Ashghal 44950476 Al Shahaniya: MM MM Water Main Available M Distance From Boundary Line E S

This document is a building permit application for a school project. It includes details about the project such as the number of floors, premises type, existing and proposed water infrastructure like tanks and pumps. It also includes undertakings by the consultant and owner to adhere to water installation standards and regulations set by Kahramaa, Qatar's electricity and water authority. In the event of any non-compliance, Kahramaa reserves the right to reject the permit or pursue legal action.

Uploaded by

abbasith
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
186 views2 pages

Ashghal 44950476 Al Shahaniya: MM MM Water Main Available M Distance From Boundary Line E S

This document is a building permit application for a school project. It includes details about the project such as the number of floors, premises type, existing and proposed water infrastructure like tanks and pumps. It also includes undertakings by the consultant and owner to adhere to water installation standards and regulations set by Kahramaa, Qatar's electricity and water authority. In the event of any non-compliance, Kahramaa reserves the right to reject the permit or pursue legal action.

Uploaded by

abbasith
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 2

BPW

‫رقم الخدمات‬ ‫البلدية‬ ‫رقم الخدمات‬ ‫رقم الرخصة‬

01010400 ‫رقم البطاقة‬ MINISTRY OF EDUCATION AND HIGHER EDUCATION ‫المالك‬

44950476 ‫تلفون االستشاري‬ ‫ا‬ASHGHAL ‫االستشاري‬ AL SHAHANIYA ‫المنطقة‬

‫عدد عدادات المياه المقترح‬ ‫ الفلل‬/ ‫عدد الشقق‬ G+1 ‫عدد الطوابق‬ SCHOOL ‫نوع البناء‬

PIN 80090013 Zone 80 Street - Plot -

Water Network: N

Mm mm Water main available m Distance from Boundary line E

S
Eng. Sign.:.......................................................... On \ \
W

NO Water network For that application

Eng. Sign.:.......................................................... On \ \

Water network mm Pass through or adjacent to the premises


Eng. Sign.:.......................................................... On \ \

To be on hold send to WND on : \ \


WND reply on : \ \ cost is : QR Paid on : \ \
Release on : \ \

OK for CD on: \ \ for Correction on: \ \

For Discussion on: \ \ For stamp on : \ \

2nd Correction on: \ \ Repeat CD on: \ \

Installation Eng. Comm.


………………………………………………………………………………………………………..
………………………………………………………………………………………………………..

CSDCSI-P1/F2 Issue : 2 22-06-2011 1 of 2


Municipality Code no. *1 12 Premises Type Code *2
21

No. of Irrigation Tanks Existing Capacity in m3 Existing

No. of Fire Tanks Existing Capacity in m3 Existing

No. Domestic Ground Tanks Existing Capacity in m3 Existing

NO. of Roof Tanks Additional 1 Capacity in m3 14.4 (3800 Gallons)

Additional Estimated Daily Average Consumption Domestic = 7.38 m3 (1959 Gallons)

Pumps Total Head Existing m No. of Pumps Existing

No. of Heaters Additional 3

Water Conservation Checklist submitted: 1

Consultant’s Guide:
*2 (Premises Type)

01 Villa 02 Floors 03 Rooms 04 Shops 05 Guard Room 06 Club House


07 Swimming 08 Fire 09 Bathroom 10 Kitchen 11 Fire System 12 Irrigation
Pool
13 flats 14 15 Station 16 saloon 17 factory 18 Factory house
19 Court house 20 Substation 21 Building 22 Public house 23 Boundaries 24 Compound

*1 Municipality

01 Doha 02 Al Ghuwairya 03 AL Al Khor 05 Al Rayyan 06 Al Wakra


Jemailiya
07 Jerayan 08 Madinat Al 09 Mesaieed 10 Umm Salal 11 Al Daayen 12 Al Shahaniya
AlBatna Shamal

Undertaking "A"
(General)
To confirm that the B.P. mentioned in this application for the project adheres to all the standards set out in Regulations of Internal Water Installations and
Connection Works May 2009. In case of deviations from KAHRAMAA Regulation, the deviations are listed in separate Annexure. Nominated
consultant/contractor shall comply with Water conservation requirements as stipulated under section 7 of the regulation during all stages of the installation. It is
understood that Kahramaa reserves the right to reject any B.P, even at the time of connection, if the B.P. does not conform to Kahramaa Regulations.

To secure reliability of the building water designs, their compliance with the approved applicable specifications and rules issued by Qatar General Electricity &
Water Corporation "Kahramaa" as and not limited to the water installations, and all related equipments. In case of any violation of the above mentioned
commitments, Kahramaa shall have the right to initiate all legal proceedings liable under such violation. This acknowledgement is subject to and is interpreted
in accordance with the Qatari Laws.

‫ والقواعد الصادرة عن المؤسسة العامة القطرية للكھرباء والماء )كھرماء( الخاصة بالتمديدات‬،‫ والمعمول بھا‬،‫ واتفاقھا مع المواصفات المعتمدة‬،‫التعھد بضمان صحة وسالمة التصميمات المائية للمشروع‬
ً ‫ يخضع ھذا التعھد ويفسر طبقا‬.‫ أن تتخذ كافة اإلجراءات القانونية المترتبة على ذلك‬،‫ فإنه يكون لكھرماء‬،‫ وفي حالة اإلخالل بااللتزامات المذكورة أعاله‬.‫المائية وتركيب األجھزة المرافقة بالتمديدات المائية‬
.‫لقوانين دولة قطر‬

Consultant Signature & Stamp _____________________ Owner Signature _____________

CSDCSI-P1/F2 Issue : 2 22-06-2011 2 of 2

You might also like