Title:SWP-SafeBoltWorkBoltTensioningProcedure   EffectiveRev#: 0Date:0     26Pg.1126.of2009113.
2009
1)   Apply work permit before start work        a) Never start work without a valid permit
2) Ensure correct equipment and location
 is identified                                  a)b
                                                      Check   equipm nt   s safe   use
                                                      Look at the working location any hazardous
                                                work been carried out.
3) Working on height    or confined space       a) All chnici ns aware of escape route
                                                before star ed to work
                                                c) Barrier the affected area
Title:SWP-SafeBoltWorkBoltTensioningProcedure       EffectiveRev#: 0Date:0          26Pg.11226.of2009113.2009
4) Defective Equipment                              a)mmediatAy elyfectiveandlabelequipment,itwithshoulda"Dornotmoveuse"it
                                                `
                                                    b)signInform    all personal working in the site about
                                                    it.
5) Connection from air supply to pump                          of w       check and pin                 must.
                                                    b     Usechck         no jubilee chipis a e fitted.
                                                    a)c All airthereoses are routed properly and will
                                                    not cause tripping hazard
7) Connection from hydraulic hose to                a     U    compatible conn ctions                   all time
                                                    c)d Never pressurizthe                unconnected hydraulic
pump                                                b) Dos     not us    under pr ss re           at            fitting and
                                                    hose            exc ed         maxim m working
                                                    pres ure
                                                    fittings.
8) Handling of equipment                            a) W ar proper PPE whi
                                                          orrectly thatfited to the apphandlingicatio
                                                                                                        the
                                                    equipment
                                                    b     Ensure          the pulle        s            d bridge is
                                                    c) Do not modify any part              ofeeveth equipment
Title:SWP-SafeBoltWorkBoltTensioningProcedure   EffectiveRev#: 0Date:0   26Pg.11326.of2009113.2009
                                                d) Never exceed the maximum working
                                                pressure
9) Keep a clean working environment             ) Always       a proper housekeeping before
during / after the operation.                   and after   dowrk