CONTRACT ID / PMS ID                      :
                                          :
PROJECT NAME                              :
PROJECT DESCRIPTION :
 -
   Limits: Sta. 1476+453.839 to Sta. 1476+574.169, L= 120
 -
   Construction of 90.28 meter bridge at 3 spans (@30 m PS
     Abutments A & B = 1.0 m dia. X 50 m on bored piles
     Piers 1,2 = 1.0 m dia x 44 meter on bored piles, Column:
 -
     Construction of craneway = 60 meters
 -
     Construction of Abutment Protection using steel sheet pile
 -
     Embankment Works
 -
     Installation of metal guardrails
 -
     Provision of coco-net and coco-log
PROJECT/CONTRACTUAL DATA :
     Project Component                    :
     Province                             :
Region                            :
Location                          :
Source of Fund                    :
Mode of Contract                  :
Implementing Office               :
Date of Bidding                   :
Contractor                        :
Contract Amount                   :
Revised Contract Amount           :
Contract Duration                 :
Revised Contract Duration         :
Effectivity of Contract           :
Contract Expiry Date              :
Revised Completion Date           :
Time Extension/Suspension
Time Extension No. 1              :
Time Extension No. 2              :
Time Extension No. 3              :
                            Total :
Time Suspension No. _             :
                            Total :
Grand Total :
PROJECT UPDATE :
 - Project On-going
PREPARED BY :
        DENNIS P. BACATCAT
            Project Inspector
                                           Republic of the Philippines
                              DEPARTMENT OF PUBLIC WORKS AND
                                    OFFICE OF THE REGIONAL DIRE
                                                   Region XI
                              R. Magsaysay Avenue corner Chavez Stre
Regional Office XI
      13LO-0056 / 1101-14-H-00055
      Construction/Improvement of Panabo City Coastal Road From Brgy
      Bridge II (Leading to Migratory Bird Sanctuary, Mangrove Sanctua
1476+574.169, L= 120.28 m.
e at 3 spans (@30 m PSCG supported by bored piles)
0 m on bored piles
n bored piles, Column: 1.4 m dia. x 5 m.
CONTRACT STATUS :
ERED :
CHECKED AND SUBMITTED BY :
               AURORA M. LACASANDILE
                    Project Engineer
f the Philippines
LIC WORKS AND HIGHWAYS
REGIONAL DIRECTOR
egion XI
rner Chavez Street, Davao City
STATUS REPORT
tober 31, 2015
al Road From Brgy. J.P. Laurel, Panabo City to La Paz, Carmen, b. Constr
Mangrove Sanctuary, Mariculture Park, City Baywalk)
                                                        EQUIPMENT ON
:   100.000 %
:    58.720 %
:   -41.280 %
:    272 C.D. ( 100.00 % )
:      0 C.D. ( 0.00 % )
:    73.700 %
:    58.720 %
:   -14.980 %
:    503 C.D. ( 93.15 % )
:     37 C.D. ( 6.85 % )
:       -
:      1
:      1
:      1
:      1
:      2
:      2
:      5
:      2
DPWH | Project Implementation Forms - Project Managem
                            Project Status Report: Construction/Improvement of P
                From Brgy. J.P. Laurel, Panabo City to La Paz, Carmen, b. Construc
               (Leading to Migratory Bird Sanctuary, Mangrove Sanctuary, Maric
", on-going.
NOTED :
. LACASANDILE                                                       ELIAS P.
t Engineer                                                      Chief, Constru
DPWH | Project Implementation Forms - Project Managem
ty to La Paz, Carmen, b. Construction of Tuganay
 ty Baywalk)
EQUIPMENT ON SITE :
                 Backhoe w/ breaker      :     1
                 Payloader               :     1
Motorized Road Grader       :   -
Vibratory Roller            :   1
Water Truck                 :   -
Welding Machine             :   -
Transit Mixer               :   -
Concrete Vibrator           :   -
Concrete Screeder           :   -
Concrete Saw                :   -
Bar Cutter                  :   -
Rotary Hammer
 Drilling Machine           :   -
Applicator Machine          :   -
Kneading Machine            :   -
Truck Mounted Crane         :   -
Crawler Crane               :   1
Bulldozer                   :   -
Pneumatic Drilling Machin   :   1
Generator Set               :   1
Bentonite Bin               :   -
Diesel Hammer               :   -
Vibro Hammer                :   1
Vibro Hammer w/
  Hydro Power Pack          :   -
Drilling Rig                :   -
Bentonite Mixer             :   -
Water Pump                  :   1
Bar Bender                  :   -
Cutting Outfit              :   1
                  Tremie Pipe Set             :    -
                  SPT & Desanding Machine     :    -
                  Portable Breaker            :    -
                  Air Compressor, Portable    :    -
                  Lighting System/Tower Li    :    -
                  Dumptruck                   :    5
                  Cargo Truck/Delivery Truc   :    -
                  Pumpcrete Whiteman          :    -
ected structures.
                          ELIAS P. BERMEJO
                      Chief, Construction Division
mentation Forms - Project Management Form   C-02
                                                             PROJECT PROGRESS & STATUS R
II   - Project Activities:
 - Pouring of PCCP at the following stations;
        a. Sta 0+897.50 to 1+001.00 R/S (Segment 1);
        b. Sta 1536+001.00 to 1536+221.5 R/S (Segment 2);
        c. Sta 1536+230.50 to 1536+433.00 L/S (Segment 2);
        d. Sta 1557+000.00 to 1557+103.50 R/S (Segment 3);
        e. Sta 1557+203.5 to 1557+597.00 L/S (Segment 3);
 - Construction of Limao, Sapdan and Kiayo Bridges
ACTIONS TAKEN:
 - Instructed the contractor to conduct overtime works if weather condition is fair.
Prepared by:
Scheduled/Planned               :    96.44 %
                                :    96.57 %
                                :     0.13 %
CONTRACT TIME
A.) ORIGINAL
Time Elapsed                  :      278 c.d.        87.42%
Time Remaining                :       40 c.d.        12.58%
Time Elapsed                  :
Time Remaining                :
MANPOWER
Project Manager               : 1        Mason                : 8
Project Engineer              : 1        Steelman             : 4
Materials Engineer            : 1        Laborer              : 20
Safety Officer                : 1
                              : 1
Const. Foreman                : 10
Operator/ Driver              : 22
                              : 10
EQUIPMENT
Motorized Road Grader         : 2        Concrete Blade       : 1
                              : 1        Backhoe              : 2
Vibratory Roller              : 2        One Bagger Mixer     : 1
Back Hoe w/pavement breaker   : 1        Concrete Vibrator    : 1
                              : 2        Bulldozer            : 2
                              : 2        Batching Plant       : 1
                              : 4        Concrete Screeder    : 1
                              : 1        Bar Cutter           : 1
                                         Plate Compactor        1
Submitted by:
                   ELIAS P. BERMEJO
                Chief, Construction Division
 DATE STARTED                       : January 27, 2015
 COMPLETION DATE                  : December 10, 2015
 CONTRACT DURATION                : 318 Calendar Days
 CONTRACTOR                         :   Maverick Builders, Inc. / AB Aponesto Const. Parts and Supply (JV)
 CONTRACT AMOUNT                  : P 274,533,318.30
                                                                                                                   Value of Work                                                        Accomplishment
 Item No.                                              Description                                                                                  Rel. Wt %
                                                                                                        Unit    Quantity           Amount                       This Month %       Previous %       Quantity
:Prepared by
                                       HILARIO T.
                                       .ALVIAR, JR
                                       Project
                                       Engineer III
                                                         Upgrading of Farm to Market Road with Bridge Components at Barangay Aguinaldo-Kidawa,
                                                                        Laak-Barangay Casoon-Banlag, Monkayo, Compostela Valley
                                                                                       As of September 31, 2015
hment                                                                                              2015
        % Total    Jan. 27-31   Feb.1-28   March1-31   April1-30       May1-31         Jun. 1-30          Jul. 1-31         Aug. 1-31    Sep. 1-30
                       5          28          31          30              31              30                 31                 31          30
                     05/318      33/318      64/318     94/318          125/318         155/318           186/318             217/318     247/318
0.207
           0.005
                                                                                                                       Revised S-Curve
           0.022                                                                                                      due to Approved
           0.006                                                                                                          PERT-CPM
           0.116
           0.063
           0.161
           1.354
           0.016
           0.002
           0.001
           0.010
           0.006
           0.006
          25.448
           0.151
           0.023
           0.100
           5.566
           1.257
18.873
          31.985
           0.081
           0.704
           0.573
           0.255
           0.146
           0.117
           0.037
           0.095
           0.240
           0.356
          0.379
          0.002
          0.255
          0.146
          0.117
          0.037
          0.095                   Original S-Curve
          0.120
          0.147
          0.379
          0.002
          0.340
          0.197
          0.117
          0.046
             -
          0.275
          0.328
          0.386
          0.002
          0.051
          1.710
          1.371
          0.402
          0.180
          0.046
          0.019
          0.899
          0.488
             -
          0.051
          96.57
PLANNED           0.12   6.13    6.79                6.57    11.95   14.31   14.79            13.25   7.75
REVISED           0.47   2.97    6.44                7.43    11.86   13.69   16.82            13.08   13.45
 ACTUAL           0.13   3.35    6.43                12.33   7.93    14.91   15.42            13.09   13.97
PLANNED           0.12   6.25    13.04               19.61   31.56   45.87   60.66            73.91   81.66
REVISED           0.47   3.44    9.88                17.31   29.17   42.86   59.68            72.76   86.21
 ACTUAL           0.13   3.48    9.91                21.95   29.72   44.63   60.05            73.14   87.11
                  0.01   0.04    0.03                4.64    0.55    1.77    0.37             0.38    0.90
                  1.57   10.38   20.13               29.56   39.31   48.74   58.49            68.24   77.67
:Submitted by
                                                                             ELIAS P.
                                                                                 BERMEJ0
                                                                             Chief, Construction
                                                                             Division
ad with Bridge Components at Barangay Aguinaldo-Kidawa,
asoon-Banlag, Monkayo, Compostela Valley
 As of September 31, 2015
          2015
                                                          Oct. 1-31   Nov. 1-30   Dec. 1-10
                                                             31          30          10
                                                           278/318     308/318     318/318
                                                                                                   100
                                                                                              ###
                                                                                              ###
                                                                                              ###
                             Revised S-Curve
                            due to Approved
                                PERT-CPM                                                      90
80
###
                                                                                              70
                                                                                               ###
                                                                                              ###
                                                                                              ###
                                                                                              ###
                                                                                              ###
                                                                                              ###
                                                                                              ###
60
                                                                                              50
                         40
30
20
                         ###
                         ###
                         10
                         ###
                         ###
0###
:Prepared by
                                       HILARIO T.
                                       .ALVIAR, JR
                                       Project
                                       Engineer III
                                                         Upgrading of Farm to Market Road with Bridge Components at Barangay Aguinaldo-Kidawa,
                                                                        Laak-Barangay Casoon-Banlag, Monkayo, Compostela Valley
                                                                                        As of November 30, 2015
hment                                                                                              2015
        % Total    Jan. 27-31   Feb.1-28   March1-31   April1-30       May1-31         Jun. 1-30          Jul. 1-31         Aug. 1-31    Sep. 1-30
                       5          28          31          30              31              30                 31                 31          30
                     05/318      33/318      64/318     94/318          125/318         155/318           186/318             217/318     247/318
           0.207
           0.495
           0.005
                                                                                                                       Revised S-Curve
           0.038                                                                                                      due to Approved
           0.006                                                                                                          PERT-CPM
           0.116
           0.063
           0.161
           1.354
           0.016
           0.002
           0.001
           0.010
           0.006
           0.006
          25.448
           0.151
           0.053
           0.226
           5.566
           1.257
18.873
          32.879
           0.081
           0.704
           0.573
           0.255
           0.146
           0.117
           0.037
           0.095
           0.240
           0.356
          0.379
          0.002
          0.255
          0.146
          0.117
          0.037
          0.095                   Original S-Curve
          0.240
          0.356
          0.379
          0.002
          0.340
          0.197
          0.117
          0.046
          0.179
          0.275
          0.328
          0.386
          0.002
          0.051
          1.710
          1.371
          0.402
          0.180
          0.046
          0.019
          0.958
          0.601
          0.802
          0.229
          99.79
PLANNED           0.12   6.13    6.79                6.57    11.95   14.31   14.79            13.25   7.75
REVISED           0.47   2.97    6.44                7.43    11.86   13.69   16.82            13.08   13.45
 ACTUAL           0.13   3.35    6.43                12.33   7.93    14.91   15.42            13.09   13.97
PLANNED           0.12   6.25    13.04               19.61   31.56   45.87   60.66            73.91   81.66
REVISED           0.47   3.44    9.88                17.31   29.17   42.86   59.68            72.76   86.21
 ACTUAL           0.13   3.48    9.91                21.95   29.72   44.63   60.05            73.14   87.11
                  0.01   0.04    0.03                4.64    0.55    1.77    0.37             0.38    0.90
                  1.57   10.38   20.13               29.56   39.31   48.74   58.49            68.24   77.67
:Submitted by
                                                                             ELIAS P.
                                                                                 BERMEJ0
                                                                             Chief, Construction
                                                                             Division
ad with Bridge Components at Barangay Aguinaldo-Kidawa,
asoon-Banlag, Monkayo, Compostela Valley
 As of November 30, 2015
          2015
                                                          Oct. 1-31   Nov. 1-30   Dec. 1-10
                                                             31          30          10
                                                           278/318     308/318     318/318
                                                                                                   100
                                                                                              ###
                                                                                              ###
                                                                                              ###
                            Revised S-Curve
                           due to Approved
                               PERT-CPM                                                       90
80
###
                                                                                              70
                                                                                               ###
                                                                                              ###
                                                                                              ###
                                                                                              ###
                                                                                              ###
                                                                                              ###
                                                                                              ###
60
                                                                                              50
                         40
30
20
                         ###
                         ###
                         10
                         ###
                         ###
0###
  A.1.1(3)   Construction of Field Office for the Engineer                                               l.s.              1.00                256,052.63             256,052.63      0.183              0.027
  A.1.2(5)   Vehicle for the Engineer Based on DO3 , s 2010, Fully Operated
              b. 4x4 pick-up 2500 CC MT diesel w/ aircon, stereo, megawheels, step board, bed liners,
                                                                                                        mo.                9.00                108,386.77             975,480.93      0.696
             GPS, Rustproof
                                                                                                                                                                                                         0.155
 A.1.1(16) Assistance to the Engineer
                                                                                                        mo.                9.00                  8,782.73              79,044.57      0.056              0.004
           A. Operations & Maintenance of Field Office for the Engineer
Part B: General Requirement
    B-5      Project Billboard                                                                          each               2.00                  5,339.25              10,678.50      0.008                    -
    B-7      Occupational Safety and Health Program                                                     mo.                9.00                 30,756.71             276,810.39      0.197                0.01
    B-8      Traffic Management                                                                         mo.                9.00                 27,309.27             245,783.43      0.175              0.012
    B-9      Mobilization & Demobilization                                                               l.s.              1.00                524,258.40             524,258.40      0.374         Err:522
  B.4 (1)   Construction Survey and Staking                                                             km.                3.75                 12,545.26              47,044.73      0.034         Err:522
Part C: Earthworks
100(1)       Clearing & Grubbing                                                                         ha.                1.59               195,474.00             310,803.66      0.222         Err:522
101(2)       Removal of Actual Structure/Obstruction (Headwall)                                         each               20.00                 2,634.03              52,680.60      0.038         Err:522
101(4)c      Removal of Existing 910mm RCPC                                                            ln.m.              41.00                 1,111.25              45,561.25      0.033                    -
102(2)       Surplus Common Excavation                                                                  cu.m.       41,127.00                     408.26            16,790,509.02    11.977         Err:522
103(1)a      Structure Excavation                                                                       cu.m.        1,858.00                     138.17              256,719.86      0.183         Err:522
103(3)       Foundation Fill                                                                            cu.m.         175.00                      765.12              133,896.00      0.096         Err:522
103(6)a      Pipe Culvert and Drain Excavation (Common)                                                 cu.m.         533.00                      397.24              211,728.92      0.151         Err:522
104(1)a1     Embankment (from Excavation)                                                               cu.m.       48,036.00                     300.86            14,452,110.96    10.309                        ##
105(1)a      Subgrade Preparation                                                                       sq.m.       31,210.58                         25.45           794,309.26      0.567         Err:522
Part D: Sub-base & Base Course
200(1)       Aggregate Subbase Course                                                                   cu.m.       12,835.00                    1,856.06           23,822,530.10    16.994              3.999
Part E: Surface Courses
300(1)       Gravel Surface Course                                                                      cu.m.        2,965.00                    1,906.88            5,653,899.20     4.033                    -
311(1)e1     PCC Pavement (unreinforced), 280 mm. thk.                                                  sq.m.       27,312.19                    1,729.17           47,227,419.58    33.690              4.132
PART F-1: Drainage Construction (Box Culvert)
404(1)a      Reinforcing Steel Bar, Grade 40 (Minor Structures)                                          kg.        30,306.00                         75.78          2,296,588.68     1.638                    -
405(1)a3     Structural Concrete, Class "A" (Minor Structures)                                          cu.m.         809.00                     5,316.00            4,300,644.00     3.068                    -
PART G. Drainage & Slope Protection Structure
500(1)b3     Pipe Culverts, 910 mm ., Class IV                                                         ln.m.         194.00                     5,782.30            1,121,766.20     0.800                    -
500(1)b6     Pipe Culverts, 1520 mm , Class IV                                                         ln.m.               6.00                 9,870.69              59,224.14      0.042                    -
504(3)c      Cleaning of Pipe Culvert in Place, 910mm Dia.                                              ln.m.              61.00                 1,090.21              66,502.81      0.047                    -
504(3)f      Cleaning of Pipe Culvert in Place, 1220mm Dia.                                             ln.m.              13.00                 2,204.15              28,653.95      0.020                    -
505(5)       Grouted Riprap, Class "A"                                                                  cu.m.         611.00                     3,176.26            1,940,694.86     1.384                    -
506(1)       Stone Masonry                                                                              cu.m.         103.00                     2,106.03             216,921.09      0.155                    -
508(1)       Handlaid Rock Embankment                                                                   cu.m.              16.00                 3,051.53              48,824.48      0.035                    -
PART H. Miscellaneous Structure
603(3)a1       Metal Guardrail (Metal Beam) Including Post                 ln.m.    3,291.83     777.95       2,560,879.15      1.827                 -
603(3)b2       Metal Beam End Piece (Bull Nose)                            each       36.00     2,046.71            73,681.56   0.053                 -
612(1)         Reflectorized Thermopalstic Pavement Marking (White)        sq.m.    1,362.13    1,730.84      2,357,629.08      1.682                 -
612(2)         Reflectorized Thermopalstic Pavement Marking (Yellow)       sq.m.      12.00     7,177.88            86,134.56   0.061                 -
620(1)a        Chevron Sign (450 x 600mm)                                  each      186.00    12,458.25      2,317,234.50      1.653                 -
622(1)a        Coco net, 400                                               sq.m.   10,589.00     215.61       2,283,094.29      1.629                 -
622(1)b        Coco net, 700                                               sq.m.    5,764.00     427.59       2,464,628.76      1.758                 -
622(2)c        Coco log/Fascine                                            ln.m.    6,592.00     670.74       4,421,518.08      3.154                 -
622(3)b        Vegetation                                                  sq.m.   16,352.00      83.91       1,372,096.32      0.979                  -
                                                                                                            140,184,038.50              100.00     0.160
     Legend:        Previous            This Month              Schedule
                                                                                                                                         MONTHLY PROGRESS
                                                                                                                                        CUMULATIVE PROGRESS
     Planned
     Actual                                                                                                                                            SLIPPA
                                                                                                                                                   TIME ELAPS
Accomplishment
Previous % Quantity % Total Apr. 24-30 May 1-31 June 1-30 July 1-31 Aug. 1-31 Sep. 1-30 Oct. 1-31 Nov. 1-30
                                                    7                  31          30                 31                 31                 30                31                 30
                                                  7/269              38/269      68/269             99/269            130/269            160/269            191/269            221/269
- 2.00 0.155
3,020.00 3.999
                                            -
                       3,350.00      4.132
                                            -
                                            -
                                            -
                                            -
                                            -
                                            -
                                            -
                                            -
                                            -        Start Date:
                                                    April 24, 2017
                                                Start Date:
                                               April 24, 2017
                                        -
                                        -
                                        -                              Actual
                                        -
                                        -
                                        -
                                        -
                                        -
                                        -
                0.35   25,724.300    11.54
                           PLANNED           0.34               5.11             11.10                17.24   17.45   15.91   16.54   11.18
OGRESS
                            ACTUAL           11.54
                           PLANNED           0.34               5.45             16.55                33.79   51.25   67.15   83.69   94.87
PROGRESS
                            ACTUAL           11.54
    SLIPPAGE                                 11.20
TIME ELAPSED ( % )                           2.60
:Noted
                                                                                ELIAS P.
                                                                                   BERMEJ0
                                                                                Chief, Construction
                                                                                Division
Concrete) of Montevista - DNAS Road (Brgy. Canidkid - Brgy. Camansi Section),
K1422+332 - K1422+879; K1423+603 - K1425+961; K1425+1007+K1426+917
                                                                                   31          17
                                                                                252/269     269/269
100
90
80
                                                                                                        7
                                                                                                        0
60
50
40
30
                                                                                                        20
                 20
10
                 0
4.29     0.84
99.16   100.00
IMPLEMENTING OFFICE                       :
CONTRACT ID / PMS ID :
PROJECT NAME :
PROJECT DESCRIPTION :
 - Concreting of pavement, 280mm thk & 150mm thk = 3,4
 - Pipe Culverts, 910mm Diameter, Class IV
 - Pipe Culverts, 1220mm Diameter, Class IV
 - Provision of Reflectorized Thermoplastic Pavement Markin
 - Provision of Metal Guardrail (Metal Beam) Inc. Post
 - Provision of Metal Beam End Piece (Bull Nose)
 - Trees (Furnishing and Transplanting)
 - Chevron Signage
 - Vegetation
PROJECT/CONTRACTUAL DATA :
   Project Component                      :
   Province                               :
   Region                                 :
   Location                               :
Source of Fund                        :
Mode of Contract                      :
Implementing Office                   :
Date of Bidding                       :
Contractor                            :
Contract Amount                       :
Revised Contract Amount               :
Contract Duration                     :
Revised Contract Duration             :
Effectivity of Contract               :
Contract Expiry Date                  :
Revised Completion Date               :
Time Extension/Suspension
Time Extension No. 1                  :
Time Extension No. 2                  :
Time Extension No. 3                  :
                                Total :
Time Suspension No. _                 :
                                Total :
                          Grand Total :
PROJECT UPDATE :
 - Project just started on April 24, 2017
        ANJEJON L. BUYOC
          Project Inspector
                                                           Republic of th
                                              DEPARTMENT OF PUBLIC
                                                             REGIONAL
                                               R. Magsaysay Ave. corner
                                                          PROJECT STA
                                                             As of May
Regional Office XI
               17LO-00111/P00119955MN
               Road Upgrading (Gravel to Concrete) of Montevista-DNAS
               K1422+879, K1423+603-K1425+961, K1425+1007-K1426+
CONTRACT STATU
               Roads                                      ACCOMPLISHME
               Compostela Valley                          A.) ORIGINAL
               Region XI
               Brgy. Canidkid-Brgy. Camansi Section,
               Compostela Valley
By Contract
Regional Office XI
                                       B.) REVISED
January 27, 2017
A.B. APONESTO CONSTRUCTION PARTS & SUPPLY
P 140,184,038.50
0 Calendar Days
cavation
se
tion
ure / Obstruction (Headwall)
NCOUNTERED :
                             HIL
                               P
 Republic of the Philippines
T OF PUBLIC WORKS AND HIGHWAYS
   REGIONAL OFFICE XI
y Ave. corner Chavez Street, Davao City
NTRACT STATUS :
CCOMPLISHMENT:
.) ORIGINAL
.) REVISED
 Sched. Accomp.          :          -
 Actual Accomp.          :          -
 Slippage to Date        :          -
 Time Elapsed to Date    :          -               -
 Time Remaining          :          -               -
NPOWER ON SITE
roject Manager           :     1
roject Engineer : 1
aterials Engineer : 1
onst. Foreman : 2
aboratory Personnel : 2
aboratory Aide : 2
river/Operator : 18
echanic : 2
killed Worker            :    10
nskilled Worker          :    10
DPWH | Project Implementation F
                         Project Status Re
                         Montevista-DNAS
                                    Compo
                                     K1423
EQUIPMENT ON SITE :
Backhoe : 5
Dumptruck : 6
Bulldozer : 3
Payloader : 3
                Batching Plant            :
Minimum Materials Testing   :   1
Lab Equipment
Water Truck                 :   1
Transit Mixer               :
Road Roller                 :
Road Grader                 :
Concrete Screeder           :
Concrete Vibrator           :
Concrete Saw                :
Bar Cutter                  :
Bagger Mixer                :
Implementation Forms - Project Management Form   C-02
Project Status Report: Road Upgrading (Gravel to Concrete) of
Montevista-DNAS Road (Brgy. Canidkid-Brgy. Camansi Section),
           Compostela Valley 1st LD, K1422+332-K1422+879,
            K1423+603-K1425+961, K1425+1007-K1426+917
                                                  Page 2 of 2
CTIONS TAKEN :
2017
        Description
                            Apr.      May      June       July    Aug.          Sep.   Oct.   Nov.   Dec.   Jan.
                             7        30        31         30     31             31     30     31     31    17
                             7        37        68         98    129            160    190    221    252    269
Project Manager              1        1         1          1      1              1      1      1      1      1
Project Engineer             1        1         1          1      1              1      1      1      1      1
Materials Engineer           1        1         1          1      1              1      1      1      1      1
Safety & Health Officer      1        1         1          1      1              1      1      1      1      1
Const. Foreman               3        3         3          3      3              3      3      3      3      3
Laboratory Personnel         2        2         2          2      2              2      2      2      2      2
Laboratory Aide              2        2         2          2      2              2      2      2      2      2
Driver/Operator             15        15        15         15     15             15     15     15     15    15
Mechanic                     2        2         2          2      2              2      2      2      2      2
Skilled Worker              10        25        25         25     25             25     25     25     25    10
Unskilled Worker            10        25        25         25     25             25     25     25     25    20
        Total Manpower      48        78        78         78     78             78     78     78     78    58
           Mandays          336      2340      2418       2340   2418           2418   2340   2418   2418   986
                                                                         2017
                            Apr.      May      June       July    Aug.          Sep.   Oct.   Nov.   Dec.   Jan.
        Description
                             7        30        31         30      31            31    30      31     31     17
                             7        37        68         98     129           160    190    221    252    269
Project Manager              1
Project Engineer             1
Materials Engineer           1
Safety & Health Officer      1
Const. Foreman               2
Laboratory Personnel         2
Laboratory Aide              2
Driver/Operator             18
Mechanic                     2
Skilled Worker              10
Unskilled Worker            10
        Total Manpower      50
           Mandays          350        0        0          0       0             0      0      0             0
Name of Project
Location                            :
Date Effectivity            :
Contract Duration       :
Expiry Date                     :
Contract Amount         :
Contractor                      :
                                  6.4
0.00
        1
        2
        3
        4
        5
        6
        7
        8
        9
0.00   10
       11
       12
       13
       14
       15
       16
       17
       18
       19
       20
       21
       22
       23
       24
       25
       26
        27
        28
        29
        30
        31
        32
        33
        34
        35
        36
        37
        38
        39
        40
        41
        42
        43
        44
        45
    0   46
0   0
0   0
0   0
0   0
0   0
0   0
0   0
0   0
0   0
0   0
0   0
0   0
0   0
0   0
0   0
0   0
0   0
0   0
0   0
0   0
0   0
0   0
0   0
0   0
0   0
0   0
0   0
0   0
0   0
0   0
0   0
0   0
0   0
0   0
0   0
0   0
0   0
0   0
0   0
0   0
0   0
0   0
0   0
0   0
0   0
0   0
0   0
0   0
0   0
0   0
0   0
0   0
0   0
0   0
0   0
0   0
0   0
0   0
0   0
0   0
0   0
0   0
0   0
0   0
0   0
0   0
0   0
0   0
0   0
0   0
0   0
0   0
0   0
0   0
0   0
0   0
0   0
0   0
0   0
0   0
0   0
0   0
0   0
0   0
0       0
0       0
0       0
0       0
0       0
0       0
0       0
0       0
0       0
0       0
0       0
0       0
0       0
0       0
0       0
0       0
0       0
0       0
0       0
0       0
0       0
0       0
0       0
0       0
0       0
0       0
0       0
0       0
0       0
0       0
0       0
0       0
0       0
0       0
0       0
0       0
0   -
0       0
0       0
0       0
0       0
0       0
0       0
0       0
0       0
0       0
0       0
0       0
0       0
0       0
0       0
0       0
0       0
0       0
0       0
0       0
0       0
0       0
0       0
0       0
0       0
0       0
0       0
0       0
0       0
0       0
0       0
0       0
0   0.000
0   0.000
0   0.000
0   0.000
0   0.000
0   0.000
0   0.000
0   0.000
0   0.000
0   0.000
0   0.000
0   0.000
0   0.000
0   0.000
0   0.000
0   0.000
0   0.000
0   0.000
0   0.000
0   0.000
0   0.000
0   0.000
0   0.000
0   0.000
0   0.000
0   0.000
0   0.000
0   0.000
0   0.000
0   0.000
0   0.000
0   0.000
0   0.000
0   0.000   0.000   0.02
0   0.000   0.020
0   0.000   0.030
0   0.000   0.040
0   0.000   0.050
0   0.000   0.060
0   0.000   0.070
0   0.000   0.080
0   0.000   0.090
0   0.000   0.100
0   0.000   0.110
0   0.000   0.120
0   0.000   0.130
0   0.000   0.140
0   0.000   0.150
0   0.000   0.160
0   0.000   0.170
0   0.000   0.180
0   0.000   0.190
0   0.000   0.200
0   0.000   0.210
0   0.000   0.220
0   0.000   0.230
0   0.000   0.240
0   0.000   0.250
0   0.000   0.260
0   0.000   0.270
0   0.000   0.280
0   0.000   0.290
0   0.000   0.300
0   0.000   0.310
            0.320    1
            0.330    2
            0.340    3
            0.350    4
            0.360    5
            0.370    6
            0.380    7
            0.390    8
            0.400    9
            0.410   10
            0.420   11
            0.430   12
            0.440   13
            0.450   14
            0.460   15
            0.470   16
            0.480   17
            0.490   18
            0.500   19
            0.510   20
            0.520   21
            0.530   22
            0.540   23
            0.550   24
0.560   25
0.570   26
0.580   27
0.590   28
0.600   29
0.610   30
0.620   31
0.630   32
0.640   33
0.650   34
0.660   35
0.670   36
0.680   37
0.690   38
0.700   39
0.710   40
0.720   41
0.730   42
0.740   43
0.750   44
0.760   45
0.770   46
0.780   47
0.790   48
0.800   49
0.810   50
0.820   51
0.830   52
0.840   53
0.850   54
0.860   55
0.870   56
0.880   57
0.890   58
0.900   59
0.910   60