. 5/1/2017 A. 8/12/2017 In Preliminary
Construction of Concrete Road 0 B. 8/21/2018 B. 6/13/2019 Detailed
Concrete Road - Sta. C. C. Engineering
Maria III Bridge and
Approaches including
40
Right-of-Way
Acquisition along
Talisay-Laurel-
Agoncillo Road,
Batangas
P00300926LZ-CW1 Replacement of 48,250,000. A. 7/1/2019 A. 12/31/2019 No NYS Reason
Replacement of Bridge Bridge 00 B. 7/1/2019 B. 12/31/2019 recorded
- Kay Tialo Br. C. C.
41
(B00136LZ) along
NCR/Bulacan Bdry-
Bigte-Ipo Dam Rd

PCMA 1/31/2020 12:04:54 AM Page 11 of 26


Advance Filter/s Used: Status: Not Yet Started;
CENTRAL OFFICE - BUILDINGS MANAGEMENT CLUSTER

SCHEDULE (DATES)

PROJECT COMPONENT TYPE OF ALLOTED NYS REASON


ID / PROJECT WORK AMOUNT START COMPLETIO
COMPONENT A. PLANNED N
DESCRIPTION B. REVISED A. PLANNED
C. ACTUAL B. REVISED
C. ACTUAL
P00240844LZ-CW1 Construction of 287,570,000 A. 1/3/2018 A. 6/4/2019 Awaiting NTP
Construction of Multi Multi Purpose .00 B. 3/25/2019 B. 3/18/2020
Purpose Building - Building C. C.
1 Construction of Multi-
purpose Building at
Camp Crame, Quezon
City
P00340107LZ-CW1 Construction of 72,375,000. A. 1/1/0001 A. 12/31/2019 In Preliminary
Construction of Multi Multi Purpose 00 B. 1/1/0001 B. 12/31/2019 Detailed
Purpose Building - Building C. C. Engineering
Construction
2
(Completion) of Multi-
Purpose Building at
Camp Crame, Quezon
City
P00340115LZ-CW1 Construction of 218,958,500 A. 9/1/2019 A. 12/31/2019 In Preliminary
Construction of Other Other Building .00 B. 9/1/2019 B. 12/31/2019 Detailed
Building - Construction C. C. Engineering
of National Labor
Relations Commission
(NLRC), Seventeen
3
(17) Storey Office
Building for NLRC-
Cental Office and
National Capital
Region, NHA Property,
Pag-asa, Quezon City

PCMA 1/31/2020 12:04:54 AM Page 12 of 26


Advance Filter/s Used: Status: Not Yet Started;
CENTRAL OFFICE - FLOOD CONTROL MANAGEMENT CLUSTER

SCHEDULE (DATES)

PROJECT COMPONENT TYPE OF ALLOTED NYS REASON


ID / PROJECT WORK AMOUNT START COMPLETIO
COMPONENT A. PLANNED N
DESCRIPTION B. REVISED A. PLANNED
C. ACTUAL B. REVISED
C. ACTUAL
P00020179LZ-CW2 Construction of 260,100,000 A. 3/5/2018 A. 11/4/2019 Awaiting NTP
Construction of Flood Flood Mitigation .00 B. 3/5/2018 B. 11/4/2019
Mitigation Structure - Structure C. C.
Construction of
1
Retarding Pond,
Kaingin Bukid, Brgy.
Apolonio Samson,
Quezon City 6th LD
P00020909LZ-CW1 Construction of 500,000,000 A. 2/6/2018 A. 10/5/2019 Awaiting NTP
Construction of Drainage .00 B. 2/6/2018 B. 10/5/2019
Drainage Structure - Structure C. C.
Construction/Improvem
2 ent of Catbalogan City
Drainage System,
Catbalogan City,
including Antiao River
Control, Samar
P00021021LZ-CW1 Construction of 310,000,000 A. A. 1/17/2019 Awaiting Change
Construction of Revetment .00 12/18/2017 B. 1/17/2019 of Implementing
Revetment - Revetment B. C. Office (based on
and Dredging Works 12/18/2017 approved
along Sta. 14+038 to C. authority)
16+050 (Tullahan River
3 - Left Bank) (Tullahan
Bridge, Brgy. Talipapa -
Goodwill Homes 1,
Brgy. San Bartolome,
Quezon City)
(Revetment
Component)
P00021023LZ-CW1 Replacement of 260,692,481 A. 9/1/2016 A. 12/31/2017 Awaiting NTP
Replacement of Bridge Bridge .86 B. 9/1/2016 B. 12/31/2017
- Flood Control Projects C. C.
based on Flood Master
Plan for Metro Manila
4
and Surrounding Areas,
Upper Marikina River
Improvement
(Upstream of Marikina
Bridge)

PCMA 1/31/2020 12:04:54 AM Page 13 of 26


Advance Filter/s Used: Status: Not Yet Started;
P00021023LZ-CW2 Construction of 130,883,262 A. 2/19/2018 A. 8/17/2018 Awaiting NTP
Construction of Flood Flood Mitigation .27 B. 2/19/2018 B. 8/17/2018
Mitigation Structure - Structure C. C.
Flood Control Projects
based on Flood Master
5 Plan for Metro Manila
and Surrounding Areas,
Upper Marikina River
Improvement
(Upstream of Marikina
Bridge)
P00120180LZ-CW1 Construction of 800,000,000 A. A. 12/31/2017 Awaiting NTP
Construction of Flood Flood Mitigation .00 12/20/2017 B. 12/31/2017
Mitigation Facility - Facility B. C.
Pasig-Marikina River 12/20/2017
Channel Improvement C.
6 Project, Phase V,
Contract Package 9 -
Construction of
Malanday Pumping
Station and Associated
Works, Marikina City
P00120181LZ-CW1 Construction of 100,000,000 A. 3/5/2018 A. 9/30/2018 Awaiting NTP
Construction of Concrete Road .00 B. 3/5/2018 B. 9/30/2018
Concrete Road - C. C.
Valenzuela- Pumping
7
Stations in Valenzuela-
Wawang Polo and
Coloong Pumping
Stations
P00221598VS-CW1 Construction of 74,067,070. A. 11/1/2018 A. 8/1/2019 Awaiting NTP
Construction of Flood Flood Mitigation 00 B. 11/1/2018 B. 8/1/2019
Mitigation Structure - Structure C. C.
Construction/Improvem
8 ent of Flood Control
Structure along
Guadalupe River, Brgy,
Pisil and Ermita, Cebu
City
P00221598VS-DR Dredging / 12,862,892. A. 11/1/2018 A. 8/1/2019 Awaiting NTP
Dredging / Desilting - Desilting 00 B. 11/1/2018 B. 8/1/2019
Construction/Improvem C. C.
ent of Flood Control
9
Structure along
Guadalupe River, Brgy,
Pisil and Ermita, Cebu
City

PCMA 1/31/2020 12:04:54 AM Page 14 of 26


Advance Filter/s Used: Status: Not Yet Started;
P00221599VS-CW1 Construction of 66,500,000. A. 1/1/2019 A. 7/31/2019 In Procurement
Construction of Cutoff Cutoff Channel 00 B. 1/1/2019 B. 7/31/2019
Channel - Metro Cebu C. C.
Flood Control Project-
Flood Control and
Drainage Improvement
10 Project - Subangdaku
River Basin (including
Parcellary Survey and
ROW), Station Cut-Off
Channel, 0+000 -
0+200, Cebu City &
Mandaue City
P00222649LZ-CW1 Construction of 96,500,000. A. 9/10/2018 A. 2/26/2021 Awaiting NTP
Construction of Sabo Sabo Dam 00 B. 9/10/2018 B. 2/26/2021
Dam - C. C.
11 Construction/Rehabilita
tion of Bolo River Dam,
Brgy. San Isidro,
Dumalneg, Ilocos Norte
P00222695VS-CW1 Construction of 87,911,106. A. 11/1/2018 A. 8/1/2019 Awaiting NTP
Construction of Revetment 00 B. 11/1/2018 B. 8/1/2019
Revetment - C. C.
Construction/Improvem
12 ent of Flood Control
Structure along Tipolo
Creek, Cebu Central
Cluster, Mandaue,
Brgy. Tipolo, Cebu City
P00222695VS-DR Dredging / 7,998,894.0 A. 11/1/2018 A. 8/1/2019 Awaiting NTP
Dredging / Desilting - Desilting 0 B. 11/1/2018 B. 8/1/2019
Construction/Improvem C. C.
ent of Flood Control
13
Structure along Tipolo
Creek, Cebu Central
Cluster, Mandaue,
Brgy. Tipolo, Cebu City
P00222696VS-CW1 Construction of 84,066,516. A. 11/1/2018 A. 8/1/2019 Awaiting NTP
Construction of Revetment 00 B. 11/1/2018 B. 8/1/2019
Revetment - C. C.
Construction/Improvem
14 ent of Flood Control
Structure along Tejero
Creek, Cebu Central
Cluster, Brgy. Tejero,
Cebu City
P00222696VS-DR Dredging / 7,243,484.0 A. 11/1/2018 A. 8/1/2019 Awaiting NTP
Dredging / Desilting - Desilting 0 B. 11/1/2018 B. 8/1/2019
Construction/Improvem C. C.
ent of Flood Control
15
Structure along Tejero
Creek, Cebu Central
Cluster, Brgy. Tejero,
Cebu City

PCMA 1/31/2020 12:04:54 AM Page 15 of 26


Advance Filter/s Used: Status: Not Yet Started;
P00264501MN-CW1 Construction of 407,797,309 A. 7/1/2018 A. 8/30/2019 Awaiting NTP
Construction of Dike - Dike .44 B. 7/1/2018 B. 8/30/2019
Flood Risk C. C.
Management Project
16 for Cagayan de Oro
River (FRIMP-CDOR)
(JICA Loan Agreement
No. PH-P259), Contract
Package 1
P00320019LZ-CW1 Construction of 144,750,000 A. 5/8/2019 A. 5/31/2020 Awaiting NTP
Construction of Dike - Dike .00 B. 5/8/2019 B. 5/31/2020
Construction of Flood C. C.
17 Control Structures
along Bayanan River,
Brgy. Bayanan,
Muntinlupa City
P00320020LZ-CW1 Construction of 144,750,000 A. 5/8/2019 A. 5/31/2020 Contract Approval
Construction of Dike - Dike .00 B. 5/8/2019 B. 5/31/2020 in Progress
Construction of Flood C. C.
Control Structures,
Laguna Lake (From
18
Bautista St. to
Montillano St.) Brgy.
Bayanan and Brgy.
Alabang, Muntinlupa
City
P00320023LZ-CW1 Construction of 144,750,000 A. 7/1/2019 A. 12/31/2019 Contract Approval
Construction of Dike - Dike .00 B. 7/1/2019 B. 12/31/2019 in Progress
19 Construction of C. C.
Navotas Coastal Dike,
Navotas City
P00320044LZ-CW1 Construction of 144,750,000 A. 7/1/2019 A. 12/31/2019 Contract Approval
Construction of Flood Flood Mitigation .00 B. 7/1/2019 B. 12/31/2019 in Progress
Mitigation Facility - Facility C. C.
Provision of Two (2)
20
Pumping Stations along
Navotas Coastal Dike
with Box Culvert
(Phase 2), Navotas City
P00320045LZ-CW1 Construction of 144,750,000 A. 7/1/2019 A. 12/31/2019 Awaiting NTP
Construction of Flood Flood Mitigation .00 B. 7/1/2019 B. 12/31/2019
Mitigation Facility - Facility C. C.
Pasig-Marikina
21 Channel Improvement
Project, Phase IV,
Contract Package 1:
Manalo Bridge
Replacement
P00320052LZ-CW1 Construction of 148,593,595 A. 7/1/2019 A. 12/31/2019 Awaiting NTP
Construction of Flood Flood Mitigation .00 B. 7/1/2019 B. 12/31/2019
Mitigation Facility - Facility C. C.
22
Upgrading of Catmon
Pumping Station,
Malabon City

PCMA 1/31/2020 12:04:54 AM Page 16 of 26


Advance Filter/s Used: Status: Not Yet Started;
P00320064LZ-CW1 Construction of 579,000,000 A. 7/1/2019 A. 12/31/2019 Contract Approval
Construction of Flood Flood Mitigation .00 B. 7/1/2019 B. 12/31/2019 in Progress
Mitigation Structure - Structure C. C.
Construction of Small
23 River Impounding
Project (SRIP) at Papa
River, Brgy. Sto. Niño,
Nueva Era, Ilocos
Norte
P00320068LZ-CW1 Construction of 772,000,000 A. 7/1/2019 A. 12/31/2019 Awaiting NTP
Construction of Flood Flood Mitigation .00 B. 7/1/2019 B. 12/31/2019
Mitigation Structure - Structure C. C.
Construction/Rehabilita
tion of Flood Control
24 Structure along Uguis
River, Brgy. Uguis and
along Tibangran River,
Brgy. Barangobong,
Municipality of Nueva
Era, Ilocos Norte
P00320069LZ-CW1 Construction of 579,000,000 A. 7/1/2019 A. 12/31/2019 Awaiting NTP
Construction of Revetment .00 B. 7/1/2019 B. 12/31/2019
Revetment - C. C.
25 Construction of Bank
Protection Works along
Chico River at Piat and
Tuao, Cagayan
P00320070LZ-CW1 Construction of 965,000,000 A. 7/1/2019 A. 12/31/2019 Awaiting NTP
Construction of Revetment .00 B. 7/1/2019 B. 12/31/2019
Revetment - C. C.
Construction of Bank
26
Protection Works along
Tuguegarao River at
Caggay, Tuguegarao
City, Cagayan
P00320107LZ-CW1 Construction of 144,750,000 A. 7/1/2019 A. 12/31/2019 Contract Approval
Construction of Flood Flood Mitigation .00 B. 7/1/2019 B. 12/31/2019 in Progress
Mitigation Structure - Structure C. C.
27
Construction of Slope
Protection of Sacobia-
Bamban River, Tarlac
P00320192VS-CW1 Construction of 193,000,000 A. 7/1/2019 A. 12/31/2019 In Preliminary
Construction of Cutoff Cutoff Channel .00 B. 7/1/2019 B. 12/31/2019 Detailed
Channel - Metro Cebu C. C. Engineering
Flood Control Project-
Flood Control and
28 Drainage Improvement
Project, Subangdaku
Cut-Off Channel,
Subangdaku, Mandaue
City, Sta. 0+000 to Sta.
0+257.87

PCMA 1/31/2020 12:04:54 AM Page 17 of 26


Advance Filter/s Used: Status: Not Yet Started;
P00320200VS-CW1 Construction of 772,000,000 A. 7/1/2019 A. 12/31/2019 Contract Approval
Construction of Revetment .00 B. 7/1/2019 B. 12/31/2019 in Progress
Revetment - Metro C. C.
Cebu Flood Control
Project-Flood Control
29
and Drainage
Improvement Project,
Kinalumsan River,
Duljo, Labangon and
Mambaling, Cebu City
P00320215VS-CW1 Construction of 102,584,325 A. 7/1/2019 A. 12/31/2019 Contract Approval
Construction of Dike - Dike .00 B. 7/1/2019 B. 12/31/2019 in Progress
Design and Build of C. C.
30 Coastal Dike and
Drainage Improvement,
Catbalogan City,
Samar
P00321816LZ-CW1 Construction of 963,070,000 A. 7/1/2019 A. 12/31/2019 Awaiting NTP
Construction of Flood Flood Mitigation .00 B. 7/1/2019 B. 12/31/2019
Mitigation Structure - Structure C. C.
Agno River Basin Flood
Control Project (Phase
III) - Construction of
Dike with Protection
Works using Gabions
and Mattresses along:
A. Sta. Maria-Asingan,
31
Sta. 24+600 to Sta.
28+600, Pangasinan;
B. Asingan-Tayug, Sta.
29+776 to Sta. 30+900
and Sta. 33+840 to
Sta.36+940,
Pangasinan; C. San
Manuel, Sta. 36+940 to
Sta. 40+730,
Pangasinan
P00321834LZ-CW1 Rehabilitation / 193,000,000 A. 7/1/2019 A. 12/31/2019 Awaiting NTP
Rehabilitation / Major Major Repair of .00 B. 7/1/2019 B. 12/31/2019
Repair of Flood Control Flood Control C. C.
Structure - Structure
Rehabilitation of Dike
System along Solsona
32
River (Breached and
Eroded Dike, Left and
Right Bank), Laoag
River Basin Flood
Control and Sabo
Project

PCMA 1/31/2020 12:04:54 AM Page 18 of 26


Advance Filter/s Used: Status: Not Yet Started;
P00321837LZ-CW1 Construction of 865,500,000 A. 7/1/2019 A. 12/31/2019 Awaiting NTP
Construction of Flood Flood Mitigation .00 B. 7/1/2019 B. 12/31/2019
Mitigation Structure - Structure C. C.
Construction of Flood
Control Structure along
33 Abra River,
Municipalities of Bucay,
Langiden, Tayum,
Sallapadan,
Lagangilang, Manabo,
and La Paz, Abra
P00321849LZ-CW1 Construction of 1,061,500,0 A. 7/1/2019 A. 12/31/2019 Awaiting NTP
Construction of Revetment 00.00 B. 7/1/2019 B. 12/31/2019
Revetment - C. C.
Construction of Bank
34
Protection Works along
Cagayan River (Section
A) at Gattaran,
Cagayan
P00321850LZ-CW1 Construction of 144,750,000 A. 7/1/2019 A. 12/31/2019 Awaiting NTP
Construction of Revetment .00 B. 7/1/2019 B. 12/31/2019
Revetment - C. C.
Construction of Bank
35
Protection Works along
Cagayan River (Section
B) at Gattaran,
Cagayan
P00321851LZ-CW1 Construction of 965,000,000 A. 7/1/2019 A. 12/31/2019 Awaiting NTP
Construction of Revetment .00 B. 7/1/2019 B. 12/31/2019
Revetment - C. C.
Construction of Bank
36 Protection Works along
Cagayan River at Iguig,
Cagayan and
Aggunetan, Lasam,
Cagayan
P00321860LZ-CW1 Construction of 916,750,000 A. 7/1/2019 A. 12/31/2019 Awaiting NTP
Construction of Revetment .00 B. 7/1/2019 B. 12/31/2019
Revetment - River C. C.
Improvement Works
along Cagayan River,
Buntun Bridge,
Tuguegarao and
37
Solana at Sta. 3+950 to
Sta. 5+800 and Slope
Protection Works for
Buntun Bridge, Right
Bank, Sta. -0+042 to
Sta. 0+410,Tuguegarao
City, Cagayan

PCMA 1/31/2020 12:04:54 AM Page 19 of 26


Advance Filter/s Used: Status: Not Yet Started;
P00321862LZ-CW1 Construction of 96,500,000. A. 7/1/2019 A. 12/31/2019 In Preliminary
Construction of Revetment 00 B. 7/1/2019 B. 12/31/2019 Detailed
Revetment - C. C. Engineering
Construction of Dike
along Groundsills
38
across Pasig-Potrero
River at the
Downstream of
Mancatian Bridge,
Porac, Pampanga
P00321875LZ-CW1 Rehabilitation / 144,750,000 A. 7/1/2019 A. 12/31/2019 Awaiting NTP
Rehabilitation / Major Major Repair of .00 B. 7/1/2019 B. 12/31/2019
Repair of Flood Control Flood Control C. C.
Structure - Flood Structure
Control Works-
39 Diking/Slope
Protection/Strengthenin
g of Gumain-Porac
River at Lubao and
Floridablanca,
Pampanga
P00321877LZ-CW1 Rehabilitation / 48,250,000. A. 7/1/2019 A. 12/31/2019 Contract Approval
Rehabilitation / Major Major Repair of 00 B. 7/1/2019 B. 12/31/2019 in Progress
Repair of Flood Control Flood Control C. C.
Structure - Flood Structure
Control Works-
40
Improvement/Rehabilit
ation of Groundsills
along Sacobia-Bamban
River, Mabalacat,
Pampanga
P00321878LZ-CW1 Rehabilitation / 96,500,000. A. 7/1/2019 A. 12/31/2019 Contract Approval
Rehabilitation / Major Major Repair of 00 B. 7/1/2019 B. 12/31/2019 in Progress
Repair of Flood Control Flood Control C. C.
Structure - Flood Structure
Control Works-
41 Improvement/Rehabilit
ation of West Lateral
Dike of Megadike along
Pasig-Potrero River,
Sta. Rita and Porac,
Pampanga
P00321879LZ-CW1 Upgrading of 96,500,000. A. 7/1/2019 A. 12/31/2019 In Procurement
Upgrading of Drainage Drainage 00 B. 7/1/2019 B. 12/31/2019
Structure - Flood Structure C. C.
Control Works-Slope
42 Protection Works along
Sta. Fe and Sta.
Filomena along
Guagua River, Guagua,
Pampanga

PCMA 1/31/2020 12:04:54 AM Page 20 of 26


Advance Filter/s Used: Status: Not Yet Started;
P00321880LZ-CW1 Construction of 96,500,000. A. 7/1/2019 A. 12/31/2019 Awaiting NTP
Construction of Dike - Dike 00 B. 7/1/2019 B. 12/31/2019
Flood/Lahar Control C. C.
Works in Pasig-Potrero
River and Pasac Delta
43
Area, Pampanga
including Diversion of
Flow of Water to Pasig-
Potrero River, Bacolor
and Porac, Pampanga
P00321881LZ-CW1 Construction of 86,500,000. A. 1/1/0001 A. 1/1/0001 Contract Approval
Construction of Waterway 00 B. 1/1/0001 B. 1/1/0001 in Progress
Waterway - C. C.
Rehabilitation of
44
Pampanga River
(Including Pulo) at
Arayat and Macabebe
Pampanga
P00322681LZ-CW1 Construction of 115,800,000 A. 7/1/2019 A. 12/31/2019 Awaiting NTP
Construction of Flood Flood Mitigation .00 B. 7/1/2019 B. 12/31/2019
Mitigation Structure - Structure C. C.
Construction of Flood
Control Structure along
Alabang River and
45 Laguna de Bay, Sta.
0+000 to Sta. 0+195
and Sta. 0+000-B to
Sta. 0+080-B,
Barangay Alabang and
Barangay Cupang,
Muntinlupa City
P00322688LZ-CW1 Construction of 14,475,000. A. 7/1/2019 A. 12/31/2019 Awaiting NTP
Construction of Revetment 00 B. 7/1/2019 B. 12/31/2019
Revetment - Upper C. C.
Marikina River
Improvement/Revetme
nt Wall, Marikina City
46 1st LD (Contract
Package 3 - River
Improvement Works
along Right Bank of
Upper Marikina River,
Sta. 14+750 to Sta.
15+450), Marikina City
P00322955LZ-CW1 Construction of 48,250,000. A. 7/1/2019 A. 12/31/2019 In Procurement
Construction of Slope Slope Protection 00 B. 7/1/2019 B. 12/31/2019
Protection Structure - Structure C. C.
Raising of Polder
47
including Slope
Protection Works
(Phase 7), Dampalit,
Malabon

PCMA 1/31/2020 12:04:54 AM Page 21 of 26


Advance Filter/s Used: Status: Not Yet Started;
P00331283LZ-CW1 Channelization 300,000,000 A. 7/1/2019 A. 12/31/2019 Contract Approval
Channelization - Pilot .00 B. 7/1/2019 B. 12/31/2019 in Progress
Channeling at Laguna C. C.
48 Lake from Napindan
River to Manggahan
Floodway Channel
(Phase I)
P00331284LZ-CW1 Channelization 300,000,000 A. 7/1/2019 A. 12/31/2019 Contract Approval
Channelization - Pilot .00 B. 7/1/2019 B. 12/31/2019 in Progress
Channeling at Laguna C. C.
49 Lake from Napindan
River to Manggahan
Floodway Channel
(Phase II)

PCMA 1/31/2020 12:04:54 AM Page 22 of 26


Advance Filter/s Used: Status: Not Yet Started;
CENTRAL OFFICE - ROADS MANAGEMENT CLUSTER I (BILATERAL)

SCHEDULE (DATES)

PROJECT COMPONENT TYPE OF ALLOTED NYS REASON


ID / PROJECT WORK AMOUNT START COMPLETIO
COMPONENT A. PLANNED N
DESCRIPTION B. REVISED A. PLANNED
C. ACTUAL B. REVISED
C. ACTUAL
P00006715LZ-CW1 Construction of 100,000,000 A. 1/1/2016 A. 1/1/2017 No NYS Reason
Construction of Concrete Road .00 B. 1/1/2016 B. 1/1/2017 recorded
Concrete Road - C-2 C. C.
1 (Gov. Forbes) St./ R-7
(España St.)
Interchange Project,
Manila City
P00202408LZ-CW1 Road Widening 675,500,000 A. 12/1/2019 A. 11/1/2022 No NYS Reason
Road Widening - .00 B. 12/1/2019 B. 11/1/2022 recorded
2 Widening of Gen. Luis- C. C.
Kaybiga-Polo-
Novaliches Road
P00303199LZ-CW1 Road Widening 51,000,000. A. 7/1/2019 A. 12/31/2019 No NYS Reason
Road Widening - 00 B. 7/1/2019 B. 12/31/2019 recorded
3 Widening of Gen. Luis- C. C.
Kaybiga-Polo-
Novaliches Road
P00304218LZ-CW1 Construction of 1,000,000.0 A. 7/1/2019 A. 12/31/2019 No NYS Reason
Construction of Flyover Flyover 0 B. 7/1/2019 B. 12/31/2019 recorded
4 - C-5 Kalayaan and C-5 C. C.
Bagong Ilog Fly-over

PCMA 1/31/2020 12:04:54 AM Page 23 of 26


Advance Filter/s Used: Status: Not Yet Started;
CENTRAL OFFICE - ROADS MANAGEMENT CLUSTER II (MULTILATERAL)

SCHEDULE (DATES)

PROJECT COMPONENT TYPE OF ALLOTED NYS REASON


ID / PROJECT WORK AMOUNT START COMPLETIO
COMPONENT A. PLANNED N
DESCRIPTION B. REVISED A. PLANNED
C. ACTUAL B. REVISED
C. ACTUAL
P00060031MN-CW1 Construction of 476,181,050 A. 7/1/2018 A. 12/31/2018 In Procurement
Construction of Concrete Bridge .00 B. 7/1/2018 B. 12/31/2018
1 Concrete Bridge - C. C.
Panguil Bay Bridge
Project
P00060031MN-CW2 Construction of 33,703,360. A. 7/1/2018 A. 12/31/2018 In Procurement
Construction of Concrete Road 00 B. 7/1/2018 B. 12/31/2018
2 Concrete Road - C. C.
Panguil Bay Bridge
Project
P00264005MN-CW1 Construction of 1,124,189,2 A. 2/4/2019 A. 12/31/2019 Awaiting NTP
Construction of Concrete Road 10.00 B. 2/4/2019 B. 12/31/2019
Concrete Road - PR06, C. C.
3
Alicia-Malangas Road
Province of
Zambaonga Sibugay
P00264005MN-CW2 Construction of 23,107,360. A. 2/14/2019 A. 12/31/2019 Awaiting NTP
Construction of Concrete Bridge 00 B. 2/14/2019 B. 12/31/2019
Concrete Bridge - C. C.
4
PR06, Alicia-Malangas
Road Province of
Zambaonga Sibugay
P00264005MN-CW3 Construction of 18,449,412. A. 2/14/2019 A. 12/31/2019 Awaiting NTP
Construction of Concrete Bridge 00 B. 2/14/2019 B. 12/31/2019
Concrete Bridge - C. C.
5
PR06, Alicia-Malangas
Road Province of
Zambaonga Sibugay
P00264005MN-CW4 Construction of 30,163,685. A. 2/14/2019 A. 12/31/2019 Awaiting NTP
Construction of Concrete Bridge 00 B. 2/14/2019 B. 12/31/2019
Concrete Bridge - C. C.
6
PR06, Alicia-Malangas
Road Province of
Zambaonga Sibugay
P00264005MN-CW5 Construction of 21,797,831. A. 2/14/2019 A. 12/31/2019 Awaiting NTP
Construction of Concrete Bridge 00 B. 2/14/2019 B. 12/31/2019
Concrete Bridge - C. C.
7
PR06, Alicia-Malangas
Road Province of
Zambaonga Sibugay

PCMA 1/31/2020 12:04:54 AM Page 24 of 26


Advance Filter/s Used: Status: Not Yet Started;
P00264005MN-CW6 Construction of 21,946,222. A. 1/1/2019 A. 12/31/2019 Awaiting NTP
Construction of Concrete Bridge 00 B. 1/1/2019 B. 12/31/2019
Concrete Bridge - C. C.
8
PR06, Alicia-Malangas
Road Province of
Zambaonga Sibugay
P00264005MN-CW7 Construction of 16,605,462. A. 2/14/2019 A. 12/31/2019 Awaiting NTP
Construction of Concrete Bridge 00 B. 2/14/2019 B. 12/31/2019
Concrete Bridge - C. C.
9
PR06, Alicia-Malangas
Road Province of
Zambaonga Sibugay
P00264005MN-CW8 Construction of 17,193,329. A. 2/14/2019 A. 12/31/2019 Awaiting NTP
Construction of Concrete Bridge 00 B. 2/14/2019 B. 12/31/2019
Concrete Bridge - C. C.
10
PR06, Alicia-Malangas
Road Province of
Zambaonga Sibugay
P00264005MN-CW9 Construction of 45,453,489. A. 2/14/2019 A. 12/31/2019 Awaiting NTP
Construction of Concrete Bridge 00 B. 2/14/2019 B. 12/31/2019
Concrete Bridge - C. C.
11
PR06, Alicia-Malangas
Road Province of
Zambaonga Sibugay
P00264006MN-CW1 Construction of 265,996,926 A. 1/4/2019 A. 12/31/2019 Awaiting NTP
Construction of Concrete Road .00 B. 1/4/2019 B. 12/31/2019
Concrete Road-PR07, C. C.
12 Tampilisan -
Sandayong Road
Province of
Zamboanga del Norte
P00264006MN-CW2 Construction of 289,727,524 A. 1/14/2019 A. 12/31/2019 Awaiting NTP
Construction of Concrete Road .00 B. 1/14/2019 B. 12/31/2019
Concrete Road-PR07, C. C.
13 Tampilisan -
Sandayong Road
Province of
Zamboanga del Norte
P00264006MN-CW3 Construction of 28,590,876. A. 1/14/2019 A. 12/31/2019 Awaiting NTP
Construction of Concrete Road 00 B. 1/14/2019 B. 12/31/2019
Concrete Road-PR07, C. C.
14 Tampilisan -
Sandayong Road
Province of
Zamboanga del Norte
P00264006MN-CW4 Construction of 13,073,912. A. 1/14/2019 A. 12/31/2019 Awaiting NTP
Construction of Concrete Bridge 00 B. 1/14/2019 B. 12/31/2019
Concrete Bridge-PR07, C. C.
15 Tampilisan -
Sandayong Road
Province of
Zamboanga del Norte

PCMA 1/31/2020 12:04:54 AM Page 25 of 26


Advance Filter/s Used: Status: Not Yet Started;
P00264006MN-CW5 Construction of 12,582,858. A. 1/14/2019 A. 12/31/2019 Awaiting NTP
Construction of Concrete Bridge 00 B. 1/14/2019 B. 12/31/2019
Concrete Bridge-PR07, C. C.
16 Tampilisan -
Sandayong Road
Province of
Zamboanga del Norte
P00264006MN-CW6 Construction of 13,289,989. A. 1/1/2019 A. 1/13/2019 Awaiting NTP
Construction of Concrete Bridge 91 B. 1/1/2019 B. 1/13/2019
Concrete Bridge - C. C.
17 PR07, Tampilisan -
Sandayong Road
Province of
Zamboanga del Norte
P00264008MN-CW1 Construction of 441,755,884 A. 2/14/2019 A. 12/31/2019 Awaiting NTP
Construction of Concrete Road .00 B. 2/14/2019 B. 12/31/2019
Concrete Road - PR09, C. C.
18 Lutiman - Guicam -
Olutanga Road
Province of
Zamboanga Sibugay
P00264008MN-CW2 Construction of 547,405,116 A. 2/14/2019 A. 12/31/2019 Awaiting NTP
Construction of Concrete Road .00 B. 2/14/2019 B. 12/31/2019
Concrete Road - PR09, C. C.
19 Lutiman - Guicam -
Olutanga Road
Province of
Zamboanga Sibugay

PCMA 1/31/2020 12:04:54 AM Page 26 of 26


Advance Filter/s Used: Status: Not Yet Started;