Emaar Plot A017 Icon Bay Residential Tower On DCH Island District
Emaar Plot A017 Icon Bay Residential Tower On DCH Island District
A
C
D
GENERAL NOTES
TO 22 / T2 _L02 TO
T1 _ LEVEL-23 (MECHANICAL-01)
OTHER RELEVANT DRAWINGS, TOGETHER WITH THE
T1 _ LEVEL-43 (PENTHOUSE-02)
T1 _ LEVEL-42 (PENTHOUSE-01)
SPECIFICATION.
7. THE CONTRACTOR SHALL BE RESPONSIBLE FOR PRODUCING
A COMPLETE SET OF DETAILED SHOP DRAWINGS FOR
T1 _ UPPER ROOF LEVEL
CONSULTANTS APPROVAL.
T1 _ LEVEL-24 TO 41
FFL 140.20 SSL 140.150
SSL 8.850
GROUND FLOOR
T1 _ CROWN LEVEL
T1 _ LEVEL-40
T1 _ LEVEL-39
T1 _ LEVEL-38
T1 _ LEVEL-37
T1 _ LEVEL-36
T1 _ LEVEL-35
T1 _ LEVEL-34
T1 _ LEVEL-33
T1 _ LEVEL-32
T1 _ LEVEL-31
T1 _ LEVEL-30
T1 _ LEVEL-29
T1 _ LEVEL-28
T1 _ LEVEL-27
T1 _ LEVEL-26
T1 _ LEVEL-25
T1 _ LEVEL-22
T1 _ LEVEL-21
T1 _ LEVEL-20
T1 _ LEVEL-19
T1 _ LEVEL-18
T1 _ LEVEL-17
T1 _ LEVEL-16
T1 _ LEVEL-15
T1 _ LEVEL-14
T1 _ LEVEL-13
T1 _ LEVEL-12
T1 _ LEVEL-11
T1 _ LEVEL-10
T1 _ LEVEL-09
T1 _ LEVEL-08
T1 _ LEVEL-07
T1 _ LEVEL-06
T1 _ LEVEL-05
T1 _ LEVEL-03
_ LEVEL-02
T2_ LEVEL-04
ARE FULLY COORDINATED.
T1 _ LEVEL-41
LEVEL-01
FACADE ACCESS DRAWINGS. CONTRACTOR TO ENSURE THESE
T18.90
ARE FULLY COORDINATED.
L03
173.60
FFL
PROJECT TITLE
CLIENT
4330
T1-E
DESIGN MANAGEMENT
6700
30200
T1-D
2070
DESIGN ARCHITECT
T1-C
PERKINS EASTMAN
7250
T1-B
2900
T1-A
CONSULTANT
DRAWING TITLE
TOWER 1
CALLOUTS ELEVATION D
1 : 300 01/31/2018 - - -