0% found this document useful (0 votes)
927 views1 page

Tower Crane Inspection Guide

The document is a tower crane inspection checklist that lists various components of a tower crane to inspect including the foundation, mast sections, swing unit, counter jib, main jib, hoist, and trolley. It provides descriptions of each component and space to record observations and measures during inspection. The checklist ensures a thorough inspection of all critical crane systems is performed.

Uploaded by

shakti123456789
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
927 views1 page

Tower Crane Inspection Guide

The document is a tower crane inspection checklist that lists various components of a tower crane to inspect including the foundation, mast sections, swing unit, counter jib, main jib, hoist, and trolley. It provides descriptions of each component and space to record observations and measures during inspection. The checklist ensures a thorough inspection of all critical crane systems is performed.

Uploaded by

shakti123456789
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 1

TOWER CRANE INSPECTION CHECKLIST

Name of Site : Job No.:

Inspected By : Date :
Make & Model: Asset Code:
Height: Jib Length:
Sl
Description Observation Measures
No
I Foundation - Stability
II Mast section
1. Check the Mast & Fasteners
2. Check the climbing ladder mountings and platforms
3. Check the tie-collar mounting and Pins
4. Check the climbing gauge mounting pins
5. Load Chart Displayed on crane mast
6. Check on the mast anchorages
7. Is the lightening arrestor available
III Swing Unit
Check on the Cat Head
1. Check the revolving bolts for tightness
2. Check the Cabin Mounting Pin and Collar pins
3. Check the counter jib tie and main Jib tie Connecting Pins
4 Check the Swing Brake, Limit switch & Alarm
5. Operator Visibility & Wind screen
6. Is the Anemometer functional
7. Is the aviation lamp is functional (Reqd. for 30mt and above)
8. Fire Extinguisher installed at operators cabin & ground level
9. Emergency Stop button is functional
IV Counter Jib
1. Check the Counter Jib Mounting Pins and Cotter Pins
2. Check the Platform mounting pins, handrail etc
3. Check the counter weight placement and pins
4. Check the mounting of the hoist winches
5. Check the Pins and cotter pins of the Tie Rod
6. Structural stability of platform & counter weight
V Main Jib
1. Check the Mounting Pins and Cotter Pins
2. Check the Tie rod pins and cotter pins.
3. Check Jib Inserts connecting pins and cotter pins
4. Check the light fitting mounting for tightness
5. SWL displayed on main jib for various operating radius
VI Hoist
1. Check the condition of wire rope
2. Check over hoist limit switch
3. Check the break pads for excessive wear
4. Check the rope swiel for free rotation
5. Check the Moment Cut off Limit Switch
6. Check the break Cylinder for proper function and leakage
VIII Trolley
1. Check the Trolley rope, break and lock arrangement
2. Check the working platform, extreme end limit switches

You might also like