(Edit) SWP Bolt Torquing

1) The document provides instructions for bolt torquing and outlines safety procedures. Technicians must obtain a work permit, ensure proper equipment is used in the correct location, and be aware of escape routes when working at heights or in confined spaces. 2) Defective equipment should be immediately labeled as defective and not used. All personnel on site must be informed. Connections from air supplies to pumps must be properly fitted and not cause tripping hazards. Hoses must not be pressurized above their maximum working pressure. 3) Proper personal protective equipment like gloves must be worn when handling equipment to avoid pinches. Tools must be correctly fitted and not modified beyond their design limits. A clean work environment

Uploaded by

ainun mardiah
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
86 views4 pages

(Edit) SWP Bolt Torquing

1) The document provides instructions for bolt torquing and outlines safety procedures. Technicians must obtain a work permit, ensure proper equipment is used in the correct location, and be aware of escape routes when working at heights or in confined spaces. 2) Defective equipment should be immediately labeled as defective and not used. All personnel on site must be informed. Connections from air supplies to pumps must be properly fitted and not cause tripping hazards. Hoses must not be pressurized above their maximum working pressure. 3) Proper personal protective equipment like gloves must be worn when handling equipment to avoid pinches. Tools must be correctly fitted and not modified beyond their design limits. A clean work environment

Uploaded by

ainun mardiah
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 4

Title: BoltBoltTorquingTorquing Effective Date: 26.1126..200911.

2009
1) Apply work permit before start work a) Never start work without a valid permit

2) Ensure correct equipment and location Check equipm nt s safe use


is identified a)b Look at the working location any hazardous
work been carried out.

3) Working on height or confined space a All technicians aware of escape route


efore) started to work

b Wear all proper PPE


Title: BoltBoltTorquingTorquing Effective Date: 26.1126..200911.2009

4) Defective Equipment a)mmediatAy elyfectiveandlabelequipment,itwithshoulda"Do rnotmoveuse"it

`
b)signInform all personal working in the site about
it.

5) Connection from air supply to pump


b of w check and pin must.
Usechck no jubilee chipis a e fitted.
a)c All airthereoses are routed properly and will
not cause trippinghazard

pump b) Do not us under press re rat fitting and


c)d Never pressurizthe unconnected hydraulic
hose exc ed maxim m working
fittings.

pres ure

8) Handling of equipment Wear proper PPE while


handling
he
equipmenta)
Always
r ain ngpinch
sockets.
b ou for poin

fitted to watchusethpplication
c) Ensure thewrench/sockets is correctly
Title: BoltBoltTorquingTorquing Effective Date: 26.1126..200911.2009

fe) NDovernotexceedmodify theany maximumpartofworkthe equipment

pressureg)Kepclear of torue wrench swing clearance

h) Ensure spanner is fully engage on the nut

9) Keep a clean working environment a) Always do a proper housekeeping before

/
during after the operation. or
after work