Republic Of The Philippines
University of Science and Technology of Southern Philippines
College of Engineering and Architecture
Department of Electrical Engineering
C.M. Recto Avenue, Lapasan, Cagayan de Oro, 9000
Tel Nos. (08822)72-60-65/ (08800)856-1739
On-The-Job Training Compilation
Submitted By:
SETH COURAGE H. ANGELES
Submitted To:
ABDUL HALIL ABDULLAH III, REE
ACKNOWLEDGMENT
I, a student from the University of Science and Technology of Southern
Philippines (USTP) would like to extend my sincerest and greatest gratitude to all the
people who helped and guide me to complete my on the job training at Auxiliary
Services Division.
I would also like to thank our Chairman, Engr. Rojien V. Morcilla, MoE, PEE,
who continue to guide and support us up to this point.
To the whole Auxiliary Services Division, USTP and Director Maria Consuelo
R. Del Castillo for accepting me as a trainee and providing us good and reliable
supervisors.
To our OJT supervisor, Engr. Orniel B. Delos Reyes for patience and guidance,
and for the encouragement and advices they have given throughout the training.
To my family, Glenn Angeles, Geraldine Angeles, Meghann Faith Angeles and
Blessila Hope angeles. Who also gave their full support and guidance financially and
emotionally throughout the entire training.
To my girl, Jonnavy Gutierrez-Abang who inspires and motivates me to put my best
in everything and for extending patience and understanding. Thank you for always being by
my side.
Lastly, to our God Almighty for making these things happen and providing us
great support, strength, wisdom, and giving me this opportunity to gain more
knowledge and undertake this training to enhance my skill in these field I have taken.
Table of Contents
Title Page
Acknowledgement
Table of Contents
I. Training Application Requirements
Recommendation Letter
Personal Information Sheet (PIS)
Student Agreement and Waiver
II. Company Profile
Background of USTP
Company Mission/Vision
III. Weekly Training Report
IV. Narrative Report
V. Evaluation Sheets
VI. Certificate of Compliance
VII. Daily Time Record
VIII. Photo Documentation
Republic Of The Philippines
University of Science and Technology of Southern Philippines
College of Engineering and Architecture
Department of Electrical Engineering
C.M. Recto Avenue, Lapasan, Cagayan de Oro, 9000
Tel Nos. (08822)72-60-65/ (08800)856-1739
SETH COURAGE HUISO ANGELES
Bachelor of Science in Electrical Engineering
+639362334453
sethcourageangeles@gmail.com
Purok 2A Cawayanon, San Miguel, Manolo Fortich Bukidnon
Personal Information
Age 21 years of age
Sex Male
Date of Birth January 1, 1998
Place of Birth Ubay, Bohol
Height 5’10
Weight 70 Kilograms
Civil Status Single
Religion Roman Catholic
Citizenship Natural Born Filipino
Father’s Name Glenn Lingat Angeles
Mother’s Name Geraldine Huiso Angeles
Siblings Meghann Faith Huiso Angeles
Blessila Hope Huiso Angeles
Education Attainment
Tertiary - University of Science and Technology of Southern Philippines (USTP)
2014-Present ǀ Bachelor of Science in Electrical Engineering
C.M. Recto Avenue, Lapasan, Cagayan de Oro City
Secondary - Holy Cross High School (HCHS)
2010-2014 ǀ
Camp Phillips, Manolo Fortich Bukidnon
Primary - Our Lady of Lourdes Elementary School (OLLES)
2001-2010 ǀ
Camp Phillips, Manolo Fortich Bukidnon
Of The Philippines
University of Science and Technology of Southern Philippines
College of Engineering and Architecture
Department of Electrical Engineering
C.M. Recto Avenue, Lapasan, Cagayan de Oro, 9000
Tel Nos. (08822)72-60-65/ (08800)856-1739
LIABILITY WAIVER
I, SETH COURAGE H.ANGELES, a student of University of Science and Technology of Southern
Philippines (USTP-CDO), hereby voluntarily agree to undergo “on-the-job training” in any
educational institution / industrial firm or establishment in order to acquire work experience related to
the academic training gained from the university / college of engineering and architecture under the
following terms and conditions:
1. That I shall abide all the company / school rules and regulations and shall comply
with those imposed for the program; otherwise, I shall be excluded from further
participation;
2. That I shall exercise care and diligence in any task assigned to me;
3. That I shall renounce and waive my claim against the school / industry /
establishment for any injury I suffer, personal or pecuniary, in the performance of my
duties or function while under training;
4. That I shall be made answerable for any and all liabilities for damages of property or
injury to a third person which may be occasioned by my intentional or neglect act
while in the course of my training.
5. That is fully understood by me that there is no employer-employee relationship
between me and the company.
Signed on this _______ day of ________________________________________ 2019 at
_________________________________________________, Philippines.
Signature of Student
Res. Cert. No.
Issued on:
Issued at:
With our consent and approval:
Signature Signature
SETH COURAGE H. ANGELES ROJIEN V. MORCILLA, PEE
Name of Parent Name of School Representative
Republic Of The Philippines
University of Science and Technology of Southern Philippines
College of Engineering and Architecture
Department of Electrical Engineering
C.M. Recto Avenue, Lapasan, Cagayan de Oro, 9000
Tel Nos. (08822)72-60-65/ (08800)856-1739
Company Profile:
The University of Science and Technology of Southern Philippines (USTP) is a state
university established on August 16, 2016 by virtue of Republic Act 10919 through the amalgamation
of the Mindanao University of Science and Technology (MUST) in Cagayan de Oro City, Misamis
Oriental and the Misamis Oriental State College of Agriculture and Technology (MOSCAT) in
Claveria, Misamis Oriental. Both campuses are located in Northern Mindanao, the Gateway to
Mindanao, which offers a strategic locational advantage for the institution to train and develop
students from all the other regions of Mindanao.
Company Vision:
A nationally-recognized S&T University providing the vital link between education and the
economy
Company Mission:
Bring the world of work (industry) into the actual higher education and training of students
Offer entrepreneurs the opportunity to maximize their business potentials through a gamut of services
from product conceptualization to commercialization;
Contribute significantly to the National Development Goals of food security and energy sufficiency
through technology solutions.
Republic Of The Philippines
University of Science and Technology of Southern Philippines
College of Engineering and Architecture
Department of Electrical Engineering
C.M. Recto Avenue, Lapasan, Cagayan de Oro, 9000
Tel Nos. (08822)72-60-65/ (08800)856-1739
University of Science and Technology of Southern Philippines
Background of USTP:
The University of Science and Technology of Southern Philippines (USTP) is a state
university system established on August 16, 2016 by virtue of Republic Act 10919 through the
amalgamation of the Mindanao University of Science and Technology (MUST) in Cagayan de Oro
City, Misamis Oriental and the Misamis Oriental State College of Agriculture and Technology
(MOSCAT) in Claveria, Misamis Oriental. Both campuses are located in Northern Mindanao, the
Gateway to Mindanao, which offers a strategic locational advantage for the institution to train and
develop students from all the other regions of Mindanao.
It has maintained its Level IV Status as State University (Highest Distinction) as adjudged by
the Commission on Higher Education (CHED) and the Department of Budget and Management
(DBM) and continues to be one of the 19 leading state universities in the Philippines.
Weekly Training Reports
ANGELES, SETH COURAGE H.
APRIL 15-17, 2019
WEEK 1
1ST Day of week 1
On the 15th day of April, our OJT began. OJT is a program in which it enhances the student’s
abilities in his/her field. As an electrical engineering student, I am quite excited about this
program. As an Aspiring future electrical engineer, I am excited to learn new things in line
with my course. Though I’m a bit late on taking my OJT, because I can’t take it last year
because of some circumstances, I am still very happy and excited about it. During the first
day, we didn’t had that many work. Instead, we had a long orientation about the OJT.
Orientation is a must for us first timers because we need to learn the do’s and don’ts’. After
the orientation, I am quite excited to apply all the things that I’ve learnedin the days to come.
2nd Day of week 1
During the second day, Engr. Orniel Delos Reyes continued to discuss about some things.
Engr. Orniel then gave us a task to work. And that task is to create an as built plan on the
buildings located inside the school. The buildings that we have to create an as built plan were
narrowed down. It was narrowed down because some of the buildings in the school was
under renovation or under demolition. After finalizing upon what buildings to work on. We,
the OJT members decided to divide the buildings equally so that the work will be faster. And
so, we divided it so that every each and every one of us will have a task to work on
3rd Day of week 1
On this day we have prepared a letter requesting for us to enter and inspect buildings. The
letter was made to let us inspect the building without the supervision of the coordinator or
instructor in all of the classrooms including the laboratory and even the offices. But before
that we needed the signature of the dean and the chairman with that regards so that instructors
in offices or rooms would truly be convinced that we’re not fooling around. The groups work
was made simple because of the help of our classmates. Our classmates gave us floor plans
on building they’ve worked for before. That made our job easier because we wont be making
floor plans anymore, instead we only need to inspect the electrical layout of the building they
gave.
WEEK 2
1st Day of week 2
During the 1st day of the second week. The group gathered files and documents on the
buildings that we lack. The group started to inspect and layout the building that doesn’t have
a floor plan. First the group inspected the building 5. The group checked each and every room
located in the vicinity. Though there are rooms that are locked, the group still continued their
work. The group also measured the floor area of the building by manual measuring. The
group used a measuring tape for the task. It took a lot of time on measuring the buildings
floor area. The group needed to measure if for them to create a floor plan on the said
building.
2nd Day of week 2
During the 2nd Day of week 2, I started to plot the datas we gathered on the first day in the
autocadd. While some of my members continued the work that was not made on the first day.
It consumed quite a lot of time because I did not know that the pc’s located in bldg.. 43-701
were deep freezed. The work ive started during the morning was deleted because the pc’s
were turned off. The group made little progress. 4th Day of week 2 The group inspected the
building 24. The group checked each and every room located in the vicinity. Though there
are rooms that are locked, the group still continued their work. The group also measured the
floor area of the building by manual measuring. The group used a measuring tape for the task.
It took a lot of time on measuring the buildings floor area. The group needed to measure if for
them to create a floor plan on the said building.
5th Day of week 2
During the 4th Day of week 2, I started to plot the datas we gathered on the third day in the
autocadd. While some of my members continued the work that was not made on the third
day. The building was quit hard to make. Its quite hard to make its floor plan because the
design of the building is quite complex inside. But at the end of the day, the group managed
to create the floor plan of the said building.
6th Day of week 2
The group inspected the building 28. The group checked each and every room located in the
vicinity. Though there are rooms that are locked, the group still continued their work. The
group also measured the floor area of the building by manual measuring. The group used a
measuring tape for the task. It took a lot of time on measuring the buildings floor area. The
group needed to measure if for them to create a floor plan on the said building.
WEEK 3
1st Day of week 3
During the 1st Day of week 2, I started to plot the datas we gathered on the 5th day in the
auto cadd. While some of my members continued the work that was not made on the third
day. The building was quit hard to make. Its quite hard to make its floor plan because the
design of the building is quite complex inside. But at the end of the day, the group managed
to create the floor plan of the said building.
2nd Day of week 3
The group polished the building that they worked on. Building 5, 24 and 28. The group put
the layouts on the plates. The group also created theschedule of loads on the said buildings,
riser diagrams and location of the buildings. During the day, Engr. Orniel Delos Reyes visited
us and taught us some auto cadd techniques. Especially layering. It made our future jobs
easier. What we have been doing in the past days were manual and sir taught us a faster way
to achieve our goals. 3rd Day of week 3 During the 3rd day of week 3. The group decided to
polish the ICT building. The design of the lighting layout and convenience layout is quit
outdated. The group changed the layout of the building because it is quite messy. It took quite
a lot of time because the work was like we were making a new plan and layout. The group
also created a floor plan on the 5th and plotted the lighting layout and convenience layout.
4th Day of week 3
In continuation of the 23d day work we do some changes in the AutoCAD file we got
because we have seen many error on it, to be specific there are symbols that are not right and
the drawings were not proportionate so we came to clean it up and then but before that we
decided that I’ll be working on the first floor and floor and my classmate will be on the third
and fourth floor.
5th Day of week 3
Still working on the building 9 – ICT its quite time consuming, on this day also we have gain
the other buildings specifically building ITB, building 41, 42 and 43. My whole classmate
decided to help on the inspection on the building 41 because the building is indeed big and
requires a lot of man power and work on the whole after schedule all we did was an
inspection of the whole building.
Week Three: Who at your workplace do you particularly admire or lookup to?
What attributes does this individual exhibit that you appreciate or aspire to?
Answer: I admired all of my group mates because they exhibit an objective oriented traits that
they will finish to a specified timeframe they have set for themselves to work on, this Is a
good trait for it help us to be more productive and create more progress.
WEEK 4
1st Day
Amid this day, We completed an assessment on structure 41 on this day, we checked each
floors which lighting is connected to the switch and counted how many lightings and also the
convenience outlet. Despite everything we can't check the panel boards for the single line
diagram because the electrical room In which the panel board is located is locked and there’s
no in-charge nearby. The group also tried top got to the office where electrical technicians by
stand.
2nd Day
On Tuesday, the group continued the inspection on building 41 because the group conducted
their inspection on Monday in the afternoon and the was not enough to cover more grounds,
so the group continued on inspecting each room and it’s not that easy inspecting each rooms
because there are rooms that are being use and we cannot disturb their class so the group
skipped the room that are being used and the group decided to proceed to the next one.
3rd Day
The group was still working on the inspection on the building 41, we are now inspecting the
rooms that we are unable to check on Tuesday. We can now check the rooms now because
there is no class during this time and this gives us the opportunity to do more progress and
then we finished the inspection on each of the rooms by the afternoon, but unfortunately we
haven’t check the electrical rooms because again the door is still closed and we need
assistance to electrical in-charge. During this day, Sir Orniel Delos Reyes taught us about
what Ampere trip to use, what wire to use and what conduit to use
4th Day
We have finally checked the electrical rooms on building 41 but all we can do is take a
picture of the panel boards and its label because we cannot do some troubleshooting or major
inspection because there’s no in- charge electrician that we can ask question to. All we could
at this time is do the electrical layout.
5th Day
There’s nothing much we can do at this time though we have a letter that could let us do
inspections but we really need an electrician that knows a lot on this field, so we go the office
of the electricians if there’s someone could help us the inspection because we badly needed
one. We are still waiting for their response about it so we could more work. The group then
decided on the afternoon to visit sir Allan in the LRC to seek assistance and guidance,. But
after which, the office of sir Allan is close by that time
Week Four: What kinds of technical and management strategies does this organization make
use of? Do you feel these are effective? How could they be made more effective?
Answer: Nothing much on the management strategies in the organization because they let us
do anything as long it is for the OJT and in technical term is that the instruction are clear
when it comes to the things we need to learn and it is very effective because the things that
were instructed to us is essential in practical. In terms of technical, we are hands on onn our
job. We are the ones who visit and check every electrical layout in the school. This gives us
more experience for us to use ibn the near future.
WEEK 5
1st Day
On this day we simply keep doing the structure of our assigned structure on the
grounds that the circuit tester still isn't accessible as of now in light of the fact that the he
needs to do his significant work first before he could engage us, we let him be for the time
being on the grounds that we need his help and helping us could take much time in light of
the fact that there are loads of structures that needs review too.
2nd Day
At long last, the circuit repairman is currently accessible and could now enable us to
do a few investigations on certain structures, so we go again help assessing the structure 41
likewise called the science complex structure in light of the fact that my colleague who is
relegated on that building has a few questions that should be routed to keep cleaning the old
electrical plan which is made by our cluster mate when that we proceed with our own
assigned structures.
3rd Day
It's the third day now of fifth seven day stretch of our OJT, what we did today is that
we examination on the structure 28 called the old science building and it is the structure I'm
appointed with, however there's and old electrical arrangement on this structure yet it is an
out-dated plan so it needs all the more cleaning the assessment is immediately completed on
the grounds that there aren't that quite a bit of burden in the structure yet there are a few
changes on it since it was revamped as of now.
4th Day
With respect to me everything I did on this day is proceeding with my cleaning my
assigned structure so I can complete the undertaking rapidly and for my different colleagues
some of then some investigation and some is doing some exploration identified with our
errand.
5th Day
We proceed with the examination on the structure 41 what we did is that we go
upstairs we the engine of the lift is found the spot is difficult to go up in light of the fact that
the stairs is so steep the circuit repairman instructed us to be progressively cautious while
assessing the rating of the engine of the lift for it may drag us down with it unintentionally.
Question:
In what ways does your employer motivate employees to work harder or more effectively?
Are there strategies used that you think are particularly helpful in motivating people? What
strategies might you suggest to improve employee morale?
Answer:
Our boss dependably persuades us to accomplish more and do our best not simply we have an
errand and afterward go along it for consistence however do our work do it wholeheartedly in
light of the fact that this is our calling sometime and should we'll to adore it as of now, there's
not a lot I could state about the techniques on the grounds that the methodology of our
manager is compelling for the present.
Narrative Report
Daily Time Record
Photo Documentation