1) The document outlines a safe bolt tensioning procedure with 9 steps: apply for a work permit, ensure the correct equipment and location are identified, be aware of escape routes for working at heights or in confined spaces, label and report defective equipment, check air and hydraulic connections and pressures, handle equipment properly using PPE, do not modify equipment, and maintain a clean work environment before, during, and after the operation.

Uploaded by

ainun mardiah
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
85 views4 pages

(Edit) SWP Bolt Tensioning

1) The document outlines a safe bolt tensioning procedure with 9 steps: apply for a work permit, ensure the correct equipment and location are identified, be aware of escape routes for working at heights or in confined spaces, label and report defective equipment, check air and hydraulic connections and pressures, handle equipment properly using PPE, do not modify equipment, and maintain a clean work environment before, during, and after the operation.

Uploaded by

ainun mardiah
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 4

Title:SWP-SafeBoltWorkBoltTensioningProcedure EffectiveRev#: 0Date:0 26Pg.1126.of2009113.

2009

1) Apply work permit before start work a) Never start work without a valid permit

2) Ensure correct equipment and location


is identified a)b
Check equipm nt s safe use
Look at the working location any hazardous
work been carried out.

3) Working on height or confined space a) All chnici ns aware of escape route


before star ed to work

c) Barrier the affected area


Title:SWP-SafeBoltWorkBoltTensioningProcedure EffectiveRev#: 0Date:0 26Pg.11226.of2009113.2009

4) Defective Equipment a)mmediatAy elyfectiveandlabelequipment,itwithshoulda"Dornotmoveuse"it

`
b)signInform all personal working in the site about
it.

5) Connection from air supply to pump of w check and pin must.


b Usechck no jubilee chipis a e fitted.
a)c All airthereoses are routed properly and will
not cause tripping hazard

7) Connection from hydraulic hose to a U compatible conn ctions all time


c)d Never pressurizthe unconnected hydraulic
pump b) Dos not us under pr ss re at fitting and

hose exc ed maxim m working


pres ure
fittings.

8) Handling of equipment a) W ar proper PPE whi


orrectly thatfited to the apphandlingicatio
the
equipment

b Ensure the pulle s d bridge is

c) Do not modify any part ofeeveth equipment


Title:SWP-SafeBoltWorkBoltTensioningProcedure EffectiveRev#: 0Date:0 26Pg.11326.of2009113.2009

d) Never exceed the maximum working


pressure

9) Keep a clean working environment ) Always a proper housekeeping before

during / after the operation. and after dowrk