Rigging/Lifting Data: This Data Sheet Shall Be Used For Tandem/ Multiple Crane Lift and Complex Operations

This document outlines the rigging and lifting data requirements for simple and repetitive crane operations, specifying that it should not be used for complex lifts. It includes sections for job performer details, crane information, load weight, and pre-lift checks, which must be completed and verified by relevant personnel. The document emphasizes safety protocols, including wind speed limits and mandatory verification signatures before lifting operations commence.

Uploaded by

pradeeshkpmtech
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
225 views1 page

Rigging/Lifting Data: This Data Sheet Shall Be Used For Tandem/ Multiple Crane Lift and Complex Operations

This document outlines the rigging and lifting data requirements for simple and repetitive crane operations, specifying that it should not be used for complex lifts. It includes sections for job performer details, crane information, load weight, and pre-lift checks, which must be completed and verified by relevant personnel. The document emphasizes safety protocols, including wind speed limits and mandatory verification signatures before lifting operations commence.

Uploaded by

pradeeshkpmtech
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

RA & SN RESTORATION & 20% TECHNICAL RATE PROJECTS

RIGGING/LIFTING DATA
THIS DATA SHEET SHALL NOT BE USED FOR TANDEM/ MULTIPLE CRANE LIFT AND COMPLEX OPERATIONS.
THE RIGGING/LIFTING DATA SHEET DESIGNED ONLY FOR SIMPLE OPERATION & REPETATIVE OPERATIONS AND SHALL BE COMPLETED BY RIGGING
TEAM. THIS DATA SHEET SHALL BE ATTACHED WITH ADNOC ONSHORE ELECTRONIC PERMIT TO WORK.
PART-1. DESCRIPTION/SCOPE (To be completed by Job Performer & Hand back to Rigging Foreman/Supervisor)
Job Performer: Date of Activity:
Name: EPTW No.:
Contractor/Subcontractor: Type of EPTW: Cold Work Permit
Contact No.: Hot Work Permit
Signature:
Description of load to be lifted:

PART-2. CRANE INFORMATION & SET-UP CONFIGURATIONS (To be completed by Crane Operator/ Rigging Foreman/Supervisor)
A) CRANE DETAILS:
1) Type of Crane: Crawler Crane Wheel Mounted Lattic Boom Wheel Mounted Hydraulic Boom
Tower Crane Make & Model:
2) Total Crane Capacity: (tons)
3) Total Boom Length: (meters)
B) CRANE SET-UP CONFIGURATIONS: THIS SECTION SHALL BE FILLED WHEN USING
MAIN BOOM FLY JIB OR LUFFER CONFIGURATIONS
1) Operating Boom Length: (meters) Operating Boom Length: (meters)
2) Operating Radius: (main boom length + jib/luffing)
2.1) Pick-up Radius: (meters) Pick-up Radius: (meters)
2.2) Erection Radius: (meters) Erection Radius: (meters)
3) Maximum Operating Radius: (meters) Maximum Operating Radius: (meters)
4) Maximum Lifting Capacity of Maximum Lifting Capacity of
the Crane @ this radius (tons) the Crane @ this radius (SWL (tons)
(SWL): of the crane):
5) Main Hook Block Auxiliary Hook Block Main Hook Block Auxiliary Hook Block
6) Number of Wire Rope : Number of Wire Rope :
PART-3. LOAD WEIGHT & LIFTING INFORMATION (To be completed by Rigging Foreman/ Rigging Supervisor)

A) Weight of Item to be lifted: (tons) Crane Chart Capacity (SWL) @ Maximum


F) Operating Radius (as per crane load chart):
B) Weight of lifting beam/spreader bar: (tons)
C) Weight of slings & shackles: (tons) (tons)
D) Weight of any other rigging gears (if any): (tons)
Percentage (%) of Crane Capacity @ Maximum
E) TOTAL WEIGHT TO BE LIFTED: (tons) Operating Radius (E ÷ F X 100):
G)
(A+B+C+D)
%
"G"- SHALL NOT BE ABOVE 75 % OF CRANE LOAD CHART CAPACITY
PART-4. PREPARED & VERIFIED BY (To be completed by Rigging Foreman/Supervisor,Site Eng./Contractor's Discipline Supv)
PRE-LIFT CHECK YES NO PREPARED & VERIFICATION BY
1) Crane inspected & approved? Prepared by Rigging Foreman/ Rigging Supervisor:
2) Inspection certificate valid? Name:
3) Certified lifting tackles? Emp#:
4) Lifting tackles color coded? Signature:
5) Crane checklist completed?
6) Load chart on crane? Verified by Subcontractor's Site Eng./Discipline Supervisor:
7) Outrigger pad acceptable? Name:
8) Outriggers fully extended? Emp#:
9) Crane in leveled condition? Signature:
10) Swing radius free from obstructions?
11) Head room checked? Verified by Contractor's Discipline Supervisor:
12) Tag lines attached? Name:
13) Wind speed @ the time of lifting: knots Emp#:
When wind speed exceeds 17 knots, crane & lifting Signature:
operation shall be stopped
NOTE: THIS DATA SHEET SHALL NOT BE USED FOR LIFTS USED BY Control Checks by Field HSE (Subcontractor/Contractor):
ARTICULATED BOOM TRUCKS. VERIFICATION SIGNATURES BY Name:
RIGGING/LIFTING SUPERVISOR, SITE ENGINEER/DISCIPLINE SUPERVISOR &
Emp#:
CONTRACTOR'S DISCIPLINE SUPVISOR IS MANDATORY PRIOR TO START
THE LIFTING OPERATIONS. CRANE LOAD CHART SHALL BE ATTACHED WITH Signature:
THIS DATA SHEET.