0% found this document useful (0 votes)
54 views1 page

Wilmont Project Team Overview

The Wilmont Project Organization chart shows the leadership structure with George Cranston as the Operation VP who reports to James Conor as the CIO. There are three levels with Mary Person as the Project Lead for IT Systems who oversees the project leads for Security and Business Operations. Level 2 includes specialists who report to their project leads and Level 3 includes pharmacy managers who report to Level 2.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
54 views1 page

Wilmont Project Team Overview

The Wilmont Project Organization chart shows the leadership structure with George Cranston as the Operation VP who reports to James Conor as the CIO. There are three levels with Mary Person as the Project Lead for IT Systems who oversees the project leads for Security and Business Operations. Level 2 includes specialists who report to their project leads and Level 3 includes pharmacy managers who report to Level 2.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

Wilmont Project Organization

George Cranston
Operation VP

James Conor
Level 1 CIO

Mary Person William Scott Shirly Johnson Allan Swanson


Philip Greenberg Gerald Peritoni Change Management
Project Lead/IT Project lead/Security Attorney/Legal
PM/Business Op Testing specialist Coordinator
Systems Team departmt

Level 2
Jonathan Perry Elizabeth Walton
Sharavani Shina Retail operations Senior testing
Senior programer assistant specialist

Steve Haskell Wilma Marcy James O'Donnell Julie Green


Pharmacy manager Pharmacy manager Pharmacy manager Pharmacy manager
Level 3 32185 33001 38734 35864

You might also like