PLUMBING NOTES:
1.) ALL WORKS SHALL CONFORM WITH THE LATEST EDITION
OF NATIONAL PLUMBING CODE, CITY AND MUNICIPAL.
2.) ALL WATERLINES SHALL BE PPR OR G.I SCH. 40.
HYDROSTICALLY TESTED AT LEAST 100 PSI PRIOR
TO TAPPING.
3.) ALL WASTE/SEWER LINES SHALL BE PVC SERIES 1000,
WATER TESTED FOR 1.5 M HEAD PRIOR TO TAPPING.
500MM MAX.
300MM MIN.
4.) ALL SANITARY VENT PIPE SHALL BE PVC SERIES 1000 &
TAPPED TO ROBINSONS EXISTING VENT PIPE.
5.) ALL WASTE AND SEWER LINES SHALL BE PROVIDED WITH
P L U M B I N G I S O M E T R Y FLOOR CLEANOUT.
SCALE: 1:100M
6.) ALL PLUMBING PIPES SHALL BE PROVIDED WITH
ADEQUATE PIPE HANGER.
7.) ALL TESTING SHALL BE CERTIFIED BY RLC ENGINEERING
MALL EXISTING REPRESENTATIVE.
SEWER PIPE
WATER METER CONNECTION DETAIL 8.) ALL LAVATORY & KITCHEN SINK SHALL BE PROVIDED
FD SCALE: NTS WITH STAINLESS STEEL/ CAST IRON GREASE TRAP WITH
C.O
WC
MINIMUM CAPACITY OF 7 GPM METMA OR APPROVED EQUAL.
9.) ALL WET AREA SHALL BE WATERPROOFED WITH HYGARD
THOROSEAL OR APPROVED EQUAL AND SHALL BE FLOOD
TESTED.
19.) SUBMIT AS-BUILT PLAN SIGNED AND SEALED BY
REGISTERED MASTER PLUMBER.
1 to 2% 1 to 2%
300MM (MAX.)
LEGENDS:
WATER SUPPLY LINE
INFORMATION/
WASTE DISPOSAL LINE
COUNTER
C.0 CLEAN OUT
F.D FLOOR DRAIN
WAITING AREA FLOOR CLEAN-OT DETAIL
SCALE: NTS
ENTRANCE
G L A S S
WATER AND SEWER PIPE LAYOUT
SCALE: 1:100M
PROPOSED COMMERCIAL BUILDING JOSE ARCENAS AS SHOWN
(PHILIPPINE AIRLINES)